Transcript of Arcelor Mittal - Cleveland 84" Hot Strip Mill Revamp
11
Arcelor Mittal - ClevelandArcelor Mittal - Cleveland84” Hot Strip Mill Revamp 84” Hot Strip Mill Revamp
22
A-M Cleveland Hot MillA-M Cleveland Hot Mill
7 Stand Finishing Train,7 Stand Finishing Train,72,000 HP72,000 HP 5 Stand Roughing Train, 5 Stand Roughing Train, 56,000 HP56,000 HP
2 Downcoilers, 2 Downcoilers, 1000 HP each1000 HP each 3 Pusher Type Furnaces, 3 Pusher Type Furnaces, 450 Tons/Hour 450 Tons/Hour EachEach
Width: Width: 26” to 72”26” to 72” Thickness: Thickness: 0.056” to 0.700”0.056” to 0.700” Capacity: Capacity: 3 Million Tons/Yr3 Million Tons/Yr
ScalebreakerRoughing MillsFinishing Mill
Coilers
Run-outTables
DelayTables
CropShear
PulpitPulpitPulpit Pulpit
Furnace AreaRoughing Mill AreaFinishing Mill AreaDelivery AreaDelay Table
Area
33
A-M Cleveland Hot MillA-M Cleveland Hot Mill Goals and RequirementsGoals and Requirements
New Windows PC Based Level 2 Setup/Data Collection SystemNew Windows PC Based Level 2 Setup/Data Collection System New Level 1 Control System on Modern Open PlatformNew Level 1 Control System on Modern Open Platform New Digital Drive Regulators for Main Drives, Loopers, and New Digital Drive Regulators for Main Drives, Loopers, and
Screwdowns (Retained Existing Power Infrastructure and Drive Screwdowns (Retained Existing Power Infrastructure and Drive Power Modules)Power Modules)
New Operator DesksNew Operator Desks New Integrated L1/L2 HMI SystemNew Integrated L1/L2 HMI System New iBA data “flight recorder”New iBA data “flight recorder” Increased Bending on Last three Finishing Stands to Improve Increased Bending on Last three Finishing Stands to Improve
Shape ControlShape Control New Hydraulic Loopers (last 3)New Hydraulic Loopers (last 3) New Flatness GaugeNew Flatness Gauge Minimal Installation (Take Advantage of Existing Terminations)Minimal Installation (Take Advantage of Existing Terminations) Phase-In over normal down-turnsPhase-In over normal down-turns
44
A-M Cleveland Hot MillA-M Cleveland Hot Mill Old System ConfigurationOld System Configuration
Obsolete Level 2 Main Frame ComputerObsolete Level 2 Main Frame Computer GEM 80 PLC GEM 80 PLC
Installed in late 80sInstalled in late 80s DOS based programming interfaceDOS based programming interface Originally 300 series controllers Originally 300 series controllers Several PLCs upgraded to 400 series (supporting GEMLAN-Several PLCs upgraded to 400 series (supporting GEMLAN-
D)D) Analog GE Silco DrivesAnalog GE Silco Drives PDP-11 System on Coilers/Delivery-EndPDP-11 System on Coilers/Delivery-End Previous Partial Upgrade (2000/2001)Previous Partial Upgrade (2000/2001)
GE Universal Stand Controllers (Obsolete)GE Universal Stand Controllers (Obsolete) Genius I/OGenius I/O Installed but not CommissionedInstalled but not Commissioned Cimplicity HMICimplicity HMI
55
A-M Cleveland Hot MillA-M Cleveland Hot Mill Control Platform Selection CriteriaControl Platform Selection Criteria
““Off The Shelf” Single-vendor Homogeneous ArchitectureOff The Shelf” Single-vendor Homogeneous Architecture End User Free From OEM Proprietary HardwareEnd User Free From OEM Proprietary Hardware
