ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project DT 175-02 ARCHITECTURAL TECHNOLOGY Emma Harrington 12/20/18 Student Number: C17750321

Transcript of ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name...

Page 1: ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date Passive House

ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project DT 175-02 ARCHITECTURAL TECHNOLOGY

Emma Harrington 12/20/18 Student Number: C17750321

Page 2: ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date Passive House

TDS PROJECT 3: Passive House Development DT 175 ARCHITECTURAL TECHNOLOGY

Date: 20 December 2018 Page 1 Student Name: Emma Harrington Student Number: C17750321

List of Drawings

Drawing 300 Site Plan / Location Plan (1: 500 /1:200)

Includes Drainage for Foul Water, Surface Water and Mains Water

Drawing 301 Block (A, B, C & D) – Ground & 1st Floor Plans (1:50) Drawing 302 Block (A, B, C & D) – 2nd & 3rd Floor Plans (1:50)

1st Floor Construction

Drawing 303 Block (A, B, C or D) – Roof & 1st Floor Construction Plans (1:50) Drawing 304 Block (A, B, C or D-) – Elevations: North, South & West (1: 50)

Drawing 305 Section AA- East Elevation (1:50) Drawing 306 Section BB – Façade Elevation (1:20) Drawing 307 Section CC – Façade Elevation (1:20) Drawing 308 Details – External Wall Types & Change of Material (Vertical) (1:5)

Brick, Render, Stone & Party Wall Drawing 309 Details – Ground Floor Foundations & Cold Roof Eaves (1:5) Drawing 310 Details – Window Detail (Cill, Head & Jamb) (1:5) Drawing 311 3D Views – North & South Elevations (NTS)

Page 3: ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date Passive House

North

SURFACE WATER DRAINAGE

FOUL WATER DRAINAGE

MAINS WATER H

NOTE: PIPES MUST BE AT LEAST 1M APART

ARMSTRONG JUNCTION300X 300MM

MANHOLE FOUL WATER600MM X 600MM

MANHOLE SURFACE WATER600MM X 600MM

BLOCK B

BLOCK A

BLOCK C

BLOCK D

BARROW ROAD

NOTE: FALL OF SURFACE WATER: 1:80FALL OF FOUL WATER 1:60

HIGH LEVEL OVERVIEW OF FOUL WATER & SURFACE WATE DRAINAGE - BROOMBRIDGE APARTMENTS

GROUND LEVEL: 36.44INVERT LEVEL: 33.40

AJ 1CL: 36.44IL: 36.14

AJ 2: CL: 36.14IL: 36.04

AJ 3:CL: 36.04IL:35.904

MH1: CL: 35.94IL: 35.816

MH2: CL: 35.94IL: 35.592

MH3: CL: 35.592IL: 35.288

AJ 5:CL: 35.664IL: 35.548

AJ 4:CL: 35.78IL: 35.664

MH 4:CL: 35.548IL: 35.427

MH5:CL: 35.427IL: 35.353

MH6: CL: 35.592IL: 35.218

MH7: Main DrainCL: 35.218IL: 33.4

H

H

SW AJ 1CL: 36.44IL: 36.14

SW AJ 2CL: 36.14IL: 35.93

SW MH1: CL: 35.93IL: 35.65

SW MH2: CL: 35.65IL: 35.41

1000 SW MH2: Main Drain CL: 35.41IL: 33.44

Location of Site Notice North

BLOCK CBLOCK D

BLOCK B

BLOCK A

Scale

Submitted to

Drawn byDateProject numberOrganisation Name

Project NameSheet Name

Client NameEmma Harrington

DT175-02 2018_19

Asindicated

Site / Location &Drainage Plan

03

Passive House

DT175 02 20th December 2018

DT175 02

DITEmma Harrington

1 : 200Site Plan with Proposed Drainage

1 : 500Site Location Plan2

Page 4: ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date Passive House

UP UP

19

18

17

16

15

14

13

12

11 10 9 8 7 6 5 4 3 2 1 11 10 9 8 7 6 5 4 3 2 1

19

18

17

16

15

14

13

12

UP UP UP UP

UP11 10 9 8 7 6 5 4 3 2 1

19

18

17

16

15

14

13

12

11 10 9 8 7 6 5 4 3 2 1

19

18

17

16

15

14

13

12

8

7

6

5

4

3

2

1

13 12 11 10 9

8

7

6

5

4

3

2

1

131211109

8

7

6

5

4

3

2

1

8

7

6

5

4

3

2

1

13 12 11 10 9

131211109

1

3830

114975

0

400

1200

13 m²BEDROOM

2 m²UTILITY

4 m²BATHROOM

4 m²HALL

30 m²

KITCHEN / DINING /LIVING ROOM

1200

TGD M ACCESSIBLE ENTRANCE

TGD M ACCESSIBLE HALL

900

1200

1000

1770

TGD M ACCESSIBLE BATHROOM

5070

1215

0

5915

1200

2

50

3830

1149 75

0

400

1200

14 m²BEDROOM

2 m²UTILITY

4 m²BATHROOM

3 m²HALL

30 m²

KITCHEN / DINING /LIVING ROOM

1200

TGD M ACCESSIBLE ENTRANCE

TGD M ACCESSIBLE

HALL

95017

70

TGD M ACCESSIBLE BATHROOM

5070

5915

1200

3

3830

114975

0

400

1200

13 m²BEDROOM

2 m²UTILITY

4 m²BATHROOM

4 m²HALL

30 m²

KITCHEN / DINING /LIVING ROOM

1200

TGD M ACCESSIBLE ENTRANCE

TGD M ACCESSIBLE HALL

900

1200

1000

1770

TGD M ACCESSIBLE BATHROOM

5070

5915

1200

50

4

3830

1149 75

0

400

1200

14 m²BEDROOM

2 m²UTILITY

4 m²BATHROOM

3 m²HALL

30 m²

KITCHEN / DINING /LIVING ROOM

1200

TGD M ACCESSIBLE ENTRANCE

TGD M ACCESSIBLE

HALL

900

1200

950

1770

TGD M ACCESSIBLE BATHROOM

5915

1200

5070

5

5908 5586 5586 5580

622937

A

B

C

D

E

1200

900

103 BRICK WITH STAINLESSSTEEL WALL TIES ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 22MM STRUCTURALOSB ON, 50MM WOODFIBRE BOARD ON, 225MMTIMBER STUD FILLED WITHLOOSE CELLULOSEINSULATION ON, 18MM OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLASTERBOARD PLANKON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY WITHBATTENS ON, 12.5MMPLASTERBOARD WITH 3MMSKIM -APPLIED IN 2 LAYERS

