Transcript of Archer Modular Rigs
Archer MDR Solutions
Private and Confidential 2
Section 1
Archer Modular Rig Solutions
The fleet
Archer Modular Rig Solutions
Services Offered
bullDrilling services
bullSnubbing services
bullThrough tubing rotary drilling (TTRD)
bullWork-over services
bullComplex completions
bullManaged-pressure drilling (MPD)
bullPlug-and-abandon activities (PampA)
bullThrough Rig Intervention support platform
for Coiled Tubing Slickline and E-Line
Key Features
bullLow POB - 16 min based on 24 Hr Operations
bullLight Modules - Max Lift is 12 Metric Tonnes
bullPatented Self Erect Mast System
bull400 short ton pull capability
bull100 short ton push ldquoSnubrdquo capability
bullEfficient Rig-up down
bullRemote Automated Drilling operation
bullBuilt in accordance with NORSOK amp UK
legislation
bullCompact Footprint
Archerrsquos modular drilling rig (MDR) solution is a breakthrough in its field utilising an
innovative modular state-of-the-art design It offers operational flexibility and cost
efficiency unrivalled by any other modular offshore drilling rigs on the market
The MDR package can be tailored to meet well-specific requirements and provide
operators with a cost efficient alternative to both mobile offshore drilling units (MODU) and
traditional platform drilling rigs on both existing and future installations
Archer currently own and operate two units Archer Emerald and Topaz respectively
bull Platform operator
Shell Todd Oil Services Ltd (STOS)
bull Location Tasman Sea New Zealand
bull Field type Gas field
bull Start of operation December 2012
bull End of operation 2014
bull Rig operation purpose
Drilling and Workover operations
Archer Emerald on MAUI A (NZ)
Private and Confidential 5
Archer Emerald (operational on STOS Maui A)
bull Platform operator STATOIL
bull Location North Sea Norway
bull Field type Gas field
bull Start of operation March 2015
bull End of operation ongoing (Q3 2016)
bull Rig operation purpose
Plug and Abandonment operations
Exploration drilling
VDD4002 Topaz on HEIMDAL (NO)
Archer Topaz (operational on Statoil Heimdal)
7Private and Confidential
bull Super Single Rig (Range III)
bull 400 short tons pull capability
bull Modular construction
bull Max module weight of 12 t
bull Two direction skidding
bull Compact footprint (14 x 12 m without power supply)
bull Automated pipe handling system
bull Hands-Off-Technology
bull Autonomous operation possible
bull Rig up time approx 34 weeks
bull Self-Erecting-Mast-System
bull Integrated mud system
bull Design according NORSOK regulations
bull Certified and tested by DNV according to
standard 27-3 (Portable Offshore Units)
Key Features Modular Offshore Rig VDD 400
Private and Confidential 9
Section 2
Technical overview
Power Supply
Control Rooms
HVAC
Drilling
Rig
Active Mud
Package amp
Hydraulic Unit
Pipe Deck
(Topaz only)
Archer MDR Packages
10Private and Confidential
Archer VDD400 Series MDR
Private and Confidential 11
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement
Primary
Arrangement
12Private and Confidential
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 2
Section 1
Archer Modular Rig Solutions
The fleet
Archer Modular Rig Solutions
Services Offered
bullDrilling services
bullSnubbing services
bullThrough tubing rotary drilling (TTRD)
bullWork-over services
bullComplex completions
bullManaged-pressure drilling (MPD)
bullPlug-and-abandon activities (PampA)
bullThrough Rig Intervention support platform
for Coiled Tubing Slickline and E-Line
Key Features
bullLow POB - 16 min based on 24 Hr Operations
bullLight Modules - Max Lift is 12 Metric Tonnes
bullPatented Self Erect Mast System
bull400 short ton pull capability
bull100 short ton push ldquoSnubrdquo capability
bullEfficient Rig-up down
bullRemote Automated Drilling operation
bullBuilt in accordance with NORSOK amp UK
legislation
bullCompact Footprint
Archerrsquos modular drilling rig (MDR) solution is a breakthrough in its field utilising an
innovative modular state-of-the-art design It offers operational flexibility and cost
efficiency unrivalled by any other modular offshore drilling rigs on the market
The MDR package can be tailored to meet well-specific requirements and provide
operators with a cost efficient alternative to both mobile offshore drilling units (MODU) and
traditional platform drilling rigs on both existing and future installations
Archer currently own and operate two units Archer Emerald and Topaz respectively
bull Platform operator
Shell Todd Oil Services Ltd (STOS)