High Performance For Demanding Real-time ApplicationsHigh Performance For Demanding Real-time Applications Multi-tasking Program ExecutionMulti-tasking Program Execution
Proven Product Life Cycle HistoryProven Product Life Cycle History Scalable To Meet A Broad Control SpectrumScalable To Meet A Broad Control Spectrum Windows Based Programming ToolsWindows Based Programming Tools
Multiple Programming LanguagesMultiple Programming Languages Very High Speed /Bandwidth Communication Network(s)Very High Speed /Bandwidth Communication Network(s) Compatible with Genius LAN & I/OCompatible with Genius LAN & I/O Open Architecture VMEOpen Architecture VME Compatible With Cimplicity PE HMICompatible With Cimplicity PE HMI
66
A-M Cleveland Hot MillA-M Cleveland Hot Mill Control Platform SelectionControl Platform Selection
GE Fanuc Rx7i PLC for Distributed Level 1 Control GE Fanuc Cimplicity PE HMI SCADA Nodes and Viewers
Level 1 And 2 Integrated HMI Dell GX260 and GX270 PC’s for HMI
GE Fanuc Cimplicity ME Windows PLC Programming Software Genius LAN Remote I/O GE Fanuc Reflective Memory High Speed Control “Network”
VME Reflective Memory for RX7i PCI Bus Reflective Memory for PC’s
Dell Poweredge 2650 server for Level 2 Control Digital Alphaserver 4100 for Roughing Mill, Finishing Mill and Coil
Temperature Control models
77
A-M Cleveland Hot MillA-M Cleveland Hot Mill New System Configuration New System Configuration
PhilosophyPhilosophy Common Programming LANCommon Programming LAN Common L1/L2 HMICommon L1/L2 HMI Remote I/O (Genius)Remote I/O (Genius)
Pyramid HierarchyPyramid Hierarchy Distributed ProcessingDistributed Processing High-Speed Control LAN High-Speed Control LAN
(Reflective Memory)(Reflective Memory)
Delivery Area Finishing Mill Area Furnace/Rougher Area
Level 1 Supervisory Control
Human Interface
Drives and Auxiliary I/O
Level 2
88
A-M Cleveland Hot MillA-M Cleveland Hot Mill New System ConfigurationNew System Configuration
Finishing Mill
Mill Stand Drives
Delay Tables Roughing MillDelivery Area Furnace Area
HMIServer(s)Level 2
Maintenance Programmers/Viewers
RX7i
RX7i RX7i
RX7i RX7i RX7i RX7i RX7i RX7iRX7i
Stand Controllers (Screw Drives)
RX7i RX7i RX7i RX7i RX7i RX7iRX7i
RX7i RX7i
RX7i RX7i RX7i
RX7i
Shear Drive
RX7i
DT Master
RX7i
Xport/Position Masters
RX7i
RX7i
RX7i
Depiler Drives
Pusher Drives
Screw MasterMill MasterDelivery Master
Auxiliary SubmasterLooper SubmastersCoiler Submasters
Process Data Acquisition(Flight Recorder)
1010
A-M Cleveland Hot MillA-M Cleveland Hot Mill Level 2Level 2
1111
A-M Cleveland Hot MillA-M Cleveland Hot Mill Main DrivesMain Drives
P-I-DController
P-I-DController
P-I-DController
P-I-DController
+-
+-
+-
t
MOR
+-
M MPowerAmp
PT
++
P-I-DController
P-I-DController
P-I-DController
VoltageIsolator
VoltageIsolator
VoltageDivider
VoltageDivider
VoltageDivider
GT
+-
XArmature
Resistance
CrossoverVolts
+-
+-
++
++
+-
CurrentIsolator
CurrentIsolator
+-
ArmatureVoltsLoop
Silco I
ME2000Motor F Cabinet
ME2000Motor E Field Exciter
ArmatureCurrentLoop
SpeedLoop
Rx7i Per StandMain Drive Software Regulator
Main Drive Hardware
RX7iMill Master
Cabinet
Feed ForwardFlux Ref
Terminal VoltsLoop
BaseRPM
Limit
FluxBias
Limit
Flux toField Current
Flux toField Current
ABS
Load BalanceLoop Field Current
Loop
Field CurrentLoop
Motor EMotor F
1212
A-M Cleveland Hot MillA-M Cleveland Hot Mill Main DrivesMain Drives
