AOLS - Articling Students Insurance and Risk Management Advice September 2018 Laura Stewart – Arthur J. Gallagher Canada Stephen Black – Maltman Group International Martin Nisbet – Insurance Advisory Committee

Transcript of Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for...

Page 1: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

AOLS - Articling Students

Insurance and Risk Management Advice

September 2018

Laura Stewart – Arthur J. Gallagher CanadaStephen Black – Maltman Group InternationalMartin Nisbet – Insurance Advisory Committee

Page 2: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

1. Introduction• Who is Who?

2. Background• Insurance Advisory Committee• Insurance Basics• General Liability vs. Professional Liability

3. Professional Liability Insurance Program• Features and Benefits

AGENDA

2

Page 3: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

4. Common Surveyor Errors• Layout / Elevation• Setback• Construction Layout• Water Boundaries

5. Recent Claim Examples 6. Suggestions on How to Avoid Errors7. Top 10 ways to ensure a problem on your next construction project

AGENDA

3

Page 4: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

8. Limiting Exposure to Liability

9. What to do when you have a Claim• Role of Adjuster• What to say / not say

10. Why do Losses Happen?

11. The Cost of making an Error or Omission

AGENDA

4

Page 5: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Insurance Broker• Insurance Company • Claim Adjuster• Insurance Advisory Committee

Introduction – Who is Who?

5

Page 6: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Executive Director – Blain Martin• Broker – Mark Sampson, Laura Stewart• Adjuster – John Breese, Stephen Black• OLS’:

• Joseph Young • Dan Dzaldov• Rudy Mak• Martin Nisbet• Roy Kirkup• Alister Sankey

Current Members of the Insurance Advisory Committee

6

Page 7: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• No Legislative Authority – only deals with issues regarding the AOLS Professional Liability Program

• Review claims presented by the Adjuster• Give technical advice to the Adjuster on

the negligence of the Surveyor • Suggest ways to mitigate the loss

7

Role of Insurance Advisory Committee

Page 8: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Review the Insurance Program rates and performance

• At its discretion, may refer a member and the reason for their concern to the Registrar when:– in the opinion of the Committee the issue may

represent a risk to the public.

8

Role of Insurance Advisory Committee

Page 9: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Insurance Basics• What is Insurance?• Role of Broker, Insurer, Adjuster, Insurance Advisory

Committee

• Types of Insurance required by a Land Surveyor

• Property Insurance – first party coverage• General Liability Insurance – third party coverage• Errors and Omissions Liability Insurance – third party

coverage• Auto Insurance – first and third party coverage

Insurance Background

9

Page 10: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Standard of Care• Professional Negligence

• General Liability vs. Errors and Omissions Liability

• General Liability– Bodily Injury or Property Damage– Occurrence based policy

• Errors and Omissions Liability – Financial Injury– Claims-made based policy– Min. required coverage as a professional = $500,000 per claim,

$1,000,000 policy aggregate

Insurance Background

10

Page 11: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

Professional Liability – Claims-made Policy

11

June 1/15 June 1/17June 1/16

Error!Dec. 1/15

Claim Discovered & Reported: April 1/16

Claims-made based policy: • Policy in force at the time of the claim is discovered/made

Policy #1 Policy #2

Page 12: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

Professional Liability – Claims-made Policy

12

June 1/15 June 1/17June 1/16

Error!Dec. 1/15

Claim Discovered & Reported: Nov. 1/16

Policy #1 Policy #2

Claims-made based policy: • Policy in force at the time of the claim is discovered/made

Page 13: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

Professional Liability – Claims-made Policy

13

June 1/15 June 1/17June 1/16

Error!Dec. 1/15

Claim Reported: Jan. 1/17

Policy #1 Policy #2

Claim Discovered: April 1/16

Claims-made based policy: • Policy in force at the time of the claim is discovered/made

Page 14: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

Professional Liability – Claims-made Policy

14

June 1/15 June 1/17June 1/16

Error!Dec. 1/15

Claim Discovered and Reported: Oct. 1/17

Policy #1 Policy #2

Claims-made based policy: • Policy in force at the time of the claim is discovered/made

Page 15: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Key Messages:• Immediately report any potential error/mistake as

soon as you realize or discover the error!

