    Planned Preventative Maintenance

    (Jadwal Pemeliharaan)

    The following schedule has been prepared to help plan and implement a cyclicalmaintenance programme that can help prolong the durability of buildings plant andequipment, and reduce reactive repairs.

    Elements Maintenance Activity FrequencyPer year 

    Comments

    A. ST!CT!E A"# C$"ST!CT%$"A& %TEMS

    F&$$' STA%S A"#&A"#%"S

    Check and inspect damagedfloors or trip hazards

    Weekly

     

    Ensure that handrailsbalustrades to landingscomply with currentstandards.

    $$F C$E%"S

    $$F !TTES A"##$*" P%PES

    eriodic inspection and ad hocrepairs

    eriodic inspection of gutters,roof outlets, rain pipes etc

    !onthly

    " !onthly or more in #utumnfrequentlyas required

    $nspect pitched and flatroofs from ground level orsuitable upper floor windowand report defects and%ordamage likely to causefailure in weather tightness.

    $nspect and remove debris,leaves etc. Clear%cleangullies and report anyblockages and%or defects #.

    Elements Maintenance Activity FrequencyPer year 

    Comments

  • 8/18/2019 Aris Maintenance

    2/13

    *%"#$*S A"##$$S

    eriodic inspection of locks andsecurity, and ad hoc repairs

    $ntegrity of glazing and visionpanels

    'lazing risk assessment

    Weekly

    (aily

     #s required

    Check operation of openingmechanisms, closers andfittings generally )and locksif fitted*.

    Check glazing andprotective films for damage.+eport damage in glassintegrity.

    &pecialist risk assessmentfor glass and glazing under+egulation -. &afety glassand fire resistant glasswhere required.

    E+TE"A& *A&&SPAT%T%$"S ,C&A##%"

    eriodic inspection and ad hocrepairs

    !onthly $nspect wall surfaceseternally and internally,check and report defects,damp and%or damage.

    M%SCE&&A"E$!SST!CT!ES

    eriodic inspection and ad hocrepairs

    !onthly $nspection of miscellaneousstructures, check and reportdefects and%or damage

    &%-T"%"P$TECT%$"

    eriodic inspection and ad hocrepairs

    Every months

    $nspect and test lightningtapes and earthing pits andreport defects and%ordamage.

    . #EC$AT%$"S

    %"TE"A& A"#E+TE"A&#EC$AT%$"S

    eriodic inspection #nnually $nspect internal and eternalfinishes, including tiling,masonry and paintwork andreport ma/or defects,deteriorate and%or seriousdamage.

  • 8/18/2019 Aris Maintenance

    3/13

    Elements Maintenance Activity FrequencyPer year 

    Comments

    C. *ATE A"# #A%"AE

    *ATE S!PP&/S/STEMS

    eriodic inspection and ad hocrepair of cold water supply anddistribution pipework

    eriodic inspection and ad hocrepairs to pumps, cold waterstorage tanks and insulation

    eriodic inspection andrepair%replacement of sanitaryfittings, taps, wastes, traps andfittings

     #nnually

     #nnually

    !onthly

    &ervice contract to checkpipework for leaks and stopvalves for correct operation

    and pipe insulation.

    &uitable service contract tocheck pumps andequipment. Chlorinate coldwater down service and antilegionella disinfections ofpipework. (rain and cleancold water storage tank.

    $nspect sanitary ware, checkand report defects and%ordamage. 

    *ASTE P%PES A"#A$E $!"##A%"AE

    eriodic inspection to check forblockages

    " !onthly $nspect drains, gullies,manhole chambers etc. andcheck need for rodding, /etting or cleaning.

  • 8/18/2019 Aris Maintenance

    4/13

  • 8/18/2019 Aris Maintenance

    5/13

    Elements Maintenance Activity FrequencyPer year 

    Comments

    #. MEC-A"%CA& SE%CESTypical frequencies and checks are noted here for information. #ctual servicing records and frequencies mayvary according to the plant installed.

    -EAT%"%"STA&&AT%$"

    &ervicing of boilers, controls,burners and associated pumps,pipes and equipment withinboiler house

    &ervicing hot water calorifiers,pumps, controls and pumps,within the boiler house

    eriod inspection of pipes,valves, insulation and generalsurfaces within boiler house

    Cleaning and servicing of boiler

    0lues and Chimneys

    Cleaning of fan convectors

    Check and service heatemitters, convectors etc.)&chool to do*.