Software Implementation of Main Drive RegulatorSoftware Implementation of Main Drive Regulator(Per Main Drive Rack, Total of 7)(Per Main Drive Rack, Total of 7) 2 Millisecond Scheduled Task:2 Millisecond Scheduled Task:
Armature Current RegulatorArmature Current Regulator Motor Speed RegulatorMotor Speed Regulator Motor Terminal Voltage Regulator (extended speed Motor Terminal Voltage Regulator (extended speed
range operation)range operation) Motor Armature Current Load Balance RegulatorMotor Armature Current Load Balance Regulator Spindle Tail Spot Position Regulator (for roll change)Spindle Tail Spot Position Regulator (for roll change)
Background Unscheduled Task:Background Unscheduled Task: Armature Circuit Breaker SequencingArmature Circuit Breaker Sequencing
1313
A-M Cleveland Hot MillA-M Cleveland Hot Mill Electric LoopersElectric Loopers
P - I - DC on tro ller
P - I - DC on tro ller
+-
+-
MPowerAm p
P T
P - I - DC on tro ller
VoltageIso lator
X
PositionFeedback
R equiredTorque
C alcu la tion
Arm atureC urrentIso la tor
F ie ldC urrentIso la tor
+-
Arm atureVoltsLoop
Silco II
250VDC Exciter
A rm atureC urrent
LoopS peedLoop
Limit
Motor
G BP - I - D
C on tro ller+
-
+-
P ositionLoop
C EM FSelect
PositionR ef
T ension R ef (PS I)
S trip W idth (Inches)
S trip T h ick (Inches)
Passline (Inches)
Looper H eight (D egrees)
T orque (ft*lbs)
T orqueC onvers ion
Arm ature C urrent
R X7i S oftware Looper D rive R egu la tor E lectrica l Looper D rive H ardware
1414
A-M Cleveland Hot MillA-M Cleveland Hot Mill Electric LoopersElectric Loopers
Software Implementation Of Looper 1,2, & 3 Drive Software Implementation Of Looper 1,2, & 3 Drive RegulatorRegulator 2 Millisecond Scheduled Task2 Millisecond Scheduled Task
Armature Current Regulators (L1, L2, & L3)Armature Current Regulators (L1, L2, & L3) 6 Millisecond Scheduled Task6 Millisecond Scheduled Task
Motor Speed Regulator (L1, L2, & L3)Motor Speed Regulator (L1, L2, & L3) Strip Tension Regulator (L1, L2, & L3)Strip Tension Regulator (L1, L2, & L3) Looper Real-time Geometry Solver (L1, L2, & L3)Looper Real-time Geometry Solver (L1, L2, & L3)
(Calculates Geometric Relation Between Desired Strip (Calculates Geometric Relation Between Desired Strip Tension And Required Motor Torque To Achieve That Tension And Required Motor Torque To Achieve That Tension As Loop Angle Changes)Tension As Loop Angle Changes)
1616
A-M Cleveland Hot MillA-M Cleveland Hot Mill Hydraulic LoopersHydraulic Loopers
P - I - DC on tro ller
P - I - DC on tro ller
+-
+-
ValveC ascade
P T
P ositionFeedback
ForceC alc
TorqueLoop
S peedLoop
Limit
P - I - DC on tro ller
+-
P ositionLoopP ositi
onR ef
T ension R ef (PS I)
S trip W idth (Inches)
S trip T h ick (Inches)
Passline (Inches)
Looper H eight (D egrees)
T orque (ft*lbs)
B
A
R od_P TB lind_P T
SpoolFeedback
T orqueArm C alc
TorqueFbk
S peed
R X7i S oftware Looper D rive R egu la tor
R equ iredTorque
C alcu la tion
H ydrau lic Looper D rive H ardware
1717
A-M Cleveland Hot MillA-M Cleveland Hot Mill Hydraulic LoopersHydraulic Loopers
Software Implementation Of Looper 4,5, & 6 Drive Software Implementation Of Looper 4,5, & 6 Drive RegulatorRegulator 2 Millisecond Scheduled Task2 Millisecond Scheduled Task