bull Location Tasman Sea New Zealand
bull Field type Gas field
bull Start of operation December 2012
bull End of operation 2014
bull Rig operation purpose
Drilling and Workover operations
Archer Emerald on MAUI A (NZ)
Private and Confidential 5
Archer Emerald (operational on STOS Maui A)
bull Platform operator STATOIL
bull Location North Sea Norway
bull Field type Gas field
bull Start of operation March 2015
bull End of operation ongoing (Q3 2016)
bull Rig operation purpose
Plug and Abandonment operations
Exploration drilling
VDD4002 Topaz on HEIMDAL (NO)
Archer Topaz (operational on Statoil Heimdal)
7Private and Confidential
bull Super Single Rig (Range III)
bull 400 short tons pull capability
bull Modular construction
bull Max module weight of 12 t
bull Two direction skidding
bull Compact footprint (14 x 12 m without power supply)
bull Automated pipe handling system
bull Hands-Off-Technology
bull Autonomous operation possible
bull Rig up time approx 34 weeks
bull Self-Erecting-Mast-System
bull Integrated mud system
bull Design according NORSOK regulations
bull Certified and tested by DNV according to
standard 27-3 (Portable Offshore Units)
Key Features Modular Offshore Rig VDD 400
Private and Confidential 9
Section 2
Technical overview
Power Supply
Control Rooms
HVAC
Drilling
Rig
Active Mud
Package amp
Hydraulic Unit
Pipe Deck
(Topaz only)
Archer MDR Packages
10Private and Confidential
Archer VDD400 Series MDR
Private and Confidential 11
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement
Primary
Arrangement
12Private and Confidential
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Archer Modular Rig Solutions
Services Offered
bullDrilling services
bullSnubbing services
bullThrough tubing rotary drilling (TTRD)
bullWork-over services
bullComplex completions
bullManaged-pressure drilling (MPD)
bullPlug-and-abandon activities (PampA)
bullThrough Rig Intervention support platform
for Coiled Tubing Slickline and E-Line
Key Features
bullLow POB - 16 min based on 24 Hr Operations
bullLight Modules - Max Lift is 12 Metric Tonnes
bullPatented Self Erect Mast System
bull400 short ton pull capability
bull100 short ton push ldquoSnubrdquo capability
bullEfficient Rig-up down
bullRemote Automated Drilling operation
bullBuilt in accordance with NORSOK amp UK
legislation
bullCompact Footprint
Archerrsquos modular drilling rig (MDR) solution is a breakthrough in its field utilising an
innovative modular state-of-the-art design It offers operational flexibility and cost
efficiency unrivalled by any other modular offshore drilling rigs on the market
The MDR package can be tailored to meet well-specific requirements and provide
operators with a cost efficient alternative to both mobile offshore drilling units (MODU) and
traditional platform drilling rigs on both existing and future installations
Archer currently own and operate two units Archer Emerald and Topaz respectively
bull Platform operator
Shell Todd Oil Services Ltd (STOS)
bull Location Tasman Sea New Zealand
bull Field type Gas field
bull Start of operation December 2012
bull End of operation 2014
bull Rig operation purpose
Drilling and Workover operations
Archer Emerald on MAUI A (NZ)
Private and Confidential 5
Archer Emerald (operational on STOS Maui A)
bull Platform operator STATOIL
bull Location North Sea Norway
bull Field type Gas field
bull Start of operation March 2015
bull End of operation ongoing (Q3 2016)
bull Rig operation purpose
Plug and Abandonment operations
Exploration drilling
VDD4002 Topaz on HEIMDAL (NO)
Archer Topaz (operational on Statoil Heimdal)
7Private and Confidential
bull Super Single Rig (Range III)
bull 400 short tons pull capability
bull Modular construction
bull Max module weight of 12 t
bull Two direction skidding
bull Compact footprint (14 x 12 m without power supply)
bull Automated pipe handling system
bull Hands-Off-Technology
bull Autonomous operation possible
bull Rig up time approx 34 weeks
bull Self-Erecting-Mast-System
bull Integrated mud system
bull Design according NORSOK regulations
bull Certified and tested by DNV according to
standard 27-3 (Portable Offshore Units)
Key Features Modular Offshore Rig VDD 400
Private and Confidential 9
Section 2
Technical overview
Power Supply
Control Rooms
HVAC
Drilling
Rig
Active Mud
Package amp
Hydraulic Unit
Pipe Deck
(Topaz only)
Archer MDR Packages
10Private and Confidential
Archer VDD400 Series MDR
Private and Confidential 11
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement
Primary
Arrangement
