1 High-containment Laboratory Design & Construction Part Two Architectural Detailing and Construction Issues Presented by: Gary Zackowitz, R.A. Harvard School of Public Health Center for Continuing Professional Education July 14 - 25, 2008 Boston, Massachusetts Goals of This Course Understanding Containment The “containment barrier” Bio-safety Level comparison Components, Details, Systems Methods and materials Focus Issues Renovation for Containment Challenges in developing countries Maintaining Construction Quality Architectural Detailing and Architectural Detailing and Construction Issues Construction Issues

Transcript of Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design &...

Page 1: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

1

High-containment LaboratoryDesign & Construction

Part Two – Architectural Detailing and Construction Issues

Presented by:Gary Zackowitz, R.A.

Harvard School of Public Health Center for Continuing Professional EducationJuly 14 - 25, 2008 Boston, Massachusetts

Goals of This Course

Understanding Containment The “containment barrier”

Bio-safety Level comparison

Components, Details, SystemsMethods and materials

Focus IssuesRenovation for Containment

Challenges in developing countries

Maintaining Construction Quality

Architectural Detailing and Architectural Detailing and Construction IssuesConstruction Issues

Page 2: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

2

Goals of This CourseUnderstanding Major Components

Be able to make reasonable choices

Recognize good (and bad) work

Identify Potential Issues

Be an active member of the “Team”

Architectural Detailing and Architectural Detailing and Construction IssuesConstruction Issues

Submarine ComparisonContinuous Barrier

Complexity

Penetrations

Functionality

Understanding ContainmentUnderstanding Containment

Page 3: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

3

Continuous Barrier

Understanding ContainmentUnderstanding Containment

Complexity

Understanding ContainmentUnderstanding Containment

Page 4: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

4

Penetrations

Understanding ContainmentUnderstanding Containment

Functionality

Understanding ContainmentUnderstanding Containment

Page 5: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

5

Bio Safety Level ComparisonBSL4 Level Requirements

Specific Engineering Criteria to mitigate risk

BSL3 Level Requirements

Open to more interpretation and possible solutions

Allows SOPs to compensate for lack of Engineering solution

BSL3 + (Enhanced)

Not an official designation

Employs additional enhancement to meet identified risks/criteria

BSL3 Ag

Understanding ContainmentUnderstanding Containment

Conflicting Requirements and Interpretation

Understanding ContainmentUnderstanding Containment

BMBL a. Laboratory Personnel must be able to verify directional air flow. A visual monitoring device which confirms directional air flow must be provided at the laboratory entry. Audible alarms should be considered to notify personnel of air flow disruption.

Page 6: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

6

Components, Details, SystemsComponents, Details, SystemsBSLBSL--3 / ABSL3 / ABSL--3 Architectural Detailing3 Architectural Detailing

Sanitary, monolithic surfaces

Caulked joints

Durable materials & finishes

Resistant to disinfectants

Impact protection

Water / moisture resistant

Vermin / pest resistance

BSLBSL--3 / ABSL3 / ABSL--3 Partitions & Finishes3 Partitions & Finishes

Page 7: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

7

Concrete Masonry Units (CMU)

ABSL-3 masonry partitions

Joint tooling

Grout filled door frames

Quality control for imbedded devices

Finishing Challenges

BSLBSL--3 / ABSL3 / ABSL--3 Partitions3 Partitions

Gypsum Wall Board (GWB)

BSL-3 gypsum wall board partitions

Abuse-resistant GWB, 20 ga. studs

Blocking and support

Wall protection

Security reinforcement may be required

BSLBSL--3 / ABSL3 / ABSL--3 Partitions3 Partitions

Page 8: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

8

Fiber Reinforced Plastic (FRP)

BSL-3 or ABSL-3 with proper protection

Composite panels vs. sheet material

Joint treatment

Sealant compatibility

More expensive option

BSLBSL--3 / ABSL3 / ABSL--3 Partitions3 Partitions

Wall Protection

Railings

Curbs

Blocking and support

Heights

BSLBSL--3 / ABSL3 / ABSL--3 Partitions3 Partitions

Page 9: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

9

BSLBSL--3 / ABSL3 / ABSL--3 Ceilings3 Ceilings

Suspended GWB ceiling construction

FRP Grid and panel systems

Locking Tiles

Access above ceiling

BSLBSL--3 / ABSL3 / ABSL--3 Finishes3 Finishes

Qualities

Durable

Resistant to disinfectants

Choices

Polymer coating systems

Fiber reinforced systems

Glove testing

Page 10: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

10

BSLBSL--3 / ABSL3 / ABSL--3 Floors3 Floors

Monolithic (including base)Resistance to disinfectantsEpoxy resin systems (ABSL-3)Seamless vinyl systems (BSL-3/BSL-2)Slip resistanceSubstrate preparationMoisture testing and waterproof coatings