    (rain, clean and inspectCalorifiers through eamination

    "% 1!onthly

    " !onthly

    !onthly

     #nnually

    1%1-!onthly

     #nnually

     #nnually

    1 2early

    3Covered by eisting&ervice Contract dependingon what fuel used

    3Covered by eisting&ervice Contract.

    &chool to do periodic visualcheck.

    3Covered by eisting

    &ervice Contract

    (epending on fuel used

    3

    Cover on some sites by&ervice Contract $nspect, clean and checkheat emitters, room

    thermostats, radiator valves.

    4o &ervice Contractcurrently.

  • 8/18/2019 Aris Maintenance

    6/13

    Elements Maintenance ActivityFrequencyPer /ear Comments

    A% C$"#%T%$"%"A"# E"T%&AT%$"

    &ervice and clean plant,equipment and duct work.

    $nternal surfaces of ductwork 5inspect and possible clean.

     #nnually 3&ervice contract to serviceplant and equipment and

    report defects and%ordamage.

    $%& A"# AS F%E#-EATES

    &ervice direct oil an%or gas firedheaters including remote boilersi.e. school keeper6s house

     #nnually 3Covered by eisting&ervice Contract.Carbon !onoidesensors%alarms.

    SE*EAE P!MPSA"# C-AMES

    &ervice foul water pumps,storage vessels etc. andperiodically desludge

     #s required $nspect 7 service equipmentin accordance withmanufacturer6srecommendations.

    $%& S!PP&/ P%PES ,TA"0S

    &chool to visually inspect.eriodic inspection and test

     #nnually &chool to periodically checkoperation.

    0%TC-E"E1!%PME"T

    &ervice gas cooking equipment,water softeners, water boilersetc

    Clean and service kitchencanopy

     #nnually

     

     #nnually

    &ervice kitchen equipmentand check safety valves 5Carford #nnual !aintenanceContract starts 0ebruary1889 for schools under the&odheo contract.

    Carbon !onoidesensors%alarms.

    (egrease canopy filters andclean stainless steel hood. #nnual service of fan motorand duct work.

    S*%MM%" P$$&S Test p: level of water andchemically treat water 

    eriodic inspection andcheck%ad/ust heating plant,filtration and associatedpipework

    &ervice plant and equipment

    (aily

    Weekly

    " !onthly

    Check water content andcarry out daily maintenance

    Carry out normalmaintenance includingbackwashing of pool filtersand plant

    Carry out two ma/or servicesin summer and spring eachyear

  • 8/18/2019 Aris Maintenance

    7/13

    ASEST$S rovide register of asbestos inproperty )Type ; survey ifbuilding works being carriedout*

  • 8/18/2019 Aris Maintenance

    8/13

    F%+E# E1!%PME"T eriodic inspection and testingof fied plant and machinery i.e.lathes, woodwork machines,kilns etc

    eriodic servicing of all kitchenequipment and white goods i.e.ovens, ranges, refrigerators etc

     #nnually

     #nnually

    0ied part and machinery.

    &ervice contract for all largeitems of kitchen equipment. #lso see Electrical ortable #ppliances Testing.

    SC-$$&E1!%PME"TE&ATE# T$C!%C!&!MACT%%T/

    ortable equipment testing andmaintenance of equipmentregister for all electrical items of a portable nature

     #nnually &ervice contract to updateequipment register, test andcertify all items of portableequipment.

    F%+E# E&ECT%CA&%"STA&&AT%$"*%%" A"#E"EA&#%ST%!T%$"2S*%TC-EA

    eriodic inspection and testingof fied wiring to >&?"?.

    !aimumtimebetweeninspections@ A years

    Electrical installationcertificate with schedule oftest results to be issued foreach A yearly test

    Elements Maintenance Activity FrequencyPer year 

    Comments

    &%FT %"STA&&AT%$"S eriodic inspection andservicing of lift motors,hydraulics, controls switchgear

    &ervicing hoists, lifting aids,barriers and electric doormotors etc

    !onthly

    " !onthly

  • 8/18/2019 Aris Maintenance

    9/13

    F%E A&AM  #udible fire alarm test.$ncluding accessible WC

    'eneral test of fire alarmsystem.

    &ervicing fire alarm system,including panel, call points,detectors etc

    Test and commission integralfire alarm, and emergencylighting system and battery backup

    Weekly

    ; !onthly

     #nnually

     #nnually

    Can be carried out bypremises manager.

    3Covered by eisting &B#

    3Covered by eisting &B#.

