ARC 2615Internship Training & Report

34
  School of Architecture, Building and Design BACHELOR OF SCIENCE (HONS) ARCHITECTURE ARC 2615 INTERNSHIP TRAINING & REPORT 5th January 2015 to 6th March 2015 LNL Sdn. Bhd.  Name: WONG JIA XIN ID: 1101G13277 Lecturer: Ms. Indrani

description

A report for the subject ARC 2615 in Bsc (Hons) Architecture, Taylor;s University.

Transcript of ARC 2615Internship Training & Report

  • School of Architecture, Building and Design

    BACHELOR OF SCIENCE (HONS) ARCHITECTURE

    ARC 2615 INTERNSHIP TRAINING & REPORT

    5th January 2015

    to

    6th March 2015

    LNL Sdn. Bhd.

    Name: WONG JIA XIN

    ID: 1101G13277

    Lecturer: Ms. Indrani

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    Contents

    1.0 Acknowledgement

    2.0 Introduction

    3.0 Organising Chart

    4.0 Flow Chart

    5.0 Projects

    6.0 Meeting Minutes

    7.0 Log Sheets

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    1.0 Acknowledgement

    First and foremost, I would like to thank Mr. Angus Lee for not

    only giving me the opportunity to be exposed to a professional

    working environment but also handling and managing this module

    well. This opportunity provided us an insight of a working

    experience of an architect.

    I would also like to thank Ms. Indrani, my visiting lecturer, for

    her time and effort to come visit us at our work place. Her suggestions

    and encouragement were invaluable which helped us to understand

    and handle situations better at our work place. Her visit is very much

    appreciated.

    I would also like to thank my supervising architects, Mr. Helmy,

    Mr. Allen and Ms. Guo Yi for their time and effort to teach and guide

    me throughout this internship. Above all, I would like to give my

    utmost gratitude to Ar. Mark Looi for giving me the opportunity to

    have my internship in his company.

    Lastly, I would like to thank colleagues and course mates for

    making my work experience in LNL Sdn Bhd a more memorable

    experience.

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    2.0 Introduction

    Figure 1: LNL Entrance.

    LNL Sdn Bhd

    in associate with MK Looi Architect

    C-2-6 & C-2-7, TTDI Plaza,

    Jalan Wan Kadir 3,

    Taman Tun Dr Ismail,

    60000 Kuala Lumpur.

    LNL Sdn Bhd is founded in 2008 by Mark Looi and Adrian

    Liew. The company is specialised in private residential and interior

    designs. LNL Sdn Bhd is made up of DIA Sdn Bhd, LNL Materpiece

    and MK Looi Architect.

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    3.0 Organising Chart

    LNL SDN BHD

    Director: Mark Looi

    Adrian Liew

    Admin Clerk: Ally Teo

    Graduate Architect: En. Helmy

    Mr. Allen Ng

    Ms. Guo Yi

    Architect Assistant: En. Shah

    En. Fizal

    Draughtsman: En. Ilyas

    Interior Designer: Ms. Claire Cheung

    Mr. Si Yuan

    Ms. Hue Weng

    Ms. Wei Wei

    -- in associate with MK Looi Architect

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    4.0 Flow Chart

    Schematic Design Phase (15%)

    Taking client's instructions

    Prepare preliminary sketch design to interpret design

    Develop sketch to sufficient stage to enable application for planning

    approval

    Estimate probable construction

    Design Development Phase (30%)

    Approved proposals will be developed to a stage to enable detailed design

    work

    Prepare working drawing and submitting to authority

    Update estimated construction costs

    Prepare construction schedule and submit to client for approval

    Contract Documentation Phase (25%)

    Prepare and finalise drawing, specification for the preparation of bills of

    quality by a QS

    Prepare necessary documents for tenders.

    Inviting on behalf of the client tenders for the work with appointed QS

    Evaluate results of tenders and submit a report and recommendation

    Award contract on behalf of client

    Contract Management Phase

    Award contract on behalf of client and perform all functions and

    management accepting responsibility and exercising authority

    Provide all information and issue instruction to building contractor in order

    to proceed with works

    Examine works programme by building contractor

    Provide periodic supervision of works

    Apply occupation permit when necessary

    Accept the building on behalf of the client

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    5.0 Projects

    (arranged according most involved to least involved)

    1. KO Lee Hartamas Heights

    - 3 storey bungalow and 1 basement with a swimming pool

    - LOT 58602, Jalan Changkat Hartamas 1, Sri Hartamas, Mukim

    Batu, Dalam Bandaraya Kuala Lumpur.

