Armuchee High SchoolFloyd County School System
Site ImprovementsAthletics & Modernization
1. Athletic Improvements
FLOYD COUNTY SCHOOL SYSTEMARMUCHEE HIGH SCHOOLPHASING
2. Roof Replacement
3. Athletic Improvements Continued
4. Total Modernization
FLOYD COUNTY SCHOOL SYSTEMARMUCHEE HIGH SCHOOL
ATLHETIC IMPROVEMENTSSchedule:Begin Feb/March & Complete Summer 2020
Scope of Work:
• New Synthetic Turf Field with goals and accessories
• New 400-meter 6 lane latex track with interior lane perimeter drain system
• New LED stadium lighting
• Replace visitor grandstands
• New scoreboard
• Misc. sitework, electrical improvements
PHASE 1
• New Synthetic Turf Field with goals and accessories
• New 400-meter 6 lane latex track with interior lane
perimeter drain system
• New LED stadium lighting
• Replace visitor grandstands
• New scoreboard
• Misc. sitework, electrical improvements
PHASE 1FLOYD COUNTY SCHOOL SYSTEM
ARMUCHEE HIGH SCHOOL
PHASE 2ROOF REPLACEMENT
Schedule:Summer 2021. Begin immediately when school is
out. Complete prior to school opening August 2021.
Scope of Work:
• New Roof (Buildings 5010 & 5030) - Remove
existing spray foam and other insulation down
to metal deck, repair any deteriorated decking
& skylights
• New insulation system to provide
minimum 1/4” / 12 slope (R25 to meet2020 codes.
• New roof drains & overflow drains per
code
FLOYD COUNTY SCHOOL SYSTEMARMUCHEE HIGH SCHOOL
BLDG 5010
BLDG 5030
ATLHETIC IMPROVEMENTS CONTINUED
Schedule:Begin Summer 2022
Scope of Work:
• Renovate Home grandstands, press box and provide ADA improvements
• Renovate existing Field House
• Renovate practice gym for hitting / pitching & weight room
PHASE 3FLOYD COUNTY SCHOOL SYSTEM
ARMUCHEE HIGH SCHOOL
PHASE 3• Renovate Home grandstands, press box and provide
ADA improvements
• Renovate existing Field House
• Renovate practice gym for hitting / pitching &
weight room
FLOYD COUNTY SCHOOL SYSTEMARMUCHEE HIGH SCHOOL
TOTAL MODERNIZATION
Schedule: Begin Summer 2023 Scope of Work:• Complete modernization of original school 1982 building. New domestic
water and sewer piping, new ceilings and lights, electrical wiring, low
voltage systems, cameras and security, new finishes, new mechanical
systems, complete new modern toilet batteries, new doors and hardware,
new windows
PHASE 4FLOYD COUNTY SCHOOL SYSTEM
ARMUCHEE HIGH SCHOOL
PHASE 4
New Admin Area
Old Admin toNew Classrooms
FLOYD COUNTY SCHOOL SYSTEMARMUCHEE HIGH SCHOOL