50MM SANDSTONECLADDING ON, 50MMVENTILATED CAVITY ONBREATHER MEMBRANE ON,22MM STRUCTURAL OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLANK PLASTERBOARDON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY ON,12.5MM PLASTERBOARDWITH 3MM SKIM - APPLIEDIN 2 LAYERS

PARTY WALLCONSTRUCTION: 3MM SKIM- APPLIED IN 2 LAYERS ON,12.5MM PLASTERBOAR ON50MM SERVICE CAVITY ON,12.5 PLASTERBOARDSOUND BLOC ON, 19MMPLANK PLASTERBOARDON, VAPOUR CONTROLLAYERS ON, 18MM OSB ON,100MM X 50MM TIMBERFRAME FILLED WITHLOOSE CELLLOUSE ON18MM OBS BOARD (REPEATFOR 2ND HOUSE)

FLOOR CONSTRUCTION150MM CONCRETE ON,100MM EPS (X3) ON,COMBINED RADON/DPMON 50MM BLINDINGLAYER ON 150MMHARDCORE

EXTERNAL CONCRETE STEPS(BUILD AS PER TGD M GUIDELINES)RISER 170MM, GOING 300MM, WIDTH 1,200MM, HEIGHT OF FLIGHT 1,500MM MAX. HANDRAIL 900MM FROM PITCH LINE, 300MM OVER RUN AT BASE. CONTINUOUS GUARDING AROUND 1ST FLOOR ENTRANCE 1,100MM HIGH

North

1215

0

5908

22937

103 BRICK WITH STAINLESSSTEEL WALL TIES ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 22MM STRUCTURALOSB ON, 50MM WOODFIBRE BOARD ON, 225MMTIMBER STUD FILLED WITHLOOSE CELLULOSEINSULATION ON, 18MM OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLASTERBOARD PLANKON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY WITHBATTENS ON, 12.5MMPLASTERBOARD WITH 3MMSKIM -APPLIED IN 2 LAYERS

1

13 m²Outdoor Deck

9 m²Kitchen

18 m²

Dining Room / LivingRoom

400

10822846

2 3 4 5

13 m²Outdoor Deck

9 m²Kitchen

18 m²

Dining Room / LivingRoom

400

2796

5070

5070

5070

13 m²Outdoor Deck

9 m²Kitchen

18 m²

Dining Room / LivingRoom

400

10502846

5070

5070

13 m²Outdoor Deck

9 m²Kitchen

18 m²

Dining Room / LivingRoom

400

1050 2796

5070

5070

1200

6

A A

B B

C C

D D

E

EXTERNAL CONCRETE STEPS(BUILD AS PER TGD M GUIDELINES)RISER 170MM, GOING 300MM, WIDTH 1,200MM, HEIGHT OF FLIGHT 1,500MM MAX. HANDRAIL 900MM FROM PITCH LINE, 300MM OVER RUN AT BASE. CONTINUOUS GUARDING AROUND 1ST FLOOR ENTRANCE 1,100MM HIGH

PARTY WALLCONSTRUCTION: 3MM SKIM- APPLIED IN 2 LAYERS ON,12.5MM PLASTERBOAR ON50MM SERVICE CAVITY ON,12.5 PLASTERBOARDSOUND BLOC ON, 19MMPLANK PLASTERBOARDON, VAPOUR CONTROLLAYERS ON, 18MM OSB ON,100MM X 50MM TIMBERFRAME FILLED WITHLOOSE CELLLOUSE ON18MM OBS BOARD (REPEATFOR 2ND HOUSE)

103 BRICK WITH STAINLESSSTEEL WALL TIES ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 22MM STRUCTURALOSB ON, 50MM WOODFIBRE BOARD ON, 225MMTIMBER STUD FILLED WITHLOOSE CELLULOSEINSULATION ON, 18MM OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLASTERBOARD PLANKON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY WITHBATTENS ON, 12.5MMPLASTERBOARD WITH 3MMSKIM -APPLIED IN 2 LAYERS

7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS

INTERMEDIATE FLOORCONSTRUCTION: 22MMT&G FLOORING ON, 18MMOSB BOARD ON,225MM X63MM TIMBER JOISTS @400MM CENTERES FILLEDWITH 225MM MINERALWOOL INSULATION ON,VAPOUR CONTROLLAYER ON, 19MMGYPROC PLASTERBOARDPLANK ON, 12.5MMGYPROC SOUND BLOCKON, 40MM BATTENS(SERVICE CAVITY) ON,12.5MM GYPROC WALLBOARD

EXTERNAL PARTY WALLCONSTRUCTION: 7MMBREATHABLE RENDERON,15MM OSB BOARD ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 18MM OSB,100MM XPSINSULATION ON, VAPOURCONTROL LAYER ON 18MMOSB ON 7MM RENDER

PRIVATE STAIRS: (COMPLY WITH TGD K)900MM WIDTH, 210MM RISER, 250MM GOING. NO MORE THAN 16 STEPS PER FLIGHT. 50MM HANDRAIL - ON BOTH SIDES FOR LESS AMBULANT USERS. (CLEAR AREA BETWEEN STAIRS 800MM). HANDRAIL OVERRUN 300MM AT TOP & BOTTOM OF STAIRS.400MM CLEAR & UNOBSTRUCTED AREA AT TOP OF STAIRS.

BALCONY FLOORCONSTRUCTION 160MMCONRETE WITHCORUS-COM FLOR 51

EXTERNAL DECK: 50MMSTONE PAVING ONPROPRIETARY FOOTINGSON, 50MM CRUSHEDAGGREGATE (20-40MMTHICK) ON, PLYWOODBACKED XPS 100MMRIGID INSULATION ON,VAPOUR CONTROLLAYER ON, 30MM OFASHPALTWEATHERPROOF LAYERS(X2) ON, PROTECTIVELAYER ON, 18MM OSBBOARD ON,225MM X63MM JOISTS WITH225MM MINERAL WOOLINSULATION (BETWENJOISTS) ON, VAPOURCONTROL LAYER ON,19MM GYPROC PLANKPLASTERBOARD ON,12.5MM GYROCSOUNDBLOCKPLASTERBOARD ON, 50 X38MM BATTENS (SERVICECAVITY) ON 12.5MMGYPROC CEILING BOARDWITH 3MM SKIM APPLIEDIN TWO LAYERS

Emma HarringtonDT175-02 2018_19

Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date

Passive House 03 DT175 02 GA - Ground & 1st Floor Plan 301 Emma Harrington 12/19/18

