AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note...
-
Upload
martin-perry -
Category
Documents
-
view
216 -
download
2
Transcript of AREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note...
AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009
Role and Contribution of AREVA NP GmbH and Siemens
for Completion of Belene NPP
Axel WirriesDeputy Project Director
AREVA NP GmbH
Copyright © AREVA NP GmbH 2009. All rights, including rights created by patent grant or registration of a utility model or design, are reserved. Any reproduction, transmission or use of this document or its contents wholly or in part is not permitted without express written authority. Any violation may result in liability for damages.
AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 2Bulatom Conference, Varna, May 27-29, 2009
Content
1. Experience of AREVA NP / Siemens - participation in modernization and new building of NPP with VVER-1000
Modernization of NPP Kozloduy Units 5 & 6
Contribution for NPP Tianwan Units 1 & 2
2. AREVA NP / Siemens Contribution for Belene NPP
Electrical systems
Safety I & C
Operational I & C
Heating-Ventilation-Air conditioning (HVAC)
Hydrogen Recombination
3. Joint Commitment for Belene
AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009
Experience of AREVA NP / Siemens - participation in modernization and
new building of NPP with VVER-1000
AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 4Bulatom Conference, Varna, May 27-29, 2009
NPP KozloduyModernization Units 5 & 6
Project objective:Adjustment to the international security standard
Scope of service and delivery:75 single projects, basically consisting of:• Security increasing measures• Additional studies and expertise• Measures improving availability• Measures for the improvement of work and maintenance of the facilities
Project duration: 01.06.2001 – 31.05.2006
Consignee:“European Consortium Kozloduy” (ECK)(Framatome ANP SAS/GmbH as leader & Atomenergoexport Russia)
Customer: Kozloduy Nuclear Power Plant PLC
Project status:The project was finalized in due time and at the customer’s high contentment.
AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 5Bulatom Conference, Varna, May 27-29, 2009
PerformanceKozloduy Unit 5 & 6 Upgrade
> Replacement of 6kV emergency power switchgear, batteries and rectifiers
> Upgrading of 6kV normal power switchgear
> Installation of new diagnostic systems inside the reactor building (loose parts monitoring (KÜS), moisture-sensitive leakage monitoring (FLÜS), fatigue monitoring (FAMOS))
> Hydrogen monitoring and recombination
> Supply of new fire alarm systems
> Seismic upgrading of existing cabinets
Examples for modernization measures
provided by Framatom NP GmbH (later AREVA NP GmbH):
AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 6Bulatom Conference, Varna, May 27-29, 2009
NPP Tianwan Units 1 & 2
Contribution of AREVA NP and Siemens for NPP Tianwan 1& 2
Duration of our Projects: 1998 – 2007
Customer: JNPC (Jiangsu Nuclear Power Corporation)Location: Lianyungang, Jiangsu Province, China
Highlights:
H2 -Recombiners were included in the VVER-design and supplied by AREVA
For the first time VVER-1000 units were designed and build with qualified digital I&C based on TXS and TXP
~ 5200 HVAC components were designed and supplied
AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009
Contribution for
NPP Belene Units 1 & 2
AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 8Bulatom Conference, Varna, May 27-29, 2009
Completion of Belene NPP Unit 1 & 2Contractual Status
November 2005:AREVA NP / Siemens submitted to Atomstroyexport (ASE) their first proposal of participation in Belene project as a Main Foreign Subcontractor
October 2007:The First Period Contract was signed between ASE and AREVA NP / Siemens to perform necessary activities to start the project.
November 2008:A Contract Agreement was signed between ASE and AREVA NP / Siemens
April 2009:The Site Specific Design and Procurement Contract was signed between ASE and AREVA NP GmbH with Siemens as Main Sub-Subcontractor, comprising the scope of supply and services to be performed within the next 12 month.
AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 9Bulatom Conference, Varna, May 27-29, 2009
Completion of Belene NPP Unit 1 & 2 AREVA NP / Siemens Scope
Electrical systems - AREVA Scope
HVAC - AREVA Scope
Safety I&C - AREVA Scope
Operational I&C (including Simulators) - Siemens Scope
H2 Recombination - AREVA Scope
The Scope of AREVA NP / Siemens supply and services for Belene NPP
includes the following “disciplines”:
AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 10Bulatom Conference, Varna, May 27-29, 2009
Completion of Belene NPP Unit 1 & 2 AREVA NP Scope
Electrical Systems:
Design of the Electrical House Load Systems and
Procurement and supply of electrical equipment
Uninterruptible Power Supply System
Medium Voltage Distribution System
Low Voltage Distribution System
Cables and Cable Penetrations
Instrumentation, Protection and Metering
Testing and commissioning of delivered equipment
AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 11Bulatom Conference, Varna, May 27-29, 2009
Completion of Belene NPP Unit 1 & 2 AREVA NP Scope
Safety Instrumentation & Control:
Design, Manufacturing, Testing and Supply,
of the digital Safety I&C-Systems:
Reactor Protection System
Reactor Limitation and Control System
Priority and Actuator Control System
Post Accident Monitoring System
Passive Heat Removal Activation
The Software scope includes all TXS-SW embedded in the
equipment and also the TXS-software part for the simulator
Installation of Safety and Operational I&C-Systems
Commissioning of Safety I&C-Systems, including
supervision during plant commissioning and trial operation
AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 12Bulatom Conference, Varna, May 27-29, 2009
Completion of Belene NPP Unit 1 & 2 Siemens AG Scope
Operational Instrumentation & Control:
Design, Manufacturing, Testing and Supply, of the digital
Operational I&C-Subsystems:
Process Information and Control System
Safety Information and Control System
Process Automation and Safety Automation Systems for: Nuclear Island Power Generation Plant Water Treatment Plant
Process Instrumentation and I&C cables Operational I&C related parts of the Full Scale Simulator as well as Analytical Simulator
Components and Equipment for Control Rooms
Commissioning of these systems, including supervision during plant commissioning and trial operation
AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 13Bulatom Conference, Varna, May 27-29, 2009
Completion of Belene NPP Unit 1 & 2 AREVA NP Scope
Heating-Ventilation-Air Conditioning:
Procurement and supply of approximately 3500 safety relevant components Quality Class QA 2 and QA 3, such as:
Fans Independent Air Conditioners Air Handling Units Recirculation Units Air Coolers and Air Filters Water Chillers and Chilled Water Pumps Shut-off Check Valves Containment Isolation and Pressure Relief Dampers Isolation and Control Damper Fire Dampers and Air Tight Dampers
including necessary engineering activities
AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 14Bulatom Conference, Varna, May 27-29, 2009
Completion of Belene NPP Unit 1 & 2 AREVA NP Scope
Hydrogen Recombination:
During design bases accidents and especially during beyond design bases accidents large amounts of hydrogen can be released inside the reactor containment.
For high increase in safety, the engineering, procurement, supply and installation of Passive Autocatalytic Hydrogen Recombiners (PAR) are included in our scope
proven high efficiency of catalytic material total prevention of combustion and combustion loads proven high resistance against poisons, cable fumes, oil
fumes, core melt aerosols several years faultless operation experiences in more than 25 plants compact, robust design optimized for back fitting easy in-service inspection with short inspection times due to easy removable catalytic insert and optimized transportable in-service inspection equipment
AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009
Joint Commitmentfor NPP Belene
AREVA NP AREVA NP Proprietary - © AREVA NP Month Year - All rights reserved, see liability note 16Bulatom Conference, Varna, May 27-29, 2009
Joint Commitment
Excerpt from the joint statement of AREVA NP and Siemens AG answering public rumors:
„Siemens AG and AREVA NP have stated clearlyand without doubt that their successful cooperation,especially in the field of Instrumentation & Control, will continue after the withdrawal of Siemens AG as shareholder of AREVA NP based on existing and future agreements.
Please be assured of our full commitment to bring the Belene plants successfully into operation.“
AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009
Role and Contribution of AREVA NP GmbH and Siemens
for Completion of Belene NPP
Thank you for your attention!
Deputy Project DirectorAREVA NP GmbH
Axel Wirries
AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009
Any reproduction, alteration, transmission to any third party
or publication in whole or in part of this document and/or its
content is prohibited unless AREVA NP has provided its
prior and written consent. This document and any
information it contains shall not be used for any other
purpose than the one for which they were provided. Legal
action may be taken against any infringer and/or any person
breaching the aforementioned obligations.
AREVA NPAREVA NP AREVA NP Proprietary - © AREVA NP GmbH, May 2009 - All rights reserved, see liability note Bulatom Conference, Varna, May 27-29, 2009