ARE Telecom & Wind 1500 AFS Assembled Foundation System Telecom-Small Wind · 2018. 12. 3. · 22...

8
ARE Telecom & Wind 1500 AFS Assembled Foundation System Telecom-Small Wind (Above/ Below-Grade) www.aretelecom.com Proprietary rights are included in the information disclosed herein. This information is submitted in confidence and neither the document nor the information disclosed here- in shall be reproduced or transferred to other documents for manufacturing or for any other purpose except as specifically authorized in writing by ARE Telecom & Wind. D E F C 1 2 3 4 B A 3 2 1 5 C D 4 6 7 8 A B MGC 5/31/13 CAD-generated drawing do not manually update scale NA size NA CAD file : Part # sheet 1 of 8 rev. XC DATE APPROVALS DRAWN CHECKED RESP ENG MFG ENG QUAL ENG MATERIAL FINISH DO NOT SCALE DRAWING E MGC 5/31/13 initial release XB REVISIONS REV. DESCRIPTION DATE APPROVED 5 ARE Telecom & Wind 1043 Grand Ave., #213 St. Paul, MN 55105 See Notes 1500-AFS XC Added component weights 7/23/13 MGC

Transcript of ARE Telecom & Wind 1500 AFS Assembled Foundation System Telecom-Small Wind · 2018. 12. 3. · 22...

Page 1: ARE Telecom & Wind 1500 AFS Assembled Foundation System Telecom-Small Wind · 2018. 12. 3. · 22 M16 x 60mm Hex Bolt Gr 8.8 (ISO 7412) 108 0.15 23 M16 Hex Nut (ISO 4775) 108 0.07

ARE Telecom & Wind1500 AFS

Assembled Foundation System

Telecom-Small Wind

(Above/ Below-Grade)

www.aretelecom.com

Proprietary rights are included in the information disclosed herein. This information is submitted in confidence and neither the document nor the information disclosed here-in shall be reproduced or transferred to other documents for manufacturing or for any other purpose except as specifically authorized in writing by ARE Telecom & Wind.

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

MGC 5/31/13

CAD-generated drawingdo not manually update

scale NA size NA

CAD file :

Part #sheet 1 of 8rev. XC

DATEAPPROVALSDRAWN

CHECKED

RESP ENG

MFG ENG

QUAL ENG

MATERIALFINISHDO NOT SCALE DRAWING

E

MGC5/31/13initial releaseXB

REVISIONSREV. DESCRIPTION DATE APPROVED

5

ARE Telecom & Wind1043 Grand Ave., #213

St. Paul, MN 55105

See Notes

1500-AFS

XC Added component weights 7/23/13 MGC

Page 2: ARE Telecom & Wind 1500 AFS Assembled Foundation System Telecom-Small Wind · 2018. 12. 3. · 22 M16 x 60mm Hex Bolt Gr 8.8 (ISO 7412) 108 0.15 23 M16 Hex Nut (ISO 4775) 108 0.07

Design CodesIEC 61400-1: Wind Turbines – Part 1: Design Requirements•EN 1993 Eurocode 3: Design of steel structures – Part 1-1 & Part 1-8•BS EN 1090-2:2008 Execution of steel structures and aluminum structures - Part 2: Technical•requirements for steel structuresEN 14399 High-strength structural bolting assemblies for preloading•EN 1997 Eurocode 7: Geotechnical design•

Design LoadingsBackfill / Ballast Material – Bulk Dry Density assumed to be 16 kN/m3•Minimum allowable soil bearing pressure shall be no less than 80 kPa•Steel Structure Self Weight – 4700 -5700 kg approx.•Tower Reactions (unfactored):•

Vertical (Fz) = 53 kN•Horizontal (Fx) = 51 kN•Moment (My) = 1085 kNm•

The above tower reactions are service loads for the Load Combination 1.0 Dead + 1.0 Wind and are•applied to the buried foundation structure at the base of the tower (Ground Level)

Design Load Combinations.Dead: Tower Self Weight + Steel Structure Self Weight + Backfill Material Self Wt•Wind: Tower Horizontal Reaction + Tower Moment Reaction•Service: 0.9 Dead + 1.35 Wind•Ultimate: 0.9 Dead +1.35 Wind•

Geotechnical InvestigationIt is recommended that a site study be conducted to verify that the soil parameters equal or exceed•the requirements shown above.

Important Note:Please contact ARE directly with questions or concerns, or if just unsure about the aforementioned details and requirements.

Proprietary rights are included in the information disclosed herein. This information is submitted in confidence and neither the document nor the information disclosed here-in shall be reproduced or transferred to other documents for manufacturing or for any other purpose except as specifically authorized in writing by ARE Telecom & Wind.

