ARC FLASH HAZARDS

56
PB/RH -- March 3, 2009 ARC FLASH HAZARDS Construction Safety Association of Ontario

description

ARC FLASH HAZARDS. Construction Safety Association of Ontario. Purpose of this Presentation. Introduction to: Hazard of arc flash New CSA Standard on electrical safety Arc flash prevention and protection. Five Main Topics. 1. Introduction to arc flash 2. Arc flash injuries - PowerPoint PPT Presentation

Transcript of ARC FLASH HAZARDS

Page 1: ARC FLASH HAZARDS

1 PB/RH -- March 3, 2009

ARC FLASH HAZARDS

Construction SafetyAssociation of Ontario

Page 2: ARC FLASH HAZARDS

2 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Purpose of this Presentation

Introduction to:

– Hazard of arc flash

– New CSA Standard on electrical safety

– Arc flash prevention and protection

Page 3: ARC FLASH HAZARDS

3 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Five Main Topics

1. Introduction to arc flash

2. Arc flash injuries

3. Codes and standards

4. Protective clothing and equipment

5. Prevention

Page 4: ARC FLASH HAZARDS

4 PB/RH -- March 3, 2009

Topic 1 – Topic 1 – Introduction to Arc FlashIntroduction to Arc Flash

4

Page 5: ARC FLASH HAZARDS

5 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

What is an Arc Flash Hazard?

“. . . a dangerous condition associated with the release of energy caused by an electric arc.”

Page 6: ARC FLASH HAZARDS

6 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

What is an Electric Arc?

An electric arc is a short circuit through the air.

Page 7: ARC FLASH HAZARDS

7 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

An electric arc will oscillate and escalate if not constrained.

A single-phase electric arc can engulf a second or third conductor in only two cycles.

An electric arc’s current propels the arc away from the power source.

Characteristics of an Electric Arc

Page 8: ARC FLASH HAZARDS

8 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

What Causes Arc Flash?

Dust, impurities, corrosion, condensation, animals

Spark discharge from:

– Accidental touching

– Dropping tools

Over-voltages across narrow gaps

Failure of insulating materials

Equipment failure

Page 9: ARC FLASH HAZARDS

9 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

What is Arc Blast?

1. The flash causes an explosive expansionof air and metal.

– For example: When copper vapourizes it expands by a factor of 67,000.

2. The blast produces dangerous:

– Pressure waves

– Sound waves

– Molten steel and shrapnel.

Page 10: ARC FLASH HAZARDS

10 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Video Clip 1 – Arc Flash DemoVideo Clip 1 – Arc Flash Demo

Page 11: ARC FLASH HAZARDS

11 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Electric arc Arc flash Arc blast

Arc Flash Events

Compliments of Salisbury Electrical Safety L.L.C.

Page 12: ARC FLASH HAZARDS

12 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Forms of Arc Flash Energy

Noise

Expansion

Vaporization

Thermal radiation

Page 13: ARC FLASH HAZARDS

13 PB/RH -- March 3, 2009

Topic 2 – Arc Flash InjuriesTopic 2 – Arc Flash Injuries

13

Page 14: ARC FLASH HAZARDS

14 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Arc Flash Injuries

Electric shock

Severe burns

Blindness

Blast injuries

– Shrapnel wounds

– Lung blast injuries

– Ruptured eardrums

– Pressure wave injuries

Page 15: ARC FLASH HAZARDS

15 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

1. Power – amount of energy at the arc

2. Distance – of the worker to the arc

3. Time – duration of the arc exposure

Severity Factors

Page 16: ARC FLASH HAZARDS

16 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Video Clip 2 – “Not Safe at 18 inches”

Page 17: ARC FLASH HAZARDS

17 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Video Clip 3 – “Not Safe Working Near”

Page 18: ARC FLASH HAZARDS

18 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Electric Shock Injury – Burn

Page 19: ARC FLASH HAZARDS

19 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Severe Burns from Arc Flash

Arc flash up to 35,000°F

Sun 9,900°F

Page 20: ARC FLASH HAZARDS

20 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Probability of Surviving Burns

0

20

40

60

80

100

20+ 30+ 40+ 50+

25% Body Burn

50% Body Burn

75% Body Burn

% S

urv

ival

Age Range, Years

Page 21: ARC FLASH HAZARDS

21 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Blindness

Flash of light is so intense it can damage vision.

Page 22: ARC FLASH HAZARDS

22 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Shrapnel Wounds

Material and molten metal can hit the body at over

700 miles per hour.

