    UNITED ARCHITECTS OF THE PHILIPPINES

    ARCHITECTSGUIDELINES

    STANDARDS OF

    PROFESSIONAL PRACTICE

    METHODSOF COMPENSATION

    & SCHEDULE OF FEESUAP DOC. 208-A

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    2/63

    ARCHITECTS

    GUIDELINESSTANDARDS OF

    PROFESSIONAL PRACTICE

    METHODS OF COMPENSATION

    & SCHEDULE OF FEES

    (UAP DOC. 208-A)

    ON THE FOLLOWING ARCHITECTURAL SERVICES

    (1)Pre-Design Services (UAP Doc. 201)

    (2) Regular Design Services (UAP Doc. 202)

    (3) Specialized Architectural Services (UAP Doc. 203)

    (4) Full-Time Supervision (UAP Doc. 204-A)

    (5) Construction Management (UAP Doc. 204-B)

    (6) Post-Construction Services (UAP Doc. 205)

    (7) Comprehensive Architectural (UAP Doc. 206)

    Services(8) Design-Build Services (UAP Doc. 207)

    (9) Architectural Design Competition (UAP Doc. 208)

    (10) Professional Architectural (UAP Doc. 209)

    Consulting Services

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    3/63

    First EditionPhilippine Copyright @ 2012 by theUnited Architects of the Philippines, Inc.

    All Rights ReservedNo part of this book may not be reproduced, stored in a retrieval system, or transmitted in any formor by any means, electronic or mechanical, including photocopying or recording, without writtenpermission from the publisher. All should be

    addressed to

    United Architects of the Philippines, Inc.53 Scout Rallos St. Brgy. LagingHanda, Diliman, Quezon City

    1103 Philippineswww.united-architects.org

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    4/63

    CONTENTS

    The Virtues of an ArchitectUAP-IAPOA Purpose and ObjectivesCode of EthicsPRBoA ResolutionPrefaceAcknowledgementsForewordArcht. Rozanno C. Rosal, FUAPUAP National President 2012- 2013

    Introduction

    Rule I Title, Rationale, Objectives, Policy Statement

    and Definition of Terms

    Section 1: Title

    Section 2: Rationale

    Section 3: Objectives

    Section 4: Policy Statement

    Section 5: Definition of Terms

    Rule IIMethods of CompensationSection 1: Criteria

    Section 2: Methods of Compensation

    Rule III Schedule of Fees onTypes of Architectural Services

    (Matrix of Services)

    Section 1: Pre-Design Services (UAPDoc.201)

    Section 2: Regular Design Services (UAPDoc.202)

    Section 3: Specialized Architectural Services (UAP Doc.203)

    Section 4: Full-Time Supervision (UAP Doc.204-A)Section 6: Construction Management (UAP Doc. 204-B)

    Section 5: Post-Construction Services (UAPDoc.205)

    Section 7: Comprehensive Architectural (UAP Doc.206)

    Services

    Section 8: Design-Build Services (UAPDoc.207)

    Section 9: Architectural Design Competition (UAP Doc. 208)

    ection 10: Professional Architectural (UAP Doc.209)

    Consulting Services

    Rule IV - Regulating and Implementing Body

    Section 1: Regulating Board

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    5/63

    Rule V- General ProvisionsSection 1: Criteria for Establishing Methods of Compensation

    Section 2: Collection of Professional Fees

    Section 3: Bank: Collecting Agent

    Section 4: Interest due on Late Payment of Fees

    Section 5: Payment Schedules

    Section 6: Clients Responsibilities

    Section 7: Other Condition of Services

    Section 8: Compliance to RA 9266

    Section 9: Compliance to Architectural Practice and Other UAP

    Documents

    Section 10: Professional Responsibility and Civil Liability

    Section 11: Arbitration Clause

    Section 12: Penalty Clause and sanction

    Section 13: Effectivity

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    6/63

    THE VIRTUES OF AN ARCHITECT

    May the Architect be high-minded;

    not arrogant, but faithful;

    just, and easy to deal with,

    without avarice;

    Not let his mind be occupied

    in receiving gifts,

    but let him preserve his good name

    with dignity

    Marcus Vitruvius Pollio

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    7/63

    UAP-IAPOA

    Purpose and Objectives

    As the Integrated and Accredited Professional Organization of Architects (IAPOA)

    under the Architecture Act of 2004 (R.A. 9266), the United Architects of the Philippines

    (UAP) has the following purpose and objectives:

    a) To cooperate with the Board of Architecture (BOA), Professional RegulationCommission (PRC) and other government agencies in discharging itsfunctions, duties and responsibilities as the Integrated and AccreditedProfessional Organization of Architects(IAPOA) as follows:

    1) Nomination to the vacant positions to the Board of Architecture (BOA);2) Responsibility of preparing the program of Continuing Professional

    Development (CPD);3) Endorsement of practice of foreign nationals to be issued temporary

    special permit;4) Recommendation of compliance with liability insurance under a temporary

    special permit;5) Monitoring compliance and endorsing to/filing a complaint with the Board

    of Architecture (BOA) and /or Professional Regulation Commission (PRC)for violation of the R.A. 9266 and its Implementing Rules and Regulations(IRR), code of ethics, standards of professional practice and other policiesof the Board and of the Commission and with other agencies for violationsof other relevant laws, regulations and the like; and

    6) Some other functions, duties and responsibilities as may be prescribed bythe Board of Architecture (BOA).

    b) To establish an appropriate organizational structure that will serve best theinterest of its individual members and providing for among others ademocratic process of election;

    c) To ensure good governance in all matters pertaining to the organization;

    d) To ensure active participation of all PRC-BOA registered architects in thisIntegrated and Accredited Professional Organization of architects (IAPOA);

    e) To establish and promote the highest standards of ethical conduct andprofessional excellence in the practice and service of architecture, throughstrict adherence with the laws and codes that protect and govern it;

    f) To maintain the highest standards of architectural education and practice,through the conduct research in architecture and architecture relatedsubjects for the academic curricula in architecture and the continuingprofessional development program;

    g) To cooperate and coordinate with other local/national and internationalorganizations in the field of architecture, environmental design and other fieldof arts, science and technology to ensure participation of UAP globalconcerns; and

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    8/63

    h) To cooperate and coordinate with other allied professions, trade and industryin developing progressive ideas in architecture and environmental concernsas well as their practical application for the welfare of the community andcountry.

    UAP Articles of Incorporation as amended and improved by SEC on Jan. 12,

    2006.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    9/63

    CODE OF ETHICS

    I shall work with the general objective that my duty is not only to myself, but also to

    my country and God.I shall uphold the ideas and follow the norms of conduct of a noble profession and

    endlessly endeavour to further its just ends.

    I shall humbly seek success not through the measure of solicited personal publicity, but

    by industrious application to my work, strive to merit a reputation for quality of service

    and for fair dealing.

    I shall ask from all, fair remuneration for my service while respecting and asking no

    profits from any other source.

    I shall hold the interest of my Client over and above any self-interest for financial

    returns.

    I shall exercise my professional prerogatives always with impartiality and

    disinterestedness.

    I shall avoid any private business investments or venture which may tend to influence

    my professional judgment to the detriment of the trust placed upon me.

    I shall inspire by my behaviour the loyalty of my associates and subordinates and take

    upon me the mentorship of the aspirants to the profession.

    I shall confine my criticisms and praises within constructive and inspirational limits and

    never resort to these means to further malicious motives.

    I shall dedicated myself to the pursuits of creative endeavour towards the goal of

    enlightened Art and Science, generously sharing with colleagues, friends and strangers

    alike the benefits of my experience and expertise.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    10/63

    PREFACE

    On October 25, 1965, the Architects National Code was approved and adopted by the

    three (3) architectural organizations existing at that time, namely; the Philippine Institute

    of Architects (PIA), the League of Philippine Architects (LPA) and the Association ofPhilippine Government Architects (APGA).

    On January 15, 1975, the three (3) architectural organizations were integrated intoone

    association called the United Architects of the Philippines (UAP).

    The UAP, in response to the need to review and update the documents in order to be

    more responsive to the practice of the Profession in the Philippines prepared and

    divided the Architects National Code into two divisions namely:

    1. Code of Ethical Conductand

    2. Standards of Professional Practice

    On July 21, 1979, the Architects National Code was approved by the UAP National

    Board of Directors and on September 24, 1979, the Professional Regulation

    Commission (PRC) through the Board of Architecture (BOA), adopted the Architects

    National Code as part of the Rules and Regulations to which all practicing architects

    shall conform in the performance of their duties and obligations.