• Immediately report any incident that it is alleged that you have made an error (oral or written)!

• There is no cost to notifying the insurance provider of a potential error!

15

Errors & Omissions Liability Policy

Page 16: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Professional Liability Insurance Program =

• Insurance Company: Novex Group Insurance (division of Intact Insurance)

• Claim Adjuster: Maltman International

16

The Insurance Program

Page 17: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Broad Insurance Coverage• Expert Claims Handling• Competitive and Stable Pricing• Free Retirement Insurance Coverage• Superior Service and Advice• Access to Business Insurance and UAV

Insurance Program

17

AOLS Professional Liability ProgramFeatures and Benefits

Page 18: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Setting of Benchmarks • for use by clients or sub-trades

• Incorrect Cut Information – calculation errors • +/- incorrect reference• top of footing elevation instead of underside of footing

elevation

• Topographic Surveys – elevation errors• Problems with locating structures, or calculation of

earthworks

• Relying on benchmark or elevation information provided by other parties or movable objects

• Fire hydrants, tops of curbs or manholes

18

Common Errors: Layout / Elevation

Page 19: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Land Surveyor retained to provide residential stake-out.

• The starting elevation point was 1’5” lower in the Party Chief’s notes compared to what was shot on site by the field crew.

• Calculation error determining elevation for top of garage walls resulted in the walls as poured being 1’5” lower than original design.

• House elevation was correct. • Damages being claimed for extra excavation costs for

drainage in addition to lost trees & landscaping. File settled for $26K + $4K investigation costs.

19

Claims Example: Layout / Elevation

Page 20: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Look Around• the most common issues could have been avoided

by noticing that what was staked does not fit in.

• Ask, Ask, Ask • You can bring in benchmarks to a site but why not

ask for temporary benchmark from engineer, site super, others to check into

• Don’t just check into the supplied temporary benchmark as you do not want to rely on their benchmark and possible error

• Crew should advise their office of discrepancy

20

How to Avoid: Layout / Elevation Errors

Page 21: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Cuts• Write cut on notes FROM STAKE so when

checked in office know what was written• Provide cuts on stake-out sheet so there is back-

up for what was done

• Take a Picture of Stake• After noting cut, showing cut and the conditions

around the stake• Provides proof of cut and of stake in case it is

moved which is often the case

21

How to Avoid: Layout / Elevation Errors

Page 22: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Residential and Commercial Layouts • Mistakes made in locating boundaries• Errors in mathematical calculations• Failing to check house plans or changes in model

or reversal of elevation• Failure to check for prior minor variances or

subdivision agreement variations (bylaws, unique topography)

22

Common Errors: Setback

Page 23: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Most Front, Rear, and minor Side yard setback issues

• Resolved by minor variances

• More serious setback infringement can result in:

• Demolition and reconstruction• Upgrades to windows and doors

23

Common Errors: Setback

Page 24: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Land Surveyor retained to provide construction layout survey for an in-fill house. New construction utilizes almost the entire buildable envelope of the lot.

• An error is made laying our the house so that it ends up skewed on the lot encroaching into the sideyardsetback on one side. Four options are available.

• 1 - Obtain a variance.• 2 - Obtain additional property from the abutting lot.• 3 - Modify the house to obtain fire code compliance.• 4 - Move the house.

