arnoosh [email protected]...
Transcript of arnoosh [email protected]...
[email protected]/[email protected]
Business DevelopmentQHSEIMS
EFQMPEMCPM3
EMBA
MIS
TBS
TiBS
PM AuditPM
PCPMICBPM
CPM3
Ross
A First Step in Probability
ISO9000:2000
1. Zare, Ali, Shakeri, Arnoosh, Sadeghi Nikoo, Mehri; Identifying and Prioritizing Legal Barriers for Technology Transfer in the
Oil and Gas Industry, Revista Publicando (ESCI)(2018).
2. Shafia, Mohammad Ali, Shakeri, Arnoosh; Determining the price of technology through TOPSIS and similarity factor,
International Journal of Advanced Manufacturing Technology (IJAMT). 64(6) pp. Commented (ISI, Expanded).
3. Shafia, Mohammad Ali, Shakeri, Arnoosh; Determining technology fair price through Game Theory, Int’l Journal of
Technology management (IJTM) 61(3) (2013) pp.112-119 (ISI, Expanded).
4. Shafia, Mohammad Ali, Shakeri, Arnoosh; Utilizing TOPSIS intensified with adjustment similarity factor to determine price of
technology, Management Science Letters (ISC) 2 (2012) pp. 1385–1396.
5. Shafia, Mohammad Ali, Shakeri, Arnoosh; Introducing a Project Management Framework for Transfer of Technologies,
International Journal of Industrial Engineering & Production Research (SR & ISC), Volume 20, Number 4, (2010) pp. 177-
185.
ISC
MADM
ISC
ISC
1. Utilizing MCDM methods to determine the Price of Technology, 7th International Conference on Management of Technology
and Innovation & the 14th Asialics conference, Tehran, 2017.
2. Project Engineering Disciplines’ Technical Audit for Checking the Realization of Client and Stakeholders’ Design Requirement
& Needs: Case Study: CMMP Project, 26th IPMA World Congress, Greece, 2012.
3. Technical Audit of Project EPC Disciplines for Checking the Realization of Client & Stakeholder’s requirements and
Expectations; Case study for Work Shop: BBII Project, 25th IPMA World Congress, Australia, Brisbane 2011.
4. Extended Interface Management (EIM) Methodology, A new Powerful Mechanism to Improve PEM Scores in OGP Projects;
Case study: EIED Company, 25th IPMA World Congress, Australia, Brisbane 2011.
5. Providing a Model to Assess Readiness to Increase Project Management Effectiveness through Change Classical Management
to Quantum Management, International Conference on Business Management, Economics and Finance (ICBMEF), Turkey,
2011.
6. A buyer–oriented approach to Brand Valuating & Selecting, 2nd International Brand Conference, Tehran, Iran, 2007.
7. Technology Transfer Project Management (TTPM), 16th International Conference on Management of Technology (IAMOT),
Florida, USA, 2007.
ISC
AHP
PIP
IMS
IPHRD
EPC
CPM3
PMP Iran
ECCAEPC
MCHE
Windows 98,2000,xp,Vista,Seven
OfficeMSWordMS ProjectMS PowerPointMS ExcelMS Access
InternetInternet ExplorerFireFox
COMFAR III,Vensim, Expert Choice, ... Win QSBMinitab, SPSS
تاريخ مدت دوره برگزاركننده نام دوره
ISO9000:1994QMI
QS9000QMI
ISO9000:1994QMI
ISO9000:2000
ISO9000:2000
ISO9000:2000Moody International
PBMRWTUV
ISO9001:2000DNV
ISO/TS 29001:2003 DNV
EFQMRWTUV
Deloitte
IPMADDeloitte
IPMA
COMFAR III
EFQMPEM
IPMA
OPM3
OPM3PMI
EFQM
APIC
EFQMMKP
IMSDNVIMS
WCPPricing Solutions LimitedPaul Hunt
EFQM
OCBErik Manson
ISO 9001:2015 TUV NORD
ISO 31000:2009TUV NORD
نرم افزاري
OFFICE 98
EXCEL97
ACCESS97
MSProject
PrimAvera
ACCESS xpICTEIED
COMFAR III
PertMaster V8.6
Primavera P6
EFQMPEM
ISO9001, ISO/TS 16949, ISO/TS 29001
HSEOHSAS18001ISO14001