BSLBSL--3 / ABSL3 / ABSL--3 Floors3 Floors

Base Detailing

Page 11: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

11

BSLBSL--3 / ABSL3 / ABSL--3 Doors, Windows & Hardware3 Doors, Windows & Hardware

Stainless steel or FRP construction (ABSL-3)

Hollow Metal Seamless construction

Grouted frames (in CMU)

Tight-fitting

Electronic hardware provisions

Sealed windows

BSLBSL--3 / ABSL3 / ABSL--3 Doors, Windows & Hardware3 Doors, Windows & Hardware

Details

Page 12: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

12

BSLBSL--3 / ABSL3 / ABSL--3 Doors, Windows & Hardware3 Doors, Windows & Hardware

HardwareHas to be selected to meet required use

BSLBSL--3 / ABSL3 / ABSL--3 Access Panels3 Access Panels

Avoid access panels within containment

Gasketed vs. gas-tight

Hinge design

Stainless steel preferred

Page 13: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

13

Simple design and accessibility for sanitation and decontamination

Suspended or mobile preferred

No sharp edges or rough surfaces

No void areas or inaccessible slots (e.g. shelving standards)

Durable finish resistant to disinfectants

Smooth, water-resistant counter tops (epoxy, stainless steel, phenolic) – no undercoatings

BSLBSL--3 / ABSL3 / ABSL--3 Casework3 Casework

BSLBSL--3 / ABSL3 / ABSL--3 Casework3 Casework

Page 14: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

14

BSLBSL--3 / ABSL3 / ABSL--3 Barrier Penetrations3 Barrier Penetrations

BSLBSL--3 / ABSL3 / ABSL--3 Barrier Penetrations3 Barrier Penetrations

General Requirements

Support of penetrating item or device

Clean, hard surfaces to seal against

Space for sealant

Use of proper sealant

Cupped escutcheons that obscure penetration not recommended

Consolidate construction details on architectural drawing(s)

Page 15: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

15

BSLBSL--3 / ABSL3 / ABSL--3 Barrier Penetrations3 Barrier Penetrations

BSLBSL--3 / ABSL3 / ABSL--3 Barrier Penetrations3 Barrier Penetrations

Page 16: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

16

BSLBSL--3 / ABSL3 / ABSL--3 Barrier Penetrations3 Barrier Penetrations

BSLBSL--3 / ABSL3 / ABSL--3 Barrier Penetrations3 Barrier Penetrations

Page 17: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

17

BSLBSL--3 / ABSL3 / ABSL--3 Barrier Penetrations3 Barrier Penetrations

Recessed Eyewash

BSLBSL--3 / ABSL3 / ABSL--3 Barrier Penetrations3 Barrier Penetrations

Page 18: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

18

BSLBSL--3 / ABSL3 / ABSL--3 Barrier Penetrations3 Barrier Penetrations

BSLBSL--3 / ABSL3 / ABSL--3 Sealants3 Sealants

NIH sealant matrix

Paintable vs. non-paintable sealants

Apply AFTER finish coatings are installed

Sealant detailing is important

MOCK UP detailed solutions

Workmanship is important

Sealant scheduleSeams and jointsPenetrationsJuncture between dissimilar materialsGaps too small to access for cleaning

Page 19: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

19

BSLBSL--3 / ABSL3 / ABSL--3 Sealants3 Sealants

BSLBSL--3 / ABSL3 / ABSL--3 Sealants3 Sealants

Neatness Counts!!Neatness Counts!!