12Private and Confidential
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
bull Platform operator
Shell Todd Oil Services Ltd (STOS)
bull Location Tasman Sea New Zealand
bull Field type Gas field
bull Start of operation December 2012
bull End of operation 2014
bull Rig operation purpose
Drilling and Workover operations
Archer Emerald on MAUI A (NZ)
Private and Confidential 5
Archer Emerald (operational on STOS Maui A)
bull Platform operator STATOIL
bull Location North Sea Norway
bull Field type Gas field
bull Start of operation March 2015
bull End of operation ongoing (Q3 2016)
bull Rig operation purpose
Plug and Abandonment operations
Exploration drilling
VDD4002 Topaz on HEIMDAL (NO)
Archer Topaz (operational on Statoil Heimdal)
7Private and Confidential
bull Super Single Rig (Range III)
bull 400 short tons pull capability
bull Modular construction
bull Max module weight of 12 t
bull Two direction skidding
bull Compact footprint (14 x 12 m without power supply)
bull Automated pipe handling system
bull Hands-Off-Technology
bull Autonomous operation possible
bull Rig up time approx 34 weeks
bull Self-Erecting-Mast-System
bull Integrated mud system
bull Design according NORSOK regulations
bull Certified and tested by DNV according to
standard 27-3 (Portable Offshore Units)
Key Features Modular Offshore Rig VDD 400
Private and Confidential 9
Section 2
Technical overview
Power Supply
Control Rooms
HVAC
Drilling
Rig
Active Mud
Package amp
Hydraulic Unit
Pipe Deck
(Topaz only)
Archer MDR Packages
10Private and Confidential
Archer VDD400 Series MDR
Private and Confidential 11
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement
Primary
Arrangement
12Private and Confidential
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 5
Archer Emerald (operational on STOS Maui A)
bull Platform operator STATOIL
bull Location North Sea Norway
bull Field type Gas field
bull Start of operation March 2015
bull End of operation ongoing (Q3 2016)
bull Rig operation purpose
Plug and Abandonment operations
Exploration drilling
VDD4002 Topaz on HEIMDAL (NO)
Archer Topaz (operational on Statoil Heimdal)
7Private and Confidential
bull Super Single Rig (Range III)
bull 400 short tons pull capability
bull Modular construction
bull Max module weight of 12 t
bull Two direction skidding
bull Compact footprint (14 x 12 m without power supply)
bull Automated pipe handling system
bull Hands-Off-Technology
bull Autonomous operation possible
bull Rig up time approx 34 weeks
bull Self-Erecting-Mast-System
bull Integrated mud system
bull Design according NORSOK regulations
bull Certified and tested by DNV according to
standard 27-3 (Portable Offshore Units)
Key Features Modular Offshore Rig VDD 400
Private and Confidential 9
Section 2
Technical overview
Power Supply
Control Rooms
HVAC
Drilling
Rig
Active Mud
Package amp
Hydraulic Unit
Pipe Deck
(Topaz only)
Archer MDR Packages
10Private and Confidential
Archer VDD400 Series MDR
Private and Confidential 11
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement
Primary
Arrangement
12Private and Confidential
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
bull Platform operator STATOIL
bull Location North Sea Norway
bull Field type Gas field
bull Start of operation March 2015
bull End of operation ongoing (Q3 2016)
bull Rig operation purpose
Plug and Abandonment operations
Exploration drilling
VDD4002 Topaz on HEIMDAL (NO)
Archer Topaz (operational on Statoil Heimdal)
7Private and Confidential
bull Super Single Rig (Range III)
bull 400 short tons pull capability
bull Modular construction
bull Max module weight of 12 t
bull Two direction skidding
bull Compact footprint (14 x 12 m without power supply)
bull Automated pipe handling system
bull Hands-Off-Technology
bull Autonomous operation possible
bull Rig up time approx 34 weeks
bull Self-Erecting-Mast-System
bull Integrated mud system
bull Design according NORSOK regulations
bull Certified and tested by DNV according to
standard 27-3 (Portable Offshore Units)
Key Features Modular Offshore Rig VDD 400
Private and Confidential 9
Section 2
Technical overview
Power Supply
Control Rooms
HVAC
Drilling
Rig
Active Mud
Package amp
Hydraulic Unit
Pipe Deck
(Topaz only)
Archer MDR Packages
10Private and Confidential
Archer VDD400 Series MDR
Private and Confidential 11
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement
Primary
Arrangement
12Private and Confidential
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Archer Topaz (operational on Statoil Heimdal)