    After 28 years on August 18, 2007, the UAP National Board of Directors headed by

    Archt. Medeliano T. Roldan, Jr., FUAP then UAP National Presidentpassed a Board

    Resolution approving the UAP Proposal No.04 with the intent of creating a Special

    Committee to handle all matters relating to the compilation, review, evaluation,

    amendments and revision of the Documents on Standards on Professional Practice

    and related UAP Documents including Guidelines on Corporate Practice of

    Architecture. Subsequently on August 21, 2007, Executive Order No. 0708-006 was

    passed creating and establishing a Special Committee on Standards of Professional

    Practice to comply with the provisions of Republic Act 9266 (the Architecture Act of

    2004) and Batas PambansaBlg. 68 (the Corporate Code of the Philippines) and other

    related rules, regulations and codes, and to respond to the increasing public and usersdemand, the evaluation of new standards of regulated professional practice, the

    advancement of technology and the enactment of new laws.

    The Ad-Hoc Committees on Standards of Professional Practice during one of their

    meetings unanimously agreed to consolidate all the Architects Compensations and

    Schedule of Fees into one (1) document, then UAP National President Archt. Ana S.

    Mangalino-Ling, FUAP, Apec Architect mandated and tasked the committee headed by

    Archt. Norberto M. Nuke, FUAP, LIKHA, Apec Architect to prepare the document to be

    presented to the UAP National Board of Directors for approval.

    The title ARCHITECTS GUIDELINES on Standards of Professional Practice,

    METHODS OF COMPENSATION AND SCHEDULE OF FEES UAP DOC. 208-A was

    adopted from the documents on Standards of Professional Practice, the 1979 UAP

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    11/63

    DOC. 208-b Methods of Compensation and the consolidation on Methods of

    Compensation and Schedule of Fees on all types of Architectural Services. The new

    version includes a comprehensive Methods of Compensation and Schedule of Fees as

    the practice of architecture has become more complex and intricate to meet the

    challenges in determining the right compensation as the Architect services increases.

    To effectively respond to the present needs and demands of the profession, the

    Committee had prepared the ARCHITECTS GUIDELINES, defining the rules and

    regulations to be followed in implementing the provisions on METHODS OF

    COMPENSATION AND SCHEDULE OF FEES UAP DOC. 208-A.

    The UAP National Board of Directors in their last regular meeting held on June 26,

    2010 at UAP National Headquarters in Quezon City, approved Board Resolution 09-10

    No. 7-16 for adoption the ARCHITECTS GUIDELINES on Standards of Professional

    Practice, METHODS OF COMPENSATION AND SCHEDULE OF FEES, UAP DOC.

    208-A.

    The Architects Guidelines will be the official IAPOA issuance to be observed by all

    IAPOA members

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    12/63

    ACKNOWLEDGEMENTS

    The Committee on Standards of Professional Practice, METHODS OF COMPENSATION & SCHEDULEOF FEES UAP DOC. 208-A would like to acknowledge the following persons for their contribution inmaking the ARCHITECTS GUIDELINES possible:

    Committee on Professional Practice 1979Chairman Felipe M. Mendoza, FUAP, LIKHA, Apec ArchitectVice Chairman Froilan L. Hong, CUAP, Apec ArchitectMembers Otilio A. Arellano, FUAP

    Cesar V. Canchela, FUAP, LIKHA, Apec ArchitectAntonio S. Dimalanta, FUAPCristina R. Fugoso, FUAPGeronimo V. Manahan, CUAP, LIKHA, Apec ArchitectNorberto M. Nuke, FUAP, LIKHA, Apec ArchitectRebecca V. Tobia, CUAP

    Professional Regulation Commission 1979

    Commissioner Eric C. Nubla, FUAPAss.Comm. Atty. NumerianoTanopo Jr.

    PRC-Board of Architecture 1979Chairman Anastacio R. Bernal, FUAPMembers Norberto M. Nuke, FUAP, LIKHA, Apec Architect

    Cresenciano C. De Castro, FUAP

    UAP Document 202 Group 2004Chairperson Corazon F. Tandoc, FUAPMembers Maria Elena C. Cayanan, FUAP

    Daniel C. Go, FUAP, Apec ArchitectJose Siao Ling, FUAP, Apec Architect

    Raul R. Locsin, FUAPSimeon C. Tan, FUAPDomingo LL. Tablizo, Jr. FUAP

    Committee on Standards of Professional Practice (SPP) 2005-2007Honorary Chairman Edric Marco C. Florentino, FUAP, Apec ArchitectChairman ProsperidadC. Luis, FUAP, Apec ArchitectMembers Norberto M. Nuke, FUAP, LIKHA, Apec Architect

    Edilberto F. Florentino, FUAP, LIKHA, Apec ArchitectFroilan L. Hong, FUAP, Apec ArchitectYolanda D. Reyes FUAP, Apec Architect, HAIAEmmanuel P. Cuntapay, FUAPMaria Cristina V. Turalba, FUAPCorazon F. Tandoc, FUAPMaria Elena C. Cayanan, FUAPDaniel C. Go, FUAP, Apec ArchitectJose Siao Ling, FUAP, Apec ArchitectAngeline T. Chua Chiaco, FUAP, Apec Architect

    PRC- Board of Architecture -Chairman EugeneG.Gan, FUAPMembers Fernando L. Santos, FUAP

    Miguel R. Caluza, FUAP

    UAP National Board of Directors 2009 2010Executive Committee

    National President Ana S. Mangalino-Ling, FUAP, Apec ArchitectNational Executive Vice-President Michael T. Ang, FUAP, Apec ArchitectVice President Area A EdithaP.De Vera, UAP

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    13/63

    Vice President Area B Domingo LL. Tablizo, Jr. FUAPVice President Area C Guillermo H. Hisancha, FUAPVice President Area D JemmaSarol-Semana, UAPSecretary General Gil C. Evasco, UAPNational Treasurer Amado E. Tandoc, Jr., UAPNational Auditor Ernesto D. Tianco, UAPImmediate Past National President Medeliano T. Roldan, Jr., FUAPChancellor, College of Fellows Noralita B. Cruz-Dumlao, FUAP

    Regional District DirectorsDistrict Director A1a Reymundo L. Florentino, UAPDistrict Director A1b Dominador P. Macatunggal, UAPDistrict Director A2aGerman F. Ramirez, Jr., UAPDistrict Director A2bMelencio D. Manalo, UAPDistrict Director A3 Richard M. Garcia, FUAPDistrict Director A4 Leonardo M. Antonio, UAPDistrict Director A5 Gerardo P. Yatco, UAPDistrict Director B1 Bernardo R. Laurena, FUAPDistrict Director B2 AnabelR.Carangan-Velencia, UAPDistrict Director B3 Wayne Matthew J. Jaro, UAP

    District Director B4 Warren P. Quiambao, UAPDistrict Director B5 Jose B. Malazarte, UAPDistrict Director C1 Alan G. Choachuy, UAPDistrict Director C2 Jose Glenn G. De Guzman, UAPDistrict Director C3 Paul L. Conde, UAPDistrict Director C4 Ramon Francisco M. Teruel, UAPDistrict Director D1 William C. Yong, UAPDistrict Director D2 Jose Luisito C. Millevo, UAPDistrict Director D3 Richard J. Tan, UAPDistrict Director D4 Trinidad G. Saligumba

    Executive DirectorsCommission on Professional Practice Daniel C. Go, FUAP

    Commission on Education Gloria B. Teodoro, FUAPCommission on Governmental Corazon C. Adivoso, UAP& External AffairsCommission on Internal Affairs Pamela N. Amador, FUAPCenter for Filipino Architecture Robert Benedict C. Hermoso, FUAPProfessional Development Commission Gerald Rey A. Lico, PhD, UAPCommission on Conventions, Roger T. Ong, UAP

    Exhibits & Area Assemblies

    College of Fellows (COF) 2009 2010Chancellor Noralita B. Cruz-Dumlao, FUAPChancellor-Elect Edric Marco C. Florentino, FUAP, Apec ArchitectVice Chancellor Armin B. Sarthou, FUAP

    Scribe Eriberto V. Aguirre, FUAPBursar KaKuen T. Chua, FUAPImmediate Past Chancellor/ Maria Cristina B. Turalba, FUAPMember, Jury of FellowsMember, Jury of Fellows Prosperidad C. Luis, FUAP, Apec ArchitectMember, Jury of Fellows Norberto M. Nuke, FUAP, LIKHA,ApecArchitectMember, Jury of Fellows Yolanda D. Reyes, FUAP, Apec Architect, HAIAMember, Jury of Fellows Corazon F. Tandoc, FUAP

    UAP National Board of Directors 2010-2011Executive CommitteeNational President Ramon S. Mendoza, FUAPNational Executive Vice-President Michael T. Ang, FUAP, Apec Architect

    Vice President Area A Richard M. Garcia, FUAPVice President Area B Rozanno C. Rosal, FUAPVice President Area C Benjamin John A. Alino, UAPVice President Area D JemmaSarol-Semana, UAPSecretary General Rey S. Gabitan, UAP