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

scale NA size NA

Part #sheet 2 of 8rev. XC

E

5 76

F

ARE Telecom & Wind1043 Grand Ave., #213

St. Paul, MN 55105

1500-AFS

Page 3: ARE Telecom & Wind 1500 AFS Assembled Foundation System Telecom-Small Wind · 2018. 12. 3. · 22 M16 x 60mm Hex Bolt Gr 8.8 (ISO 7412) 108 0.15 23 M16 Hex Nut (ISO 4775) 108 0.07

6200mm

2100mm

Steel structure self weight = 5700 kg

Above Grade Foundation

6200mm

2400mm

Steel structure self weight = 4700 kg

Below Grade Foundation

Proprietary rights are included in the information disclosed herein. This information is submitted in confidence and neither the document nor the information disclosed here-in shall be reproduced or transferred to other documents for manufacturing or for any other purpose except as specifically authorized in writing by ARE Telecom & Wind.

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

scale NA size NA

Part #sheet 3 of 8rev. XC

E

5 76

F

ARE Telecom & Wind1043 Grand Ave., #213

St. Paul, MN 55105

1500-AFS

Page 4: ARE Telecom & Wind 1500 AFS Assembled Foundation System Telecom-Small Wind · 2018. 12. 3. · 22 M16 x 60mm Hex Bolt Gr 8.8 (ISO 7412) 108 0.15 23 M16 Hex Nut (ISO 4775) 108 0.07

2

56

3

10(A)

11

12

4

1

7

8

9

13(B)15

14

(A)

(B)

16

17

Bill of Materials (Below Grade)

# Description Qty Weight ea.(kg)

1 Kingpost 1 8652 Upper Chord 18 703 Base Tray Segment 18 1214 Diagonal Web (RA) 63x63x5x1475 18 7.55 Vertical Web (RA) 63x63x5x920 w/ gusset plate 18 116 Circumferential Brace (RA)63x63x5x600 18 37 M33 x 325mm Anchor Stud Gr. 8.8 (ISO 7412) 36 28 M33 Hex Nut (ISO4775) 180 0.39 M33 Washer (ISO 7416) 144 0.1

10 (A) M24 x 80mm Hex Bolt Gr 8.8 (ISO 7412) 90 0.411 M24 Hex Nut (ISO 4775) 90 0.212 M24 Washer (ISO 7416) 180 0.0713 (B) M16 x 60mm Hex Bolt Gr 8.8 (ISO 7412) 90 0.1514 M16 Hex Nut (ISO 4775) 90 0.0715 M16 Washer (ISO 7416) 180 0.0416 Handhole Cover (230mm x 600mm) 1 5.117 M12 x 40 SHCS 2 0.05

Proprietary rights are included in the information disclosed herein. This information is submitted in confidence and neither the document nor the information disclosed here-in shall be reproduced or transferred to other documents for manufacturing or for any other purpose except as specifically authorized in writing by ARE Telecom & Wind.

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

scale NA size NA

Part #sheet 5 of 8rev. XC

E

5 76

F

ARE Telecom & Wind1043 Grand Ave., #213

St. Paul, MN 55105

1500-AFS

Page 5: ARE Telecom & Wind 1500 AFS Assembled Foundation System Telecom-Small Wind · 2018. 12. 3. · 22 M16 x 60mm Hex Bolt Gr 8.8 (ISO 7412) 108 0.15 23 M16 Hex Nut (ISO 4775) 108 0.07

18

1920

21

22

2423

Notes:Ballast stone size shall be equal to or grater than 100mm, not1.to exceed 200mm.Ballast bulk dry density shall be equal to or grater than 16 kN/m32.Minimum allowable soil bearing capacity shall be no less than 80 kPa.3.Gravel or course sand shall be used to develop a stable bearing4.surface. Care must be taken when placing the stones within the foundation so5.as not to damage the structural steel members.

Bill of Materials (Above Grade, Mesh Wall)

# Description Qty Weight ea. (kg)

18 Mesh Wall (75mm sq.) 18 5019 Link 36 0.920 Diagonal Brace (1226mm) 18 3.621 Horizontal Brace (1000mm) 18 322 M16 x 60mm Hex Bolt Gr 8.8 (ISO 7412) 108 0.1523 M16 Hex Nut (ISO 4775) 108 0.0724 M16 Washer (ISO 7416) 216 0.04

Proprietary rights are included in the information disclosed herein. This information is submitted in confidence and neither the document nor the information disclosed here-in shall be reproduced or transferred to other documents for manufacturing or for any other purpose except as specifically authorized in writing by ARE Telecom & Wind.

