Are Your Continuous Tests Too Fragile for Agile?

43
Parasoft Copyright © 2015 1 2015-05-01 Are Your Continuous Tests Too Fragile for Agile Arthur Hicken Parasoft Evangelist

Transcript of Are Your Continuous Tests Too Fragile for Agile?

Parasoft Copyright © 2015 1

2015-05-01

Are Your Continuous Tests Too Fragile for Agile

Arthur Hicken

Parasoft Evangelist

Parasoft Copyright © 2015 22

Arthur Hicken Bio

Arthur “Code Curmudgeon” Hicken is heavily involved in the development and testing communities. He is passionate about businesses realizing the full potential of testing solutions. As an expert in his field, Arthur is a sought after speaker regarding testing strategies, efficiencies and results.

He has been at Parasoft for over 20 years driving the strategic conversation around SDLC practices that enhance productivity and quality. In addition to holding the title of Evangelist, Arthur represents Parasoft on multiple industry organizations including ICSQ, OWASP, NIST/SAMATE, CWE and more.

Parasoft Copyright © 2015 33

Agenda

Challenges of Continuous Agile

Testing defined

Testing is hard (no one wants to do it)

Best practices

A modest proposal: Spring cleaning

Parasoft Copyright © 2015 44

The role of QA in Agile

QA is part of development, not an afterthought

Review developer testing efforts

Additional testing of requirements

Iterative during development

Fast discovery and reporting of defects

Investigate root cause of defects

Influence development policy

Parasoft Copyright © 2015 55

Challenges of Agile

Need to be fast

Need to be flexible

Testing can be overlooked if not baked in

Architectural compromises from schedule

Parasoft Copyright © 2015 66

Challenges of Continuous

Tests must produce binary decision go/no-go

Reuse unit test and functional tests from devto QA

High level of automation

Requires disciplined mature process

Testing must automatically answer

Is it stable

Will it do what it’s supposed to do

Parasoft Copyright © 2015 77

Importance of Testing

How do you know when you're done?

How do you know if a fix for a minor bug broke a major function of the system?

How can the system evolve into something more than is currently envisioned?

Testing, both unit and functional, needs to be an integrated part of the development process.

Parasoft Copyright © 2015 88

Testing delivers

A maintained suite of unit tests:

Represents the most practical design possible

Provides the best form of documentation for classes

Determines when a class is "done"

Gives a developer confidence in the code

Is a basis for refactoring quickly

Parasoft Copyright © 2015 99

Why Testing is Often Ignored

• Too much effort

• Too much time

• We’re on a schedule – no time to test.

• Why is there always time to do it over, but never to do it right?

Perceived as “burdensome”

• “I don’t need to test my code – I don’t make mistakes.”

• Testing means I have to admit that I might have made a mistake.

• I don’t like to test – it’s beneath me.

• Testing isn’t fun – I just want to code!

• That’s for the QA dept.

Developer Ego

Parasoft Copyright © 2015 1010

Definitions

Unit

Functional

Regression

Parasoft Copyright © 2015 1111

Unit Testing

Unit tests that validates your method behaves a certain way given a specific parameters

Regressions testing

Validate behavior of existing code hasn’t changed

Scheduled and run automatically

Test Driven Development

Validate behavior of new code to be written

Created before developing, turned into regression tests after

Parasoft Copyright © 2015 1212

Functional Testing

• Unit tests (Junit, CppUnit, Nunit, etc)

• Integration tests

• Scripted tests

• Manual tests

Incarnations of functional tests

• Manually written

• Machine generated from application tracing

• Machine generated from capturing traffic

• Machine generated from recording clicks

Ways to create functional tests

Parasoft Copyright © 2015 1313

Regression Testing

• Functional unit tests that pass

• Machine generated unit tests for current behavior

• Unit test written by developers and testers

• Tests written to validate bug fixes

Contributors to the regression test suite

• Unwanted change in behavior – fix the code

• Intentional change in specification – update test controls

Regression test failures

Parasoft Copyright © 2015 1414

What’s the Difference?

Unit Tests

• The code is doing things right

• Written from programmers perspective

• Confirm code gives proper output based on specific input

Functional Tests

• The code is doing the right thing

• Written from users perspective

• Confirm the system does what the user expects it to do

Regression Tests

• It still works

Parasoft Copyright © 2015 1515

Why Do Unit Testing

Software bugs are inserted during coding phase, but often aren’t found until functional testing, or worse

they are found by customers. The longer a bug stays in the system, the more expensive it is to fix it.

Unit testing is a strategy that allows you to find out if your system is behaving the way you expect early in

the SDLC.

Unit testing allows for easy regression testing, so you can find out quickly whether you have introduced

some unexpected behavior into the system.

Parasoft Copyright © 2015 1616

The Cost of Defects

Parasoft Copyright © 2015 1717

Best Practices

Parasoft Copyright © 2015 1818

What’s Important

Unit tests require a LOT of care

Unit testing is a continuous operation

Test suite maintenance is a commitment

Control data (assertions) in the code

Parasoft Copyright © 2015 1919

Test incorporation

Take existing unit tests and schedule them into build process

Run and fix tests as part of build process

Ideal goal: 0 failures and 100% code coverage

Realistic goal: 10% test failures and 80% code coverage

If the unit test suite is noisy, don’t qualify the build based on assertion failures

Parasoft Copyright © 2015 2020

Unit Test Creation

Maintainability

Proper assertions

Nightly runs

Tests should be:

Automatic (no human input or review)

Repeatable (no strange dependencies)

Parasoft Copyright © 2015 2121

Legacy Test Suites

Leverage your existing suite

Clean up incrementally

Set policy based on current results

Tighten policy when in compliance

Parasoft Copyright © 2015 2222

Maintaining and Creating UT

Maintaining is more of a problem than creating.