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    14/63

    National Treasurer Armando Eugene C. De Guzman III, UAPNational Auditor Angelito S. Soriano, UAPImmediate Past National President Ana S. Mangalino-Ling, FUAP, Apec ArchitectChancellor, College of Fellows Edric Marco C. Florentino, FUAP, ApecArchitectRegional District Directors

    District Director A1a Claudio O. Rillera, Jr., UAPDistrict Director A1b Jose P. Gonzaga, UAPDistrict Director A2a Reynaldo DC. Abad, UAPDistrict Director A2b Melencio D. Manalo, UAPDistrict Director A3 Alfred Geoffrey C. Carandang, UAPDistrict Director A4 Donato B. Magcale, UAPDistrict Director A5 Felicisimo A. Tejuco, Jr., UAPDistrict Director B1 Annie Corpuz-Pugeda, UAPDistrict Director B2 Junar P. Tablan, UAPDistrict Director B3 Jaime A. Pua, UAPDistrict Director B4 Jaime A. Patalud, UAPDistrict Director B5 Rommel R. Alanis, UAPDistrict Director C1 Emmanuel Jesus DR. Avila, UAPDistrict Director C2 Gil V. Juesna, Jr., UAP

    District Director C3 Danilo M. Fuentebella, FUAPDistrict Director C4 Rony P. De Juan, UAPDistrict Director D1 Ramonito G. Octaviano, UAPDistrict Director D2 Noel DS.Querijero, UAPDistrict Director D3 Ferdinand A. Dumpa, UAPDistrict Director D4 Trinidad G. Saligumba, UAP

    Executive DirectorsCommission on Professional Practice Bibiano A. Luzante, Jr., FUAPCommission on Education John Joseph T. Hernandez, UAPCommission on Governmental Ma. Benita O. Regala, UAP& External AffairsCommission on Internal Affairs Domingo LL. Tablizo, Jr., FUAP

    Center for Filipino Architecture Gerald Rey A. Lico, PhD, UAPProfessional Development Commission Leah M. Punongbayan-Dela Rosa, UAPCommission on Conventions, Roger T. Ong, UAP

    Exhibits & Area Assemblies

    College of Fellows (COF) 2010-2011Chancellor Edric Marco C. Florentino, FUAP, Apec ArchitectChancellor-Elect Renato L. Punzalan, FUAPVice- Chancellor KaKuen T. Chua, FUAPScribe Eriberto V. Aguirre, FUAPBursar Maria Lisa V. Santos, FUAPImmediate Past Chancellor/ Noralita B. Cruz-Dumlao, FUAPMember- Jury of Fellows

    Member, Jury of Fellows Corazon F. Tandoc, FUAPMember, Jury of Fellows Norberto M. Nuke, FUAP, LIKHA, ApecArchitectMember, Jury of Fellows Prosperidad C. Luis, FUAP, Apec ArchitectMember, Jury of Fellows Ricardo R. Poblete, FUAP

    UAP National Board of Directors 2011 2012Executive CommitteeNational President Ramon S. Mendoza, FUAPNational Executive Vice-President Ma. Benita O. Regala, UAPVice President Area A Melencio D. Manalo, UAPVice President Area B Norman B. Morales, UAPVice President Area C Alan G. Choachuy, UAPVice President Area D Marlo J. Basco, UAP

    Secretary General Rey S. Gabitan, UAPNational Treasurer Armando Eugene C. De Guzman III, UAPNational Auditor Angelito S. Soriano, UAPImmediate Past National President Ana S. Mangalino-Ling, FUAP, Apec ArchitectChancellor, College of Fellows Renato L. Punzalan, FUAP

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    15/63

    Regional District DirectorsDistrict Director A1a Abel S. Navarro, UAPDistrict Director A1b James S. Tuddao, UAPDistrict Director A2a Ma. Teresa V. Gopez, UAPDistrict Director A2b Tony-Kar M. Balde III, UAPDistrict Director A3 Emiterio C. Nolasco, UAPDistrict Director A4 Noel E. Nicolas, UAPDistrict Director A5 Jesus R. Aguinaldo, UAPDistrict Director B1 Serge T. Chua (Unsu), Jr., FUAPDistrict Director B2 Mark Louie M. Soriquez, UAPDistrict Director B3 Rene Richie A. Corcuera,UAPDistrict Director B4 Darwin L. Averion, UAPDistrict Director B5 Nonito V. Manila, UAPDistrict Director C1 Maria Sarah J. Abadia, UAPDistrict Director C2 Roberto T. Aguillon, UAPDistrict Director C3 Edito A. Cumpio, UAPDistrict Director C4 Gil V. Japitana, UAPDistrict Director D1 Maia Rebecca F. Hagad, UAPDistrict Director D2 Raoul L. Quijano, UAP

    District Director D3 Ferdinand L. Dumpa, UAPDistrict Director D4 Bernoven D. Nayal, UAP

    Executive DirectorsCommission on Professional Practice Abelardo E. Firmeza, FUAPCommission on Education John Joseph T. Fernandez, UAPCommission on Governmental Mohammadsarfraz A. Uttoh, UAP& External AffairsCommission on Internal Affairs Antonio A. Valdez, UAPCenter for Filipino Architecture Gerard Rey A. Lico, PhD, UAPProfessional Development Commission Leah M. Punongbayan-dela Rosa, UAPCommission on Conventions, Roger T. Ong, UAP

    Exhibits & Area Assemblies

    College of Fellows (COF) 2011- 2012Chancellor Renato L. Punzalan, FUAPChancellor-Elect Medeliano T. Roldan, Jr. FUAPVice-Chancellor MariaLisa V. Santos, FUAPScribe Miguel M. Carpio, FUAPBursar Domingo LL. Tablizo, FUAPImmediate Past Chancellor/ Edric Marco C. Florentino, FUAP, Apec ArchitectMember- Jury of FellowsMember- Jury of Fellows Edilberto F. Florentino, FUAP, LIKHA, Apec ArchitectMember- Jury of Fellows Maria Cristina V. Turalba, FUAPMember- Jury of Fellows Yolanda David. Reyes, FUAP, Apec Architect, HAIAMember- Jury of Fellows Richeto C. Alcordo, FUAP

    Past UAP National Presidents (Council of Elders)Norberto M. Nuke, FUAP, LIKHA, Apec ArchitectManuel T. Manosa, Jr. FUAP, LIKHA, Apec ArchitectFroilan L. Hong, FUAP, Apec ArchitectAngel R. Lazaro, Jr. FUAP, LIKHA, Apec ArchitectJaime C. Marquez, FUAPRicheto C. Alcordo, FUAPNestor S. Mangio, FUAP, ApecArchirtectEmmanuel P. Cuntapay, FUAPYolanda David. Reyes, FUAP, Apec Architect, HAIAProsperidad C. Luis, FUAP, Apec ArchitectRobert S. Sac, FUAP

    Enrique O. Olonan, FUAPEdric Marco C. Florentino, FUAP, Apec ArchitectMedeliano T. Roldan, Jr. FUAPAnaS. Mangalino-Ling, FUAP, Apec Architect

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    16/63

    Special Committee on Professional Practice 2007 2010Chairman Edric Marco C. Florentino, FUAP, Apec ArchitectMembers Norberto M. Nuke, FUAP, LIKHA, Apec Architect

    Prosperidad C. Luis, FUAP, Apec ArchitectYolanda D. Reyes FUAP, Apec Architect, HAIAMaria Cristina V. Turalba, FUAPEdilberto F. Florentino, FUAP, LIKHA, Apec Architect

    Ana S. Mangalino-Ling, FUAP, Apec ArchitectMichael T. Ang, FUAP, Apec ArchitectGeorge S. Salvan, FUAPArmin B. Sarthou, Jr., FUAPMiguel C. Guerrero III, FUAP, Apec ArchitectLeah F. Ybaez-Martin, UAP

    PRC-Board of Architecture 2008 - 2012Chairman Armando Dominador N. Alli, FUAP, Apec ArchitectMembers Angeline T. Chua Chiaco, FUAP, Apec Architect

    Marietta B. Segovia, UAP

    PRC-Board of Architecture 2012 up to present

    Chairman Rolando L. Cordero, FUAPMembers Angeline T. Chua Chiaco, FUAP, Apec ArchitectMarietta B. Segovia, UAP

    Special Committee on SPP UAP Doc. 208-A 2011 - 2012Renato L. Punzalan, FUAP

    Edilberto F. Florentino, FUAP, LIKHA, Apec ArchitectProsperidad C. Luis, FUAP, Apec ArchitectYolanda D. Reyes, FUAP, Apec Architect, HAIAEdric Marco C. Florentino, FUAP, Apec Architect

    Ana S. Mangalino-Ling, FUAP, Apec ArchitectMichael T. Ang, FUAP

    Guillermo H. Hisancha, FUAP

    Corazon F. Tandoc, FUAPCrisencio V. Benitez, FUAPArmin B. Sarthou, Jr., FUAPSerge T. Chua, Jr., FUAP

    Special thanks to Archt. Prosperidad C. Luis, FUAP, Apec Architect for making this document possible.

