    1993] 2 MLJ xvii; [1993] 2 MLJA 171993 2 MLJ xvii; 1993 2 MLJA 17

    1993Article: LACUNAE IN THE STRATA TITLES ACT 1985 AND SCHEDULE H OF THEHOUSING DEVELOPERS (CONTROL & LICENSING) REGULATIONS 1989Stephen Sya Lieng

    Siew, LLB (Hons)(Sing) Advocate & Solicitor, High Court of Malaya

    [*17]

    In view of the many learned treatises and the relatively rich case law on this subject, I

    propose for the purposes of this paper, to focus on the practical legal problems faced by

    both purchasers and developers of subdivided buildings alike. The main problems

    confronting purchasers of such buildings, in my view, are:

    (1) delay in the issuance of strata titles;

    (2) developers subjecting the main title to further encumbrances before issuance of strata

    titles;

    (3) buildings or facilities not being built according to expectations or specifications; and(4) management problems particularly the issue of enforceability of by-laws.

    I shall examine whether and how the Strata Titles Act 1985 and the Housing Developers

    (Control & Licensing) Regulations 1989 addresses these problems (if ever). After attempting

    a full discussion of these issues, I shall, in the course of this paper, propose legal solution

    including a call for legislative intervention to resolve any lacunae or gaps (if any) in the

    existing legislation.

    Strata titled developments are a relatively recent phenomenon in Malaysia. Although

    proving increasingly popular, this form of development brings with it certain practical

    problems that are usually not faced by purchasers of bungalows, link or semi-detached

    houses. First, purchasers of strata titled developments have to contend with the problem of

    living in harmony with fellow residents whilst sharing common facilities. Secondly, they have

    to face the reality that they will not get the title to their parcel for some time.

    Delay in the issuance of strata titles

    The long delay in the issuance of strata title is a well known phenomenon in this country.

    Many reasons and various parties have been blamed for this. Whatever the case, all parties

    involved in the process must fulfil their roles for the good of the public. It would be ideal to

    have the process sped up and for strata titles to be issued at a much faster pace than they

    presently are.

    However, with the present situation, how does the purchaser of a sub-divided building effect

    a resale of his parcel in the absence of a strata title? [*18The] legal document such a

    purchaser would use would be a deed of assignment. This deed purports to assign all his

    legal and beneficial rights under the original sale agreement to the new purchaser.

  • 7/31/2019 ART_Lacunae in STA 1985

    2/9

    Since there is no title and therefore no provision for registration with a land registry, what is

    to stop an unscrupulous purchaser from engaging in multiple resale transactions, ie he sells

    the same parcel to two or more parties. Again, what if the developer sells the same parcel

    twice by mistake.

    To prevent this, lawyers normally require the consent of the developer before the balance

    purchase price is released. This was a standard clause in all sale agreements before reg

    11(1) 1came into effect.

    Regulation 11(1) reads:

    Every contract of sale for the sale and purchase of a housing accommodation together

    with the subdivisional portion of land appurtenant thereto shall be in the form prescribed in

    Schedule G and where the contract of sale is for the sale and purchase of a housing

    accommodation in a subdivided building, it shall be in the form prescribed in Schedule H.

    In prescribing Sch H as the only statutory and standard sale and purchase agreement, thelegislature was responding, in typical knee jerk fashion, to a situation where developers

    were drawing up all kinds of contracts with vastly differing terms. Some contained terms so

    onerous that there was a call for a standard form sale agreement.

    Although the intention was laudable, reg 11(1) and Sch H unfortunately contains several

    lacunae.

    First, it is highly disturbing that the requirement for the developer s consent before a

    purchaser can assign his parcel (a safeguard clause contained in all sale agreements before

    Sch H) had disappeared in Sch H. This lacunae alone, has led to a proliferation of remedial

    measures with lawyers and developers drawing up separate documents such as deeds ofmutual covenants, supplemental agreements, etc to preserve the requirement for the

    developer s consent to be obtained before the property can be assigned. However, one

    wonders whether such side agreements are valid or even enforceable in view of reg 11(1) s

    clear and unequivocal language.

    Schedule H should therefore be amended to make it mandatory for consent to be obtained

    from the developer before the purchaser can assign his parcel. By the same token, its

    neighbour Sch G, which relates to the sale of houses, should also be amended for the same

    reasons

    To tackle the problem at its roots, however, we have to resolve the problem of delay in theissuance of strata titles.