Don’t create a test if you can’t or don’t plan to maintain it.

Creating as you go creates a better test suite

Tests not run regularly become irrelevant

Parasoft Copyright © 2015 2323

Write tests with the code

Create the test when you’re writing the code

Have a test for every task you complete

Increases understanding

Improve assertions

Parasoft Copyright © 2015 2424

Connect Unit Tests

Associate tests with Code and Requirements

Naming Conventions should have meaning

Use code comment tags @task @pr @fr

Use check-in comments @task @pr @fr

Improve change-based testing

Parasoft Copyright © 2015 2525

Specific Generation

Don’t be lured by 100% coverage

Auto assertions are not meaningful unless validated

Review the tests as you work on the code

Parasoft Copyright © 2015 2626

Code Review Test

Code for unit tests should be reviewed

Consider doing test-design review

Ensures you’re testing what you think you are

Helps reduce noise

Helps improve understanding

Review the code and the test code together

Parasoft Copyright © 2015 2727

Testing Exception Handling

Frequently Skipped

Prevents crashes

Prevents death spiral

Rule of thirds

1/3 basic functionality

1/3 advanced features / infrequent settings

1/3 error handling

Parasoft Copyright © 2015 2828

All About Assertions

Verifies that the code behaves as intended

True/false

Null or not null

Specific values

Complex conditions

Parasoft Copyright © 2015 2929

Why Assert?

Excuses:

My code already has console output

I can check it visually/manually

Binary output (pass/fail)

Part of overall test suite

No human intervention

Parasoft Copyright © 2015 3030

Assertion failures

Introduced coding error

• Fix the new code

Functionality changed

• Update the assertion

Improper assertion

• Comment it out

Parasoft Copyright © 2015 3131

Assertion Policy

Assign failures as tasks

Author of the test or of the changed code

Try to reach developer that has the highest chance to understand the change

Developer assesses failure:

Bug (fix)

Changed functionality (update assertion)

Bad assertion (improve or remove) - don’t delete; instead, comment out

Parasoft Copyright © 2015 3232

What to assert

Ease of creating assertions leads to poor choices

Anything CAN be checked – but should it be?

Assertions should be connected to what you’re trying to test

Assertions should be logically invariant

Check values by range, not equivalence

“What do I expect here logically?”

Parasoft Copyright © 2015 3333

How to recognize bad assertions

How often do you WANT to manually verify an assertion?

Daily or near-daily checking indicates poor assertion.

Troublesome possibilities:

Date

User or machine name

OS

Filesystem names and paths

Parasoft Copyright © 2015 3434

Missing Assertions

Error was found after code changed

Test suite never caught the error

Update unit-test with new assertion

Write new unit tests as necessary

Parasoft Copyright © 2015 3535

Cleaning It Up

Parasoft Copyright © 2015 3636

The Challenge: Management’s Perspective

Need tests to reduce risks

Testing takes time from features/fixes

Not enough time

Not enough people

Tests and reports lack context

Parasoft Copyright © 2015 3737

The Challenge: Development’s Perspective

Hundreds of failing or broken tests

Test requirements unclear

Existing tests are dubious

Deadline pressure

Parasoft Copyright © 2015 3838

Spring Cleaning Solution

Throw out the useless, old junk Identify and eliminate “noisy” tests

Organize the remaining chores Prioritize unit test tasks

Keep it clean Establish and follow a routine test maintenance plan

Parasoft Copyright © 2015 3939

Throw out the Junk: Identifying Noisy Tests

Tests that are fragile

• Pass/Fail/Incomplete results frequently change

• Frequent changes are required to keep up-to-date

Tests that are outdated

• More than “n” releases have occurred despite this test failure

• The test applies to legacy code that is frozen

• The test has not been executed for “x” period of time

Tests that are unclear

• It takes more than 5 minutes to understand why the test exists

• The failure message is incorrect/unhelpful/irrelevant

• There is no associated requirement or defect

Be merciless!

Parasoft Copyright © 2015 4040

Organize Chores: Prioritize Tasks with Policy

All tasks are created equal

Some tasks are more equal than others

Policies establish prioritization and assignment

Parasoft Copyright © 2015 4141

Keep it Clean: Establish a Routine Process

Management and Development need to co-define a Policy

Clear testing goals that tie tests to business needs

Clear delineation of responsibility

Test creation and deletion

Test failure resolution

Naming conventions

Peer review

Clear and frequent communication

Understand the technical and business impact

Enhance traceability to project requirements

Ask questions

Focus on safety/quality, not coverage

Keep the number of tests minimal

Run all tests on a regularly scheduled, frequent basis

Clean as you go

Parasoft Copyright © 2015 4242

Spring Cleaning Recap

Find and delete “noisy” tests

Use policies to prioritize, assign, and plan

Co-design and follow a process to keep it clean

Parasoft Copyright © 2015 4343

Web http://www.parasoft.com/jsp/resources

Blog http://alm.parasoft.com

Social

Facebook: https://www.facebook.com/parasoftcorporation

Twitter: @Parasoft @MustRead4Dev @CodeCurmudgeon