Looper Torque Regulators (L4, L5, & L6)Looper Torque Regulators (L4, L5, & L6) Looper Torque Feedback (L4, L5, & L6)Looper Torque Feedback (L4, L5, & L6)
(Calculates Geometric Relation Between Looper (Calculates Geometric Relation Between Looper Torque and Required Hydraulic Cylinder Linear Force)Torque and Required Hydraulic Cylinder Linear Force)
6 Millisecond Scheduled Task6 Millisecond Scheduled Task Motor Speed Regulator (L4, L5, & L6)Motor Speed Regulator (L4, L5, & L6) Strip Tension Regulator (L4, L5, & L6)Strip Tension Regulator (L4, L5, & L6) Looper Real-time Geometry Solver (L4, L5, & L6)Looper Real-time Geometry Solver (L4, L5, & L6)
(Same as Electric Looper Calculation)(Same as Electric Looper Calculation)
1919
A-M Cleveland Hot MillA-M Cleveland Hot Mill ScheduleSchedule
Proof o f C oncept
FM Auxilia ry M aster
FM M ain D rives
FM Loopers
FM Factory Acceptance T est
FM C oord inated C ontro l Shadow ing
FM C ontro l Sw itchover
FM D esk Insta lla tion
FM Level 2
D elay T able M aster & Shear
R M M asters
R M Factory Acceptance T est
C om pletion o f L2 and Pacing
D epiler/Pusher D rives
C oilers
T ask 19
T ask 20
Aug Sep Oct Nov Dec Jan Feb M ar Apr M ay Jun Jul Aug Sep Oct Nov Dec Jan Feb M ar Apr M ay Jun Jul Aug Sep Oct
2003 2004 2005Task N am e
FM M asters
D elivery M aster and C T C
FM S tand C ontro llers
2121
A-M Cleveland Hot MillA-M Cleveland Hot Mill TestingTesting
““Proof-of-Concept”Proof-of-Concept” Component-Level Hardware TestingComponent-Level Hardware Testing
Facilitates phased shipping for installationFacilitates phased shipping for installation Offline Testing Equipment at Customer SiteOffline Testing Equipment at Customer Site
FM Test Drive/MotorFM Test Drive/Motor FM Test Stand for LooperFM Test Stand for Looper
Integrated Factory Acceptance TestIntegrated Factory Acceptance Test Temporary Equipment Setup for Temporary Equipment Setup for
Components Already ShippedComponents Already Shipped Complete Staging of HMI and Operator Complete Staging of HMI and Operator
DesksDesks SimulatorsSimulators
2222
A-M Cleveland Hot MillA-M Cleveland Hot Mill Project Execution: Phase-In Project Execution: Phase-In
StrategyStrategy One Section at a TimeOne Section at a Time
1.1. Finishing Mill Area (Best ROI)Finishing Mill Area (Best ROI)2.2. Roughing Area (Replaced Remaining Roughing Area (Replaced Remaining
Gems)Gems)3.3. Furnace Area (Replaces Drives)Furnace Area (Replaces Drives)4.4. Coilers (Replaces Obsolete PDP-11)Coilers (Replaces Obsolete PDP-11)
““Bottom-Up” ApproachBottom-Up” Approach1.1. DrivesDrives2.2. Masters & Sub-Masters Masters & Sub-Masters 3.3. Operator DesksOperator Desks4.4. Level 2Level 2
ScalebreakerRoughing MillsFinishing Mill
Coilers
Run-outTables
DelayTables
CropShear
PulpitPulpitPulpit Pulpit
Furnace AreaRoughing Mill AreaFinishing Mill AreaDelivery AreaDelay Table
Area
1 2 3
4 1a
1b
1f
1d 1c 1e
2323
A-M Cleveland Hot MillA-M Cleveland Hot Mill Bridge to Old System for Phase-InBridge to Old System for Phase-In
GEM-80 GEM-80
RX7i
RX7i
RX7i
RX7i
RX7i
HMI
DEC AlphaBridge
GEMlanD
Reflective Memory Ring Level 2
2424
A-M Cleveland Hot MillA-M Cleveland Hot Mill I/O Switching for Phase-In ApproachI/O Switching for Phase-In Approach
RX7i
NewMotor Current
Regulator
Analog Control
OldMotor Current