    UAP National Secretariat

    Admin. Officer Jason R. Aban

    Compiled and Prepared by:

    Committee on ARCHITECTS GUIDELINES on Standards of Professional Practice, METHODS OF

    COMPENSATION AND SCHEDULE OF FEES, UAP DOC. 208-A

    Norberto M. Nuke, FUAP, LIKHA, Apec ArchitectChairman

    Amado E. Tandoc, Jr., UAP PotencianoC.Estanislao,FUAPMemberMember

    Diogenes A. Barredo, FUAP Maria Lisa V. Santos, FUAPMember Member

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    17/63

    INTRODUCTION

    There are architects all over the Philippines practising in the seventeen (17) regions of

    the country. However, at this point in time, they are uncertain and confused as to what

    standards of fees and what manner of payments would apply to the various types of

    projects they undertake. To complicate the situation, technology has evolved so fast

    that the classification of types of buildings has becomecomplex, and numerous types of

    structures have made their appearance in the planning, design and construction scene,

    which makes the calculation of charges for professional fees more complicated.

    In general, professional fees are project-based, with basic fees computed as a

    percentage of construction cost of materials and labor plus incidentals. However, there

    are various types of projects and various levels of complexity, and so, guidelines for

    computation of professional fees must be produced for such variations in the projects

    undertaken by Architects.

    Thus, the United Architects of the Philippines is publishing this document entitled UAP

    Doc. 208-A: Architects Guidelines on Standards of Professional Practice,

    Methods of Compensation and Schedule of Fees, on how Architects would charge

    their Clients for services rendered, in order to provide a convenient consolidatedreference for the use of Architects. This document consolidates in onereferencethe

    methods of compensation of services found and discussed in the other UAP

    documents.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    18/63

    RULE I

    TITLE, RATIONALE, OBJECTIVES, POLICY STATEMENT AND

    DEFINITION OF TERMS

    SECTION 1: TITLE

    This Document shall be known asARCHITECTSGUIDELINES ONMETHODS

    OF COMPENSATION AND SCHEDULE OF FEES, UAP DOC.208-A (replacing the

    1979 DOC. 208-b)METHODS OF COMPENSATION &THE CONSOLIDATION ON

    METHODS OF COMPENSATION & SCHEDULE OF FEES ON ALL TYPES OFARCHITECTURAL SERVICES.

    SECTION 2: RATIONALE

    2.1 The urgent need to set the parameters on Architects Guidelines on Methods of

    Compensation and Schedule of Fees is paramount to the Architect in the

    practice of his profession. This will standardize the ranges for which the Client

    will compensate an Architect in direct relation to the value of services that the

    Architect provides.

    2.2 The professional competence of the Architect must be well established andadequate to meet the Clients needs and requirements.In order to grow andprogress in his career the Architect must possess the appropriate knowledgeand skills needed to be proactive,he must gained the training, exposure andrelevant experience in order to deliver the project at par to the satisfaction of theClient.

    2.3The purpose of the Architects Guidelines is to complement existing professional

    regulatorylaws governing the practice State-regulated, specifically architectureas governed by R.A. 9266 (The Architecture Act of 2004) and its derivative

    regulations, the Code of Ethical Standard, Standards of Professional Practice

    and other related laws, policies, rules and regulations approved and

    implemented by the Professional Regulation Commission (PRC) and/or other

    concerned government entities. Therefore nothing in the Guidelinesmust unduly

    affect the said laws, policies, rules and regulations, and Architects National

    Code (ANC) specifically Codes of Ethical Conduct and Standards of Professional

    Practice.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    19/63

    SECTION 3: OBJECTIVES

    3.1By law, the Architect must first belicensed and registered by the PRC and UAP-IAPOA respectively. As such, the standards andparameters, to which theArchitect who offer and/or make his services available, are adhered to in order to

    develop and nurture the competencies, credibility and integrity of the Architect inthe practice of his profession.

    3.2 The common practice of the Architect to determine his compensation on aproject-based fee structures were often estimated through the percentage of theproject cost as indicated on theSchedule on Minimum Basic Fees under theRegular Design Services, UAP Doc. 202. However, with the evolvement of newtechnology, the complexity andlarge scale development projects and uniquenessof many building projects, the most common practice is lump sum fee based onthe project cost, complexity and deliverables, and also had led to the use ofseveral trends in calculating compensation for architectural services in order to

    meet changing Client expectations and improve the economic performance ofthe Architect.

    3.3Integrity, good performance and deliveryof the project on time to the satisfaction

    of the Client maintains a long-term Architect-Client relationshipsthat will lead to

    the success of the Architect in the practice of his profession.

    SECTION 4: POLICY STATEMENT

    Architects should perform professional services only when they are qualified by

    education, training and or experience in the specific technical areas involved and duly

    registered by the PRC-BoA.

    Vision

    A National Code for Architects relevant to the times, setting the standards for the

    proper maintenance of ethical and professional conduct in the practice of architecture.

    Mission

    To achieve the desired high degree of professionalism in line with R.A. No.

    9266, to enhance the standards for global competitiveness and to formulate guidelines

    and policies for the protection of life, health and property.

    SECTION 5: DEFINITION OF TERMS

    As used in this UAP DOC. 208-A, the following terms shall be defined as follows:

    1. Cost of Workmeans the total cost of all expenses, which iseither designed,owner supplied items, specified or

    procured by the Architect and/or his SpecialistConsultants for the Client, and that were used orinstalled in the project.

    2. Direct Costs refer to expenses in connection or related to the

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    20/63

    orReimbursableExpenses

    project that may include but not limited to thefollowing:

    a) Salary Costb) Living and travelling expenses of employees,

    partners, and principals when away from the

    home office on business.c) Identifiable communication expenses, such as

    long-distance telephone, telegraph, internet,short messaging system (SMS), cable, expresscharge, postage, etc.

    d) Services directly applicable to the work, suchas special legal and accounting expenses,computer rental and programming costs,special consultants, borings, laboratorycharges, commercial printing and bindings andsimilar costs that are not applicable to general

    overhead.e) Identifiable expenses for supplies and

    materials charged to the project at hand, asdistinguished from such supplies and expensesapplicable to two or more projects.

    f) Identifiable reproduction costs applicable to thework, such as blue-printing, mimeographing,printing, etc.

    These also include expenses, which seldom canbe determined in advance with any invoice costs,plus a service as may be mutually agreed upon bythe Architect and his Client.

    3.Ideal Site Conditionrefers to site/land condition that is not within the

    bound of Geo Hazard Map prepared by Mines

    and Geo Science Bureau of Department of

    Environment and Natural Resources

    (DENR).Sites that are notprone to dangersuch as

    earthquakes(near the fault line), typhoon paths,

    flash floods, tsunamis, erosion, sink holes, within

    range of high-tension wires and other

    natural/man-made disasters.

    4. Multiplier refers to a factor which compensates theArchitect for the following items:

    a) Overhead costs of the officeb) Fringe benefits and social charges

    c) Fee for contingencies,d) Interest on capital reserves ande) Profitf) Technical Salaries

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    21/63

    The size of the multiplier varies according tothe types of work, the organization andexperience of the Architect and the geographicarea in which his office is located.

    5. Overhead refers to the following:a) provisions for office, light, air conditioning,

    and similar items for working space,b) depreciation allowances or rental of furniture,

    equipment and instruments,c) automobile expenses,d) office suppliese) taxes and insurances other than those

    included as salary costf) library and periodical expenses and other

    means of keeping abreast with new

    developments and/or technologiesg) executive, administrative, accounting, legal,

    stenographic, and clerical salaries andexpenses, other than those that areidentifiable as salaries includingreimbursable non-salary expenses, plussalaries or imputed salaries of partners andprincipals to the extent that they performgeneral executive and administrativeservices as distinguished from technical oradvisory services directly applicable toparticular projects. These services andexpenses, essential to the conduct of thebusiness, includes preliminary arrangementsfor new projects or assignments, and intereston borrowed capital.

    h) business development expenses, includingsalaries of principals and salary costs ofemployees so engaged.

    i) provisions for loss of productive time oftechnical employees between assignments,

    and for time of principals and employees onpublic interest assignments.

    6. Project Cost means the total cost of the project whichincludes but not limited to construction cost(labor& materials), fees for professional services(preparation of contract documents &supervision), permits and licenses, utilities,insurance and the likes.

