![Page 1: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/1.jpg)
Blackleggs CreekBig Run AMD
Treatment Complex
Indiana County, PA
![Page 2: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/2.jpg)
![Page 3: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/3.jpg)
Big Run AMD Treatment Complex
![Page 4: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/4.jpg)
Big Run #2
![Page 5: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/5.jpg)
Big Run #2 Intake Valve
![Page 6: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/6.jpg)
Big Run #2 Limstone Bed Piping
![Page 7: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/7.jpg)
Big Run #2 Settling Wetland
![Page 8: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/8.jpg)
Big Run #2 Iron Coating of Limestone
![Page 9: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/9.jpg)
Big Run #2 Limestone Washing and Replacing
![Page 10: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/10.jpg)
Big Run #2 OM&R
• System is too small for flow requires constant adjustment of boards in drop boxes
• Requires regular flushing• Predicted dissolution and coating of stone• Plugging of holes in pipes – now using chain-sawed
slats rather than drilled holes• Uncooperative Landowner – during high flow, 10-20%
flow goes untreated• Fear that during high flow a siphon is created• Erosion in Overflow channel
![Page 11: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/11.jpg)
Big Run #7
![Page 12: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/12.jpg)
Big Run #7 Mine Water Capture
![Page 13: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/13.jpg)
Big Run #7 Pipe Labyrinth
![Page 14: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/14.jpg)
Big Run #7 Drop Boxes
![Page 15: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/15.jpg)
Big Run #7 OM&R
• Cleaning Debris around mine opening• Cleaning Stone• Flushing• Cleaning and replacing stone• Clogging pipes
![Page 16: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/16.jpg)
Big Run #7A Mine Blowout
#7A #8
![Page 17: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/17.jpg)
Big Run #7A Mine Blowout
![Page 18: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/18.jpg)
Big Run #7A Incidental Coal Extraction
![Page 19: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/19.jpg)
Big Run #7, #7A, and #8 Combined
![Page 20: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/20.jpg)
Discharges of Big Run #7A and #8
#7A #8
![Page 21: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/21.jpg)
Big Run #8 Construction Logistics
![Page 22: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/22.jpg)
Big Run #8 Drilling to Locate Mine Portal
![Page 23: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/23.jpg)
Big Run #8 Partial Construction to Protect Against Possible Mine Blowout
![Page 24: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/24.jpg)
Big Run #8 Construction Challenges
![Page 25: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/25.jpg)
Big Run #8 COG and Robot Exploration
![Page 26: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/26.jpg)
Big Run #8 Mine Water Capture
![Page 27: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/27.jpg)
Big Run #8 Mine Water Inflow Management
![Page 28: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/28.jpg)
Big Run #8 Completed System
![Page 29: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/29.jpg)
Big Run #7, #7A, and #8 Combined
![Page 30: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/30.jpg)
Big Run #8 OM&R
• Ponds too small to treat the flow and iron levels due to space constraints. We have full iron clogging every 4 months. Now we are facing decision of Lime in silo vs. cleaning stone
• Broken valve down over the bank allowing untreated water to escape to stream.
![Page 31: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/31.jpg)
Big Run #3 Silo Pad
![Page 32: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/32.jpg)
Big Run #3 Lyme Dosing Silo
![Page 33: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/33.jpg)
Downstream of the Big Run AMD Treatment Complex
7/28/99 4/11/00 4/21/02 8/3/03 2/18/04 1/22/05 7/9/05 1/21/06 7/22/06 1/17/07 7/21/07 2/4/08 7/27/08 5/3/09 6/26/10 4/6/11 7/18/12-50
0
50
100
150
200
250
Combined Total and Hot Acidity (mg/L)
![Page 34: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/34.jpg)
Big Run #3 OM&R
• At this time, we do not know how much lime is needed/yr or how much it will cost/yr
• The more lime you use, the more sludge is generated for disposal
• No sludge pond, the designed sludge pond is only big enough for #7 but two additional discharges will be sent through silo, #7A and #8
• #3 is a combo of all discharges so it is important to control flow of all other system discharges.
![Page 35: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/35.jpg)
Big Run AMD Treatment Complex OM&R
• During normal flow, 1hr/wk• During high flow it is easy to spend >20hrs/wk• Not enough sunshine to depend on solar• The more you flush the longer the system is
efficient• Constantly monitoring pH at outflow and
mouth of Big Run
![Page 36: Art Grguric, Backleggs Creek Watershed Association, Operations and Maintenance Panel](https://reader037.fdocuments.in/reader037/viewer/2022110119/55572f3bd8b42a067f8b50b9/html5/thumbnails/36.jpg)
Blackleggs Creek Watershed Association and Cooperative Trout Nursery
• Find us on Facebook at Blackleggs Creek
Thanks,Art GrGuricWatershed and Nursery Manager