Regulator
RX7i
NewMotor Current
Regulator
Analog Control
OldMotor Current
Regulator
SILCO SCRs
M
NEWOLD
SILCO SCRs
M
Push-PinTerminal Blocks
2525
A-M Cleveland Hot MillA-M Cleveland Hot Mill FM Main Drives Phase-In ApproachFM Main Drives Phase-In Approach
Final Drive Regulator Design Tested On-site Using Final Drive Regulator Design Tested On-site Using Test Drive/Motor Prior To CommissioningTest Drive/Motor Prior To Commissioning
Temporary Mill Master Installed To Accept Analog Temporary Mill Master Installed To Accept Analog Speed Referencing From Old SystemSpeed Referencing From Old System
Reflective Memory Segment Installed Between Reflective Memory Segment Installed Between Temporary Mill Master And New DrivesTemporary Mill Master And New Drives
Push-pin Switchover Schemes For OutputsPush-pin Switchover Schemes For Outputs Subset Of HMI Installed To Support New Main DrivesSubset Of HMI Installed To Support New Main Drives Drives Commissioned Over Multiple Regular Weekly Drives Commissioned Over Multiple Regular Weekly
Maintenance TurnsMaintenance Turns
2626
A-M Cleveland Hot MillA-M Cleveland Hot Mill Electric Loopers Phase-In ApproachElectric Loopers Phase-In Approach
Temporary Analog I/O Installed in Looper Drive To Accept Temporary Analog I/O Installed in Looper Drive To Accept Analog Tension Referencing From Old SystemAnalog Tension Referencing From Old System
Ethernet Bridge Installed To Exchange Control Parameters Ethernet Bridge Installed To Exchange Control Parameters With Existing Mill MasterWith Existing Mill Master
Reflective Memory Segment Installed Between Temporary Reflective Memory Segment Installed Between Temporary Mill Master And New Electric Looper DriveMill Master And New Electric Looper Drive
Push-pin Switchover Schemes For OutputsPush-pin Switchover Schemes For Outputs Subset Of HMI Installed To Support New Looper DrivesSubset Of HMI Installed To Support New Looper Drives Drives Commissioned Over Multiple Regular Weekly Drives Commissioned Over Multiple Regular Weekly
Maintenance TurnsMaintenance Turns
2727
A-M Cleveland Hot MillA-M Cleveland Hot Mill Hydraulic Loopers Phase-In Hydraulic Loopers Phase-In
ApproachApproach Final Hydraulic Control System Design Tested On-Site using Final Hydraulic Control System Design Tested On-Site using
Test StandTest Stand Ethernet Bridge Expanded To Exchange Control Parameters Ethernet Bridge Expanded To Exchange Control Parameters
With Existing Mill MasterWith Existing Mill Master Reflective Memory Segment Installed Between Temporary Reflective Memory Segment Installed Between Temporary
Mill Master And New Hydraulic Looper DriveMill Master And New Hydraulic Looper Drive Subset Of HMI Installed To Support New Hydraulic Looper Subset Of HMI Installed To Support New Hydraulic Looper
DrivesDrives Commissioned Over Single Mini-Outage (Mechanical Commissioned Over Single Mini-Outage (Mechanical
Installation of New Hydraulic Looper)Installation of New Hydraulic Looper)
2828
A-M Cleveland Hot MillA-M Cleveland Hot Mill Delivery Master Phase-In ApproachDelivery Master Phase-In Approach Feedback Signals Paralleled to Facilitate ShadowingFeedback Signals Paralleled to Facilitate Shadowing
FM Delivery Speed and Metal Detectors for Head/Tail FM Delivery Speed and Metal Detectors for Head/Tail TrackingTracking