    Clause 10(1) 2of Sch H attempts to do this by requiring the developer to apply at it s own

    cost and expense, for subdivision of the building so as to obtain a separate title under the

    Strata Titles Act 1985. However cl 10(1) is silent as to the time frame within which the

    developer must make the application. [*19The] Strata titles Act 1985 is not of much help

    either. Section 7 of the Act appears to make it optional for the proprietor of any alienated

    https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n1https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n1https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n2https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n2https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n2https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n1
  • 7/31/2019 ART_Lacunae in STA 1985

    3/9

    land and which there is any building capable of being subdivided to apply for subdivision.

    Section 7 reads;

    The proprietor of any alienated land on which there is any building which is capable of

    being subdivided under section 6, may subject to the provisions of this Act, apply for the

    subdivision thereof to the Director.

    In fact, s 8 of the 1985 Act exacerbates the problem further by referring to a completed

    building .

    Section 8(1) reads:

    The proprietor of any alienated land on which there is a completed building capable of

    being subdivided under Section 6 shall, within the period specified in subsection (2), apply

    in accordance with Section 10 for the subdivision of the building if at any time he has sold

    or agreed to sell any parcel in such building to any person.

    We must remember that s 8 of the 1985 Act which has its origin in the former s 151A of theNational Land Code 1965 was aimed at curbing the then prevailing and undesirable practice

    of some developers not to apply for strata titles even after the building was completed. Lack

    of separate strata titles meant that purchasers were not legal owners but mere beneficial

    owners. This enabled some less scrupulous developers to use the building that were not

    fully sold as collateral for further loans by charging the main title. To the further detriment

    of purchasers, financial institutions declined their individual parcels as collateral for loans as

    the purchasers were not, strictly speaking, legal owners. Section 8 therefore sought to

    compel all developers of completed buildings so long as they have sold or agreed to sell any

    parcel in such building, to apply for subdivision of the building within six months from the

    date of the first sale or agreement.

    The use of the phrase completed building in s 8(1) gives rise to difficulties of interpretation.

    Does it mean that only if the building is completed need the proprietor apply for subdivision

    even though the first sale or agreement to sell which was later than 1 June 1985 took place

    more than six months before the building was completed? To remove any such ambiguities

    which may arise on an interpretation of s 8(1) and (2) of the 1985 Act, a new section should

    be added to supplement s 8 or s 8 itself amended to remove the ambiguity. 3

    Alternatively, guidance may be had to the former s 151A(2)(i) of the National Land Code

    1965 in which case the application for subdivision would have to be made within six months

    from the date of completion of the building. This latter interpretation is to be preferred in

    view of the requirements laid down in s 9(a) and (b) of the 1985 Act.4

    One can quite understand the concern of the authorities to ensure that the building is

    constructed in accordance with the plans and specifications before approval for subdivision

    is given. However the present situation of long delays before the issuance of strata title

    cannot be accepted. [*20]

    To achieve a lasting and sustained solution to this problem of delays in the issuance of

    https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n3https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n3https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n4https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n4https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n4https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n3
  • 7/31/2019 ART_Lacunae in STA 1985

    4/9

    strata titles, a way to overcome such delays would have to be found. One way, it has been

    suggested, is for qualified strata titles to be introduced in the same way that qualified titles

    for houses are issued. This would be a temporary title issued upon approval of building

    plans or even upon certificate of fitness for occupation being issued pending the issuance of

    the final strata title once the Director of Lands and Mines is satisfied that the conditions

    specified in s 9 have been complied with.

    Another way is to amend s 7 5of the Strata Titles Act 1985 to make it mandatory for all

    developers of multi-storeyed buildings (whether intended for sale or not) to apply for

    subdivision and strata titles within a statutorily prescribed time frame.

    Restrictions against further encumbrances

    As discussed earlier, another common complaint made by purchasers relates to the

    undesirable practice of some developers to offer buildings which has been partially sold ascollateral to secure further loans by charging the main title. This was possible due partly to

    ignorance and partly to the blind insistence of financial institutions here for titled collaterals.