Each step is progressively more expensive, from as little as $1K to $100K - $150K+

24

Claims Example: Setback

Page 25: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Put onus on Client to provide Setbacks• Put it in writing that if they do not provide same they

acknowledge you are not responsible• DO NOT RELY ON ARCHITECTS

• for anything!!! • ASK, ASK, ASK

• When site plans on architects floor plans do not match it is not the surveyor’s job to figure it out

• It usually means someone gave the surveyor the wrong version

• Internal communication at survey office

25

How to Avoid: Setback Errors

Page 26: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Gridline errors• Foundation issues• Piles and/or Caissons errors• These errors caused by:

• Plans being out of date• Using plans not intended for construction or using

preliminary plans• Use of different formats in reproducing plans (digital,

pdf, AutoCad)• Poor communication with office, architect, engineer,

contractor

26

Common Errors: Commercial Layout

Page 27: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Land Surveyor retained to provide survey layout services for the construction of a large commercial development.

• An error setting temporary benchmarks resulted in the elevation of the floor of the main complex being 1 ft higher than planned.

• This resulted in a claim for extra costs for additional fill for the parking lot to bring the parking grade higher. File settled for $100K + investigation costs.

27

Claims Example #1: Commercial Layout

Page 28: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Land Surveyor retained to provide survey layout services for the construction of a large pre-fabricated residential building.

• During the initial calculation stage using the “for construction” drawings of the 2 wing structure, a scaling factor was introduced to obtain a coordinate match. Unfortunately this scaling factor caused the pile positions to be laid out so that the pre-fabricated structure would not fit the foundation piles. This caused a 2 month delay in construction as the piles were re-located.

• Remedial costs $100K to re-locate the piles and change the foundation design and $75K for delay costs. Investigation costs were approximately $15K.

• If this sounds familiar, we’ve seen it several times. We’ve also seen angular errors introduced as well as grid offset errors.

28

Claims Example #2: Commercial Layout

Page 29: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Similar to Setback Errors:• Put onus on client, do not rely on architects, ASK, ASK, ASK,

internal communication

• Do not rely on cad files, get paper set and make sure they match

• Keep a paper trail of versions, normally construction starts before they finished or checked the drawings.

• The paper is what governs. If they say use the cad, get it in writing and then decide if you agree to do so.

• Do not calculate buildings on site. Do not provide notes or cut sheets without office check.

29

How to Avoid: Commercial Layout Errors

Page 30: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Be careful what you give at Site • Consider a different layout sheet with only offsets

and points numbers

• Keep track of when work has been checked and docket time as back-up

30

How to Avoid: Commercial Layout Errors

Page 31: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Failing to identify title issues• Reserves

• Boundary issues created by failing to identify encroachments or adverse possession

• Interpretation of historical plan• Crown patents, original grants

• Poor research of older surveys• Interpretation of terms

• High water mark, top of bank, accretion or erosion and their effect on water boundaries

• Intent of landowner or surveyor to include excess lands or beach front in the subdivided lands or retain it

31

Common Errors: Water Boundaries

Page 32: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Requires proper research• If you don’t normally do water boundaries, ask

others more familiar for advice

• Consider transferring to a Surveyor has more expertise/experience

• Get Ministry’s opinion• Refer to it on communications

32

How to Avoid: Water Boundaries Errors

Page 33: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

10. Assume that missing dimensions on site plans or architectural plans are not critical to the layout and that it’s OK to scale or compute them without further verification.

9. Assume that digital files from other consultants are always reliable and that you can enquire the drawing to obtain missing design info needed for layout.

8. Believe the site super when he says that the drawings in the trailer are the latest approved drawings and can be used for caisson layout and nothing should change.

33

Top 10 Ways to Ensure a Problem on your Next Construction Project

Page 34: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

7. Allow a field crew to attend on site for preliminary work prior to undertaking the necessary survey research and/or before the client approves of the scope of work and the associated fees.

6. Allow field crews to respond to changes to a design after they arrive on site (ie PC is handed the latest drawings or asked to layout a few unexpected extra points).

5. Allow field crews to use the contractors control or grid points to verify the contractor’s work or to continue with additional layout.

34

Top 10 Ways to Ensure a Problem on your Next Construction Project

Page 35: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

4. Allow field crews to set vertical control on a site from a single bench mark located down the road or from the on-site fire hydrant used last year.