Spray On/Off Status for Cooling Temperature Control Spray On/Off Status for Cooling Temperature Control (CTC)(CTC)
Finishing/Coiling Temperature Pyrometers for CTCFinishing/Coiling Temperature Pyrometers for CTC
Push-pin Switchover Scheme for Spray Solenoids and Push-pin Switchover Scheme for Spray Solenoids and Table Speed ReferencingTable Speed Referencing
2929
A-M Cleveland Hot MillA-M Cleveland Hot Mill Screwdown Drives Phase-In Screwdown Drives Phase-In
ApproachApproach Temporary Analog I/O Installed To Accept Analog Temporary Analog I/O Installed To Accept Analog
Speed Referencing From Old SystemSpeed Referencing From Old System Ethernet Bridge Expanded To Exchange Control Ethernet Bridge Expanded To Exchange Control
Parameters With Existing Screw MasterParameters With Existing Screw Master Reflective Memory Segment Installed Between Reflective Memory Segment Installed Between
Screw Master And New Screw DrivesScrew Master And New Screw Drives Push-pin Switchover Schemes For OutputsPush-pin Switchover Schemes For Outputs Subset Of HMI Installed To Support New Screw Subset Of HMI Installed To Support New Screw
DrivesDrives Screw Drives Commissioned Over Multiple Screw Drives Commissioned Over Multiple
Regular Weekly Maintenance TurnsRegular Weekly Maintenance Turns
3030
A-M Cleveland Hot MillA-M Cleveland Hot Mill FM Masters Phase-In ApproachFM Masters Phase-In Approach
Integration Test Using New Desks and Simulator RacksIntegration Test Using New Desks and Simulator Racks Extensive Mill Rolling Simulations in Factory EnvironmentExtensive Mill Rolling Simulations in Factory Environment Operator InvolvementOperator Involvement
Looper Height Regulators Tested/Tuned on Production TurnsLooper Height Regulators Tested/Tuned on Production Turns Bridge to Existing System Used to Interface with Existing Bridge to Existing System Used to Interface with Existing
DesksDesks Desks Replacement Deferred until All Level 1 Equipment Desks Replacement Deferred until All Level 1 Equipment
CommissionedCommissioned
M odel Coil Index Buffer
Lev el 2 Coil Index Buffer FM M _P DI
FS M _F7_M IMM A INT_S E TUP _M ODE
FM M _F1_SE TPOINTS
PDI PDI
FM Next P ointe r (from L2)
FM Next P ointe r (from L2)
S E TUP _V ALID
Setpoints
L2 Reflective Mem ory
Includes Next Piece PDI
Includes Next PieceSetup
Setup
Model Reflective Mem ory
FMM Reflective Mem ory
FM M _F2_SE TPOINTS
FM M _F3_SE TPOINTS
FM M _F4_SE TPOINTS
FM M _F5_SE TPOINTS
FM M _F6_SE TPOINTS
FM M _F7_SE TPOINTS
FS M _F2_M IM
FS M _F3_M IM
FS M _F4_M IM
FS M _F5_M IM
FS M _F6_M IM
FS M _F7_M IM
S-Ramp Acceleration
0
20
40
60
80
100
120
0 2 4 6 8 10
Time
Mas
ter
Sp
eed
Ref
. (%
)
3131
A-M Cleveland Hot MillA-M Cleveland Hot Mill Main Desks Phase-In ApproachMain Desks Phase-In Approach
Mini-Outage Required to Demo Old and Install NewMini-Outage Required to Demo Old and Install New Minimal Down-Time Required (Communications, E-Stop, and Power)Minimal Down-Time Required (Communications, E-Stop, and Power) Software Switch in PLC(s) Set to Use New Desks (Very Low Risk)Software Switch in PLC(s) Set to Use New Desks (Very Low Risk)
70'-7 1/2"
63'-8 3/8"
26'-9 13/16"
8'-7 1/4"
MILL
STAND
11'-2 1/8"
CE
NT
ER
LIN
ET
UR
NT
AB
LE
MA
X.