7Private and Confidential
bull Super Single Rig (Range III)
bull 400 short tons pull capability
bull Modular construction
bull Max module weight of 12 t
bull Two direction skidding
bull Compact footprint (14 x 12 m without power supply)
bull Automated pipe handling system
bull Hands-Off-Technology
bull Autonomous operation possible
bull Rig up time approx 34 weeks
bull Self-Erecting-Mast-System
bull Integrated mud system
bull Design according NORSOK regulations
bull Certified and tested by DNV according to
standard 27-3 (Portable Offshore Units)
Key Features Modular Offshore Rig VDD 400
Private and Confidential 9
Section 2
Technical overview
Power Supply
Control Rooms
HVAC
Drilling
Rig
Active Mud
Package amp
Hydraulic Unit
Pipe Deck
(Topaz only)
Archer MDR Packages
10Private and Confidential
Archer VDD400 Series MDR
Private and Confidential 11
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement
Primary
Arrangement
12Private and Confidential
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
bull Super Single Rig (Range III)
bull 400 short tons pull capability
bull Modular construction
bull Max module weight of 12 t
bull Two direction skidding
bull Compact footprint (14 x 12 m without power supply)
bull Automated pipe handling system
bull Hands-Off-Technology
bull Autonomous operation possible
bull Rig up time approx 34 weeks
bull Self-Erecting-Mast-System
bull Integrated mud system
bull Design according NORSOK regulations
bull Certified and tested by DNV according to
standard 27-3 (Portable Offshore Units)
Key Features Modular Offshore Rig VDD 400
Private and Confidential 9
Section 2
Technical overview
Power Supply
Control Rooms
HVAC
Drilling
Rig
Active Mud
Package amp
Hydraulic Unit
Pipe Deck
(Topaz only)
Archer MDR Packages
10Private and Confidential
Archer VDD400 Series MDR
Private and Confidential 11
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement
Primary
Arrangement
12Private and Confidential
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 9
Section 2
Technical overview
Power Supply
Control Rooms
HVAC
Drilling
Rig
Active Mud
Package amp
Hydraulic Unit
Pipe Deck
(Topaz only)
Archer MDR Packages
10Private and Confidential
Archer VDD400 Series MDR
Private and Confidential 11
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement
Primary
Arrangement
12Private and Confidential
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Power Supply
Control Rooms
HVAC
Drilling
Rig
Active Mud
Package amp
Hydraulic Unit
Pipe Deck
(Topaz only)
Archer MDR Packages
10Private and Confidential
Archer VDD400 Series MDR
Private and Confidential 11
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement
Primary
Arrangement
12Private and Confidential
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Archer VDD400 Series MDR
Private and Confidential 11
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement
Primary
Arrangement
12Private and Confidential
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Archer MDR - rig-up arrangement flexibility
Secondary
Arrangement
Primary
Arrangement
12Private and Confidential
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
VDD 400 Series MDR Alternative arrangementsAMS in Secondary location
Private and Confidential 13
BRP
AMSDrillfloor
Stairs
Drillfloor
Stairs
When the AMS is located in the Secondary position mobilisation of a Drillfloor
Access Egress Stair or gangway shall be required
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Example - rig up Animation
Private and Confidential 14
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 15
Section 3
Drilling Rig
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Mast
Hoisting System
and Top Drive
Drag Chains
Trip Tank
Choke and Kill Manifold
Local Electrical Room
Baseframe
Substructure Modules
Drillerlsquos Cabin
Drill Floor Crane
HTV Pipehandler
Pipe Feeder
Skidding Unit
BOP Trolley
Poorboy Degasser
VDD400 Series Drilling Rig
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
bull Welded box type mast with gear racks
bull Clear working height 19 m
bull Max hook load 400 short tons (363 t)
bull Overall height incl substructure 40 m
bull Rack and Pinion-Hoisting System
bull Modular Box-on-Box-Substructure
bull 9 modules incl Drill Floor
bull Quick connectors for fast module stacking
bull Footprint 6 x 6 m
bull Two direction skidding (pad drilling)
bull Safety Bails wind sensor warning lights for airplanes
Drilling Rig
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Mobilsation amp rig up - Drilling Rig mast construction