1 : 500 Ground FFL1

1 : 501 First FFL2

Page 5: ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date Passive House

UP UP UP UP

12 11 10 9

8

7

6

5

4

3

2

1

8

7

6

5

4

3

2

1

131211109 12 11 10 9

8

7

6

5

4

3

2

1

8

7

6

5

4

3

2

1

1211109

1

2349

2686

3130

1552

1426

622

4 m²MAIN BATHROOM

10 m²BEDROOM 1

4 m²ENSUITE

12 m²BEDROOM 2

3 m²STORE11

10

23761735

900

420

3 4 5

2349

2686

3130

1376

622

4 m²MAIN BATHROOM

10 m²BEDROOM 1

4 m²ENSUITE

12 m²BEDROOM 2

3 m²STORE 11

10

2326 1735

967

420

2349

2686

3130

1520

1426

622

4 m²MAIN BATHROOM

10 m²BEDROOM 1

4 m²ENSUITE

12 m²BEDROOM 2

3 m²STORE11

10

23761735

900

420

2349

2686

3130

1520

1376

622

4 m²MAIN BATHROOM

10 m²BEDROOM 1

4 m²ENSUITE

12 m²BEDROOM 2

3 m²STORE 11

10

2326 1735

900

420

6

7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS

7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS

PRIVATE STAIRS: (COMPLY WITH TGD K)900MM WIDTH, 210MM RISER, 250MM GOING. NO MORE THAN 16 STEPS PER FLIGHT. 50MM HANDRAIL - ON BOTH SIDES FOR LESS AMBULANT USERS. (CLEAR AREA BETWEEN STAIRS 800MM). HANDRAIL OVERRUN 300MM AT TOP & BOTTOM OF STAIRS.400MM CLEAR & UNOBSTRUCTED AREA AT TOP OF STAIRS.

7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS

INTERMEDIATE FLOORCONSTRUCTION: 22MMT&G FLOORING ON, 18MMOSB BOARD ON,225MM X63MM TIMBER JOISTS @400MM CENTERES FILLEDWITH 225MM MINERALWOOL INSULATION ON,VAPOUR CONTROLLAYER ON, 19MMGYPROC PLASTERBOARDPLANK ON, 12.5MMGYPROC SOUND BLOCKON, 40MM BATTENS(SERVICE CAVITY) ON,12.5MM GYPROC WALLBOARD

1

2656

13 m²BEDROOM 3

6 m²STORE

12 m²Store

1970

5154

2040

2385

2910

2 3 4 5

12 m²Store

90

2656

13 m²BEDROOM 3

6 m²STORE

1970

5153

2040

2385

2910

5070

12 m²Store

90

2656

13 m²BEDROOM 3

6 m²STORE

1970

5154

2385

2910

5070

12 m²Store

90

2656

13 m²BEDROOM 3

6 m²STORE

1920

5154

2385

2910

5070

6

A

B

C

D

7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS

7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS

7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS

PRIVATE STAIRS: (COMPLY WITH TGD K)900MM WIDTH, 210MM RISER, 250MM GOING. NO MORE THAN 16 STEPS PER FLIGHT. 50MM HANDRAIL - ON BOTH SIDES FOR LESS AMBULANT USERS. (CLEAR AREA BETWEEN STAIRS 800MM). HANDRAIL OVERRUN 300MM AT TOP & BOTTOM OF STAIRS.400MM CLEAR & UNOBSTRUCTED AREA AT TOP OF STAIRS.

INTERMEDIATE FLOORCONSTRUCTION: 22MMT&G FLOORING ON, 18MMOSB BOARD ON,225MM X63MM TIMBER JOISTS @400MM CENTERES FILLEDWITH 225MM MINERALWOOL INSULATION ON,VAPOUR CONTROLLAYER ON, 19MMGYPROC PLASTERBOARDPLANK ON, 12.5MMGYPROC SOUND BLOCKON, 40MM BATTENS(SERVICE CAVITY) ON,12.5MM GYPROC WALLBOARD

Emma HarringtonDT175-02 2018_19

Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date

Passive House 03 DT175 02 GA - 2nd & 3rd Floor Plans 302 Emma Harrington 12/19/18

1 : 502 Second FFL1

1 : 503 Third FFL2

Page 6: ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date Passive House

UP

1 2 3 4

200

6

A

B

C

D

PV PANELS:(AS PER TGD L - ENSURE AT LEAST 3 X PV PANELS (900MM X 1500MM) PER HOUSE ON FRONT / SOUTH ELEVATION. EACH PANEL WILL PROVIDE THE HOUSE WITH 300 WATTS OF POWER.

ROOF CONSTRUCTION: FIBRE CEMENT TEGRAL THRUTONE ENDURANCE TEXTURED BLUE BLACK TILES (600 X 300MM), WITH 9OMM LAP - AS PITCH <350 ON;50 X 36MM S/F BATTENS @ ON; 150MM X 47MM RAFTERS @ 400MM CENTRES WITH 150MM X 2 MINERAL WOOL INSULATION WEDGED BETWEEN RAFTERS ON;VAPOUR CONTROL LAYER ON;50 X 38MM BATTENS ON 19MM GYPROC PLANK BOARD ON 12.5MM GYPROC CEILING BOARD WITH 3MM SKIM APPLIED IN 2 LAYERS

NOTE: WHEN SPECIFICYING A CLOSE FITTING COVERING (SUCH AS FIBRE CEMENT TILES) THERE IS A RISK OF INTERSTITIAL CONDENSATION FORMING ON THE UNDERSIDE OF THE UNDERLAY AND THE EXTERNAL COVERING - THEREFORE SPECIFY A LR (LOW RESISTANCE <0.25MNs/g) UNDERLAY AND ENSURE THE BATTEN SPACE IS VENTILATED IN ACCORDANCE WITH BS 5250:2011 USING A VENTILATED COUNTERBATTEN VOID

5908 5586 5586 5580

6494

22912

ROOF DRAINAGE;(AS PER TGD H - PARA 1.5.1.2)EFFECTIVE ROOF AREA >103M2, THEREFORE THE GUTTER SIZE SHOULD BE 150MM WITH RWO WITH OUTLETS OF 89MM MIN. 2 X RWO PER HOUSE - IN CASE THERE IS A BLOCKAGE IN ONE.