    7. Salary Cost means the cost of salaries (including sick leave,

    vacation, holiday and incentive payapplicablethereto) of professional consultants forthe time directly chargeable to the projects; plusexcise, and payroll taxes as well as all other

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    22/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    23/63

    RULE II

    METHODS OF COMPENSATION

    SECTION 1: CRITERIA

    The criteria for computing the Architects compensation should be based on mutual

    evaluation of the amount of the Architectural firms talents, skill, experience,

    imagination, effort and time available for, and required by the project.

    1.1 The method of compensation should:

    a. Be fair to the Architect in that it should permit him to recover his costs andnet him an adequate profit, provided he is reasonably efficient.

    b. Be fair to the Client and the Architect by reflecting the value of theArchitects services.

    c. Be flexible to protect the Architect from cost increases because of changesor the scope of the commission.

    d. Not create legal problems for the Architect.e. Encourage the Client to be cooperative and supportive.f. Provide incentive for the Architect to produce the highest design quality.g. Be easy to understand and simple use.h. Provide a basis for the Client to pre-determine his costs for architectural

    services, and be otherwise acceptable to him.i. Encourage the Architect to develop a solution which will result in the lowest

    possible construction cost consistent with the Clients requirements.j. Not focus the Clients attention on price, but rather on the quality and

    performance of the Architects services.k. Protect the Architect against the rising costs of providing services during the

    course of a commission.

    1.2. The computation of the compensation of fees shall depend on the type ofservices to be rendered and the conditions under which they are to be

    performed. Compensation for services that require only one kind of expertise orrelated types of expertise shall be treated differently from those services thatrequire the use of more than one type of expertise.

    1.3 Compensation of an Architect may be computed based on one or acombination of the following methods, with modifications applicable to the typesof services and/ or specific cases, if and when needed.

    SECTION 2: METHODS OF COMPENSATION

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    24/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    25/63

    This method is based on the total rate cost of Architect, Consultantand hisstaff multiplied by a factor from 1.5 to 3.0 as a multiplier plus cost ofcertain items that are reimbursable to the Architect classified underDirect Cost or Reimbursable Expenses.

    The following formula is used to compute the total fee:

    Total Fee = Rate Cost x Multiplier + Reimbursable Expenses

    Assume:

    A = Architects rate / hour

    C = Consultants rate / hour

    T = Rate per hour of Technical Staff, Researchers and other involved in theProject

    N = No. of hours

    AN, CN, TN = No. of hours spent by Architect,. Consultants and Technical

    Staff

    Rate Cost = AN + CN +TN

    Multiplier - from 1.5 to 3.0 depending on office set-up of Architect and complexity

    of the Project.Multiplier to take care of overhead and reasonable profit.

    Reimbursable Expenses - such as transportation, housing and living

    allowance of Consultant, transportation, per diem, housing and living

    allowance of local consultants and technical staff if assigned to place over

    100km. from area of operation of the Architect.

    Cost of printing of extra set of drawings, reports, maps, contract

    documents, etc. over the seven (7) copies submitted to the Client;

    overseas and long distance calls; technical and laboratory tests, licenses,

    fees and taxes, needed by the Project.

    (d) Professional Fee plus reimbursable expenses - This method ofcompensation is frequently used where there is continuing relationship ona series of Projects. It establishes an agreed lump sum over and abovethe reimbursement for the Architects technical time and overhead. Anagreement on the general scope of the work is necessary in order to setan equitable fee.

    (e) Fixed/Lump sum payment This method of compensation may beused when the scope of services required can be clearly and fully defined.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    26/63

    Two methods may generally be used to arrive at a lump-sumcompensation for the basic services:

    1. The first is the computation of a lump-sum as an appropriatepercentage of the estimate total cost of the project.

    2. The second is direct development of a fixed amount of compensationby estimating the individual elements of the cost outlines, plus areasonable margin of profit, all expressed as a single lump-sum.

    These two methods are frequently used concurrently with one serving asa check to the other.

    Where compensation is given on a lump-sum basis, the agreementsshould contain a clearly stated time limit during which the services will beperformed, and a provision for additional compensation for extra timeused. In design assignments, these should be a provision for charges

    required after the approval of preliminary designs, with a clearunderstanding as to where the final approval authority lies. Which meansthat there are changes made by the Client either during the design orconstruction stage that add costs not only to the construction but also thework of the Architect, thus for every change in the work, the Architect andthe Client will have to supplement their contract to stipulate the additionalfee and time involved.

    (f) Percentage FeeThis is a world-wide used method of compensation forarchitectural services. The amount of the percentage is related to the sizeand the type of the Project. This method is fair to both the Client and theArchitect as the fee is pegged to the cost of the Project the Client is willingto undertake. It is flexible and easy to apply since if there will be changes,additions or deductions of the work demanded by the Project or requiredby the Client, the Client-Architect agreement need not be supplemented.

    (g) Mixed Methods of Compensation This document provide for morethan one methods of compensation on a project. Each project should beexamined to determine the most appropriate method of establishing an

    equitable method of compensation between the Architect and the Client.There is no reason that an assortment of compensation methods shouldnot be used if appropriate in a single project.

    For example, Pre-Design Services and Construction Work Services couldbe compensated on a multiple of Direct Personnel Expense, while theRegular and Specialized Allied Design Services could be paid on aPercentage of Construction Cost basis.

    (h) Unit Cost Method The remuneration under this method is based on

    cost per square meters of the project such as room, store, buildings orother unit. Example, office planning and interior design which is the sameunit used in lease rates and tenant allowances in commercial building.Other like hotel projects is often based on cost per square meter.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    27/63

    However, unit cost estimating requires accurate and timely data on thecost of providing services for each unit and renovation of unit requiresmore service effort than those new unit.

    (i) Based Value Pricing The remuneration under this method is a

    valuepricing based on the outcome of revenue, cost and profitabilityresult of a project engagements or based on a measurable profit onspecific Clients. Examples of such metrics include sales in retail facilities,leasing in housing or commercial office/residence developments.

    NOTES:

    1) It is important that prior to the start of any project or commission, aProfessional Service Agreement is necessarily be approved mutually byArchitect and the Owner/Client. The standard practice for rendering RegularDesign Services is to request for a five percent (5%) Mobilization Fee of theagreed amount upon signing of the Professional Service Agreement.

    2) Owner/Client shall make payments upon request of the Architect within seven(7) calendar days from the submission of the statement of the account.

    3) Should the Owner/Client prefers to engage the Architect for ArchitecturalServices only and separately hire the services of Allied Professional and/or

    Specialist Consultant their professional fees shall be for the account of theClient. In such case, the fee of the Architect for coordinating and relating thework of the Allied Professional and/or Specialist Consultant to the designconcept of the Architect will be five percent (5%) of the Allied Professionaland/or Specialist Consultants feeaside from his fees from Regular DesignServices.

    4) The Architect is the prime professional for having a contract directly with theClient/Owner for professional services and responsible for directing the teamof the Allied Professional/ Specialist Consultants.

    5) For government projects, the selection of Professional Consulting Architectshall be in accordance with the relevant provisions of R.A. No. 9184,otherwise known as the Government Procurement Reform Act of 2003. BasicFee(BF) shall be integrated Architectural and Engineering Services into one(1) contract.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    28/63

    RULE III

    SCHEDULE OF FEESON ALL TYPES

    OF ARCHITECTURAL SERVICES

    The entire range of the Architects services is divided into ten (10)major services

    as follows:

    1) Pre-Design Services (UAP Doc. 201)2) Regular Design Services (UAP Doc. 202)3) Specialized Architectural Services (UAP Doc. 203)4) Full-Time Supervision (UAP Doc. 204-A)5) Construction Management (UAP Doc. 204-B)6) Post-Construction Services (UAP Doc. 205)7) Comprehensive Architectural (UAP Doc. 206)

    Services8) Design-Build Services (UAP Doc. 207)9) Architectural Design Competition (UAP Doc. 208)

    10) Professional Architectural Consulting (UAP Doc. 209)

    Services

    Each of these ten (10) major services can be contracted separately to the

    Architect depending upon the desire and needs of the Client.The terms and

    conditions for the delivery of theseArchitects Services are stipulatedon each

    Architects Guidelines on Standards of Professional Practice Documents.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    29/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    30/63

    MATRIX OF SERVICES

    SERVICES

    METHODS OF COMPENSATION

    SCHEDULE OFFEES

    PERDIEM

    RETAIN

    ER

    RATEC

    OST

    PROFE

    SSIONALFEE

    FIXED/

    LUMPSUMP

    AYMNENT

    PERCE

    NTAGE

    FEE

    MIXED

    METHOD

    UNITC

    OSTMETHOD

    BASED

    VALUEPRICING

    SECTION 1. PRE-DESIGN

    SERVICES(UAP DOC. 201)

    Prior to the start of anyPre-Design Services, aProfessional Serviceagreement betweenOwner/Client andArchitect is necessary.The Architect shouldrequest for a 5%mobilization fee uponsigning of the agreement.(Please refer to Rule IIIGroup 10 for addedinformation)

    1.1 Consultation 1.2 Pre-Feasibility Studies 1.3 Feasibility Studies 1.4 Site Selection and Analysis 1.5 Site Utilization and Analysis Different Methods of

    Compensation are beingapplied on the Pre-Design Services as thevolume and range ofworks varies on eachservices.