18Private and Confidential
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Who we are
VDD400 Series ndash Hoisting Mechanism
19
Maximum Hookload
800000 Lbs
400 sT
362 MTe
Maximum Push Capacity
200000 Lbs
100 sT
905 MTe
Racks
6 x Pinion
Motors
3 each
side
Pinion
Rack
6 x Pinion Motors
Mounted in
Top-Drive
Hoisting Unit
Rack located
either side of
drillfloor face of
mast
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Who we are
VDD400 series Top-Drive
20
Top-Drive System
OEM MAX STREICHER GmbH amp Co
Model Streicher PPDM350
Maximum Hoisting Speed 45 metresmin
Maximum Pull Capacity 400sT (800000 lbs 362 mT)
Maximum Push Capacity 100sT (200000 lbs 90 mT)
Maximum Torque 85000 Nm (62692 ftlbs)
Maximum rpm 190
Maximum Circulating Pressure 5000 psi (345 Bar G)
I-BOP 1 x 5000 psi Remotely Operated (Drillerrsquos Cabin) 1 x 5000 psi Manually Operated
Wireline Entry Yes
Elevator Varco BJ BX Frame 4 500sT
Standard Bail Load Capacity 350 sT
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Who we are
Drillfloor Equipment Key Features
21
bull 37-12rdquo Rotary Table unit capable of producing 33150 ftlbs of torque at 10 rpm
bull Flush mounted NOV Varco PS21 power slips amp Maritime Hydraulics Cathead
bull Torque turn computer integrated within Drillerrsquos cabin and via Real Time No Tubular Running crew
required
bull Sufficient mast height available to install a casing drilling system
bull Weatherford Unitong ndash Automatic Thread cleaning amp Doping 150000ftlbs of Torque range 2-38rdquo to 20rdquo
bull Unitong capable of running up to 20rdquo Casing joints ndash No requirement for Casing Crew
UniTong
OEM V-Tech Weatherford
Torque Capacity 150000 ftlbs
Tubular Range 2-38rdquo to 20rdquo
Features Torque Turn Computer
Integrated Mud Bucket
Remote Thread Dope
Remote Thread Clean
Safety Clamp
Bit Breaker
Pipe guide
Remote Stabbing Pin in Box
Running intelligent completion (Cable guide)
Make up of link threads
Stabbing whilst rotating pin side
Thread compensator
Utility Lift capacity 5 Tonnes
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Who we are
VDD 400 Series - Drillerrsquos Cabin Cyber Based System
22
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 23
Section 4
Active Mud System (AMS) amp
Hydraulic Package
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Who we are
VDD 400 Series - Active Mud System (AMS)
24
Sub-base
Access Stairs (can be mounted either side of package
depending on requirements
4 x NOV D750 LA Mud Pump Modules
2 x Shale Shaker Module
2 x Shale Shakers
1 x Vacuum Degasser
Drillfloor Main Access Egress walkway
Y-Direction PCST
Drag Chain2 x HPU Modules
660 bbl Active amp Mud Treatment System
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
AMS ndash High Pressure Mud Pump Modules
bull 4 Triple single acting Piston Pumps
bull Rated power each 750 hp (560 kW)
bull Max discharge capacity 1820 lmin
bull Max working pressure 5000 psi (345 bar)
bull Driven by AC-motors (660 kW)
bull Sea water cooling system
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 26
VDD 400 Series - Active Mud System (AMS) ndash Lvl 1
Mud Pump Module 1 to 4 (Each)
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Mud Pump OEM National Oilwell
Mud Pump Model D-750L Triplex Piston Pump
Maximum Input Horsepower 750 Horsepower (continuous)
Stroke Length 8rdquo
Piston Diameter 4-12rdquo to 7rdquo
Piston Liners Chrome or Ceramic Sleeved
Suction Pipework 6rdquo ANSI 150 psi 10 BAR
Discharge Pipework 6rdquo API 5000 psi 345 BAR
Pulsation Dampner OEM Baoji Mengtai Petroleum Machinery co
Pulsation Dampner Model KB-45
Pulsation Dampner WP 5000 psi 345 BAR
Pump Saver OEM Worldwide Oilfield Machine (WOM)
Pump Saver Model 3-116 5000 psi Magnum Pump Saver
Pump Saver WP 5000 psi 345 BAR
Strainer Block OEM Max Streicher GmbH Co
Strainer Block Diameter 4-116rdquo
Strainer Block Working Pressure 5000 psi 345 BAR
Mud Pump Module
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Mud Package Tank Modules
bull 5 tanks in 4 tank modules
bull Overall tank capacity 105 m3
bull Automatic tank cleaning system
bull Round tank bottoms providing
easy cleaning
bull Valve control from Drillerlsquos
Cabin
bull Mixing and transfer pumps
bull Conveying screws in two
directions for cuttings from
Shale Shaker
bull Air extraction system (HVAC)
Sand Trap 1255 m3
Sand Trap 2255 m3
Pill Tank7 m3
Suction Tank 119 m3
Suction Tank 228 m3
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 28
VDD 400 Series - Active Mud System (AMS) ndash Lvl 2