    2. Dato' Chen Bungalow

    - 4 storey bungalow that consist of a 1 storey of ground level and a 3

    storey basement with a swimming pool

    - Sub-lot 477, Sebahagian lot 826, Jalan Khaya, Country Heights

    Damansara, Mukim Batu, Dalam Bandaraya Kuala Lumpur

    3. Site Visit

    - 3 storey bungalow house with a swimming pool

    - Lot Pt. 4533 (No.9) Jalan Pekaka 8/17b, Seksyen 8, Kota

    Damansara, Petaling Jaya Dalam Mukim, Petaling Dalam Daerah

    Petaling

    4. Site Cleaning

    - Additions and Changes to a existing 3 Storey Bungalow

    - Lot P.T.1772 above, No.10, Jalan Desa, Taman Desa, Kuala Lumpur

    Wilayah Persekutuan

    5. Colour Scheme

    - 3 Storey Bungalow along with a swimming pool

    - Sub-Lot 240, Part of Lot 826, Jalan Jemerlang ,

    Country Heights Damansara, Mukim Batu, Kuala Lumpur

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    Project 1: KO Lee Bungalow

    Involving weeks:

    Week 1 - Tender Drawing: Toilet Details

    Week 5- Tender Drawing: Toilet Details

    Week 6- Tender Drawing: Toilet Details, Staircase Details

    Week 7- Tender Drawing: Staircase Details

    Week 8- Tender Drawing: Staircase Details

    Week 9- Tender Drawing: Swimming Pool Detail

    WEEK 1- WEEK 6

    This project is a 4 storey bungalow with 11 toilets. There are so

    many details that I started to pay more attention to. I learned about

    basin heights, basin designs (ie. semi-recessed, wall hung or above

    counter). Also, I learned about W.C. being placed preferrably aligned

    with the tiles and the types of W.C. (ie. close coupled water closet or

    one piece water closet). In addition, I learned about the different

    surface finishes to improve the toilet's ambience. Lastly, I learned

    about floor levels and the appropriate drop levels in bathrooms,

    powder rooms and shower areas.

    The tiles sizes that this company normally uses are 300mm x

    600mm homogeneous tile finish for smaller bathrooms and 600mm x

    600mm homogeneous tile finish for bigger bathrooms and powder

    rooms. The toilets all use stainless steel floor traps.

    This project allowed me to be introduced to more specific

    measures of construction taking place in real life. I became more

    attentive to the detailing and dimensions and sizes of the components.

    The quality of my drawings also improved in terms of line weight and

    detailing.

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    Figure 2: Floor plans

    Figure 3: Elevations A and B

    The toilet details are amended later

    on in such that the surrounding

    structure are removed to save time.

    Drawings I did and had been

    corrected by my supervisor.

    Figure 4: Elevation C and D

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    Figure 5: Floor plan

    The toilet details are amended later

    on in such that the surrounding

    structure are removed to save time.

    Figure 6: Elevation A & B

    Figure 7: Elevation C

    Figure 8: Elevation D

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    WEEK 6-WEEK 8

    The staircase has 4 flights. The first 2 flights are made out of

    R.C. steps with timber cladding while the rest are made of 1425mm X

    300mm Timber Step C/W M.S. Bracket To Engr's detail. They are

    supported by 150mm X 40mm X 4mm Thk L Bracket M.S. angle

    with bolt and nut connection.

    Figure 9: The completed construction staircase drawing for KO Lee bungalow.

    Figure 10: Detailed drawing Scale 1: 5

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    This project made me investigate more about the construction

    detail that happens during the construction of the staircase which

    allow me to be exposed the construction methods and systems. I also

    learnt to evaluate the construction and the detailing of the project.

    WEEK 9

    The size of the swimming pool is approximately 5.2m x 16.4m

    including the infinity pool for drainage and storage. Here I learnt

    about the approved depth of the pool at 1.2m deep. I also learnt about

    the overflowing system, filter and pump. I also learnt about the

    waterproofing system and the tiling arrangement.

    Figure 11: 3D model of swimming pool.

    The most common design used is by building an infinite pool

    where the water discharge will flow to balancing tank and pump

    room. This design has more aesthetic value as compared to having a

    storage tank below the pool.

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    Figure 14: Swimming Pool

    Detail

    Figure 13: Swimming Pool

    Section

    Figure 12: Swimming Pool Plan

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    Project 2: Dato' Chen Bungalow

    Involving weeks:

    Week 2- Week 4: Bungalow Model Making

    WEEK 2- WEEK 4

    We were advised to build the model in sequences similar to the

    real construction method. In this site making project, I learnt to study

    the site plan analytically and was able to understand the drawing.