Page 23: ARC FLASH HAZARDS

23 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Blast Lung Injury (BLI)

Arc blast can cause inhalation injuries.For example:– Inhaling high temperature

copper vapour.– More than 100 toxic

substances can be foundin the fumes.

BLI + Burns = Greater chance of death

Page 24: ARC FLASH HAZARDS

24 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Hearing Damage

Arc blast at 2 feet 145 decibels

Jet engine at 200 feet 132 decibels

Pain threshold 130 decibels

Page 25: ARC FLASH HAZARDS

25 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Pressure Wave Injuries

Arc blast can throw a worker:– Off a ladder– Into nearby walls or equipment.

2000 lbs/ft2 pressure on the body can cause:– Concussion– Collapsed lungs– Other internal injuries

Page 26: ARC FLASH HAZARDS

26 PB/RH -- March 3, 2009

Topic 3 – Topic 3 – Codes and StandardsCodes and Standards

26

Page 27: ARC FLASH HAZARDS

27 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Standards

US Occupational Safety & Health Administration

US National Fire Protection Association -Standard NFPA 70E

Institute of Electrical & Electronics Engineers -Standard 1584

Canadian Standards Association -Standard Z-462

Occupational Health & Safety Act -Applicable regulations

Canadian Electrical Code -Rule 2-306

Page 28: ARC FLASH HAZARDS

28 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

What is NFPA 70E?

National Fire Protection Association

“Standard for Electrical Safety in the Workplace”

• Standard for electrical safety in United Sates

• “Harmonized” with CSA Z462

Page 29: ARC FLASH HAZARDS

29

What is CSA Standard Z462?

The standard for workplace electrical safety in Canada.

“Harmonized” with NFPA 70E.PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Page 30: ARC FLASH HAZARDS

30 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Electrical Safety Program

Arc Flash Hazard Analysis

– Flash Protection Boundary

– Fault Current Calculations

– Arc Fault Clearing Time

– Incident Energy Exposure

Required PPE

CSA Standard Z462 addresses:

Page 31: ARC FLASH HAZARDS

31 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Institute of Electrical and Electronics Engineers

Offers a method for performing arc flash hazard calculations.

What is IEEE Standard 1584?

Page 32: ARC FLASH HAZARDS

32 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

What is CEC Rule 2-306?

Canadian Electrical Code

“Rule 2-306 Shock and Flash Protection” A requirement for field-marking electrical

equipment to warn persons of potential electric shock and arc flash hazards.

Page 33: ARC FLASH HAZARDS

33 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Sample label that complies with CEC Rule 2-306.

Required Warning Label

Page 34: ARC FLASH HAZARDS

34 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Optional Warning Label

Page 35: ARC FLASH HAZARDS

35 PB/RH -- March 3, 2009

Topic 4 – Protective ClothingTopic 4 – Protective Clothingand Equipmentand Equipment

35

Page 36: ARC FLASH HAZARDS

36 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Flame-Resistant (FR) Clothing

Protects a worker from receiving severe burns if the worker is exposed to a flame.

Is self-extinguishing when the source of the flame is removed.

Page 37: ARC FLASH HAZARDS

37 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

What is a Calorie?

A calorie is the amount of heat needed to raise the temperature of one gram of water by 1°C.

Thermal energy is measured in calories/cm².

1.2 calories/cm² = Holding your finger

in the blue part of the

flame for one second.

Page 38: ARC FLASH HAZARDS

38 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Limit the ‘Incident Energy’ level of the

arc flash to 1.2 cal/cm² against the

worker’s chest. Look for a label that states:

– 1506 approval (ASTM F1506)

– Arc rating of the garment. All materials in the garment

should be FR Rated:

– Thread

– Buttons

– Insulation

– Zippers, etc.

FR Rated Clothing

Photo compliments ofSalisbury Electrical Safety L.L.C.

Page 39: ARC FLASH HAZARDS

39 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Typical PPE Requirements

Hazard/RiskCategory

Eye protection, ear canal inserts, long sleeve shirt

and pants

Arc rated clothing

Face & Head Protection

Flash Suit Hood

0 1 2 3 4

Page 40: ARC FLASH HAZARDS

40 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Typical Protective Clothing

Hazard/Risk Category Clothing Description Required Minimum

Clothing Arc Rating

0 Non-melting, flammable materialwith fabric weight of at least 4.5 oz/yd2

Not applicable

1 Arc-rated FR shirt + FR pants or FR coveralls 4 calories/cm²

2 Arc-rated FR shirt + FR pants or FR coveralls 8 calories/cm²

3 Arc-rated FR shirt + FR pants or FR coveralls, and Arc-rated flash suit, the layered system must meet the required minimum rating.