1

400

50

400

BRIDGING / STRUTTING:1 x ROW OF SOLID BUT STAGGERED BRIDGING REQUIRED FOR SPANS >2.5M.2 x ROWS OF BRIDGING REQUIRED FOR SPANS >4.5M @ 1.35M CENTRES (max.)BRIDGING SHOULD BE AT LEAST 3/4 depth of JOIST (225MM X 63MM). NO BRIDGING REQUIRED ON OUTER DECK AS SPAN IS LESS THAN 2.5M

1350

2

A

B

C

TRIMMERS:ENSURE TRIMMERS AROUND STAIR OPES (2 X 225MM X 63MM) ON 2ND AND 3RD FLOORS.

DOUBLE JOISTS: TO BE USED UNDER SANITARY FIXINGS (BATH,SHOWER, TOILET ETC.)ALSO TO BE USED WHERE STUD PARTITIONS ARE AT RIGHT ANGLES TO THE JOIST

SPAN OF FLOOR = 5.07MSPAN 1/20 = JOIST DEPTH OF 253MM. ACCORDING TO TRADE SPAN TABLES OPTIMUM JOIST TO SPAN 5M+ = 225MM X 63MM/.

ENSURE 1ST JOIST IS 50MM FOR WALL. USE FOLDING WEDGES (50X75MM) AT GABLE / PARTY WALLS AT EACH ROW OF BRIDGING.

Emma HarringtonDT175-02 2018_19

Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date

Passive House 03 DT175 02 GA - Roof Plan & IntermediateFloor Constrruction

303 Emma Harrington 12/19/18

1 : 504 Roof Plan1

1 : 501 First Floor Construction Plan2

Page 7: ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date Passive House

0 Ground FFL0

1 First FFL3150

-1 Top Found-600

1

2 Second FFL5950

4 Roof Plan11550

3 Third FFL8750

1A Balcony Wall4250

5 Top of Parapet12750

23456

7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS

103 BRICK WITH STAINLESSSTEEL WALL TIES ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 22MM STRUCTURALOSB ON, 50MM WOODFIBRE BOARD ON, 225MMTIMBER STUD FILLED WITHLOOSE CELLULOSEINSULATION ON, 18MM OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLASTERBOARD PLANKON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY WITHBATTENS ON, 12.5MMPLASTERBOARD WITH 3MMSKIM -APPLIED IN 2 LAYERS

0 Ground FFL0

1 First FFL3150

-1 Top Found-600

1

2 Second FFL5950

4 Roof Plan11550

3 Third FFL8750

1A Balcony Wall4250

5 Top of Parapet12750

2 3 4 56

7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS

EXTERNAL CONCRETE STEPS(BUILD AS PER TGD M GUIDELINES)RISER 170MM, GOING 300MM, WIDTH 1,200MM, HEIGHT OF FLIGHT 1,500MM MAX. HANDRAIL 900MM FROM PITCH LINE, 300MM OVER RUN AT BASE. CONTINUOUS GUARDING AROUND 1ST FLOOR ENTRANCE 1,100MM HIGH

50MM SANDSTONECLADDING ON, 50MMVENTILATED CAVITY ONBREATHER MEMBRANE ON,22MM STRUCTURAL OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLANK PLASTERBOARDON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY ON,12.5MM PLASTERBOARDWITH 3MM SKIM - APPLIEDIN 2 LAYERS

ROOF CONSTRUCTION: FIBRE CEMENT TEGRAL THRUTONE ENDURANCE TEXTURED BLUE BLACK TILES (600 X 300MM),

PV PANELS:(AS PER TGD L - ENSURE AT LEAST 3 X PV PANELS (900MM X 1500MM) PER HOUSE ON FRONT / SOUTH ELEVATION. EACH PANEL WILL PROVIDE THE HOUSE WITH 300 WATTS OF POWER.

0 Ground FFL0

1 First FFL3150

-1 Top Found-600

2 Second FFL5950

4 Roof Plan11550

3 Third FFL8750

1A Balcony Wall4250

5 Top of Parapet12750

A B C D E

103 BRICK WITH STAINLESSSTEEL WALL TIES ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 22MM STRUCTURALOSB ON, 50MM WOODFIBRE BOARD ON, 225MMTIMBER STUD FILLED WITHLOOSE CELLULOSEINSULATION ON, 18MM OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLASTERBOARD PLANKON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY WITHBATTENS ON, 12.5MMPLASTERBOARD WITH 3MMSKIM -APPLIED IN 2 LAYERS

7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS

50MM SANDSTONECLADDING ON, 50MMVENTILATED CAVITY ONBREATHER MEMBRANE ON,22MM STRUCTURAL OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLANK PLASTERBOARDON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY ON,12.5MM PLASTERBOARDWITH 3MM SKIM - APPLIEDIN 2 LAYERS

ROOF CONSTRUCTION: FIBRE CEMENT TEGRAL THRUTONE ENDURANCE TEXTURED BLUE BLACK TILES (600 X 300MM),

PV PANELS:(AS PER TGD L - ENSURE AT LEAST 3 X PV PANELS (900MM X 1500MM) PER HOUSE ON FRONT / SOUTH ELEVATION. EACH PANEL WILL PROVIDE THE HOUSE WITH 300 WATTS OF POWER.

EXTERNAL CONCRETE STEPS(BUILD AS PER TGD M GUIDELINES)RISER 170MM, GOING 300MM, WIDTH 1,200MM, HEIGHT OF FLIGHT 1,500MM MAX. HANDRAIL 900MM FROM PITCH LINE, 300MM OVER RUN AT BASE. CONTINUOUS GUARDING AROUND 1ST FLOOR ENTRANCE 1,100MM HIGH

Scale

Submitted to

Drawn byDateProject numberOrganisation Name

Project NameSheet Name

Client NameEmma Harrington

DT175-02 2018_19

1 : 100

GA - Elevations

03

Passive House

DT175 02 20th December 2018

DT175 02

DITEmma Harrington

1 : 100North2

1 : 100South3

1 : 100West4

Page 8: ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date Passive House

0 Ground FFL0

1 First FFL3150

-1 Top Found-600

2 Second FFL5950

4 Roof Plan11550

3 Third FFL8750

3150

2800

2800

1A Balcony Wall4250

5 Top of Parapet12750

ABCDE

7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS

7MM EXTERNALBREATHABLE RENDER ON,15MM AQUABOARD O,50MM BATTENS VERTICALVENTILATED CAVITY ON,BREATHER MEMBRANE ON,18MM OSB ON, 50MMWOOD FIBRE BOARD ON,225M TIMBER STUD FILLEDWITH LOOSE CELLULOSEON, 18MM OSB BOARD ON,VAPOUR CONTROL LAYERON, 19MM GYPROCPLASTERBOARD PLANKON, 12.5MM GYPROCSOUND BLOCK ON, 50MMBATTENS (VERTICAL)SERVICE CAVITY ON12.5MM GYPROC BOARDWITH 3MM SKIM APPLIED INTWO LAYERS