    As strata titles had not been issued, the purchasers were mere beneficial owners and not

    legal owners. Such developers could charge their main title with impunity on the basis that

    they have still not sold some parcels and since the building had not been subdivided yet, the

    developers remain the legal owner of the title.

    To overcome this and to prevent such abuse, many lawyers resorted to lodging private

    caveats to block further transactions.

    The legislature has not been idle either. Clause 2 of Sch H6

    expressly prohibits thedeveloper from subjecting the land to any further encumbrances without the prior approval

    of the purchasers. The developer also has to undertake that the parcel shall be free from

    encumbrances immediately prior to the handing over of vacant possession to the

    purchasers.

    Clause 2 reads:

    The Proprietor and the Vendor shall not immediately after the date of this Agreement

    subject the said Land to any encumbrances without the prior approval of the Purchaser and

    the Proprietor and the Vendor hereby undertakes that the said Property shall be free from

    encumbrances immediately prior to the handing over of vacant possession of the said

    Building to the Purchaser.

    At first impression, cl 2 appears to have plugged the loophole of developers subjecting the

    land to further encumbrances.

    However, a closer examination will show that the drafting of cl 2 leaves much to be desired.

    It may still be argued that the clause as it stands only prohibits the developer subjecting the

    land to further encumbrances only for the period immediatelyafter the date of execution of

    https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n5https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n5https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n6https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n6https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n6https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n5
  • 7/31/2019 ART_Lacunae in STA 1985

    5/9

    the sale agreement. [*21So] long as the developer were to remove the encumbrances

    immediately prior to the handing over of vacant possession to the purchasers for the

    specific parcel, the developer may not have contravened cl 2 even if he were to subject the

    main title to further encumbrances after a lapse of time from the date of the sale

    agreement.

    Such ambiguity could lead to confusion. Even worse, it could lead to abuse. Perhaps if a

    comma were to be inserted after the phrase the Vendor shall not the meaning of cl 2 would

    become clearer, ie immediately after the agreement is executed the developer cannot

    subject the land to further encumbrances. 7However, as things stand, we are bound by the

    language of the Parliamentary draftsman. Therefore, unless and until cl 2 is amended and

    tidied up, lawyers will attempt to continue lodging private caveats on behalf of their

    purchaser clients. On the other hand, the Supreme Court s decision in Tan Heng Poh v Tan

    Boon Thong & Co, 8that a caveat expressed to building the whole land would be invalid if

    the party lodging the caveat has an interest in only a portion of the land, has further

    complicated the issue.

    To counter this, most developers resort to inserting a clause in deeds of mutual covenants

    expressly prohibiting the lodgement of any caveat against the master/main title or block

    title to the parcel.

    However, as pointed out earlier, the legality of all supplemental agreements conflicting with

    Sch H are suspect in the light of reg 11(1).

    Building and facilities not built according to expectations and specifications

    A frequent source of conflict arises from differing perceptions of structural, or architectural

    finishes for both the parcel and the common facilities.

    Common marketing devices employed by developers include the use of glossy brochures,

    artist impressions and perspectives as well as scale models. Whilst these marketing tools

    play a large part in influencing the purchasers decision to buy, they do not form in any way

    part of the contract between the developer and the purchaser.

    Schedule H only ties the developer down to the location and level of the parcel and the

    building design and specifications within the parcel together with the common facilities.

    Clause 12 of Sch H9

    only requires the developer [*22to] construct the parcel and thecommon property in accordance with the very perfunctory specifications in the fourth

    schedule. Clause 15 enjoins the developer to construct the common facilities and provide

    maintenance services according to the second schedule thereto

    Practical experience tells us that most of the specifications listed in the fourth schedule and

    the second schedule are inserted by the developers themselves and are, at best,

    perfunctory.

    https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n7https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n7https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n8https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n8https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n9https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n9https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n9https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n8https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n7
  • 7/31/2019 ART_Lacunae in STA 1985

    6/9

    The saving grace is however found in cl 12 of Sch H where the developer is required to

    adhere to the plans approved by the appropriate authority over and above the specifications

    in the fourth schedule thereto.

    Perhaps, Sch H should at least emulate Sch G which is used for the sale of houses. ScheduleG requires front, back and side elevations together with a section plan. The same can be

    done for Sch H to protect the buyer from architectural omissions. Besides the finishes of the

    parcel itself, Sch H should also provide for some of the finishes of the common facilities.

