![Page 1: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/1.jpg)
Are contractors ready to build a 21th century railway on
Scandinavian soil?
2013-04-10 | Nicholas Lusack, Aarsleff
![Page 2: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/2.jpg)
CONTENTS BUILDABILITY
- BACKGROUND
- GEOLOGY AND GEOMETRY
- RISKS
- BRIDGE vs CONVENTIONAL RAILWAY
- LOGISTICS and LEAN PRODUCTION
- CONCLUSION
![Page 3: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/3.jpg)
BACKGROUND ECONOMIC BENEFITS
Project
Client
Floire Nathanael Daub
The Scandinavian 8 million City
Reinertsen Sverige AB:
Nicholas Lusack
Fredrik Karlsson
Stefan Krii
Anna Olsson
Steer Davies Gleave:
Charles Russell
Favorit Consult Floda:
Elke Rosiers
![Page 4: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/4.jpg)
PER AARSLEFF A/S
![Page 5: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/5.jpg)
GEOLOGY AND GEOMETRY RECENT EXPERIENCE
![Page 6: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/6.jpg)
CLAY AND HARD ROCK FORMATIONS PERPENDICULAR RIDGES AND VALLEYS
![Page 7: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/7.jpg)
CLAY AND HARD ROCK FORMATIONS ALONG RIDGES AND VALLEYS
![Page 8: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/8.jpg)
Sidefod
http:/RISK STABILITY Scene 1 from the quick clay landslide in Rissa 1978 – YouTube
![Page 9: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/9.jpg)
IMPACT
Structural damages and limitations i.e.
• Embankment deformation
• Train vibrations
• Vibrations in buildings and other structures
• Deformations in other structural foundations
• Speed limitations (230 km/h)
RISK WAVES AND VIBRATIONS
![Page 10: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/10.jpg)
Sidefod
http:/RISK SETTLEMENTS (differential)
![Page 11: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/11.jpg)
Slide 11
HARD ROCKS OBSTACLE AND RESOURCE
![Page 12: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/12.jpg)
HIGHWAY E6 EMBANKMENT
• PILED EMBANKMENT
• LENGTH 180 m
• HEIGHT 12 – 16 m
• CREST WIDTH 22 m
• WIDTH AT TOE 65 M
• REINFORCED WITH 58 000 m
PILES
• COST OF INSTALLED PILES 22
MILLION SEK (1998)
• APPROXIMATED TOTAL COST
50+ MSEK
• EQUALS 2.8 BILLION SEK / 10KM
GROUND WORKS EMBANKMENTS AND CUTTINGS
![Page 13: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/13.jpg)
Slide 13
GIANT LEAP HSR vs CONVENTIONAL RAILWAY
![Page 14: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/14.jpg)
Dias 14
LOGISTICS UNCONVENTIONAL METHODS
![Page 15: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/15.jpg)
Slide 15
PRODUCTION INDUSTRIAL
![Page 16: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/16.jpg)
PILED BRIDGE FOUNDATIONS BENEFITS
• LESS INVASIVE
• REDUCED LAND CLAIM
• NO SETTLEMENTS (DIFFERENTIAL)
• CONTROLLED STABILITY
• PRECAST MATERIALS ENHANCES LEAN PRODUCTION
• OTHER BENEFITS SUCH AS SNOW DRIFT, NO BARRIER ETC.
![Page 17: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/17.jpg)
Are contractors ready to build a 21th century railway on
Scandinavian soil?
![Page 18: Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik,](https://reader035.fdocuments.in/reader035/viewer/2022070307/551a83ad550346761a8b51b7/html5/thumbnails/18.jpg)
Are contractors ready to build a 21th century railway on
Scandinavian soil?
Yes, I believe we are.