103 BRICK WITH STAINLESSSTEEL WALL TIES ON,40MM VENTILATED CAVITYON, BREATHER MEMBRANEON, 22MM STRUCTURALOSB ON, 50MM WOODFIBRE BOARD ON, 225MMTIMBER STUD FILLED WITHLOOSE CELLULOSEINSULATION ON, 18MM OSBBOARD ON, VAPOURCONTROL LAYER ON, 19MMPLASTERBOARD PLANKON, 12.5MM SOUND BLOCPLASTERBOARD ON, 50MMSERVICE CAVITY WITHBATTENS ON, 12.5MMPLASTERBOARD WITH 3MMSKIM -APPLIED IN 2 LAYERS

FLOOR CONSTRUCTION150MM CONCRETE ON,100MM EPS (X3) ON,COMBINED RADON/DPMON 50MM BLINDINGLAYER ON 150MMHARDCORE

INTERMEDIATE FLOORCONSTRUCTION: 22MMT&G FLOORING ON, 18MMOSB BOARD ON,225MM X63MM TIMBER JOISTS @400MM CENTERES FILLEDWITH 225MM MINERALWOOL INSULATION ON,VAPOUR CONTROLLAYER ON, 19MMGYPROC PLASTERBOARDPLANK ON, 12.5MMGYPROC SOUND BLOCKON, 40MM BATTENS(SERVICE CAVITY) ON,12.5MM GYPROC WALLBOARD

EXTERNAL CONCRETE STEPS(BUILD AS PER TGD M GUIDELINES)RISER 170MM, GOING 300MM, WIDTH 1,200MM, HEIGHT OF FLIGHT 1,500MM MAX. HANDRAIL 900MM FROM PITCH LINE, 300MM OVER RUN AT BASE. CONTINUOUS GUARDING AROUND 1ST FLOOR ENTRANCE 1,100MM HIGH

BALCONY FLOORCONSTRUCTION 160MMCONRETE WITHCORUS-COM FLOR 51

ROOF CONSTRUCTION: FIBRE CEMENT TEGRAL THRUTONE ENDURANCE TEXTURED BLUE BLACK TILES (600 X 300MM),

BALCONY DECK COMPOSITION50MM (MIN.) THICK PAVING SLABS ON PROPRIETARY SUPPORTS ON,[50MM (MIN.) LAYER OF 20-40MM ROUNDED WASHED AGGREGATE ON, IKO WATER CONTROL LAYER ON, IKO ENERTHERM XPS (80MM) ON, PERAFLASH F PROTECTION LAYER ON, 2 X COATS OF PERMATEC ECOWRAP INCORPORATING PERMAFLASH - R REINFORCEMENT (HOT MELT) ON 18MM OSB 3 WITH PERMATEC PRIMER ON, 225MM X63MM TIMBER JOISTS @ 400MM CENTRES WITH 225MM MINERAL WOOL INSULATION BETWEEN JOISTS, ON VAPOUR CONTROL LAYER, ON 19MM GYPROC PLASTERBOARD PLANK ON, 12.5MM GYPROC SOUND BLOC PLASTERBOARD ON, 38MM X 50MM S/W BATTENS (SERVICE CAVITY) ON, 12.5MM GYPROC WALL BOARD WITH 3MM SKIM APPLIED IN TWO LAYERS

Scale

Submitted to

Drawn byDateProject numberOrganisation Name

Project NameSheet Name

Client NameEmma Harrington

DT175-02 2018_19

1 : 50

Section AA

03

Passive House

DT175 02 20th December 2018

DT175 02

DITEmma Harrington

1 : 50East Elevation - Section AA1

Page 9: ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date Passive House

0 Ground FFL0

1 First FFL3150

-1 Top Found-600

2 Second FFL5950

4 Roof Plan11550

3 Third FFL8750

1A Balcony Wall4250

5 Top of Parapet12750

BALCONY DECK COMPOSITION50MM (MIN.) THICK PAVING SLABS ON PROPRIETARY SUPPORTS ON,[50MM (MIN.) LAYER OF 20-40MM ROUNDED WASHED AGGREGATE ON, IKO WATER CONTROL LAYER ON, IKO ENERTHERM XPS (80MM) ON, PERAFLASH F PROTECTION LAYER ON, 2 X COATS OF PERMATEC ECOWRAP INCORPORATING PERMAFLASH - R REINFORCEMENT (HOT MELT) ON 18MM OSB 3 WITH PERMATEC PRIMER ON, 225MM X63MM TIMBER JOISTS @ 400MM CENTRES WITH 225MM MINERAL WOOL INSULATION BETWEEN JOISTS, ON VAPOUR CONTROL LAYER, ON 19MM GYPROC PLASTERBOARD PLANK ON, 12.5MM GYPROC SOUND BLOC PLASTERBOARD ON, 38MM X 50MM S/W BATTENS (SERVICE CAVITY) ON, 12.5MM GYPROC WALL BOARD WITH 3MM SKIM APPLIED IN TWO LAYERS

A

FLOOR CONSTRUCTION150MM CONCRETE ON,100MM EPS (X3) ON,COMBINED RADON/DPMON 50MM BLINDINGLAYER ON 150MMHARDCORE

INTERMEDIATE FLOORCONSTRUCTION: 22MMT&G FLOORING ON, 18MMOSB BOARD ON,225MM X63MM TIMBER JOISTS @400MM CENTERES FILLEDWITH 225MM MINERALWOOL INSULATION ON,VAPOUR CONTROLLAYER ON, 19MMGYPROC PLASTERBOARDPLANK ON, 12.5MMGYPROC SOUND BLOCKON, 40MM BATTENS(SERVICE CAVITY) ON,12.5MM GYPROC WALLBOARD

INTERMEDIATE FLOORCONSTRUCTION: 22MMT&G FLOORING ON, 18MMOSB BOARD ON,225MM X63MM TIMBER JOISTS @400MM CENTERES FILLEDWITH 225MM MINERALWOOL INSULATION ON,VAPOUR CONTROLLAYER ON, 19MMGYPROC PLASTERBOARDPLANK ON, 12.5MMGYPROC SOUND BLOCKON, 40MM BATTENS(SERVICE CAVITY) ON,12.5MM GYPROC WALLBOARD

PV PANELS:(AS PER TGD L - ENSURE AT LEAST 3 X PV PANELS (900MM X 1500MM) PER HOUSE ON FRONT / SOUTH ELEVATION. EACH PANEL WILL PROVIDE THE HOUSE WITH 300 WATTS OF POWER.

