Transcript of Arena Presentation (41916)
-
8/18/2019 Arena Presentation (41916)
1/25
Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
S E A T T L E A R E N A
-
8/18/2019 Arena Presentation (41916)
2/25
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
PUBLIC BENEFITS OVERV
5
4
51
7 7
6
33 5
5
4
5
4
66
3
2
2
7
Ped/Bike Bridge Amtrak Office
Parking Garage
1st Ave S
Utah Ave S
Occidental Ave SOccidental Ave S
S
H o l g a t e S t
S
W a l k e r S t
3rd Ave S
Safeco Garage
Publicly Accessible Open Space & Living M
S Mass. St ROW Improvements & Curbless S
1st Ave S Enhanced ROW Improvements
S Holgate St Enhanced ROW Improvements
Public Art Program
Bike Facilities
Off-Site Wayfinding
ARENA
1
S
M a s s .
S t
L E G E N D
Surface Par
-
8/18/2019 Arena Presentation (41916)
3/25
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
Project P
0N
S
M a s s a c h u s e t t s
S t
S a f e c o
A c c e s s D
r i v e
S
H o l g a t e
S t
1st Ave S
Occidental Ave S Oc
Access Road
Player/StaffParking
ServiceEntrance
TeamStoreStairs Stairs
Lobby
LobbyYear RoundRestaurant
PedestrianBridge
SafecoGarage
Bike Shop/Valet
TicketOffice Reception
Public Open Space& Living Machine
ARENA
Public Restrooms
Plaza Storage
SITE PLAN - ENLARGEM
-
8/18/2019 Arena Presentation (41916)
4/25
Living Machine Gardens
Living Machine Markers & AccessHatches
Interactive Display Panel
Water Feature
Programmable Community Area
Daytime Loading ZoneS. Mass. Curbless Street
Significant Artwork
S
M
a s s a c h u s e t t s
S t
1st Ave S
Lobby
Ticket Office Reception
4
6
5
3
2
1
7 6
5
Bike Shop / Va le t
2
4
4
1
1
3
7
8
8
Sit
Storage
PublicRestroom
2
2
N
L E G E N D
1- PUBLIC OPEN SPACE & LIVING MAC
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
-
8/18/2019 Arena Presentation (41916)
5/25
Westlake Park Occidental Park
Hing Hay Park
18,000SF
35,000SF
35,000SF
24,500SF
31,800SF
Arena Public Open Space
Pioneer Square
Comparable Public Open 1- PUBLIC OPEN SPACE & LIVING MAC
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
-
8/18/2019 Arena Presentation (41916)
6/25
-
8/18/2019 Arena Presentation (41916)
7/25
LIVING MACHINE
• A Living Machine is an ecological sewage
treatment facility that will enable a 99%reduction in wastewater
• It will remove 4 million gallons of wastewatereach year from the overflowing combined sewer
system (not required by code)• Treated water will be re-used in the building for
toilet flushing, landscape irrigation and other
potentail re-use.
• The system is scalable and allows for a districtopportunities
• The system is educational opportunities andcan be incorporated into the public open spaceprogram
• The sytems is the first of its kind among North
American sports facilities
4
6
5
3
2
Settling Tank
Equalization &Recirculation Tank
Stage 1 Treatment Cells
Stage 2 Treatment Cell
Reuse Tank
Potential Reuse: toilets, irrigation hockey rink iceInteractive Display Panel
Garden Beds at Public Open Space
1
Arena bui lding
8
7
8
4
5
3
2
1
7
2
2
LEGEND
1- PUBLIC OPEN SPACE & LIVING MACLiving M
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
-
8/18/2019 Arena Presentation (41916)
8/25
1- PUBLIC OPEN SPACE & LIVING MACView of Living Machine G
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
-
8/18/2019 Arena Presentation (41916)
9/25
Public
OpenSpace
U t a h
A v e
O c c i d e n t a l
A v
e S
Future Development
A
Loading
Curbless Street
1 s t
A v e S
Exist ing Condit ion
Proposed Street Alignment and ImprovementsN
2 - S MASSACHUSSETTS ST ROW IMPROVEM
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
-
8/18/2019 Arena Presentation (41916)
10/25
PublicOpen Space
34’Drive Lanes
80’ ROW
12’Sidewalk
24’Planting / Furn. Zone
10’Loading
S Massachussets St east of 1st Ave S.