    Client shall makepayments upon requestof the Architect withinseven (7) calendar daysfrom the submission ofthe statement of theaccount.

    1.6 Architectural Research 1.7 Architectural Programming 1.8 Space Planning

    1.9 Space Management Studies 1.10 Value Management 1.11 Design Brief Preparation 1.12 Promotional Services

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    31/63

    SERVICES

    METHODS OF COMPENSATION

    SCHEDULE OFFEES

    PER

    DIEM

    RETAINER

    RATECOST

    PROFESSIONALFEE

    FIXED/LUMPSUMP

    AYMN

    ENT

    PERCENTAGE

    FEE

    MIXEDMETHOD

    UNITCOSTMETHOD

    BASED

    VALUEPRICING

    SECTION 2. REGULAR DESIGNSERVICES(UAP DOC. 202)

    2.1 Project Definition Phase

    The payment of RegularDesign Services of theArchitect shall be made inthe following manner:

    Refer to Schedule ofRegular Basic Fees (RBF)

    2.1) 5% of the RBF asengagement fee +10% of the RBF forthis Phase or a totalof 15%

    2.2) 25% of the RBF

    2.3) 25% of the RBF

    2.4) 20% of the RBF

    2.5) Payment to Architectshall be adjusted sothat it will amount to

    a sum equivalent to85% of the RBF,computed upon thewinning Bid Price.

    2.2 Schematic design Phase

    2.3 Design Development Phase

    2.4 Contract Document Phase

    2.5 Bidding and Negotiation Phase

    2.6 Supervision and ArchitectsLiability

    2.6)Remaining 15% ofRBF is broken asfollows:a. 10% for Architects

    Liability under theCivil Code and

    b. 5% for Periodicvisit during

    construction

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    32/63

    SCHEDULE OF REGULAR BASIC FEES (RBF)

    NOTE: THE FOLLOWING GROUPING OF BUILDINGS WERE CLASSIFIED IN

    ACCORDANCE WITH THE DEGREE OR COMPLEXITY OF EACH STRUCTURE

    Group 1

    Buildings of the simplest utilization and character, which are without complication of plan/design

    or detail and which require only a minimum of architectural finishes, engineering and allied

    architectural elements:

    Armories Parking Structures

    Bakeries Printing Plants

    Habitable Agricultural Buildings Public Markets

    Freight Facilities Service Garages

    Hangars Simple Loft-Type Buildings

    Industrial Buildings Warehouses

    Manufacturing/Industrial Plants Packaging and Processing Plants

    Other similar utilization type buildings

    Statement of Probable

    Project Construction Cost

    (SPPCC)

    Recommended Basic Fee

    (RBF)

    (Integrated Architectural &

    Engineering Services in

    One Contract)

    Recommended Basic Fee

    (RBF)

    Architectural Services only

    P 50.0 million and less 6 % of PPCC 3.6% of PPCC

    Over P50.0 million to

    P100.0 million

    P3,000,000 plus 5% of

    excess of P 50.0 million

    P1,800,000 plus 3% of excess

    of P50.0 million

    Over P100.0 million to

    P200.0 million

    P5,500,000 plus 4% of

    excess of P100.0 million

    P3,300,000 plus 2.4% of excess

    of P100.0 million

    Over P200.0 million to

    P500.0 million

    P9,500,000 plus 3% of

    excess of P200.0 million

    P5,700,000 plus 1.8% of excess

    of P200.0 million

    Over 500.0 million to

    P1.0 billion

    P18,500,000 plus 2% of

    excess of P500 million

    P11,100,000 plus 1.2% of

    excess of P500.0 million

    Over P1.0 billion P28,500,000 plus 1% of

    excess of P1.0 billion

    P17,100,000 plus 0.6% of

    excess of P1.0 billion

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    33/63

    Group 2

    Buildings of moderate complexity of plan/design requiring a moderate amount of research and

    of engineering and allied architectural design:

    Art Galleries Nursing Homes

    Banks, Exchange and other Buildings Office Buildings/Office Condominium

    Financial Institutions Park, Playground and Open-Air

    Bowlodromes Recreational Facilities

    Call Centers Residential Condominiums

    *Temples/Churches and Religious Facilities Police Stations

    City/Town Halls & Civic Centers Postal Facilities

    College Buildings Private Clubs

    Convents, Monasteries & Seminaries Publishing Plants

    Correctional & Detention Facilities Race Tracks

    Court Houses/Halls of Justice Restaurants/Fastfoods

    Dormitories Retail/Wholesale Stores

    Exhibition Halls & Display Structures Schools

    Fire Stations Shopping Centers

    Laundries & Cleaning Facilities Specialty Shops

    Libraries Supermarkets/Hypermarts

    Malls/Mall Complexes Serviced Apartments

    Motels &Apartels Welfare Buildings

    Multi-storey Apartments Mixed Use Buildings

    Showrooms/Service Centers Other buildings of similar natureor use

    For Temples/Churches and Religious Facilities, Architects professional services exceptfor Engineers services can be pro-bono and/or the Architect can charge the productioncosts of architectural documents.

    Statement of Probable

    Project Construction Cost

    (SPPCC)

    Recommended Basic Fee

    (RBF)

    (Integrated Architectural &

    Engineering Services inOne Contract)

    Recommended Basic Fee

    (RBF)

    Architectural Services only

    P 50.0 million and less 7 % of PPCC 4.2% of PPCC

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    34/63

    Over P50.0 million to

    P100.0 million

    P3,500,000 plus 6% of excess

    of P 50.0 million

    P2,100,000 plus 3.6% of

    excess of P50.0 million

    Over P100.0 million to

    P200.0 million

    P6,500,000 plus 5% of excess

    of P100.0 million

    P3,900,000 plus 3.0% of

    excess of P100.0 million

    Over P200.0 million to

    P500.0 million

    P11,500,000 plus 4% of excess

    of P200.0 million

    P6,900,000 plus 2.4% of

    excess of P200.0 million

    Over 500.0 million to

    P1.0 billion

    P23,500,000 plus 3% of excess

    of P500 million

    P14,100,000 plus 1.9% of

    excess of P500.0 million

    Over P1.0 billion P38,500,000 plus 2% of excess

    of P1.0 billion

    P23,100,000 plus 1.2% of

    excess of P1.0 billion

    Group 3

    Buildings of exceptional character and complexity of plan/design or requiring comparatively

    large amounts of research and of engineering and allied architectural design:

    Aquariums Laboratories/Testing Facilities

    Nuclear Facilities Marinas and Resort Complexes

    Auditoriums Medical Arts Offices & Clinics

    Airports/Wet & Dry Ports & Terminals Mental Institutions

    Breweries Mortuaries

    Cold Storage Facilities Observatories

    Telecommunication Buildings Public Health Centers

    Convention Facilities Research Facilities

    Gymnasiums Stadia

    Hospitals & Medical Buildings Theaters& Similar Facilities

    Hotels Veterinary Hospitals

    Transportation Facilities & Systems Other buildings of similar nature or use

    Statement of Probable

    Project Construction Cost

    (SPPCC)

    Recommended Basic Fee

    (RBF)

    (Integrated Architectural &

    Engineering Services in

    One Contract)

    Recommended Basic Fee

    (RBF)

    Architectural Services only

    P 50.0 million and less 8 % of PPCC 4.8% of PPCC

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    35/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    36/63

    Statement of Probable

    Project Construction Cost

    (SPPCC)

    Recommended Basic Fee

    (RBF)

    (Integrated Architectural &

    Engineering Services in

    One Contract)

    Recommended Basic Fee

    (RBF)

    Architectural Services only

    12% of PPCC 7.5% of PPCC

    Group 6

    When the plan/design and related Contract Documents are re-used for the repetitive

    construction of similar buildings without amending the drawing and the specifications, the

    Architects fee is computed as follows:

    Building Number Recommended Repetitive

    Fee (RRF)

    (Integrated Architectural &

    Engineering Services in

    One Contract)

    Recommended Repetitive

    Fee (RRF)

    Architectural Services only

    First (1st) Building RBF for type of building RBF for type of building

    Second (2nd) Building 80% of RBF for type of building 80% of RBF for type of building

    Third (3rd) Building 60% of RBF for type of building 60% of RBF for type of building

