Area Operating Agreement Repackage

21
Area Operating Agreement Repackage (AOA) August 21, 2005

description

Area Operating Agreement Repackage. Land Stewardship. (AOA) August 21, 2005. Disposition Life Cycle. Planning. Approvals. Reclamation. Abandonment Decommission. Construction. Operations. Outcomes. Stewardship over entire life cycle of a disposition - PowerPoint PPT Presentation

Transcript of Area Operating Agreement Repackage

Page 1: Area Operating Agreement Repackage

Area Operating Agreement Repackage

(AOA)

August 21, 2005

Page 2: Area Operating Agreement Repackage

Approvals

Planning

Construction

Operations

Abandonment Decommission

Reclamation

Page 3: Area Operating Agreement Repackage

Outcomes

• Stewardship over entire life cycle of a disposition• Processes and outcomes characterized by:

– Comprehensiveness,

– certainty,

– predictability, and

– timeliness

• Greater integration and common use• Continual improvement

Page 4: Area Operating Agreement Repackage

Industry Issues with AOA

• Consistency

• Approval time for AOA

• Continual requests for more detail prior to AOA approval

• Better definition of what is a “project”

• Confusion about what is meant by “Best Operating Practices”

Page 5: Area Operating Agreement Repackage

Industry Issues (Cont)

• When to file application?

• Want electronic application processing

• Relationship of AOA to EFR

• Would like other approvals included in AOA process as well, eg. EPEA

Page 6: Area Operating Agreement Repackage

AOA Process

• Repackage AOA

• More industry accountability for planning

• More industry accountability for integration with other users

• More industry accountability for monitoring and self-reporting

• Includes Part A, Part B, and Part C

Page 7: Area Operating Agreement Repackage

AOA Part A

• Standard across province • Reference to Public Lands Handbook• Best operating practices• Addresses all stages of the life cycle of a

disposition• Identifies company monitoring and reporting• Address and identify process and timelines for

sites approved but not entered

Page 8: Area Operating Agreement Repackage

AOA Part A (Cont)

Reporting required

a. Electronic format

b. Additional clearings

c. Abandoned/reclaimed

d. As builts

e. Reporting on all dispositions including abandonment and reclamation

Page 9: Area Operating Agreement Repackage

AOA Part A (Cont)• Due diligence

• Compliance Plan

• Core conditions

• Forest Protection – Fire Smart plans

• Range management– PGR, Grazing Lease, etc.

Page 10: Area Operating Agreement Repackage

AOA Part B

• Area or region specific

• Identifies how the company will be planning and operating to address specific issues. Examples are species at risk in the area, high risk erosion sites, major water crossings, perma frost, timber salvage, prairie vegetation maintenance.

Page 11: Area Operating Agreement Repackage

AOA Part B (Cont)

• Integration with other land users– Agreement reached among major users– Joint planning– Result in Consents not an issue

• Examples of consents neededFMA Holders, Timber licensees

Grazing Lessees

Page 12: Area Operating Agreement Repackage

AOA Part B (Cont)• Consultation

• SRD/Company communications

• Forest protection/grazing

• Notification to other users e.g. trappers

• How approval for specific sites will proceed

Page 13: Area Operating Agreement Repackage

AOA Part C

• Disposition development

• Preliminary plan and map

• Final plan

• Specific site approval

• Low risk vs high risk

Page 14: Area Operating Agreement Repackage

Site Development

• Reporting

• Monitoring

• As builts

Page 15: Area Operating Agreement Repackage

AOA

• Training for general management of disposition including construction, drilling waste proposed to be handled by third party e.g. PITS

Page 16: Area Operating Agreement Repackage

P ublic LandsH andbook

P art AS tandardR eporting

Form s

E nteredin to D ata

B ase

C om pany signsP art A

P art B

Page 17: Area Operating Agreement Repackage

C om ple teP art B

P art C

EFRM anual and

otherinform ation

W aterC rossing,C odes of

Practice, etc.

W ild lifeR eferra l M ap

Species at risk ,Specia l s ites,

regional factors

IR P & otherdata

C onsultation

O ther U sers,Joint P lanning,

C onsents

LSAS

N otifications,e.g. T rapper

Ap

pro

va

l

Page 18: Area Operating Agreement Repackage

Prelim inary P lan R isk M anagem entApproach

(H igh - low risk , routine -non-routine)

Part C(Approval for a groupof s ites in fina l p lan orind ividual s ites in h igh

risk )

F ina l O perating P lan/S ite P lan

(G roup of ind ividuals ites or ind ividual s ites)

D ecis ion/Approval

D ecis ion

Application &Subm ission

Survey, D ID s

C onsents, where notadequate ly

addressed in Part B

Letter ofAuthority

Page 19: Area Operating Agreement Repackage

Quality Assurance

• Assessments of activities will be done during all stages of the life cycle

• Monitoring or compliance checks

• Enable focusing on high risk sites

• Address problem companies

• Provide measures or more verification on stewardship

Page 20: Area Operating Agreement Repackage

Approvals

Planning

Construction

Operations

Abandonment Decommission

Reclamation

Page 21: Area Operating Agreement Repackage

Where to from Here

• AOA– Finalization of repackage of AOA– Consultation with industry – Aug 31– Identification of companies for pilot – Aug 31– Draft on website – Sep 15– Industry information sessions – Oct 1

• Quality Assurance– Compliance process – Dec 31