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Hydraulic Power Units
bull 2 Hydraulic Power Units (HPU)
bull Supply of Top Drive Hoisting System Rotary
Table pipe handling Drill Floor Crane Auxiliary
Winch
bull Max working pressure 350 bar (5076 psi)
bull Each HPU driven by electric motor (850 kW)
bull Sea water cooling system
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Mud Package Shale Shaker Modules
bull 2 Shale Shakers
bull Max flow rate each 3410 lmin
bull Produced G Forces 40 to 80 G
bull Vacuum Degasser
bull Air extraction system (HVAC)
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 31
VDD 400 Series - Active Mud System (AMS) ndash Lvl 3
HPU Module 1 amp 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Hydraulic Tank 17m3
Filtration NAS 7
Soundproofed Enclosure 75 db
Power Requirement 850 kW 690V 50Hz
Hydraulic Pump OEM Bosch Rexroth
Hydraulic Pressure 2175 psi 350 BAR
Hoisting Hydraulic Pump Model A4CSG 355
Hoisting Flowrate 710 litresmin
Rotational Hydraulic Pump Model A4CSG 355
Rotation Flowrate 710 litresmin
Unitong Hydraulic Pump Model A4VSO 125
Unitong Flowrate 210 litresmin
Pipehandler Hydraulic Pump Model A4VSO 125
Pipehandler Flowrate 210 litresmin
Hydraulic Charge Pump Model PGH5-21
Charge Pump Flowrate 67 litresmin
Motor Cooling and Control Hydraulic Pump Model
PGH4-21
Motor cooling amp Controls pump Flowrate
67 litresmin
Shale Shaker Module 1
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 1 OEM NOV Brandt
Shale Shaker 1 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Vacuum Degasser OEM Burgess Manufacturing Limited
Model Model 1500 Burgess Magna-Vac Degasser
Power Requirement 225 kW 690V 50Hz
Capacity 1000 GPM 15rdquo of Mercury Vacuum
Ditch Magnet Alexander GmbH Co
Ditch Magnet Model Perm- magn
Shale Shaker Module 2
OEM MAX STREICHER GmbH amp Co
Dimensions 6 x 3 x 29 metres
Shale Shaker 2 OEM NOV Brandt
Shale Shaker 2 Model VSM 300
Shale Shaker G-Force 46 ndash 75 (64 G Nominal)
Ditch Magnet OEM Alexander GmbH Co
Ditch Magnet Model Perm- magn
VSM300 Nominal Flow Rates(For Information Only)
50M
70M
84M
110M
140M
175M
210M
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
9 10 11 12 13 14 15 16 17
Mud Weight ppg
Flo
w R
ate
g
pm
The VDD400 Series MDR is supplied with 2 x HPU modules as
standard
The HPU Modules are Electro hydraulic and are rated for
operation within Zone 2 areas Each HPU has a total of 6 x
hydraulic pumps located within that provide fluid power to the
Hoisting Drilling Pipehandling and utility systems on the basic
rig package
Each HPU is identical and designed so that all operational
functions can be conducted via 1 x HPU thus providing
redundancy
Operations are generally conducted utilising both HPU units to
reduce load on HPU pumps Operation via 1 x HPU will be at a
reduced speed efficiency when power demands are high
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 32
Section 5
Power Generation System (PGS)
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Power Supply and System Control
Power Distribution
AC-Drive and Monitoring System (ACDM)
Power Generation
(Generator Sets)
Power supply from
platform
Transformer
Local Electrical RoomsHydraulic Power Units (HPU)
Mud system
(Mud Pumps Shale
Shaker Tanks)
Hoisting
System
Top
Drive
Pipe
Handling
Rotary
Table
or
Safety and
Automation
System Control
Center
(SAS CC)
Drillerlsquos Cabin
Autonomous operation
Auxiliary
Equipment
Uninterruptible
Power Supply
(UPS)
BOP
Control
Unit
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 34
VDD 400 Series ndash Power Generation System (PGS)
SAS UPS
SAS CC
Powerhouse 1 to 4
Generator Sets 1 to 3
NOTE
Configuration
can be altered
to suit
platform
location
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Power Supply ndash Power Generation ndash Stand alone power
bull 3 Generator Sets
bull Rated power 1320 kW
bull Effective power 1200 kW
bull Generator rating 1500 kVA
bull Voltage 690 V
bull Frequency 50 Hz
bull Day tank capacity 1000 l
bull Sea water cooling system
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Power Supply ndash Transformers and Powerhouses
2 Transformers (each 1750 kVA)
4 Powerhouse Modules
AC-Drive and Monitoring System
Power Distribution
HVAC Channels (Overpressure encapsulation)
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
HVAC Module
bull Overpressure encapsulation of all control
rooms for operations in Ex-zone 2
bull Ventilation system within HVAC module
for overpressure generation
bull Heat exchanger for heating cooling and
dehumidification
