Ares Project Joel Best / EO10 November 6, 2006

11
www.nasa.gov National Aeronautics and Space Administration Ares Project Joel Best / EO10 November 6, 2006 Ares I System Requirement s Review (SRR) Operational Concepts Overview

description

Ares I System Requirements Review (SRR) Operational Concepts Overview. Ares Project Joel Best / EO10 November 6, 2006. Lunar Sortie Crew DRM. MSFC Ares I Ops Con Flow. Step One Land to Land. Large machines called crawlers move the vehicle to the launch pad. - PowerPoint PPT Presentation

Transcript of Ares Project Joel Best / EO10 November 6, 2006

Page 1: Ares Project Joel Best / EO10 November 6, 2006

www.nasa.gov

National Aeronautics and Space Administration

Ares ProjectJoel Best / EO10November 6, 2006

Ares I System Requirements Review (SRR)Operational Concepts Overview

Page 2: Ares Project Joel Best / EO10 November 6, 2006

2National Aeronautics and Space Administration

Lunar Sortie Crew DRM

Ascent Stage Expended

ED

S, L

SA

M

CE

V

Earth Departure Stage Expended

LSAM Performs LOI100 km Low Lunar Orbit

Vehicles are not to scale.

Low Earth Orbit

Service Module Expended

MOONMOON

EARTHEARTH

Direct Entry or Skip Landing

Ascent Stage Expended

ED

S, L

SA

M

CE

V

Earth Departure Stage Expended

LSAM Performs LOI100 km Low Lunar Orbit

Vehicles are not to scale.

Low Earth Orbit

Service Module Expended

MOONMOON

EARTHEARTH

Direct Entry or Skip Landing

Page 3: Ares Project Joel Best / EO10 November 6, 2006

MSFC Ares I Ops Con Flow

Page 4: Ares Project Joel Best / EO10 November 6, 2006

4National Aeronautics and Space Administration

Step OneLand to Land

Large machines called crawlers move the vehicle to the launch pad.The crawlers “are 131 feet long and 113 feet wide, with a flat upper deck measuring 90 feet square—about the size of a baseball diamond—that serves as the carrying surface. They move on four double-tracked tread belts, similar to those on a military tank. Each contains 57 "shoes" weighing more than a ton apiece.” The crawler’s surface is kept level at all times by using 16 jacking, equalizing, and leveling hydraulic cylinders.

Page 5: Ares Project Joel Best / EO10 November 6, 2006

5National Aeronautics and Space Administration

Step TwoLand to Air

Once in place, the vehicle is ready for launch. Upon liftoff, the vehicle is lifted out of the earth’s atmosphere and into earth’s orbit.

Page 6: Ares Project Joel Best / EO10 November 6, 2006

6National Aeronautics and Space Administration

Step ThreeAir to Space (earth’s orbit)

Page 7: Ares Project Joel Best / EO10 November 6, 2006

7National Aeronautics and Space Administration

Step FourSpace (earth’s orbit) to Space (lunar orbit)

Ascent Stage Expended

ED

S, L

SA

M

CE

V

Earth Departure Stage Expended

LSAM Performs LOI100 km Low Lunar Orbit

Vehicles are not to scale.

Low Earth Orbit

Service Module Expended

MOONMOON

EARTHEARTH

Direct Entry or Skip Landing

Ascent Stage Expended

ED

S, L

SA

M

CE

V

Earth Departure Stage Expended

LSAM Performs LOI100 km Low Lunar Orbit

Vehicles are not to scale.

Low Earth Orbit

Service Module Expended

MOONMOON

EARTHEARTH

Direct Entry or Skip Landing

Once in earth’s orbit, the Ares I and Ares V will rendezvous and will perform a translunar injection burn which will push the vehicle into moon’s orbit.

Page 8: Ares Project Joel Best / EO10 November 6, 2006

8National Aeronautics and Space Administration

Step FiveSpace (lunar orbit) to Land (lunar surface)

Once in moon’s orbit, the crew will travel to the moon’s surface using the lunar lander vehicle.

Page 9: Ares Project Joel Best / EO10 November 6, 2006

9National Aeronautics and Space Administration

Step SixLand (lunar surface) to Space (lunar orbit)

The lunar lander will then propel the crew back to the moon’s orbit to dock with the crew capsule.

Page 10: Ares Project Joel Best / EO10 November 6, 2006

10National Aeronautics and Space Administration

Step SevenSpace to Air

The Orion capsule will return to earth’s orbit and land back on earth.

Page 11: Ares Project Joel Best / EO10 November 6, 2006

11National Aeronautics and Space Administration

Step EightAir to Land/Water (recovery)