    Succeeding Buildings 40% of RBF for type of building 40% of RBF for type of building

    Major adjustment due to site condition will affect Engineers Fee

    Group 7

    When the Architect is engaged to undertake a Housing Project involving the construction of

    several residential units on a single site with the use of one (1) set of plans/design,specifications and related documents, the Architects Fee chargeable shall conform with the

    following:

    Unit Number Recommended Housing

    Project Fee (RHPF)

    (Integrated Architectural &

    Engineering Services in One

    Contract)

    Recommended Housing

    Project Fee (RHPF)

    Architectural Services only

    First (1st) Unit 10% of PPCC as basic fee 6% of PPCC

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    37/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    38/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    39/63

    SERVICES

    METHODS OF COMPENSATION

    SCHEDULE OFFEES

    PER

    DIEM

    RETAINER

    RATECOST

    PROFESSIONALFEE

    FIXED/LUMPSUMP

    AY

    MNENT

    PERCENTAGE

    FEE

    MIXEDMETHOD

    UNITCOSTMETHOD

    BASED

    VALUEPRICIN

    G

    SECTION 3. SPECIALIZED

    ARCHITECTURAL

    SERVICES(UAP DOC. 203)

    3.1 Architectural Interior (AI)

    For Architectural Interior (AI),Acoustic Design, ArchitecturalLighting Layout and Design andSite Development Planning(SDP), the recommendedprofessionalfee is10% to 15% ofthe cost of work depending onthe complexity of the workrequired by the project.The following payment schedule

    is applied to these services:a) Upon submission of the

    preliminary design - 30%of the fee

    b) Upon submission of the finaldesign 50% of the fee

    c) Upon completion of theproject 20% of the fee

    Another method that can beapplied is the Unit Cost that isbased on per square meters ofthe project.

    Should the Client hire separatelythe services of the Consultant,the fee of the Consultant shall beon the account and paid directlyby the Client. In such case, thefee of the Architect forcoordinating andrelatingthe workof the Consultant to the designconcept of the Architect will be5% of theConsultants fee.

    The Architect may bill and bepaid for the progress paymentsduring construction proportional tothe percentage of progress ofcompletion of the construction

    work. Should the work notcompleted, the pro-rated RSAFcomponent shall be paid to thearchitect by the client.

    3.2 Acoustic Design

    3.3 Architectural Lighting Layoutand Design

    3.4 Site Development Planning (SDP)

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    40/63

    SERVICES

    METHODS OF COMPENSATION

    SCHEDULE OFFEES

    PER

    DIEM

    RETAINER

    RATECOST

    PROFESSIONALFEE

    FIXED/LUMPSUMP

    AYMN

    ENT

    PERCENTAGE

    FEE

    MIXEDMETHOD

    UNITCOSTMETHOD

    BASED

    VALUEPRICING

    3.5 Site and Physical Planning(including Master DevelopmentPlanning and SubdivisionPlanning) Services

    Physical Planning for buildingsites such as Industrial Estates,

    Commercial , Religious,Institutional and Government/Civic Centers, Sports Complexes,Tourist Centers/TourismEstates/Resorts, AmusementParks, Educational Facilities,Residential and HousingSubdivisions and the like.

    The Recommended ProfessionalArchitectural Fee (RPAF) is aminimum of P50,000.00 perhectare net to the architect

    The following payment schedule isapplied to this service:

    a) Framework DevelopmentPlan (FRDP). Theprofessional fee shall be30% of RPAF.

    b) Conceptual MasterDevelopment Plan (CMDP).The professional fee shall be30% of RPAF.

    c) Preliminary MasterDevelopment Plan (PMDP).The professional fee shall be20% of RPAF.

    d) Detailed MasterDevelopment Plan (DMDP).The professional fee shall be20% of RPAF.

    Note: The above services pertainonly to architectural outputs anddo not include engineeringservices and other allied services.e.g. landscape design,transportation planning,environmental investigationsand other services.

    The rate stipulated above is basedon the assumption that the land tobe developed is moderately flat.However, if the land is rugged withsteep terrain the fee shall increaseby 20% to 30%.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    41/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    42/63

    SERVICES

    METHODS OF COMPENSATION

    SCHEDULE OFFEES

    PER

    DIEM

    RETAINER

    RATECOST

    PROFESSIONALFEE

    FIXED/LUMPSUMP

    A

    YMNENT

    PERCENTAGE

    FEE

    MIXEDMETHOD

    UNITCOSTMETHOD

    BASED

    VALUEPRICING

    3.6 Comprehensive DevelopmentPlanning

    Basic compensation for the

    foregoing SpecializedArchitectural Services, all ofwhich are classified asadditional or extra services,shall be through man-months i.e. 22 man-daysmultiplied by 8 man-hours,and multiplied by a factor tocover other direct andindirect costs e.g. overhead,etc.

    Other applicable mode ofdetermining the Architectsfee that is mutually agreedupon by the Architect andthe Client are the following:

    a) Per diem plusreimbursable expenses

    b) Retainer plusreimbursable expenses

    c) Rate cost times amultiplier plusreimbursable expenses

    3.7 Historic and Cultural HeritageConservation and Planning

    3.8 Security Evaluation and Planning

    3.9 Building System Design

    3.10 Facilities Maintenance Support

    3.11 Building testing andCommissioning

    3.12 Building EnvironmentCertification

    3.13 Forensic Architecture

    3.14 Building Appraisal

    3.15 Structural Conceptualization

    3.16 Preliminary Services

    3.17 Contract Documentationand Review

    3.18 Post-Design Services(including ConstructionManagement Services)

    3.19 Dispute Avoidanceand Resolution

    3.20 Architectural ResearchMethods

    3.21 Special Building/FacilityPlanning and design

    3.22 Building Components

    3.23 Management of architecturalPractices

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    43/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    44/63

    Continuation of SCHEDULE OF FEES

    OTHER CONSTRUCTION MANAGEMENTCONTRACTINGCONCEPTS

    (1) To motivate the Construction Manager to reduceacquisition and operating costs, the services of theConstruction Manager is compensated for by arange ofincentive-type contracts & provisions.During the initial stages of acquisition, incentivetype contracts are appropriate such as:

    a. Award Fee Provisions-The Construction Manager has the opportunity toobtain an award fee of specified maximum size ifthe measured cost-related values meet or exceedthe specified target values.

    b. Price Adjustment Provision-The contract price is adjusted upward ordownward in accordance with a prearrangedformula.

    c. Operating and support cost factor provisionprovides a direct incentive on operating and

    support costs.

    (2) For the later stages of a project, contract typesare used to encourage better constructionmanagement services. The preceding types ofcontracts for construction management servicesare used according to gross estimates andcomplexity of work.

    a. Firm Fixed Price -The Owner will pay the Construction Manager afixed fee. The fee will be unaffected byvariations between the estimate and the bids or bychange orders during the construction phaseunless the Owner initiates an increase in scope.

    b. Fixed Price Incentive -The Owner will pay the Construction Manager afixed fee which is adjusted according to the

    difference between the final allowable costs andthe target costs.

    c. Cost plus Incentive Fee (CPIF) or Cost plusAdjusted Fee (CPAF) -Cost reimbursement type contracts will provisionsfor a fee that is adjusted by sharing formulasapplied to the difference between the finalallowable costs and the target costs.

    a) Cost Plus Fixed Fee -The Owner will pay the construction managementa fixed fee plus reimbursement of certainexpenses incurred in the performance of basis

    services.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    45/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    46/63

    SERVICES

    METHODS OF COMPENSATION

    SCHEDULE OFFEES

    PER

    DIEM

    RETAINER

    RATECOST

    PROFESSIONALFEE

    FIXED/LUMPSUMP

    AYMNENT

    PERCENTAGE

    FEE

    MIXEDMETHOD

    UNITCOSTMETHOD

    BASED

    VALUEPRICING

    SECTION 6. POSTCONSTRUCTION

    SERVICES(UAP DOC. 205)

    6.1 Building and EquipmentMaintenance

    The services of theArchitect can becompensated by thefollowing methods:

    a. Retainer plusreimbursableexpenses

    b. Rate cost times amultiplier plusreimbursableexpenses

    c. Based Value Pricing

    For Percentage FeeMethodthe recommended

    management fee isbased from 4% to 6%of gross rental.

    .