ROOF CONSTRUCTION: FIBRE CEMENT TEGRAL THRUTONE ENDURANCE TEXTURED BLUE BLACK TILES (600 X 300MM), WITH 9OMM LAP - AS PITCH <350 ON;50 X 36MM S/F BATTENS @ ON; 150MM X 47MM RAFTERS @ 400MM CENTRES WITH 150MM X 2 MINERAL WOOL INSULATION WEDGED BETWEEN RAFTERS ON;VAPOUR CONTROL LAYER ON;50 X 38MM BATTENS ON 19MM GYPROC PLANK BOARD ON 12.5MM GYPROC CEILING BOARD WITIH 3MM SKIM APPLIED IN 2 LAYERS

NOTE: WHEN SPECIFICYING A CLOSE FITTING COVERING (SUCH AS FIBRE CEMENT TILES) THERE IS A RISK OF INTERSTITITAL CONDENSATION FORMING ON THE UNDERSIDE OF THE UNDERLAY AND THE EXTERNAL COVERING - THEREFORE SPECIFY A LR (LOW RESISTANCE <0.25MNs/g) UNDERLAY AND ENSURE THE BATTEN SPACE IS VENTILATED IN ACCORDANCE WITH BS 5250:2011 USING A VENTILLATED COUNTERBATTEN VOID

kKINGSPAN RAISED ACCESS FLOOR RG3 (600MM X 600MM) WITH KINGSPAN EUROPED PEDESTAL

Emma HarringtonDT175-02 2018_19

Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date

Passive House 03 DT175 02 Facade Section BB 306 Emma Harrington 12/19/18

1 : 20Facade Section BB1

Page 10: ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date Passive House

7mm Render (Breathable)18mm OSB Board

EXTERNAL INTERNAL

50mm Services Cavity with 50x38mm Battens (not visible in this section) attached with 40mm Ring Shank Nails

Breather Membrane

15mm Aquaboard attached to 50 x 38mm Battens (Not visible in this section with 40mm Exterior Grade Ring Shank nails

50mm Air Cavity

50mm Wood Fibre Board

18mm OSB Board - nailed to 225 x 47mm Timber posts (Not visible in section) using 60mm Exterior Grade Ring Shank nails

225mm Cellouse (Loose) between 225mm x 47mm Timbers spaced @ 600mm centres (Not visible in this section)

Vapour Control Layer

12.5mm Gyproc Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)

12.5mm Plasterboard with 3mm Skim coat applied in 2 layers

WALL TYPE 1: RENDER (OUTER LEAF)

Note:Expansion Joints - Ensure there are adequate horizontal expansion joints in the render to accomodate any timber settlement, compressions and shrinkages as required.Insect Mesh - Ensure Insect Mesh is placed at bottom of Rendered section.

19mm Gyproc Brown Plank Plasterboard (600mm x 2400mm)

Note on Plasterboard installation:Each layer to be fixed independently into timber battens (50 x 38mm Battens and ring shank nails are not visible in this section).Plasterboard layers are staggered and supported at 750mm centres.All products to be installed in line with manufactures guidance

103mm Brick (Outer Leaf) with 10mm Render, with 40mm Ventilated Cavity 18mm OSB Board

EXTERNAL INTERNAL

50mm Service cavity with 50 x 38mm Battens (Softwood) - Not visible in section attached with 40mm Ring Shank nails

Breather Membrane

22mm Structural OSB

50mm Wood Fibre Board - atttached to Timber studs with 50mm Ring Shank Nails

225mm Cellouse (Loose) between 225mm x 47mm Timber Studs spaced @ 600mm centres (Not visible in this section)

Vapour Control Layer

12.5mm Gyproc Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)

12.5mm Plasterboard with 3mm Skim (Applied in 2 layers)

WALL TYPE 2: BRICK (OUTER LEAF)

Note: Brick Outer Leaf - Ensure open perpends to ventilate and drain cavity space at max 1.5m centresWall Ties - Ensure all Wall Ties installed to manufacturers specification and spacings comply with TGD A Para 1.1.3.27 450mm (max vertically & 900mm horizontally with 300mm (max) around Opes

Stainless Steel Wall Ties attached to Structural OSB Boards and Bricks with 100mm side cramp

19mm Gyproc Brown Plank Plasterboard (600mm x 2400mm)

Notes on Plasterboard installation:Each layer to be fixed independently into timber battens (50 x 38mm Battens and ring shank nails are not visible in this section).Plasterboard layers are staggered and supported at 750mm centres.All products to be installed in line with manufactures guidance

50mm Stone (Outer Leaf) with 40mm Ventilated Cavity with 5mm gap between stones to befilled with Sealant or Mortar (as per manufacturers specification

18mm OSB Board

EXTERNAL INTERNAL

50mm Service Cavity with 50mm x 38mm Battens (Softwood) - not visible in Section attached with 40mm Ring Shank nails

Breather Membrane

22mm Structural OSB

50mm Cavity

50mm Wood Fibre Board - attached to Timber studs (Not visible in section)

18mm OSB Board

220mm Cellouse (Loose) between 220mm x 47mm Timbers spaced @ 600mm centres (Not visible in this section)

Vapour Control Layer

12.5mm Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)

12.5mm Plasterboard with 3mm Skim applied in 2 layers

WALL TYPE 3: STONE (OUTER LEAF)

Note: Sandstone - Ensure ventilated and drained cavity behind stone cladding. Ensure cladding support system is line with BS8298:2000 and that all supports comply with dead and imposed (wind load etc.). Ensure all Cladding Ties / supports are installed to manufacturers specification and spacings comply with TGD A Para 1.1.3.27

Stainless Steel Wall Ties

Note: Ensure Insect Mesh placed at bottom of Stone Cladding to keep cavity clear

5

19mmGyproc Brown Plank Plasterboard (600mm x 2400mm)

18mm OSB Board

Airtight Membrane

50mm Services Cavity. All services to be contained here. No services to enter party wall proper

12.5mm Sound Bloc Blue Plasterboard on 19mm Gyproc Plank Plasterboard. Note: Thicker plasterboard required for acoustic requirements and will also comply with 60 minute Fire Resistance. Each layer to be fixed independently into timber battens (50 x 38mm Battens and ring shank nails are not visible in this section).Plasterboard layers are staggered and supported at 750mm centres.

18mm OSB Board

100mm Cellouse (Loose) between 100mm x 50mm Battens spaced @ 600mm centres Note: Insulation only required on one party wall for accoustic requirements TGD E).