Arena
2 - S. MASSACHUSSETTS ST ROW IMPROVEMStreet S
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
-
8/18/2019 Arena Presentation (41916)
11/25
S
M a s S
S t
1st Ave S
Drive LanesDrive Lanes23’ min
Clear ZoneRain Garden
23’ minClear Zone
Clear ZoneRain Garden
ARENA
3 - 1ST AVE S. ROW IMPROVEMS Massachussets St to S Holgate S (Arena Fro
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
A B
A B
-
8/18/2019 Arena Presentation (41916)
12/25
S
M a s S
S t
1st Ave S
E d g a r M a r t i n e z D r S
Drive LanesDrive Lanes
16’-0”Ped. Zone
16’-0”Ped. Zone
ExistingParking Lot
ExiBuiRain Garden
Ped Zone
Rain Garden
Private Property
3 - 1ST AVE S. ROW IMPROVEMEdgar Martinez Dr S to S Massachussets St (block north of Aren
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
A B
A B
3 1ST AVE S ROW IMPROVEM
-
8/18/2019 Arena Presentation (41916)
13/25
3 - 1ST AVE S. ROW IMPROVEM1 Ave S. lookin
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
4 S HOLGATE ST ROW IMPROVEM
-
8/18/2019 Arena Presentation (41916)
14/25
Exist ing Condit ion
Proposed Street Alignment and Improvements
Amtrak
Pedestr ianBridge
WF
JTh
Krispy
Kreme
Proposed Arena
Parking Garage
Rai l Corr idor
1 s t A v
e S
3 r d
A v
e S
O c c .
A v e S
S Holgate St
Proposed
Arena
4 - S. HOLGATE ST ROW IMPROVEM
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
4 S HOLGATE ST ROW IMPROVEM
-
8/18/2019 Arena Presentation (41916)
15/25
Drive Lanes
11’Sidewalk
3’Setback
30’Rain garden / Vertical circulation
Planting
4 - S. HOLGATE ST ROW IMPROVEMSection at Pedestrian
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
4 S HOLGATE ST ROW IMPROVEM
-
8/18/2019 Arena Presentation (41916)
16/25
Direct Connectionto Arena
West Landing& Ramp
East Landing& Ramp
S. H o l g a
t e S t.
O c c . A
v e S .
3 r d A v e S .
4 t h A v e
Rail Corr id or
1 s t
A v e S
4 - S. HOLGATE ST ROW IMPROVEMPedestrian
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
4 S HOLGATE ST ROW IMPROVEM
-
8/18/2019 Arena Presentation (41916)
17/25
East Landing& Ramp
West Landing& Ramp1s t A ve S
3 r d A v
e S.
S . H o l g a t e S t .
Wells Fargo BaDrive Thru
Ra il Co rr idor
4 - S. HOLGATE ST ROW IMPROVEMPedestrian
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
5 PUBLIC
-
8/18/2019 Arena Presentation (41916)
18/25
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
5 - PUBLIC
0N
S
M a s s a c h u s e t t s S t
S
H o l g a t e S t
1st Ave S
Occidental Ave S Oc
Access Road
Significant Artwork for Public Open Space
Temporary Artworks
Integrated Artworks in ROW
Pedestrian Bridge
P U B L I C A R T L O C A T I O N S
A B
C
D
C
A
D
C
B
6 BICYCLE FACIL
-
8/18/2019 Arena Presentation (41916)
19/25
Existing and P
Utah GreenwayExistingWaterfront Trail
Alaskan WayCycle Track
Airport WayCycle Track
Atlantic Multi-UseTrail Connection
Holgate Multi-Use Trail
Connection to Holgate Ramp (S
Mountain to Sound Greenway
Pedestrian / Bike Bridge
Holgate Multi-Use Trail (SDOT)
L E G E N D
B I K E F A C I L I T I E SP R O P O S E D B Y A R E N A
Off StreetCycle Track
In StreetGreenway
Shared-Use Street
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
SafecoField
Century
Link Field
S .