Page 20: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

20

BSLBSL--3 / ABSL3 / ABSL--3 Equipment3 Equipment

Sterilization Equipment

Autoclaves

Tissue digestors

Bioseals

Capture hoods

Gas and vapor decontamination systems

FormaldehydeVHPChlorine dioxide

Require proven test results and efficacy testing

BSLBSL--3 / ABSL3 / ABSL--3 Equipment3 Equipment

Bioseals

For all pass through equipment

Factory testing of equipment flange

Page 21: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

21

BSLBSL--3 / ABSL3 / ABSL--3 Equipment3 Equipment

Bioseals

Special Details

Stainless Steel Barrier Panels

BSLBSL--3 / ABSL3 / ABSL--3 Equipment3 Equipment

Bioseals

Challenges in Gyp Board

Page 22: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

22

BSLBSL--3 / ABSL3 / ABSL--3 Equipment3 Equipment

BSLBSL--3 / ABSL3 / ABSL--3 Equipment3 Equipment

Containment EquipmentClass II biosafety cabinetsClass III biosafety cabinetsPass boxesDunk tanksNecropsy equipment

Page 23: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

23

BSLBSL--3 / ABSL3 / ABSL--3 Equipment3 Equipment

Equipment EvaluationAppropriate UseAppropriate LocationAccessories

Components, Details, SystemsComponents, Details, SystemsBSLBSL-- 4 / ABSL4 / ABSL-- 4 Architectural Detailing4 Architectural Detailing

Page 24: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

24

Sanitary, monolithic surfaces

Durable materials and finishes

High-build finishes

Resistant to disinfectants

Impact protection

Water / moisture resistant

Vermin / pest resistance

Air pressure resistant

BSLBSL-- 4 / ABSL4 / ABSL-- 4 Partitions & Finishes4 Partitions & Finishes

Reinforced Concrete

Imbedded utility pathways & penetrations

Ultra-critical mix & curing procedures

Sandblasted to ensure finish adhesion

Pressure resistant construction

BSLBSL-- 4 / ABSL4 / ABSL-- 4 Construction & Finishes4 Construction & Finishes

Page 25: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

25

BSLBSL-- 4 / ABSL4 / ABSL-- 4 Penetrations and Imbeds4 Penetrations and Imbeds

Steel

Used selectively in USA

Offers flexibility and accuracy for equipment / barrier interface

Can be adapted later in the process

BSLBSL-- 4 / ABSL4 / ABSL-- 4 Construction & Finishes4 Construction & Finishes

Page 26: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

26

BSLBSL-- 4 / ABSL4 / ABSL-- 4 Construction & Finishes4 Construction & Finishes

Air Pressure Resistant (APR) doors

Pneumatic and mechanical

BSLBSL-- 4 / ABSL4 / ABSL-- 4 Doors & Hardware4 Doors & Hardware

Page 27: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

27

APR Door Complexity

BSLBSL-- 4 / ABSL4 / ABSL-- 4 Doors & Hardware4 Doors & Hardware

Simple design & accessible for sanitation and decontamination

Stand off at walls for sanitation and decontamination

Suspended, mobile, or Freestanding tables

No sharp edges or rough surfaces

No void areas or inaccessible slots (e.g. shelving standards)

Durable finish resistant to disinfectants

Smooth, water-resistant counter tops (epoxy, stainless steel, phenolic) – no undercoatings

BSLBSL-- 4 / ABSL4 / ABSL-- 4 Casework4 Casework

Page 28: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

28

Breathing air systems

BSLBSL-- 4 / ABSL4 / ABSL-- 4 Special Features4 Special Features

Chemical decontamination showers

BSLBSL-- 4 / ABSL4 / ABSL-- 4 Special Features4 Special Features

Page 29: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

29

Effluent decontamination systems

Double walled containment pipe

BSLBSL-- 4 / ABSL4 / ABSL-- 4 Special Features4 Special Features

Focus IssuesFocus Issues

-- Renovation for ContainmentRenovation for Containment

-- Challenges in Developing CountriesChallenges in Developing Countries

-- Maintaining Construction QualityMaintaining Construction Quality

Page 30: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

30

Renovation For ContainmentRenovation For Containment

How does it compare to new construction

Client expectations = new constructionDesign criteria = new constructionBiosafety criteria = new constructionSecurity requirements = new constructionDesign objectives = new constructionSF costs often > new constructionConstraints often > new construction

Renovation For ContainmentRenovation For Containment

Limited Design Flexibility

Creating the Barrier

Accommodating Special Features

Inappropriate Utility Systems

Demanding capacities for Biocontainment

Poor Maintenance Accessibility

Difficult to keep maintenance out of containment

Renovation Issues Renovation Issues Effecting ContainmentEffecting Containment

Page 31: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

31

Renovation For ContainmentRenovation For Containment

Restrictive Site Conditions

Impact on/to adjoining spaces

Inadequate Structure

Inadequate Headroom

Limitations on equipment selection

Inexperienced Designers & Contractors

Reluctant Neighbors

Additional Scrutiny for a Biocontainment project

Renovation Issues Effecting Renovation Issues Effecting ContainmentContainment……Cont.Cont.

