Arch 2005 project week 4 1(phillip) - sheet - a-7-1 - wall sections

1

Click here to load reader

Transcript of Arch 2005 project week 4 1(phillip) - sheet - a-7-1 - wall sections

Page 1: Arch 2005 project week 4 1(phillip) - sheet - a-7-1 - wall sections

J

123 m²

DRIVE IN TRUCK BAY

CASSON FOUNDATION1200mm DIA

150 mm CONCRETE SLAB

TORCH DOWN ROOFING16mm ROOF SHEATHING

3A.8.1

W4

150 mm CONCRETE SLAB

T/O PARAPET

T/O OWSJ

T/O SECOND FLOOR

4.72

4 m

3.50

5 m

3.76

2 m

0.20

0 m

T/O MAIN FLOOR

B/O CASSON

STEEL BEAM SIZE TO BESPECIFIED BY ENGINEER

CASSON FOOTING 1200mm DIA2360mm DIA BOTTOM

150mm GRAVEL

W1

12K1 @ 1830 O/C

1.98

1 m

STEEL BEAM SIZE TO BESPECIFIED BY ENEGINEER

G

1A.8.1

150 mm CONCRETE SLAB

150 mm CONCRETE SLAB

TORCH DOWN ROOFING16mm ROOF SHEATHING

CASSON FOUNDATION1200mm DIA

W1

4627 m²

RECEIVING AREA

W4

0.20

0 m

3.76

2 m

3.50

5 m

4.72

4 m

T/O PARAPET

T/O OWSJ

T/O SECOND FLOOR

T/O MAIN FLOOR

B/O CASSON

CASSON FOOTING 1200mm DIA2360mm DIA BOTTOM

150mm GRAVEL

12K1 @ 1830 O/C

STEEL BEAM SIZE TO BESPECIFIED BY ENGINEER

STEEL BEAM SIZE TO BESPECIFIED BY ENGINEER

1.98

1 m

1.20

0 m

Scale

Project number

Date

Drawn by

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

1 : 30

A.7.1

WALL SECTIONS

0001

FINAL DRAWINGS

FEBRUARY 25TH, 2014PHILLIP MORRIS, 1004447251 : 30

WALL SECTION 31 1 : 30

WALL SECTION 42

No. Description Date