Metal Ties are recommended if required structurally with specific manufacturers fixing schedule. Accoustic Compliance can be met with metal ties 3mm (max thickness) and 30mm (width), at 1.2m horizontal centres, one per storey height fixed to underside of top railor side of adjacent party wall study within 150mm of top rail. Minimum 600mm from staircase head.

WALL TYPE 4: PARTY WALL WITH INTERMEDIATE FLOORS

22mm Tongue & Groove Flooring

13

300

Airtight Tape (ensure 150mm minimum lapping)

Note: Minimum distance between OBS's in Party Walls 200mm, with no hard connection unless metail ties are required structurally with fixing schedule

Knauf Earthwool Wire Reinforced Wire Barrier to provide 60 minutes Fire Resistance at line of Party Floor, not required at Intermediate floors

Airtight Membrane

19mm Gyproc Plank Plasterboard and 12.5mm Gyproc Sound Bloc (Blue Plasterboard) - See note opposite to see how plasterboard should be fixed.

225mm x 47 mm Double Floor Joists at 400mm centres

22mm Structural OSB Flooring Board

50 x 100mm Top Rail with 40mm Dryline Screw 12.5mm Plasterboard with 3mm Skim applied in 2 layers

Knauf Earthwool Wire Reinforced Fire Barrier installed between roof battens to provide 60 minutes Fire Resistance between Roof Finish (not shown) and Membrane

225mm Mineral Wool Insulation

Vapour Control Layer

12.5mm Plasterboard with 3mm Skim Coat (applied in 2 x layers)

HOUSE 1HOUSE 2

50mm x 100mm Bottom Rail and Sole Plate

103mm Brick (Outer Leaf) with 10mm Render, with 40mm Ventilated Cavity

18mm OSB Board

EXTERNAL INTERNAL

50mm Service cavity with 50 x 38mm Battens (Softwood) - Not visible in section attached with 40mm Ring Shank nails

Breather Membrane

22mm Structural OSB

50mm Wood Fibre Board - atttached to Timber studs with 50mm Ring Shank Nails (not visible in Section)

225mm Cellouse (Loose) between 225mm x 47mm Timber Studs spaced @ 600mm centres (Not visible in this section)

Vapour Control Layer

12.5mm Gyproc Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)

CHANGE IN MATERIAL (VERTICAL)

Note: Brick Outer Leaf - Ensure open perpends to ventilate and drain cavity space at max 1.5m centresWall Ties - Ensure all Wall Ties installed to manufacturers specification and spacings comply with TGD A Para 1.1.3.27 450mm (max vertically & 900mm horizontally with 300mm (max) around Opes

Stainless Steel Wall Ties attached to Structural OSB Boards and Bricks with 100mm side cramp

19mm Gyproc Brown Plank Plasterboard (600mm x 2400mm)

Notes on Plasterboard installation:Each layer to be fixed independently into timber battens (50 x 38mm Battens and ring shank nails are not visible in this section).Plasterboard layers are staggered and supported at 750mm centres.All products to be installed in line with manufactures guidance

EPDM / Vertical DPC on top of Brick (Outer Leaf)

38mm x 50mm Batten Chamfered on Top for Drainage

Insect Mesh at bottom of Render

Min 15mm Gap at bottom of Cladding & Flashing

7mm External Render (Breathable) with Expansion Joints

15mm Aquaboard attached to 50 x 38mm Battens (Not visible in this section with 40mm Exterior Grade Ring Shank nails

62

50

12.5mm Plasterboard with 3mm Skim applied in 2 layers

Emma HarringtonDT175-02 2018_19

Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date

Passive House 03 DT175 02 Wall Types & Change ofMaterial

308 Emma Harrington 11/19/18

1 : 5Wall Type 1 - Render1

1 : 5Wall Type 2 - Brick2

1 : 5Wall Type 3 - Stone3

1 : 5Wall Type 4 - Party Wall4

1 : 5Change of Material - Vertical5

Page 11: ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date Passive House

103mm Brick (Outer Leaf) with 10mm Render, (Starts 225mm from GL) with 50mm Ventilated Cavity 18mm OSB Board

EXTERNAL INTERNAL

50mm Service cavity with 50 x 38mm Battens (Softwood) - Not visible in section attached with 40mm Ring Shank nails

Breather Membrane

22mm Structural OSB

50mm Wood Fibre Board - atttached to Timber studs with 50mm Ring Shank Nails

225mm Cellouse (Loose) between 225mm x 47mm Timber Studs spaced @ 600mm centres (Not visible in this section)

Vapour Control Layer

12.5mm Gyproc Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)

12.5mm Plasterboard with 3mm Skim (applied with 2 layers)

GROUND FLOOR FOUNDATIONS (VIKING RAFT SYSTEM) & WALL

Note: Brick Outer Leaf - Ensure open perpends to ventilate and drain cavity space at max 1.5m centresWall Ties - Ensure all Wall Ties installed to manufacturers specification and spacings comply with TGD A Para 1.1.3.27 450mm (max vertically & 900mm horizontally with 300mm (max) around Opes

Stainless Steel Wall Ties attached to Structural OSB Boards and Bricks with 100mm side cramp

Visqueen Combined DPM / Radon Barrier 1200 Gauge

EPS 100

50mm Blinding Layer (Sand)

150mm Hardcore Layers -Clean & Graded (40mm min size of stones)

150mm Concrete Floor with Reinforcement

Land Drain around Perimeter of Building - confirm Distance with Tony

ø 100

GROUND LEVEL

Earth

EPS 200/300

100mmm Concrete Block (High Density) below Ground (Rising Walls) and up to 225mm

Note:300mm minimum amount of Top Soil to be removed (TGD C -Site Preparation)

19mm Gyproc Brown Plank Plasterboard (600mm x 2400mm)

Airtight Tape (ensure 150mm lapping)

22mm Tongue & Groove Flooring

120mm x 25mm S/W Skirting Board

200 x 300mm Concrete Strip Foundation (Dimensions as per TGD A)

670

Engineering Bricks from Ground Level 0 to DPC 150mm

DPC (Vertical at 150mm)

225mm x 47mm Sole Plate and Bottom Rails

Min

imum

Dep

th fo

r Vik

ing

Raf

t Fou

ndat

ion

225mm x 300mm Concrete Reinforced Ring Beam

150

40mm Sand Blinding Layer

Note: Ramp is less than 2M, therefore maximum gradient 1:12 (166mm maximum rise) TGD M 1.1. Approach to Buildings

100mm Concrete base for ramp / footpath

7mm Render (Breathable)

18mm OSB Board

EXTERNAL

INTERNAL

50mm Services Cavity with 50x38mm Battens (not visible in this section) attached with 40mm Ring Shank Nails

Breather Membrane

15mm Aquaboard attached to 50 x 38mm Battens (Not visible in this section with 40mm Exterior Grade Ring Shank nails

50mm Air Cavity

50mm Wood Fibre Board

18mm OSB Board - nailed to 225 x 47mm Timber posts (Not visible in section) using 60mm Exterior Grade Ring Shank nails

225mm Cellouse (Loose) between 225mm x 47mm Timbers spaced @ 600mm centres (Not visible in this section)

Vapour Control Layer

12.5mm Gyproc Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)

12.5mm Plasterboard with 3mm Skim coat applied in 2 Layers

EAVES & WALL DETAIL

Note:Expansion Joints - Ensure there are adequate horizontal expansion joints in the render to accomodate any timber settlement, compressions and shrinkages as required.Insect Mesh - Ensure Insect Mesh is placed at bottom of Rendered section.