    Management problems - by-laws

    Regulation 11(1), 10in prescribing Sch H as the only agreement that purchasers and

    developers could enter into, had led the legislature to overlook the issue ofmanagement,

    a very important and crucial aspect of condominium living.

    A close examination of Sch H will evince the alarming fact that, apart from cl 27, Sch H is

    virtually silent on the by-laws for the purchasers to abide by and the management to

    enforce. Without by-laws, the potential for anarchy is omnipresent.

    Clause 27 by itself is too specific to be of much use. It relates only to the use, without or

    with vehicles of every description ... to pass and repass along, over and upon all roads

    serving the said development ... and to use in a proper manner the drains, pipes, cables

    and wires laid or constructed by the Vendor ... . 11Thus even though cl 27(2) 12requires

    the developer to undertake that subsequent purchasers should enter into similar covenants,

    the clause itself renders the covenants virtually trapped by its very restrictive drafting, iethe covenants can only relate to the use and enjoyment of the roads, drains, pipes, cables

    and wires in the development. No mention is made of the perils of unrestrained human

    behaviour. What happens if some purchasers decide to hang out long and unsightly laundry

    poles, keep domestic pets or party late into the night with loud music? [*23]

    Perhaps the legislature was of the impression that such by-laws have been covered by the

    Strata Titles Act 1983. Indeed, at first reading, s 44(1) 13of the 1985 Act appears to

    prescribe by-laws as laid out in the third schedule of the same Act. In fact s 44(2) even

    goes so far as to give the management corporation the flexibility to make additional by-

    laws or make amendments to such by-laws .

    However, on closer scrutiny, the third schedule by-laws cannot come into force until the

    opening of a book of the Strata register . 14For all practical purposes, therefore, these by-

    laws can only take effect after the issuance of strata titles which, we are well aware, could

    be many years down the road.

    So what happens in the meantime? Many developers resort to requiring all purchasers to

    execute the often mentioned deed of mutual covenants containing, inter alia, by-laws

    https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n10https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n10https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n11https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n11https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n12https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n12https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n13https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n13https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n14https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n14https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n14https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n13https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n12https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n11https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n10
  • 7/31/2019 ART_Lacunae in STA 1985

    7/9

    loosely borrowed from the third schedule of the 1985 Act. However as we have discussed

    earlier, such deeds may not be legally enforceable because of reg 11(1). 15

    Proponents of the deed of mutual covenants, so popularly used nowadays, may argue that

    reg 11(1) only precludes amendments to the provisions of Sch H. Since the deed is a

    separate instrument and relates only to management issues (having nothing to do with thesale), the parties are free to execute such deeds in the absence of a clear prohibition by reg

    11(1).

    In my view, as the courts have yet to make a ruling on this issue, caution should be

    exercised here. Developers would be well advised to invoke reg 11(3) 16and write to the

    Controller of Housing to incorporate their deeds of mutual covenants as a modification or

    waiver of the provisions of Sch H. The Controller may or may not grant the certificate as he

    may feel that reg 11(3) is limited strictly to special circumstances, hardship or necessity

    (sic) compliance with the provisions of Sch H. Thus he may consider modification for the

    purposes of regulating management problems outside the ambit of his discretion as

    defined by reg 11(3).

    Legislative intervention is therefore clearly required here. The Strata Titles Act 1985 should

    be amended to bring forward the operation of the third schedule by-laws to the date of the

    handing over of vacant possession [*24of] the parcels instead of after the opening of the

    strata register. The jurisdiction for enforcing these by-laws should be given to the developer

    pending the issuance of strata titles and the formation of the management corporation.

    After all, s 62(1) of the Strata Titles Act 1985 appears to have anticipated this problems by

    making an exception for lower cost subdivided buildings.

    Section 62(1) reads:

    The by-laws set out in the Third Schedule shall during the period before themanagement corporation comes into existence, have effect in relation to every

    subdivided low-cost building and shall apply by substituting for the word corporation

    wherever it appears the words original proprietor .

    Therefore in the case of low-cost subdivided buildings the developer is given the power to

    enforce the third schedule by-laws even before the issuance of strata titles and the coming

    into existence of the management corporation.

