Are Lean Production and Global Sourcing Compatible? Just-in-time Shipping times Freight costs...

6
Are Lean Production and Global Sourcing Compatible? Just-in-time Shipping times Freight costs Inventory levels 30 days of inventory for shipping by sea Time and forecast accuracy Design-for-Manufacturing proximity helps Need frequent and quick replies

Transcript of Are Lean Production and Global Sourcing Compatible? Just-in-time Shipping times Freight costs...

Page 1: Are Lean Production and Global Sourcing Compatible? Just-in-time Shipping times Freight costs Inventory levels 30 days of inventory for shipping by sea.

Are Lean Production and Global Sourcing Compatible?

• Just-in-time

Shipping times

Freight costs

• Inventory levels

30 days of inventory for shipping by sea

Time and forecast accuracy

• Design-for-Manufacturing

proximity helps

Need frequent and quick replies

Page 2: Are Lean Production and Global Sourcing Compatible? Just-in-time Shipping times Freight costs Inventory levels 30 days of inventory for shipping by sea.

Delivery Times for Each CCT Plant and Market (in days)

To MarketsU.S. Europe Pacific (Japan)

From

Plants AirSea/

LandAir

Sea/

LandAir

Sea/

Land

California-- 7 4 14 3 16

Ireland4 14 3 5 NA NA

Singapore4 25 4 35 4 18

Page 3: Are Lean Production and Global Sourcing Compatible? Just-in-time Shipping times Freight costs Inventory levels 30 days of inventory for shipping by sea.

Freight Cost and Product Type(Percentage of Cost of Goods Sold)

Low-End Product

High-End Product

Peripheral

(Monitor)

Air Freight 5.4% 4.0% 20.9%

Sea Freight 1.2% 1.0% 1.0

Page 4: Are Lean Production and Global Sourcing Compatible? Just-in-time Shipping times Freight costs Inventory levels 30 days of inventory for shipping by sea.

Inventory/Sales Ratioand Pipeline Time

Short Pipeline Long Pipeline

Mean pipeline time (in days) 23.25 40.6

Mean Inventory/ Sales Ratio 0.67 1.87

Inventory cost as % CGS 1.27% 3.54%

Page 5: Are Lean Production and Global Sourcing Compatible? Just-in-time Shipping times Freight costs Inventory levels 30 days of inventory for shipping by sea.

Distance and Monthly Sales Forecast Errors

Local Market Remote Market

Mean 30 day forecast error 12% 22%

Mean 90 day forecast error 38 45

Page 6: Are Lean Production and Global Sourcing Compatible? Just-in-time Shipping times Freight costs Inventory levels 30 days of inventory for shipping by sea.

Solutions• Frequent visits to suppliers

• Build in domestic plant first, then outsource

• Teleconferences

• Incorporate DFM rules into CAD

• DFM and TQM are more feasible than JIT and low inventory