Artificial Rockwork Specialist MYOUNG-SAN. CAPABILITY Established in 1979 Specialized in Design &...

19
Artificial Rockwork Specialist MYOUNG-SAN

Transcript of Artificial Rockwork Specialist MYOUNG-SAN. CAPABILITY Established in 1979 Specialized in Design &...

Page 1: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

Artificial Rockwork Specialist

MYOUNG-SAN

Page 2: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

CAPABILITY

• Established in 1979

• Specialized in Design & Construction

of Landscape Facilities, Artificial Rock Products

• Certification: ISO 9001:2000 / ISO 10041:2004 / Innovative Biz Class A /

Exclusive R&D Biz

Page 3: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

CAPABILITY

• Patents on Artificial Rock

- No. 10-0743816 : Artificial Rock Panel Structure Combining & Combining Method

- No. 10-0796241 : Artificial Rock Construction Method

- No. 10-0877977 : Artificial Garden Rock & Manufacturing Method

- No. 10-0943672 : Manufacturing Method for Artificial Rock with Cracks

- No. 10-1018566 : Manufacturing Method for Artificial Rock with Durability

- No. 20-0368973 : Artificial Rock

Page 4: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

TRACK RECORD

Yeoju Sky Valley C.C. 1998 Incheon International Airport 2001 Rex Field C.C. 2001

Gapyeong Benest Golf Club 2003 Jecheon Uirim-Reservoir 2004 Shinlim Humansia Apartment 2006

Page 5: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

TRACK RECORD

Songdo Jack Nicklaus C.C. 2008

Sungbok Hillstate Apartment 2010CJ Nine Bridge C.C. 2008

Pangyo Cullinan Housing 2007 Mudeungsan 2007

Gwangmyeong, Speeddom bicycle race park 2011

Page 6: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

TRACK RECORD

Ulsan, Posco The sharp apartment 2013 Sunchen, Garden exhibition. 2013

Kimhae, Lotte waterpark 2014 Kimhae, Lotte waterpark 2014 Inchen, Asian sports complex, 2014

Ara Waterway, Gulpo 2012

Page 7: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

TRACK RECORD

Overseas ProjectsCountry Year Project

Japan

1990 Artificial Rock for Edelweiss C.C (Saitama Prefecture)

Exhibition Venue at Harumi (Tokyo)

1991 Artificial Rock Construction at Sablés C.C (Nara Prefecture)

USA1998 Artificial Rock Construction for Holiday Inn (New York)

Miniature Golf Course Construction (New Jersey)

Page 8: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

CONSTRUCTION

• Manufacturing Method for Durable Artificial Rock

- Beautification work of retaining wall or concrete structure

- Special construction process to prevent cracks and corrosion during installation

Special Painting on top of Concrete Rock (5~6

times)

Reinforcing Steel Bar

Steel Cage

Concrete Primer

Concrete Finish Spray

Steel Angle Retaining

Concrete Wall or Structural

Steel

<Domestic Patent No. 10-1018566>

Page 9: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

CONSTRUCTION

• Artificial Rock Planter Construction

- Provision of rock planter for better natural look

- Also easily used for installing other equipment if required

Reinforcing Steel Bar

Concrete Spray

Soil

Stiffener

Structural Steel

Drainage

Artificial Rock

10, 10a : Artificial Rock Surface11 : Planter (Concrete Pot)220, 410, P : Drainage50 : Soil

Precast Panel Construction In Situ Construction

Page 10: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

CONSTRUCTION

• Artificial Rock Construction Process

1. Fabrication of Steel Cage

2. Anchoring of Support Structure

3. Installation of Steel Cage

Page 11: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

CONSTRUCTION

• Artificial Rock Construction Process

4. Scaffolding on Site

5. Primer Concrete Spray Coat

6. Finish Spray Coat & Sculpturing

Page 12: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

CONSTRUCTION

• Artificial Rock Construction Process

7. Art-Painting

8. Site Clean up

Page 13: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

CONSTRUCTION

• Texture & Color (nature-type)

: Naturally exposed forms brown, dark brown, red

: Old worn-out forms (faceted) brown, dark brown, blue

: Old worn-out forms (rounded) brown, dark brown

: Naturally exposed granite forms light brown, red

: Partial moss-grown forms dark brown, red

: Partial moss-grown forms dark brown, red

Page 14: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

CONSTRUCTION

: castle wall forms bright brown

: masonry forms brown, dark brown, grey

: semi-indeterminate form

: indeterminate form

• Texture & Color (artificiality-type)

Page 15: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

CASE STUDY _ Ara Waterway, Gulpo

• Progress of construction process1 2 3

4 5

1.Situation before Initial work

2. Steel-frame structure

3. Installation of Steel Cage

4,5. Set up a scaffold

* The waterfall contains the largest artificial work of Domestic records

Page 16: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

6 7 8

9 10 6,7. Sprayed a rough shotcrete

8. Facing a complete shotcrete

9. Painting structure

10. Create a plant pot

CASE STUDY _ Ara Waterway, Gulpo

• Progress of construction process

Page 17: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

Vertical Section

∙Perspective view

1 2 3

CASE STUDY _ Ara Waterway, Gulpo

• Structural cross section

Page 18: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

• Completion image

Test Run of Water Fall

CASE STUDY _ Ara Waterway, Gulpo

Page 19: Artificial Rockwork Specialist MYOUNG-SAN.  CAPABILITY Established in 1979 Specialized in Design & Construction of Landscape Facilities,

www.myoungsan.co.kr

APPENDIX

• Related goods