H o l g a t e S t
.
S .
A t l a n t i c S t .
1st Ave S.
Occidental A
6th Ave S.
S .
J a c k s o n
S t .
E .
M a r t i n e z D r . S .
6 - BICYCLE FACIL
N
0
-
8/18/2019 Arena Presentation (41916)
20/25
-
8/18/2019 Arena Presentation (41916)
21/25
PUBLIC BENEFITS MATRIX & C
-
8/18/2019 Arena Presentation (41916)
22/25
3
2
1
PUBLIC BENEFITS MATRIX & C
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
PUBLIC BENEFIT DESCRIPTION PROPOSED CODE EIS COST
Publicly Accessible Open Space &
Living Machine Gardens
Flexible accessible plaza open space 31,800 sf
None
Ped safety &
crowd control
(Queuing at
Ticketing and
Ingress/Egress atLobby)
$9m -
Living Machine: on-site waste water treatment and reuse 4m gal capacity
Seasonal programming (food trucks, movable seating, etc.) Programming Doc
Utility connections for public event use 3 event connections
Public restroom access 2 restrooms
Plaza storage room 500 SFPublic seating (permanent) 300+ LF seating
Water features 2 water features
Drinking fountains 2 drinking fountains
Pedestrian lighting (poles, bollards and surface lighting) 1/2 FC average
S Massachusetts St ROWImprovements & Curbless Street
Dedication of private property to public ROW 2,400 SF
New curbs,
sidewalk (min. 6’
width) and street
trees
None $800k
Realignment / improvement of curbless street between 1st & Occidental (east)
Concrete and granite resurfacing, drainage, channelization and signage 16,000 SF
Street Trees 15 trees
Seating 20 LF seating
Pedestrian lighting (poles and bollards) 1/2 FC average
Realignment / improvement of standard curb / gutter street between 1st & Utah(west)
Asphalt resurfacing, curb & gutter, drainage, channelization and signage 12,500 SF
Street Trees 4 trees
Rain Garden 2,600 SF
1st Ave S Enhanced ROWImprovements
Improvements between Massachusetts and Holgate
New curb,
sidewalk (16’
width per Street
Concept Plan),
and street trees
Ped safety &
crowd control
(Ingress/Egress at
Team Store and
Year-Round Club/
Stairs)
23’ Min ClearZone
$900k
Rain garden 5,800 SF
Pedestrian lighting (poles) 17 light poles
Seating 460 LF seating
Improvements between Mass. and E. Martinez (sidewalk, street trees, rain garden)
Sidewalk 9,300 SF
Rain garden 4,700 SF
Pedestrian lighting (poles) 16 light poles
-
8/18/2019 Arena Presentation (41916)
23/25
CAPITAL IMPROVEMENT C
-
8/18/2019 Arena Presentation (41916)
24/25
CAPITAL IMPROVEMENT C
Seattle Arena Public Benefits Review | City Council Sustainability & Transportation Committee | April 19, 2016
CAPITAL IMPROVEMENTS (partial) COST RANGE
Construct new south parking garage and incorporate modal options $45.0m - $65.0m
Install new traffic signal at South Walker Street and 1st Avenue South $250 - $450k
Pro rata contribution to Lander Street grade separation project Unknown
Construct new Holgate pedestrian bridge for pedestrians and bicyclists $15m - $18m
-
8/18/2019 Arena Presentation (41916)
25/25