    It is difficult to fathom why the legislature should make an exception only for low cost

    developments. The problem of delay in issuance of strata titles and consequently non-

    formation ofmanagement corporation is an industry-wide problem affecting virtuallyevery type and level of development from condominiums, shop offices to medium cost

    apartments.

    Perhaps, s 62(1) could be amended to delete the reference to low cost subdivided buildings

    and, to extend the third schedule by-laws to all subdivided buildings of every description

    irrespective of cost. In view of the many completed subdivided buildings still without strata

    titles, this amendment would have to be given restrospective effect.

    https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n15https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n15https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n16https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n16https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n16https://www.lexis.com/research/retrieve?cc=&pushme=1&tmpFBSel=all&totaldocs=&taggedDocs=&toggleValue=&numDocsChked=0&prefFBSel=0&delformat=CITE&fpDocs=&fpNodeId=&fpCiteReq=&brand=&_m=50d9faa167c57103feb43010fb0cfd02&docnum=21&_fmtstr=FULL&_startdoc=1&wchp=dGLbVtz-zSkAz&_md5=ba60823c3ed308ad6cc9487b343a25ca&focBudTerms=&focBudSel=all#n15
  • 7/31/2019 ART_Lacunae in STA 1985

    8/9

    Return to Text

    n 1Regulation 11(1) of the Housing Developers (Control & Licensing) Regulations 1989.

    n 2Clause 10(1) of Sch H reads: The Vendor shall, at its own cost and expense, apply for

    subdivision of the said Building so as to obtain the issue of a separate strata title to the said

    Parcel under the Strata Titles Act 1985.

    n 3See Strata Titles in Malaysia by Teo Keang Sood (Butterwoods) at p 10.

    n 4Ibid at p 10.

    n 5Section 7 reads: The proprietor of any alienated land on which there is any building

    which is capable of being subdivided under section 6, may subject to the provisions of this

    Act, apply for the subdivision thereof to the Director.

    n 6Clause 2 of Sch H of the Housing Developer (Control & Licensing) Regulations 1989.

    n 7See Halim Abdullah, Everything the Condominium Developer Should Have Told You But

    Didn t.

    n 8[1992] 2 MLJ 1.

    n 9Clause 12 reads: The said Parcel together with all the common property shall be

    constructed in a good and workmanlike manner in accordance with the description set out in

    the Fourth Schedule hereto and in accordance with the plans approved by the Appropriate

    Authority which description and plans have been accepted and approved by the Purchaser,

    as the Purchaser hereby acknowledges. No changes in writing of the Purchaser except such

    as may be required by the Appropriate Authority. The Purchaser shall not be liable for thecost of such changes or deviations and in the event that the changes or deviations involve

    the substitution or use of cheaper materials or the omission of works originally agreed to be

    carried out by the Vendor the Purchaser shall be entitled to a corresponding reduction in the

    purchase price herein or to damages in respect thereof.

    n 10Regulation 11(1) of the Housing Developers (Control & Licensing) Regulations 1989.

  • 7/31/2019 ART_Lacunae in STA 1985

    9/9

    n 11Paraphrased and abbreviated.

    n 12Clause 27(2) reads: The Vendor hereby undertakes that the purchasers of parcelscomprised in the said housing development shall enter into similar covenants and hereby

    further undertakes to ensure that in the event of any transfer of the said Parcel from the

    Purchaser to a subsequent purchaser the latter shall undertake to be bound by the

    covenants of this clause which shall continue to apply notwithstanding the completion of the

    sale and purchase agreement.

    n 13Section 44(1) reads: The by-laws set out in the Third Schedule shall, as and from the

    opening of a book of the strata register be in force for all purposes in relation to every

    subdivided building and shall not be amended by the management corporation. Section

    44(2) reads: The management corporation may be special resolution make additional by-laws, or make amendments to such additional by-laws, not inconsistent with the by-laws set

    out in the third Schedule, for regulating the control, management, administration, use and

    enjoyment of the subdivided building.

    n 14Vide s 44(1).

    n 15Regulation 11(1) of the Housing Developers (Control & Licensing) Regulations 1989.

    n 16Regulation 11(3) reads: Where the Controller is satisfied that owing to special

    circumstances or hardship or necessity compliance with any of the provisions in the contract

    of sale is impracticable or unnecessary, he may, by a certificate in writing, waive or modify

    such provisions.