bull Redundant System
bull Max flow rate 10 000 m3h
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
VDD 400 Series MDR Alternative arrangementsPGS ndash System potential configurations
Private and Confidential 38
Triple Stacked
Generator Set
arrangement
Quad Stack
arrangement
Typically places
HVAC and SAS
modules clear
of Zone 2
Hazardous Area
boundaries
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 39
Section 6
Pipe-handling System
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Pipehandling
Pipehandling Cranebull Transportation of
tubulars from Pipe Deck
to Pipe Feeder Pipe Feederbull Adjustment
separation and
intermediate
storage of tubulars
HTV Pipehandlerbull Transportation of
tubulars from
horizontal Pipe
Feeder to vertical
position at well centre
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull Pipedeck Pipehandler Crane
bull Maximum operating wind speed 30 ms (60 Knots)
bull Hookload Capacity 217 Te 14m Radius
bull Gripper Head Capacity 2-12rdquo to 14rdquo Tubulars Used on 13 NOCS platforms
bull Gripper Head Rotational Capability of 180 Degrees
bull Crane Cab scoping capability of 2 metres
bull CCTV cameras located on gripper head Link to Pipefeeder CCTV camera
bull Memory function
bull SIL Level 2 Sensors
Emerald ndash Pipe-handling System
41
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Who we are
bull Pipefeeder Table
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum Storage capacity of 9 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull CCTV Camera and SIL level 2 sensors
Emerald ndash Pipe-handling System
42
bull Horizontal to Vertical (HTV) Pipehandler
bull Maximum operating wind speed 30 ms (60 Knots)
bull Maximum capacity of 3 Te
bull 2-12rdquo to 20rdquo Tubulars ndash Rang e I II and III
bull Remote operation from Drillers Cabin
bull Non marking gripper inserts for Chrome Tubulars
bull CCTV Camera and SIL level 3 sensors
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Who we are
bull Pipe-handling System designed in accordance with NORSOK D-001
bull Remote ldquoHands Freerdquo Operation
bull ldquoFailure Mode Analysis conducted on Pipehandler Crane amp HTV ndash Verified by DNV
bull Dropped Object Prevention Protection
bull Pipe-handling equipment systems designed fail safe
bull HTV amp Pipehandler Gripper head tested over period of 24 hrs with full weight
bull Drillfloor sub-base ndash Impact strength tested with 3Te (9-12rdquo DC) from 15m height
bull Wire mesh safety netting between pipedeck and Pipefeeder ndash use similar on Statfjord
bull Red Zone policy applied to safety critical areas
bull Rig safety features include Interlocks
bull HTV will not open until confirmation from Elevator closed
bull Safety arms will not retract until Elevator latched Gripper head opened locked
Emerald ndash Pipe-handling Safety Considerations
43
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 44
Section 7
Well Control
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Who we are
VDD400 Series - Well Control
45
BOP Stack
OEM T3 Energy
Size 13-58 Inches
Pressure Rating 10000 psi WP
T3 7082 Annular BOP 13-58 Inches 5000 psi
T3 6012 Double Ram BOP 13-58 Inches 10000 psi
T3 Drilling Spool 13-58 Inches 10000 psi
T3 6012 Single Ram BOP 13-58 Inches 10000 psi
BOP Accumulator Unit
OEM T3 Energy
Design Code NORSOK D-001
Design Pressure 3000 psi
Normal Operating Pressure 1500 psi
Shear Ram Operating Pressure 2800 psi
No of Accumulator Bottles 24
Accumulator Bottle Capacity 15 US Gallons
Accumulator BOP Hose Connections
Quick Connect Fast Lock
Remote Panels (Zone 1 compliant) 2
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
BOP Handling System
bull Trolley for BOP transportation
bull Electrically driven
bull Extendable for mast segment
transportation
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 47
Section 8
Additional Support equipment
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Additional Bespoke Equipment amp Solutions
bull Interface components for adaption of the
modular rig to various platforms
bull Realization of specific customer
requirements
bull Exemplary modules and systems
bull Additional modular Pipe Deck
bull Additional pipe handling equipment
bull Swarf Unit for PampA operations
bull Additional mud treatment components
bull Additional stair towers
bull Additional escape routes
bull Additional gangways from platform to
rig
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 49
RMT ndash Reserve MudMix Tanks
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 50