3. Respond to a client’s midday unexpected request for a RUSH crew to stake some key points for excavation or for footings.

2. Continuously alternate crew staff or their equipment prior to attending a construction site and assume they are self sufficient “to carry on” thereby failing to adequately instruct or supervise them.

1. Allow the party chief to prepare fieldnotes and/or to finalize field checks including level loop closures in the office the next day or “whenever he is not too busy”.

35

Top 10 Ways to Ensure a Problem on your Next Construction Project

Page 36: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• In the Field• Acceptance of evidence / verbal statements• Obtaining a site benchmark or control info from a

contractor• Document everything you do

36

Limiting Exposure to Liability

Page 37: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Legal Plans• Difficult to do for legal plans that are deposited or

registered• Make reference on the plan that the report is a part

of the survey• Refrain from use of terminology that has a legal

Implication (example: encroachment, possession, right-of-way).

37

Limiting Exposure to Liability

Page 38: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Topographic Plans• State of the source of data if compiled, i.e.

boundary info.• Qualify utility information for buried services

(compiled or surveyed).• If surveyed in winter conditions put a note that

survey may be incomplete.

38

Limiting Exposure to Liability

Page 39: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Proposal Letters & Contracts• Clearly define scope of work to prevent scope

creep and cost over runs and back charges.• State the role you will play in a project and limit the

extent of expertise you will provide (i.e. you are the OLS not an environmental engineer).

• Inform client that you will provide an opinion based upon your collection and analysis of evidence and you can’t guarantee and outcome in a hearing or in the courts.

39

Limiting Exposure to Liability

Page 40: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Survey Reports• Define the nature or scope of work that was

undertaken • Provide a review of evidence and significant

findings.• Base conclusions or opinion on proven facts.

40

Limiting Exposure to Liability

Page 41: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Digital Files• Digital information is provided for convenience

only.• Data contained on CD/DVD/e-mail attachments

etc. are not certified.• Contents are not guaranteed to have been

received/transferred in whole or compatible with software at receiver's end.

• Digital data is not to be reissued or transferred to a third party without your express written consent.

41

Limiting Exposure to Liability

Page 42: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Final Thoughts• Review & Maintain minimum standards of care including

reasonable expectations of crews.• Establish In-house guidelines for construction surveys.• Establish In-house guidelines for preparation of field notes.• Provide in-house training or access to seminars for all

technical staff.• Establish corporate Policy for Quality Management System.• Establish, document and maintain a QA/QC procedure.• Establish & maintain appropriate document control process.• Limit liability through the use of disclaimers.

42

Limiting Exposure to Liability

Page 43: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Do not Admit Liability• Many claims could have been avoided by client or

subcontractor• Report the Claim Immediately

• Cooperation – The Adjuster is on your side, admit the truth, provide required information

• Do not attempt to Negotiate Settlement• Require direction from Maltman’s/Intact

• Report. Report. Report. Report.• Any error that you feel may give rise to a claim• There is no cost to report a potential claim

• What to Say / Not Say

43

What to Do When Confronted by a Potential Claim

Page 44: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Why Losses occur:• Losses occur because of an error or omission• Errors or omissions occur because of a mistake• Mistakes occur because the proper process /

procedures were not followed or important steps were skipped

• Mistakes happen – it’s what you do when they happen!

• Do not take shortcuts! • Always follow the proper procedures!• Pay particular attention to construction related work!

44

Why do Losses Happen?

Page 45: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

• Per Claim Deductible • Claim Surcharge• Hidden Costs:

• Reputation: individual, firm, client• Productivity: defending allegation / claim • Profitability: loss of fees, unpaid remedial work

45

The Cost of making an Error or Omission

Page 46: Articling Students Insurance Seminar - 2018 · are the latest approved drawings and can be used for caisson layout and nothing should change. 33 Top 10 Ways to Ensure a Problem on

46

Discussion and Questions