19mm Gyproc Brown Plank Plasterboard (600mm x 2400mm)

Notes on Plasterboard installation:Each layer to be fixed independently into timber battens (50 x 38mm Battens and ring shank nails are not visible in this section).Plasterboard layers are staggered and supported at 750mm centres.All products to be installed in line with manufactures guidance

150mm Mineral Wool Insulation

150mm x 44mm Prefabricated Mono pitch Roof Truss

Vapour Control Layer (Warm side of Insulation)

50mm x 38mm Battens @ 400 centres

30mm x 5mm Stainless Steel Wall Strap(Ensure all Wall Straps are installed in conjunction with TGD A 1.1.3.25)

Calcium Silicate Board Cavity Closer (Fire Resistant) - ensure ventilation in Wall Structure

Tegral Thurtone Endurance Textured Blue Black Fibre cement slates 600mm x 300mm(Note: Ensure there are 3 Slates at Eaves; 1 x 245mm, 1 x 345mm & 1x 600mm)

50mm x 36mm S/W Battens @ 400mm centres at least 1,200mm long

Plastic Cross Flow Ventiliator (50mm x 700mm). Ensure roof void is ventilated at least equal to continuous strip 10mm wide (as per Lean to Roof - TGD F -Diagram 11, Page 28)

Gang Nail Plate -Centred over Top Rails

Tilting Fillet

Roofing Felt / Breather Membrane - Ensure LR Sarking felt - as the roof is a tight construction with Fibre Cement tiles there is a risk of interstitial condensation under the tiles so ensure there is ventilation between sarking felt and battens.

Plaster Gutter -100mm Diameter

25mm Fascia Board

19mm Soffit with Vent (10mm Minimum) to allow continuous ventiation

51

80mm Mineral Wood Insulation

Scale

Submitted to

Drawn byDateProject numberOrganisation Name

Project NameSheet Name

Client NameEmma Harrington

DT175-02 2018_19

1 : 5

Ground FloorFoundations & RoofEaves

03

Passive House

DT175 02 20th December 2018

DT175 02

DITEmma Harrington

1 : 5Ground Floor Foundations1 1 : 5

Eaves / Roof Detail2

Page 12: ARCH 2020 TDS - Project 3: Revit Drawings Passive House Project · 2019-06-13 · Project Name Project Number Client Name Sheet Name Sheet Number Author Sheet Issue Date Passive House

50mm Stone (Outer Leaf) with 40mm Ventilated Cavity with 5mm gap between stones to befilled with Sealant or Mortar (as per manufacturers specification

18mm OSB Board

INTERNAL

50mm Service Cavity with 50mm x 38mm Battens (Softwood) - not visible in Section attached with 40mm Ring Shank nails

Breather Membrane

50mm Ventilated Cavity

50mm Wood Fibre Board - attached to Timber studs (Not visible in section)

22mm Structural OSB Board

225mm Cellouse (Loose) between 225mm x 47mm Timbers spaced @ 600mm centres (Not visible in this section)

Vapour Control Layer wrapped around reveals and sealed to window frames over airtight tapes

12.5mm Gyproc Blue SoundBloc Plasterboardwith aerated gypsum core (1,200mm x 2,400mm)

3mm Skim

Note: Sandstone - Ensure ventilated and drained cavity behind stone cladding. Ensure cladding support system is line with BS8298:2000 and that all supports comply with dead and imposed (wind load etc.). Ensure all Cladding Ties / supports are installed to manufacturers specification and spacings comply with TGD A Para 1.1.3.27

Stainless Steel Wall Ties

Note: Ensure Insect Mesh placed at bottom of Stone Cladding to keep cavity clear

19mmGyproc Brown Plank Plasterboard (600mm x 2400mm)

EXTERNAL

225mm x 47mm (x2) Timber Lintels

80mm Xtra Therm Thin-R Timber Frame Insulation Board

50mm x 38mm S/W Timber Batten

100mm x 80mm Generic Timber Frame shown for Illustrative purposes For the project, Munster Joinery O.E.A.A. windows will supplied, installed and certified by manufacture with fixing brackets to manufacturers detail, spec and installation

Alfa Flex Airtight Tape to Window Junction Interval

19mm Painted and Sealed Softwood window board proud of wall edges

Munster Joinery O.E.A.A. fixing brackets to manufacturers detail, spec and installation

80mm Xtra Therm Thin-R Timber Frame Insulation Board

225mm x 47mm Timber Lintels

Vapour Control Layer wrapped around reveals and sealed to window frames over airtight tapes

Treated Timber Fire Stop Batten

Powder Coated pressed metal cill RAL TBC with wrapped DPC fixed to underside of window frame behind cill profile as indicated

EPDM to protect batten and insulation sealed tight to timber frame and window

Line

of W

indo

w R

evea

l

Line

of W

indo

w R

evea

l

Alfa Fultra Airtight / Windtight Tape to Window junction and sealed with EDPM

12 mm Greenspan O.E.A.A Cement Board with 7mm Breathable External Render Note: Ensure cavity remains ventilated

50mm Stone (Outer Leaf) with 40mm Ventilated Cavity with 5mm gap between stones to be filled with Sealant or Mortar (as per manufacturers specification

EXTERNAL

INTERNAL

WINDOW HEAD DETAIL

WINDOW CILL DETAIL

WINDOW JAMB DETAIL

5

50

13

Scale

Submitted to

Drawn byDateProject numberOrganisation Name

Project NameSheet Name

Client NameEmma Harrington

DT175-02 2018_19

1 : 5

Window Detail - Head,Cill & Jamb

03

Passive House

DT175 02 20th December 2018

DT175 02

DITEmma Harrington

1 : 5Window - Head /Cill /Jamb1