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

scale NA size NA

Part #sheet 4 of 8rev. XC

E

5 76

F

ARE Telecom & Wind1043 Grand Ave., #213

St. Paul, MN 55105

1500-AFS

Page 6: ARE Telecom & Wind 1500 AFS Assembled Foundation System Telecom-Small Wind · 2018. 12. 3. · 22 M16 x 60mm Hex Bolt Gr 8.8 (ISO 7412) 108 0.15 23 M16 Hex Nut (ISO 4775) 108 0.07

M33

M16

M16

M24

M12

Preloaded High Strength Structural boltsThe bolts shall be in accordance with DIN 6914 / ISO 7412.•The bolts shall be installed and preloaded in accordance with BS EN 1090-2:2008 Execution of steel structures and aluminum•structures - Part 2: Technical requirements for steel structures.The slip resistances of the structural bolts were calculated in accordance with EN 1993-8: 2005. It is•understood that the steel will be hot dipped galvanized after fabrication and a bitumen coating willbe applied. The bitumen coating is not suitable on the surface of these joints and therefore it isnecessary to mask the faying areas prior to the application of the bitumen paint.The friction coefficient factor is taken as 0.2 which is recommended for hot dipped galvanized surfaces.•

Preloaded bolt installationThe contact surfaces shall be free from all contaminants, such as oil, dirt or paint.•Burrs that would prevent solid seating of the connecting parts shall be removed.•The preloading force required for an M24 bolt is 198kN and shall be preloaded using the torque control method or other•methods described in EN 1090-2:2008.

Torque control methodIn the torque control method the torque is applied in two steps.•

The first step, after bedding of the joint, is to apply a torque of up to 75% of the required torque value to all the bolts.1.The second step is to apply an additional torque to each bolt such that the total applied to the bolt is up to 110% of2.

the required nominal torque value. The extra 10% is to offset the subsequent torsional relaxation of preload in the connection when the tightening wrench is removed.

Bolt Torque and Preload RequirementsBolt Size (Gr 8.8)

Torque Coefficient

Torque (N-m)

Torque 75% (N-m)

Torque 110% (N-m)

Preload (kN)

M33x3.5 0.2 1900 1425 2090 289M24x3 0.2 950 712 1045 198M16x2 0.2 220 165 242 69

M12x1.75 0.2 75 NA NA NA

Proprietary rights are included in the information disclosed herein. This information is submitted in confidence and neither the document nor the information disclosed here-in shall be reproduced or transferred to other documents for manufacturing or for any other purpose except as specifically authorized in writing by ARE Telecom & Wind.

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

scale NA size NA

Part #sheet 6 of 8rev. XC

E

5 76

F

ARE Telecom & Wind1043 Grand Ave., #213

St. Paul, MN 55105

1500-AFS

Page 7: ARE Telecom & Wind 1500 AFS Assembled Foundation System Telecom-Small Wind · 2018. 12. 3. · 22 M16 x 60mm Hex Bolt Gr 8.8 (ISO 7412) 108 0.15 23 M16 Hex Nut (ISO 4775) 108 0.07

(C) 2100mm

(A) 6300mm

(D)

(B)

Grade

Site Control(A) - Earth material shall be excavated 6.3m-sq x 2.1m deep.Excavation walls shall be properly sloped to avoid cave-in.

(B) - Minimum allowable soil bearing capacity shall meet or exceed 80 kPa. Subsoil layer (bearing strata) shall be leveled prior to placing foundation structure in excavated hole. A layer of coarse sand may be used to provide good contact between foundation and compacted subsoil layer.

(C) - Backfill using excavated soil. Backfill material shall be free fromall organic materials and be mechanically compacted in layers not exceeding 250mm. Backfill material must be equal to or exceed a drybulk density of 16 kN/m3.

(D) - Distance from top of kingpost flange to grade shall be 100mm. A slope gradient of 3% to 5% is recommended to mitigate soil saturation andto facilitate runoff away from tower.

Note: For more details and analysis results, refer to the design review report "Direct Burial Foundation System for a Wind Turbine" revB, prepared by JOR Consulting Civil & Structural Engineers.

Compacted Backfill (native excavated soil)

Native Soil

Compacted Subsoil Layer

Slope Gradient (3% - 5%)

Direct Burial XL-AFS

Proprietary rights are included in the information disclosed herein. This information is submitted in confidence and neither the document nor the information disclosed here-in shall be reproduced or transferred to other documents for manufacturing or for any other purpose except as specifically authorized in writing by ARE Telecom & Wind.

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

scale NA size NA

Part #sheet 7 of 8rev. XC

E

5 76

F

ARE Telecom & Wind1043 Grand Ave., #213

St. Paul, MN 55105

1500-AFS

Page 8: ARE Telecom & Wind 1500 AFS Assembled Foundation System Telecom-Small Wind · 2018. 12. 3. · 22 M16 x 60mm Hex Bolt Gr 8.8 (ISO 7412) 108 0.15 23 M16 Hex Nut (ISO 4775) 108 0.07

210mm

15mm

DETAIL G

M33 - Anchor BoltBolt Circle Diameter = 1230mm•

# of Bolts = 36•

Proprietary rights are included in the information disclosed herein. This information is submitted in confidence and neither the document nor the information disclosed here-in shall be reproduced or transferred to other documents for manufacturing or for any other purpose except as specifically authorized in writing by ARE Telecom & Wind.

D

E

F

C

1 2 3 4

B

A

321 5

C

D

4 6 7 8

A

B

scale NA size NA

Part #sheet 8 of 8rev. XC

E

5 76

F

ARE Telecom & Wind1043 Grand Ave., #213

St. Paul, MN 55105

1500-AFS