Archer Engineering Drilling Facilities Capabilities · NORSOK S-002 compliant. Archer Engineering...

10
Archer Engineering Drilling Facilities Capabilities SEMTECH 2019 Martin Nilsen, Area Manager Archer Engineering Norway

Transcript of Archer Engineering Drilling Facilities Capabilities · NORSOK S-002 compliant. Archer Engineering...

Page 1: Archer Engineering Drilling Facilities Capabilities · NORSOK S-002 compliant. Archer Engineering –Engineering home the Future Completed Projects: Upgrade Drillstring Compensator

Archer Engineering – Drilling Facilities CapabilitiesSEMTECH 2019

Martin Nilsen, Area Manager Archer Engineering Norway

Page 2: Archer Engineering Drilling Facilities Capabilities · NORSOK S-002 compliant. Archer Engineering –Engineering home the Future Completed Projects: Upgrade Drillstring Compensator

2

About Archer - Scale and reach

Over 5,000

employees

Own & operate

81 land rigsPerform Project Services

onboard > 50 assets

Own & operate 2 Modular

Drilling Rigs (MDR)

Surface Capabilities

• Integrated services

• Offshore Platform Drilling

• Offshore MODU management

• Offshore Modular Rigs

• Land Drilling / Rigs

• Rentals

• Engineering

• Survey & Inspection

Well integrity

& intervention

• Oil Tools

• Wireline

• Diagnostics

Page 3: Archer Engineering Drilling Facilities Capabilities · NORSOK S-002 compliant. Archer Engineering –Engineering home the Future Completed Projects: Upgrade Drillstring Compensator

3

Archer Global Footprint

Page 4: Archer Engineering Drilling Facilities Capabilities · NORSOK S-002 compliant. Archer Engineering –Engineering home the Future Completed Projects: Upgrade Drillstring Compensator

4

40Years of Drilling Facility

Design & Construction

Experience

Archer Engineering

150 Discipline Engineers

We combine operations experience, engineering excellence and asset management expertise to deliver highly effective and efficient drilling

and well solutions

• Engineering

• Drilling Facility Engineering & Modification Projects

• Multi Discipline Engineering Green & Brownfield

• Studies, Survey, FEED & Detail Engineering

• Project Management & Execution

• Construction Supervision

• Installation, Commissioning, Coordination

• Inspection and rope access

• Consulting

• Drilling, Well and Operational

• Engineering & Technology

• Management and Support

• Segments

• Fixed Platform facilities, Jack up's and floating units

Page 5: Archer Engineering Drilling Facilities Capabilities · NORSOK S-002 compliant. Archer Engineering –Engineering home the Future Completed Projects: Upgrade Drillstring Compensator

Archer Engineering – Rig Concepts

Classing on Location

MODU Project

ManagementEPCIC

Inspection & Rope Access

DisciplineEngineering

Reactivation& ConditionAssessment

Archer Engineering undertake modifications of all sizes for Mobil Offshore Drilling Units (MODU) and

offshore vessels.

We always aim to provide solutions to suit project needs.

We are able to handle the entire project from initial phases including maturation processes and all the way

through execution and project close-out.

Page 6: Archer Engineering Drilling Facilities Capabilities · NORSOK S-002 compliant. Archer Engineering –Engineering home the Future Completed Projects: Upgrade Drillstring Compensator

Archer Engineering – Engineering home the Future

Current Ongoing Drilling Projects conducted by Archer Engineering

Layout and structural

Engineering for Robotics project

Digitalization ofDriller’s Cabin

Shaker ModuleUpgrades

New RNX installation

New CasingModule incl.

Material Handling

Upgrade ofDriller’s cabin

New Subsea BOP’s

Upgrade BOP control system’s

New Utility & Manrider Winch

Refurbishmentsin Drilling Module

Upgrade ofMixing Unit and

Slurry Unit

New FrequencyConverters

MudpumpUpgrades

Mud CoolerModifications

3rd party Integration

Re-certification ofSubsea

Equipment

Page 7: Archer Engineering Drilling Facilities Capabilities · NORSOK S-002 compliant. Archer Engineering –Engineering home the Future Completed Projects: Upgrade Drillstring Compensator

Archer Engineering – Engineering home the Future

Completed Projects: Modification of Pipehandler Cabin

Client Challenges

•Ergonomics

•Blind zones

•Noise

•Outdated Instrumentation

•Rig Layout

•Schedule & Budget

Archer Engineering – Solutions

•Modification of cabin

•New Operator’s chair on rails

•New HVAC and improved sealing

•Self-closing door

•Re-arrange instrumentation, CCTV and screens

Project Success factors

•Early involvement of users and safety delegates

•Good relationship with client

•Close follow up of suppliers and 3rd parties

•Engagement of multi-discipline engineering competency (layout, technical safety, working enviroment, structure, E&I etc)

NORSOK S-002 compliant

Page 8: Archer Engineering Drilling Facilities Capabilities · NORSOK S-002 compliant. Archer Engineering –Engineering home the Future Completed Projects: Upgrade Drillstring Compensator

Archer Engineering – Engineering home the Future

Completed Projects: Upgrade Drillstring Compensator

Client Challenges

•Lack of double barrier in case of undesired closure of isolation valve

•Non-compliance with DNV rules

•Additional scope escalation (OEM recommendations, Maintenance, AHC, HPU, MRU etc)

•Weather constraints, exhaust and flaring

•Risk of lack of project control

•Tight installation window

Archer Engineering – Solutions

•Replacement of valves, cabinets, control panels etc

•New cushioning cylinders

•Structural modifications on rig

Project Success factors

•Early involvement of users and safety delegates

•Good relationship with client

•Close follow up of suppliers and 3rd parties

•High focus on risk management in project

•Strong commitment to planning lifting operations and work at height

•Thorough planning related to other drillfloor related activities

DNV-OS-E101 compliant

Page 9: Archer Engineering Drilling Facilities Capabilities · NORSOK S-002 compliant. Archer Engineering –Engineering home the Future Completed Projects: Upgrade Drillstring Compensator

Archer Engineering – Engineering home the Future

Completed Projects: Upgrade Cuttings Re-injection System

Client Challenges

• Insufficient capacity of CRI Unit vs Client requirements

•Wear and tear on existing CTS and CRI system

• Insufficient deck capacity with new modification

•Tight project schedule (critical path activity during yardstay)

•Lack of as-built drawings on rig, operational changes made without proper updates in doc

Archer Engineering – Solutions

•New coarse tanks and pumps

•New pipelines and valves

•Deck Re-inforcement

•Upgrade new power supply

•Upgrade of existing CRI control system

•New weather protection for compressors

•HVAC installation

Project Success factors

•Scanning surveys

•Early focus on LLI’s

•Good cooperation with customer including users

•Hands-on Engineering with competent discipline engineers

•High focus on proper change management (TQ/VOR system, Change log etc)

•Early focus on lifting plans and lifting equipment, incl commitment with users

End-Client REQ. compliant

Page 10: Archer Engineering Drilling Facilities Capabilities · NORSOK S-002 compliant. Archer Engineering –Engineering home the Future Completed Projects: Upgrade Drillstring Compensator

10

ARCHER ENGINEERING

THANK YOU!