Local MaterialsEvaluate use of local materials

ExpertiseDesign Specialties

Construction Trades

EquipmentAvailability – Long lead

Follow-up Service

The Modular OptionCost vs. Time

Challenges in Developing Countries Challenges in Developing Countries

Page 32: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

32

Local MaterialsEvaluate use of local materials for containment

Field fabricated vs. catalog items

First cost vs. maintenance labor costs

Challenges in Developing Countries Challenges in Developing Countries

ExpertiseCapable design and construction services available locally

Need to supplement with outside expertise in specialized areas

Challenges in Developing Countries Challenges in Developing Countries

Page 33: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

33

Equipment

Challenges in Developing Countries Challenges in Developing Countries

Laboratory Equipment

Equipment

Challenges in Developing Countries Challenges in Developing Countries

Vivarium Specialties

Page 34: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

34

The Modular Option

Challenges in Developing Countries Challenges in Developing Countries

Full Turn Key Package

Time Savings

Quality control

Involve Local labor

Commissioning and certification

Maintaining Construction QualityMaintaining Construction Quality

Field quality control – mock ups

Coordination DrawingsLarge Scale or 3D

Value Engineering

Proven Technology

Neatness Counts

Construction Dos and Don'ts

Page 35: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

35

Field quality control –Mock ups

Adequate Scope

In Budget and Schedule

Timing – Before actual construction

Maintaining Construction QualityMaintaining Construction Quality

Field quality control –Mock ups

Maintaining Construction QualityMaintaining Construction Quality

Page 36: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

36

Maintaining Construction QualityMaintaining Construction Quality

Coordination DrawingsLarge Scale or 3D

“Butterfly Drawings”

Combine All Trades

Confirm Access

Value EngineeringTeam Review

Consider project scale

Consider long-term effect

Putting back in is costly!

Maintaining Construction QualityMaintaining Construction Quality

Page 37: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

37

Proven TechnologiesSafety First!

Contractor’s Abilities

Project Scrutiny

Maintaining Construction QualityMaintaining Construction Quality

Maintaining Construction QualityMaintaining Construction Quality

Utility PipingUtility Piping

Neatness CountsNeatness Counts

Page 38: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

38

Welded Stainless SteelWelded Stainless Steel

Maintaining Construction QualityMaintaining Construction Quality

Neatness CountsNeatness Counts

Neatness counts!Neatness counts!

Maintaining Construction QualityMaintaining Construction Quality

Interstitial DeckInterstitial Deck

Page 39: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

39

Neatness CountsNeatness Counts

Maintaining Construction QualityMaintaining Construction Quality

Dust Collecting in HEPADust Collecting in HEPA Equipment ProtectedEquipment Protected

Does it Look right?Does it Look right?

Maintaining Construction QualityMaintaining Construction Quality

Deformed DuctworkDeformed Ductwork Different Box typesDifferent Box types

Page 40: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

40

Does it Look right?Does it Look right?

Maintaining Construction QualityMaintaining Construction Quality

Duct tape Duct tape BiosealBioseal Pipe through a DuctPipe through a Duct

Maintaining Construction QualityMaintaining Construction Quality

Page 41: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

41

DosDosGet BSL experienced contractor or have contractor visit similar jobs

Have the right people on the job review shop drawings and submittals

Construct a mock up before its too late-for ALL finishes and penetrations.

Check equipment access and delivery paths

Protection of equipment and finishes during construction

Check work quality thoroughly and often

Commissioning (barrier integrity, security hardware, door interlocks, equipment)

Maintaining Construction QualityMaintaining Construction Quality

Don'ts Don'ts

Burden the future operation of the building by accepting VE items that may not pay off in the long run

Skimp on the preparation of substrate for high performance coatings.

Have the sealants and finishes done by the wrong sub contractors

Forget the users during the evaluation of any construction issues that may impact them

Allow changes to the program after construction has started.

-- [email protected]@niaid.nih.gov

Part Two – Architectural Detailing and Construction

Questions?Questions?

Page 42: Architectural Detailing and Construction Issues · 1 High-containment Laboratory Design & Construction Part Two – Architectural Detailing and Construction Issues Presented by: Gary

42

AcknowledgementsAcknowledgements

Thanks to Thanks to Uri Yokel, Uri Yokel, R.A. with LSY Architects for contributing R.A. with LSY Architects for contributing material and support for this lecture.material and support for this lecture.