11833 Grenfell Tower Regeneration Works
CONTENTS
Part
Part 2
Part 3
Part 4
Part 5
Part 6
APPENDICES
Appendix A
Appendix 8
Appendix c
Appendix D
Appendix E
Appendix F
Appendix G
~ .A.RTELI.P
Instructions to Tenderers
Employer's Requirements Section A - Preliminaries (JCT Design and Build Contract 2011 Edition) Section B- Specification and Design Requirements
Requirements for Contractor's Proposals (logistic plan, etc)
Employer's Provisional Sums
Contract Sum Analysis, General Summary
Quality Criteria and Tender Scoring
List of Tender Drawings, Specification and Sundry Reports including: -
Asbestos Survey Report Concrete Health analysis by Curtins Consulting Intrusive Structural Investigation report by Curtins Consulting Condition survey of the existing heating system pipe work by Max Ford ham Existing Electric Cable condition Survey Condition Survey of existing Residential Flats and Common Spaces Special Planning Guidance Fire Safety Report TMO's Residents Decant Plan Any other relevant Reports Room Data Sheets TMO code of practice for works in occupied premises (All tender drawings, specification and reports are on CD-ROM)
Planning Permission and Conditions for Development
Pre-Construction Information including Risk Assessment Schedule
Standard TMO Terms of Novation and Form of Professional Consultants Appointment
Model Forms Form of Performance Bond Form of Parent Company Guarantee
Sub-contractor collateral warranties
Daywork Schedule
BREEAM information
Artelia 00005754
ART00008952_ 0001 ART00008952/1
11833 Grenfell Tower Regeneration Works
Artelia 00005754
ART00008952_0002 ART00008952/2
Part 1
Instructions to Tenderers
Artelia 00005754
ART00008952_0003 ART00008952/3
Part 2
Employer's Requirements Section A - Preliminaries (JCT Design and Build Contract 2011 Edition)
Section 8 - Specification and Design Requirements
Artelia 00005754
ART00008952_0004 ART00008952/4
Part 3
Requirements for Contractor's Proposals (logistic plan, etc)
Artelia 00005754
ART00008952_0005 ART00008952/5
Part 4
Employer's Provisional Sums
Artelia 00005754
ART00008952_0006 ART00008952/6
Artelia 00005754
ART00008952_0007 ART00008952/7
Part 5
Summary
Artelia 00005754
ART00008952_0008 ART00008952/8
Part 6
Quality Criteria and Tender Scoring
Artelia 00005754
ART00008952_0009 ART00008952/9
AppendixA
List of Tender Drawings, Specification and Sundry Reports including: -
Asbestos Survey Report
Concrete Health analysis by Curtins Consulting Intrusive Structural Investigation report by Curtins Consulting Condition survey of the existing heating system pipe work by Max Fordham Special Planning Guidance Fire Safety Report Room Data Sheets TMO code of practice for works in occupied premises (All tender drawings, specification and reports are on CD-ROM)
Artelia 00005754
ART00008952_001 0 ART00008952/10
AppendixB
Planning Permission and Conditions for Development
Artelia 00005754
ART00008952_0011 ART00008952/11
AppendixC
Pre-Construction Information including Risk Assessment Schedule
Artelia 00005754
ART00008952_0012 ART00008952/12
AppendixD
Standard TMO Terms of Novation and Form of Professional Consultants Appointment
Artelia 00005754
ART00008952_0013 ART00008952/13
AppendixE
Form of Performance Bond Form of Parent Company Guarantee Sub-contractor collateral warranties
Artelia 00005754
ART00008952_0014 ART00008952/14
AppendixF
Daywork Schedule
Artelia 00005754
ART00008952_0015 ART00008952/15
AppendixG
BREEAM information
Artelia 00005754
ART00008952_0016 ART00008952/16
Scope of works Mech ventilation for kitchen extract fans, cost to include new dedicated circuit to power the kitchen extract fans