    6.2 Building and GroundAdministration

    6.3 Post-Construction Evaluation

    6.4 Building Audit

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    47/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    48/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    49/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    50/63

    SECTION 9: ARCHITECTURALDESIGN COMPETITION METHODS OF COMPENSATION

    9.1 Competition Secretariata. Secretary/Receptionistb. Students (OJT)

    c. Encoder/Researcher

    a.Monthly Basisb. Weekly Allowance + Transportation &

    Foodc. Lump Sum based on volume of works

    9.2 Consultants Monthly Basis

    9.3 Professional Advisor Honorarium + Accommodation, food &Transportation/Airfare

    9.4 Juror Honorarium + Accommodation, food &Transportation/Airfare

    9.5 Winner/s Prizes stipulated on the CompetitionManual

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    51/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    52/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    53/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    54/63

    RULEV

    GENERAL PROVISIONS

    SECTION 1: Criteria for Establishing Methods of Compensation

    1.1 The criteria for establishing Methods of Compensation ispromulgated,approved and adopted by UAP-IAPOA based on the Board Resolution no.09-10 No. 7-16 duringtheir regular meeting held on June 26, 2010 at UAPNational Headquarters in Quezon City.

    1.2 Furthermore, fees for services that require inputs of an artistic, innovativeand creative endeavour shall not be determined in the same manner asservices that involve purely technical and scientific undertakings.

    SECTION 2: Collection of Professional Fees

    2.1 It shall be unlawful for any unlicensed and unregistered person to collect afee on architectural services exceptfor employees of a Registered andLicensed Architect.

    SECTION 3: Bank: Collecting Agent

    3.1 It is important to remember that compensation terms dont mean much

    without the ability to collect payment on a timely basis. Architects can often

    overlook the importance of collections in negotiating contracts and

    managing projects and client relationships. Collection usually needs to be

    addressed by firm principals with their Client counterparts. Even the best

    accounting staff cannot overcome high-level misunderstandings about

    payment obligations. Through assigning the bank as a collecting agent,collection of payments for the architect will be simplified.

    3.2 Client may pose collection of compensation payment through banks as

    agreed by both Clients and Architects.

    SECTION 4: Interest Due on Late Payment of Fees

    4.1 The Architect shall be entitled to interest at the prevailing rate set by the

    BangkoSentralngPilipinas (BSP) in additional to a percentage as may bedetermine by the UAP-IAPOA unless otherwise mutually agreed upon bythe Architect and his client, on all fees, other charges and reimbursementsdue and not paid within thirty (30) days from receipt of billing.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    55/63

    SECTION 5: Payment Schedules

    5.1Payments on account of the Architects Regular Services shall be as follows:

    5.1.1 Upon the signing of the Professional Service Agreement, aminimum payment equivalent to five percent (5%) of the

    compensation for Basic services.

    5.1.2 Upon completion of Project Definition Phase Services, but not morethan seven (7) days after the submission of the Project Definition tothe Owner, a sum equal to ten percent (10%) of the Basic Fee,computed upon a reasonable estimated construction cost of thestructure.

    5.1.3 Upon the completion of the Schematic Design Services, but not

    more than seven (7) days after the submission of the SchematicDesign to the Owner, a sum equal to twenty five percent (25%) ofthe Basic Fee, computed upon a reasonable estimatedconstruction cost of the structure.

    5.1.4 Upon the completion of the Design Development Services, but not

    more than seven (7) days after submission of the Design

    Development to the Owner, a sum sufficient to increase the total

    payments on the fee to twenty five percent (25%) of the Basic Fee

    computed upon the same estimated construction cost as in (5.1.2).

    5.1.5 Upon the completion of the Contract Documents Services but notmore than seven (7) days after submission of the ContractDocuments to the Owner, a sum sufficient to increase the totalpayments on the fee to twenty percent (20%) of the Basic Fee,computed upon reasonable estimated construction cost of thestructure as in (5.1.2).

    5.1.6 Within seven (7) days after the awards of Bids, the payment to theArchitect shall be adjusted to a sum of equivalent to eighty fivepercent (85%) of the Basic Fee, computed upon the winning Bid

    Price.

    5.1.7 The remaining fifteen percent (15%) of his work is broken down asfollows:

    a. ten percent (10%) for the Architects liability under the CivilCode and

    b. fivepercent (5%) for the construction phase service whichincludes preparation of contract document forms and periodicvisits during the construction.

    5.2 Upon Completion of the construction work, the balance of the ArchitectsFee, computed on the Final Project Construction Cost of the structure shallbe paid.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    56/63

    6.3 The Owner shall make partial payments during each of the various stages of

    the Architects work, upon request of the Architect, provided that suchpayments are within the framework of the manner of payments outlinedabove.

    SECTION 6: Clients Responsibilities

    6.1 Provide full information as to his requirements for the project.

    6.2 Designate when necessary, a representative authorized to act in his behalf.

    Examinedocuments submitted by the Architect and render decisions

    pertaining thereof promptly, to avoid reasonable delay in the progress of

    the Architects work.

    6.3 Arrange and pay for such legal, auditing and any other fees for services as

    may be required for the project.

    6.4 Pay for all reimbursable expenses incurred in the project as called for in

    Section 7Other conditions on Services and all taxes (exclude income tax)

    that the government may impose the Architect as a result of the services

    rendered on the project whether the services were performed as an

    individual practitioner, as a partnership or as a corporation.

    6.5 Informs the Architect ifthe Client observes or otherwise becomes aware of

    anything that may impair the successful implementation of the project, heshall give prompt written notice thereof to the Architect.

    SECTION 7 : Other Conditions of Services

    7.1 Conditions for Minimum Basic Fee

    The Minimum Basic Fee applies to construction work done by a Contractor

    on the basis of a Lump Sum Contract. Construction works that are let oncost-plus-fee basis, or any basis other than the Lump Sum Contract, wherethe Architect has to render additional services shall be subject to additionalcompensation commensurate with the additional services required. Suchadditional compensation shall be in addition to the Minimum Basic Fee.

    7.2 Miniature Models/3-D Model and Animation and CAD Files

    The Architect may make and include miniature models of his design as partof his preliminary work if he so deems it to be necessary but no extracharge for such miniature models shall be made by the Architect. However,

    if the Client desires to have a miniature model of the final and approveddesign for exhibition and display purposes, the Client shall pay for the costof said miniature model.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    57/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    58/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    59/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    60/63

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    61/63

    Comparative Estimates between Percentage on Regular Basic Fee and Basic Fee on persq. meter basisExample: A Client wants to build a Shopping Center(commercial building) in the amount ofP 20 million (Project Construction Cost)

    Schedule of Regular Basic Fee (IntegratedArchitectural & Engineering Services - A&E)This will fall under Group 2 7% of Probable ProjectConstruction Cost (PPCC).

    Based on current valuation of Project Construction Costthe amount is P20,000.00 per sq. meter. Thus the areaof the building with a Project Construction Cost of P20million will be 1,000 sq.meters.

    Particular:20,000,000.00 = 1,000 sq.meters

    20,000.00

    Basic Fee on per square meter basis(P1,000.00 per sq. to P1,500.00 per sq. meter)

    Based on current valuation of Project Construction Costthe amount is P20,000.00 per sq. meter. Thus the areaof the building with a Project Construction Cost of P20million will be 1,000 sq.meters.

    Particular:

    1,000 sq.m.x 1,000.00 per sq.m. = P1,000,000.00To

    1,000 sq.m.x 1,500.00 per sq.m. =P1,500,000.00

    Statement ofProbableProjectConstructionCost (SPPCC)

    Basic Fee(IntegratedArchitectural &EngineeringServices)

    Amount

    P 50 million andless

    7%

    P20 millionProject Const.Cost

    7% P1,400,000,00

    TOTAL (A & E Fees) P1,400,000.00

    NOTES:

    The Comparative Estimates between the Percentage on Regular Basic Fee is within the range on theBasic Fee per sq. meter basis as shown.

    However the computation of Basic Fee per sq. meter is possible only on the current valuation of ProjectConstruction Cost of the Building as of 2011. Thus the increase on Project Construction Cost must beproportional to theamount of Basic Fee per sq. meter.

  • 7/25/2019 ARCHITECTS GUIDELINES - UAP doc 208-A.pdf

    62/63

    RECOMMENDED FEE FOR TOWN PLANNING SPECIALIZED ARCHITECTURAL SERVICES(UAP DOC. 203)

    Area Basic Fee(Architectural Feeonly)

    Amount

    Site and Physical Planning(including Master DevelopmentPlanning and Subdivision Planning)

    Services

    The Recommended Professional Architectural Fee(RPAF) is a minimum of P50,000.00 per hectare net tothe architect

    Basic rate for the

    first 5 hectaresorless1 hectare (10,000sq.m.)

    P5.00 per sq. meter P50,000.00

    Over 5 hectares upto 10 hectares

    P4.00 per sq. meter P250,000.00 +P40,000.00 perhectare inexcess of 5hectares

    Over 10 hectaresup to 50 hectares

    P3.00 per sq. meter P450,000.00 +P30,000.00 perhectare inexcess of 10

    hectaresOver 50 hectaresand above

    P1.50 per sq. meter P1,650,000.00+ P15,000.00per hectare inexcess of 50hectares