25 calories/cm²

4 Arc-rated FR shirt + FR pants or FR coveralls, and Arc-rated flash suit, the layered system must meet the required minimum rating.

40 calories/cm²

Page 41: ARC FLASH HAZARDS

41 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Synthetic Clothing

Synthetic clothing that melts shall not be worn, such as:– Acetate– Nylon– Polyester– Polypropylene– Spandex.

Page 42: ARC FLASH HAZARDS

42 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Arc Flash Rated PPE

Required minimum clothing:– Non-melting, flammable material,

– Fabric weight of at least 4.5 oz/yd.

PPE must also providearc flash protection:– Face shield

– Gloves, etc.

Photo compliments ofSalisbury Electrical Safety L.L.C.

Page 43: ARC FLASH HAZARDS

43 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Video Clip 4 – 100% Cotton Clothing

Page 44: ARC FLASH HAZARDS

44 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Video Clip 5 – Polyester/Cotton Clothing

Page 45: ARC FLASH HAZARDS

45 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Video Clip 6 – FR Clothing

Page 46: ARC FLASH HAZARDS

46 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Increases level of protection.

May be lighter than a singleheavy garment.

Manufacturer must providethe new combined arc ratingafforded by layering.

FR Clothing Can Be Layered

Photo compliments ofSalisbury Electrical Safety L.L.C.

Page 47: ARC FLASH HAZARDS

47 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Tell the supplier that you needarc flash rated PPE and clothing.

PPE must have some resistance to:– Flame– Ignition– Melting.

obtain PPE from a known and

trusted supplier.

When Purchasing PPE

Not all FR clothing is tested to ASTM F1506

Photo compliments ofSalisbury Electrical Safety L.L.C.

Page 48: ARC FLASH HAZARDS

48 PB/RH -- March 3, 2009

Topic 5 – PreventionTopic 5 – Prevention

48

Page 49: ARC FLASH HAZARDS

49 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Tasks with Potential for Arc Flash

Operating a switch or circuit breaker

Inserting or removing a circuit breaker

Opening an enclosure door

Removing a cover (bolted or hinged)

Testing for voltage

In each task:

Worker is interacting with energized equipment.

Page 50: ARC FLASH HAZARDS

50 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Conduct a Flash Hazard Analysis to determine the

Flash Protection Boundary Incident Energy exposure Type and arc rating of PPE

If work must be done on or near energized electrical equipment,

identify the potential for arc flash.

Arc Flash Hazard Analysis

Page 51: ARC FLASH HAZARDS

51 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Reduce the fault clearing time.

Reduce the short-circuit current.

Improve equipment maintenance.

CONTROLLING ARC FLASH HAZARDS

At the Source

Page 52: ARC FLASH HAZARDS

52

Use flash-resistant equipment.

PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

CONTROLLING ARC FLASH HAZARDS

At the Source

These disconnect switch-plugs have beendesigned with built-in flash-protection.

Photos courtesy of Meltric Corporation

Page 53: ARC FLASH HAZARDS

53 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Increase the working distance.

Reduce the energy exposure.

Use hinged doors instead of bolted doors to eliminate the risk of bolts falling into the panel.

Work de-energized.

CONTROLLING ARC FLASH HAZARDS

Along the Path

Page 54: ARC FLASH HAZARDS

54 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Energized electrical work permit

Barriers

Training and skills

Job briefings

PPE

Tools

CONTROLLING ARC FLASH HAZARDS

At the Worker

Photo compliments ofSalisbury Electrical Safety L.L.C.

Page 55: ARC FLASH HAZARDS

55 PB/RH -- March 3, 2009Arc Flash Hazards -- Construction Safety Association of Ontario

Prevention Summary

1. Include Electrical Safety in your Occupational Health and Safety Management Program.

2. Use an electrical work permit system.

3. Conduct regular equipment maintenance and label equipment that poses a flash hazard.

4. Confirm single-line diagrams for accuracy and available fault current.

5. Maintain documentation process.

6. Provide training and job briefings.

7. Conduct periodic safety audits.

Page 56: ARC FLASH HAZARDS

56 PB/RH -- March 3, 2009

ARC FLASH HAZARDSARC FLASH HAZARDS

It is ALWAYS

preferable to work on

de-energized equipment.

56