G

STEEL BEAM SIZE TO BESPECIFIED BY ENEGINEER

PRE-CASTCONCRETEWALL

STEEL BEAM

75mmVERTICALTRACKASSEMBELY

0.241 m

RECEIVING AREA

OVERHEAD TRACK

2435mmx1981mm STEELSLATTED OVERHEAD DOOR

0.07

5 m

4

B

3c

200x200 WIDE FLANGE STEELCOLUMN

200x200 WIDE FLANGE STEELCOLUMN

0.18

1 m

VESTIBULE

WAREHOUSE

SHOWROOM/RECPTION

STEEL BEAM SIZE TO BESPECIFIED BY ENEGINEER

PRE-CAST CONCRETE WALL

2x 16mm GYPSUM BORD

CURTAIN WALL GLAZINGALUMINIUM FRAME

J

EXPASION JOINT

150 mm CONCRETE SLAB

2435mmx1981mm STEELSLATTED OVERHEAD DOOR

CASSON FOUNDATION1200mm DIA

DRIVE IN TRUCK BAY

150 mm GRAVEL150 mm CONCRETE SLAB

SLOPE DN.

300mm POUREDCONCRETEWALL

19

F

200x200 WIDE FLANGE STEELCOLUMN

RECEIVING AREA

WAREHOUSE

PRE-CASTCONCRETEWALL

STEEL BEAM SIZE TO BESPECIFIED BY ENEGINEER

Scale

Project number

Date

Drawn by

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

1 : 10

A.8.1

PLAN DETAILS &SECTION DETAILS

0001

FINAL DRAWINGS

FEBRUARY 25TH, 2014PHILLIP MORRIS, 100444725

1 : 10SECTION DETAIL 3

1

1 : 10PLAN DETAIL 3

2

1 : 10SECTION DETAIL 4

3 1 : 10Callout (6) of MAIN FLOOR

4

No. Description Date