END
C
VC
RO
LLS
LC MILL
6'-11 1/8"
20'-1
3/8
"
HC
E
25'-3
1/1
6"
25'-3
1/1
6"
5'-1 11/16"
2'-7
13/
16"
3'-5
9/1
6"
0°
2'-4
1/8
"
17'-3 9/16"
3232
A-M Cleveland Hot MillA-M Cleveland Hot Mill Level 2 Phase-In ApproachLevel 2 Phase-In Approach
Extensive use of DEC Alpha Bridge between Reflective Memory and GEMlanD
Step 1: Coil Temperature Control Step 2: Finishing Mill through Delivery End
Used Furnace Supervisory Control System to Monitor Slab Charge Messages From The Old Level 2 to Get Handle to Slab PDI
Tracking Hand-off to New System at Roughing Mill Exit – Use Handle to Retrieve PDI from DB
Step 3: Furnace through Roughing Mill
3333
A-M Cleveland Hot MillA-M Cleveland Hot Mill HMI NavigationHMI Navigation
Select W ho You Are
Select the Areaof Interest
Select Screen TypeAssociated w ithArea of Interest
Select Help forThis Screen
3737
A-M Cleveland Hot MillA-M Cleveland Hot Mill Mill TrackingMill Tracking
4040
A-M Cleveland Hot MillA-M Cleveland Hot Mill RecorderRecorder
4141
A-M Cleveland Hot MillA-M Cleveland Hot Mill Furnace MapFurnace Map
4242
A-M Cleveland Hot MillA-M Cleveland Hot Mill Rougher(1)Rougher(1)
4545
A-M Cleveland Hot MillA-M Cleveland Hot Mill FM 1FM 1stst / 2 / 2ndnd Coil Setup Coil Setup
4848
A-M Cleveland Hot MillA-M Cleveland Hot Mill FM ScrewsFM Screws
4949
A-M Cleveland Hot MillA-M Cleveland Hot Mill FM SpeedsFM Speeds
5050
A-M Cleveland Hot MillA-M Cleveland Hot Mill Runout TablesRunout Tables
5151
A-M Cleveland Hot MillA-M Cleveland Hot Mill CoilerCoiler
5252
A-M Cleveland Hot MillA-M Cleveland Hot Mill FM HydraulicsFM Hydraulics
5353
A-M Cleveland Hot MillA-M Cleveland Hot Mill PermissivesPermissives
5656
A-M Cleveland Hot MillA-M Cleveland Hot Mill Alarm SummaryAlarm Summary
5757
A-M Cleveland Hot MillA-M Cleveland Hot Mill Alarm/Fault DetailAlarm/Fault Detail
5858
A-M Cleveland Hot MillA-M Cleveland Hot Mill Maintenance – Machine ControlMaintenance – Machine Control
5959
A-M Cleveland Hot MillA-M Cleveland Hot Mill Maintenance – Equip. Maintenance – Equip.
Enable/DisableEnable/Disable
6060
A-M Cleveland Hot MillA-M Cleveland Hot Mill Maintenance – Auto Mill ModulusMaintenance – Auto Mill Modulus
6262
Arcelor Mittal - ClevelandArcelor Mittal - Cleveland84” Hot Strip Mill Revamp 84” Hot Strip Mill Revamp