    SEC!%T/ S/STEM eriodic inspection and testing

    of security system

    " !onthly &ervice contract for testing

    and maintenance of securitysystem including detectors,cameras, panel etc

    EMEE"C/&%-T%"

    eriodic inspection and testingof the emergency lights.

    !onthly, "monthly 7 #nnually.

    3Covered by eisting &B#

  • 8/18/2019 Aris Maintenance

    10/13

    Elements Maintenance Activity FrequencyPer year 

    Comments

    F. F!"%T!E' F%+T!ES A"# F%TT%"S

    F%+E# SP$TS A"#/M"AS%!ME1!%PME"T

    eriodic inspection and ad hocrepairs

    " !onthly &chools to arrange.

    E+TE"A& P&A/E1!%PME"T

    eriodic inspection and ad hocrepairs to childrens play

    equipment and adventure areas

    !onthly $nspect equipment, check andreport defects and%or damage

    0%TC-E"E1!%PME"T

    &icomo table%chair units. #nnually $nspect, check and repairdefects and%or damage.

    PEST C$"T$& eriodic inspection anderadication of vermin

     #s required Check for signs ofpest%vermin infestation andrequest specialist attendance

    . E+TE"A& *$0S2SC-$$&0EEPE3S -$!SE

    P&A/$!"#S' CAPA0S' $A#S A"#F$$TPAT-S

    'eneral inspection,maintenance and surfacetreatment.etrol interceptors to car parksif installed

    $nspect kerbs, channels,verges, line marking etc and adhoc repairs

    Eternal Bighting

     #s required

     #s required

    !aintain hard surfaces andwalkways in safe conditionand request ad hoc repairs asnecessary

    'enerally maintainperimeters of hard surfaces,clean channels and maintain

    line markings as required

    $!"#E"EA&&/

    P&A/%" F%ES

    4ormal ground maintenance

     #ll weather pitches

    Weekly 'round maintenance forgrass cutting, planting andflower bed maintenance etcto suit

  • 8/18/2019 Aris Maintenance

    11/13

    FE"CES' $!"#A/*A&&S A"# ATES

    eriodic inspection and ad hocrepairs

     #s required Check gates for correctoperation, inspect andmaintain boundary walls,fences etc in safe conditionand request ad hoc repairs asrequired

    TEES eriodic inspection to maintainsafety

     #nnually Check for damagedbranches, rot, structuralstability periodically by epert.

     

    &umber sebagai acuan Dschools.richmond.gov.uk/  planned_preventative_maintenance

  • 8/18/2019 Aris Maintenance

    12/13

    Elements Maintenance Activity FrequencyPer year 

    Comments

    -. E&$* $!"# #A%"AE

    F$!& #A%"AE eriodic inspection of allmanhole%access chambers.

    eriodic rodding and flushing ofdebris.

     #nnual

     #s required

    Check clear running locationand fit of access doors,grease and refit seals asappropriate.Clear soil and debris fromchannels.4ote condition of pointing,broken covers and otherobvious defects and arrange

    remedial work.

    +eport frequent need foradvice and%or camerainspection forbreakages%serious blockages.

    S!FACE *ATE#A%"AE

    eriodic inspection of allmanhole%access chambers.

    eriodic rodding and flushing ofdebris.

     #nnual

     #s required

    Check clear running locationand fit of access doors,grease as appropriate.Clear soil and debris fromchannels.

    4ote conditions of pointing,broken covers and otherobvious defects and arrangeremedial work.

    +eport frequent need foradvice and%or camerainspection forbreakages%serious blockages.

    PEME&%-AAA" &%"% PETAMA (F%ST &%"EMA%"TE"A"CE)

    Selain pengisian tunai, tim kami juga melakukan Pemeliharaan Lini Pertama sebagai

    layanan yang meliputi:

    • !engambil kartu yang macet atau ditahan oleh #T!

    • !engganti /urnal kertas printer % /urnal disket

    • !emeriksa fungsi mesin seperti kesalahan (ispenser, kerusakan ournal,

    kesalahan rinter dan !engatur Flang !esin

    • embersihan Fmum

  • 8/18/2019 Aris Maintenance

    13/13

    • Dari standar waktu pengoperasian di atas terdapat sejumlah 27 unit AT !"A yang berada di

     bawah

    • koordinasi "abang !alikpapan yang beroperasi 2# jam setiap hari$ AT%AT tersebut

    memerlukan monitoring

    • yang intensi&$ onitoring AT !"A dibedakan dalam 2 'dua( jenis '!"A, 2))*:"%2+( yaitu :

    • a$ onitoring uang di AT !"A

    •  b$ onitoring perangkat keras AT !"A