AS9104-3 Report
Sep 14, 2011Long Beach, CA
![Page 2: AS9104-3 Report Sep 14, 2011 Long Beach, CA. Team Members Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division Shanya Salamaca Jeff.](https://reader035.fdocuments.in/reader035/viewer/2022072922/56649e4f5503460f94b46e5a/html5/thumbnails/2.jpg)
Team Members Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division Shanya Salamaca Jeff Wood Rick Downs, Cessna-Textron Vince May, Honeywell Ian Folland Tony Marino, Boeing Ian Dummigan Dominique Thiault Lisa Greenleaf Jeffery Long, UTC (Pratt & Whitney) Reg Blake, IAAR Shuji Komori Giuseppe Leoni Kimberly Maggie Ron Tharach Frank Phillips
![Page 3: AS9104-3 Report Sep 14, 2011 Long Beach, CA. Team Members Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division Shanya Salamaca Jeff.](https://reader035.fdocuments.in/reader035/viewer/2022072922/56649e4f5503460f94b46e5a/html5/thumbnails/3.jpg)
Auditor Authentication Process
![Page 4: AS9104-3 Report Sep 14, 2011 Long Beach, CA. Team Members Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division Shanya Salamaca Jeff.](https://reader035.fdocuments.in/reader035/viewer/2022072922/56649e4f5503460f94b46e5a/html5/thumbnails/4.jpg)
AA Authentication
• 4 audits comprising 20 on-site auditor days QMS/AQMS audits 2 audits may exclude design (7.3)
• QMS Lead Auditor course• AQMS Foundation Course (AATT)• Audit Competency Demonstration
• CB Process• AAB Process
AEA Authentication
• 4 audits comprising 20 on-site auditor days QMS/AQMS audits within 3 yrs 2 audits may exclude design (7.3)
• QMS/AQMS Lead Auditor course• AQMS Foundation Course (AATT)
within 3 yrs• 2/10 years ASD experience minimum• Technical Competence evaluated by
CB/AAB –process approved by SMS• Auditor Competency Demonstration after
successful technical evaluation
New Auditor
![Page 5: AS9104-3 Report Sep 14, 2011 Long Beach, CA. Team Members Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division Shanya Salamaca Jeff.](https://reader035.fdocuments.in/reader035/viewer/2022072922/56649e4f5503460f94b46e5a/html5/thumbnails/5.jpg)
AA AEA Expansion
• 300 on-site audit days of an AQMS in 5 yr or 500 on-site audit days of an AQMS in 10 yrEquivalent to full time relevant full time exp. @ 5 days/Mo.
• Technical Competence evaluated by CB/AAB approved by SMS
• Auditor Competency evaluation• Re-authentication in 5 yrs
Re-authentication
• Every 5 yrs• Same criteria as initial authentication• Attendance at one SMS auditor workshop
during re-authentication period• Decision made by AAB, no SMS concurrence
Suspension / Withdrawal
• Not fulfilling AS9104-1/3 reqmts• AQMS authentication contains false info• Falsified audit findings• Actions that would bring ICOP into dispute• Not informing AAB of a previous rejection,
suspension, or withdrawal from another AAB• Decision for suspension, AAB will determine
conditions of suspension
![Page 6: AS9104-3 Report Sep 14, 2011 Long Beach, CA. Team Members Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division Shanya Salamaca Jeff.](https://reader035.fdocuments.in/reader035/viewer/2022072922/56649e4f5503460f94b46e5a/html5/thumbnails/6.jpg)
• Training Provider Requirements• QMS• Administrative Procedures• Security• Record Retention • Complaints and appeals• Confidentiality• Course configuration mgmt (changes)• Course Variations• TP Suspension and withdrawal
• TPAB Requirements• Record retention requirements• Training Courses requirements
• 75% exam grade on essay questions• Requirements for training instructors• AAB requirements• Guidance on assessment Principles and Practices
Additional Requirements contained within AS9104/3 Draft
![Page 7: AS9104-3 Report Sep 14, 2011 Long Beach, CA. Team Members Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division Shanya Salamaca Jeff.](https://reader035.fdocuments.in/reader035/viewer/2022072922/56649e4f5503460f94b46e5a/html5/thumbnails/7.jpg)
Additional Document Contents
• Evaluator Qualification– Training reqmts of AA/AEA– Demonstrated knowledge of AQMS standard(s)– Demonstrated knowledge of assessment principles and
practices– Continuing experience in 5yr period: 3 competency
evaluations, 15 hrs of continuing education related to ASD
• Annex A – Detaliled reqmts for Training Courses• Annex B – Definition of Competencies for ASD: AA and
AEA competencies• Annex C – AEA Technical Knowledge• Annex D – Guidance on Assessment Principles and
Practices
![Page 8: AS9104-3 Report Sep 14, 2011 Long Beach, CA. Team Members Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division Shanya Salamaca Jeff.](https://reader035.fdocuments.in/reader035/viewer/2022072922/56649e4f5503460f94b46e5a/html5/thumbnails/8.jpg)
• CBs express concern over 300d/5yr and 500d/10 yr for AEA• Standard competency evaluation Checklist would be beneficial• AAB resource issues with oversight of CB evaluation Process• Need for AB to offer alternative to CB evaluation Process• Evaluate methodology to allow non-authenticated auditors
provisional status to conduct evaluation audit• Resources required to develop approved “Evaluators”• Need to add process for AABs to communicate applicant
rejection info to other AABs•
Feedback and Issues
![Page 9: AS9104-3 Report Sep 14, 2011 Long Beach, CA. Team Members Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division Shanya Salamaca Jeff.](https://reader035.fdocuments.in/reader035/viewer/2022072922/56649e4f5503460f94b46e5a/html5/thumbnails/9.jpg)
Questions and Thoughts