Section 9
Operating animation
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Archer MDR ndash Example operation animation
Private and Confidential 51
Click on Archer screen below for hyperlink to example rig up animation
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Private and Confidential 52
Section 10
Real life feedback
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Archer Emerald - Real life feedback
Private and Confidential 53
Click on Archer screen below for hyperlink to video
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Archer Emerald - Real life feedback
Private and Confidential 54
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Archer Emerald - Real life feedback
Private and Confidential 55
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Topaz ndash Real life feedback
Private and Confidential 56
Statoil extends modular rig deal
Efficiency boost Heimdal platform
06 January 2015 0836 GMT
Steve Marshall 28 September 2015 0912 GMT
Statoil has extended its contract with Archer for use of modular drilling rig Archer Topaz
after achieving a significant efficiency gain in plug-and-abandonment work with the unit at
the Heimdal field off Norway
The state-owned operator now intends to use the platform -based rig to drill a new production well at the North
Sea gas field which has been shut down under the three-month extension to the charter that kicked off last year
A Statoil spokesman told Upstream the time required for the 12-well PampA campaign at the disused field had been
reduced by 50 giving it the opportunity to use the rig for the production well that will start drilling in the fourth
quarter and has an estimated duration of 90 days
He said a sidetrack will be drilled in the eleventh hole to be plugged to tap warm gas from the fieldrsquos own
reservoir to facilitate accelerated start-up of the platform which now serves as a processing hub for other fields
including Atla Huldra Skirne and Vale after Heimdal reached the end of its producing life last year
ldquoThis will increase recovery from the Heimdal field and also boost the production efficiency of the platform by
reducing downtimerdquo the spokesman said adding the PampA efficiency gain was in line with Statoilrsquos so-called Step
(Statoil Technical Efficiency Programme) initiative
Heimdals HMP1 drilling production and accommodation platform is meanwhile being upgraded to serve as a
gas processing and distribution hub after Statoil secured a 20-year life extension for the facility from Norwayrsquos
Petroleum Safety Authority to keep it operational until 2034
Once the production well is drilled the rig will then carry out plugging of the final 12th hole in the PampA programme
in the first half of 2016 before the unit is demobilised for planned maintenance
An Archer spokesman said plugging and abandonment of the 11 wells had been carried out 55 days ahead of
schedule
However the drilling services contractor - backed by shipping and offshore billionaire John Fredriksenrsquos Seadrill -
has so far not lined up any further work for the Archer Topaz as contracts have dried up due to a market slump
Archer was earlier this year hit by the cancellation of a $96 million deal for its other modular rig Archer Emer ald
by Talisman Sinopec Energy UK that had intended to use it for drilling work starting in the first quarter of next
year on the Montrose Area redevelopment scheme in the British sector
The spokesman stated in an e-mail ldquoBoth rigs are currently being actively marketedrdquo
The contractor is touting the modular rig concept as a cost-efficient alternative to mobile offshore rigs and
traditional drilling platforms stating its compactness reduces the platform size required the size of the drilling
crew and associated construction costs
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
Real life feedbackTopaz Statoil Heimdal PPampA performance
57
WellA-06
WellA-08
WellA-12
WellA-09
WellA-07
WellA-11
WellA-10
WellA-02
WellA-03
WellA-05
WellA-01
WellA-04
Actual 442 15 46 145 148 10 8 13 11 88 15 0
Planned 36 32 53 29 22 15 15 15 15 7 26 0
0
5
10
15
20
25
30
35
40
45
50
55
60
Da
ys
Planned vs Actual
Rig shake-down + crew familiarisation well
ldquoRed Wellrdquo known integrity and pressure issued
Completed ahead of plan
Injector well PPampA to be conducted post
completion of planned A-05 drilling operation
548 days ahead
Two section side-track
production well planned
Private and Confidential
END
Private and Confidential 58
END