    Figure 15: Site Model

    The purpose of building a physical model is to minimise

    mistakes that may occur during the construction of the bungalow. As

    the bungalow sits on the steep site, I had apply my knowledge of

    building construction in order to support the bungalow. This allow the

    demonstration of knowledge and understanding of building structure.

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    In conclusion, this model making project allowed me understand

    the process of assemble and detailing more. This also allow me to

    demonstrate a comprehensive understanding of the drawings.

    Figure 16: Initial stages

    Figure 17: Final model

    Figure 18: Models made by 5 interns. My model is at the most right.

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    Project 3: Site Visit Dato' Fam Bungalow

    WEEK 2: Site Visit

    During this site visit, I was exposed to the communication

    among an architect, an interior designer and a contractor. I also

    developed understanding of the importance of workmanship.

    Moreover, I learnt that it is critical to foster good communication

    skills among the people you work with.

    Figure 19: Dry kitchen.

    Figure 20: Staircase

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    Figure 23: Post Its indicating minor uneven plastering that needed retouching.

    Figure 21 & Figure 22: Completed toilets designed by LNL that I was able to be exposed

    to the material and the construction method they used.

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    Project 4: Site Cleaning James Liew Bungalow

    WEEK 4: Site Cleaning

    Figure 24: Front elevation of James' Bungalow.

    Figure 25: Swimming pool and main entrance of the bungalow.

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    Figure 26: Bedroom.

    Figure 27: Living room

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    Figure 28: A photo of the completed bungalow toilet

    The client requested as such that we clean his bungalow even

    though it is not part of the architect's contract. On the bright side, it

    was an opportunity to be able to visit a completed bungalow done by

    LNL Sdn Bhd. On the other hand, I was also able to be exposed to the

    fully constructed toilets. This allowed me to further understand about

    toilet detailing. I was able to analyse and document the construction

    methods and materials on site.

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    Project 5: Colour Scheme

    WEEK 6:

    Figure 29 & Figure 30: Elevations colour scheme

    Figure 31: Side elevation

    Figure 32: Side elevation

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    These are to determined the exterior colour scheme of the house.

    I learnt to refer to a colour template provided by the supplier. Neutrals

    are selected as it is a more accepting colour as compared to other

    colour types. I learnt to identity areas to colour according to a 3D

    model provided. I also learnt to note down the codes of colours.

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    6.0 Meeting Minutes

    Ref: LNL/ ref-no.

    Date:

    PROJECT TITLE

    eg. PROPOSED 3 STOREY BUNGALOW WITH SWIMMING POOL AT LOR 123, KUALA LUMPUR

    Date:

    Time:

    Venue:

    Next Meeting

    Date:

    Time:

    Venue:

    Attendance:

    Name Company Fax Email

    Absence

    Name Company Fax Email

    Distribution:

    As above

    Client Consultant Meeting No. 3

    Letter Head

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    1.0 General

    1.1 NIL

    2.0 Programme

    2.1

    Programme Start Finish Remarks

    3.0 Authority Matters

    3.1 Authority Submission Checklist

    Authority 1st submission 2nd submission Remarks

    Demolition works

    DO submission

    BP submission

    3.2 Demolition Work

    4.0 Client Matters

    4.1 Bungalow ready by April

    4.2 Site need to be cleared

    5.0 Architectural Matters

    5.1 LNL brief the team on latest design and layout plan

    5.2 LNL provide basic drawing

    5.3 DO submission targeted on 13 January 2014

    5.4 LNL to prepare schedule of finishes and specification selection

    6.0 Civil and Structures Matters

    6.1 ABC to do pre-consultation with DEF

    6.2 ABC to prepare structural drawing based on latest revised layout

    7.0 Mechanical and Electrical Matters

    7.1 XYZ need to do pre-consultation with QRS

    7.2 JKL to advice on M&E elements dimension and location based on latest revised layout

    plan

    8.0 Quantity Surveyor Matters

    8.1 TUV to prepare prelim budget plan once basic plan firm up

  • ARC 2615 INTERNSHIP REPORT STUDENT NAME: WONG JIA XIN STUDENT ID: 1101G13277

    All files, images, drawings and related documents are owned by the company and protected under the

    company's copyright and intellectual right. Any use of this information in the Report must be

    consulted with and obtained permission from the company or the owner.

    8.2 TUV submitted draft demolition tender document to client; pending on client comment

    and confirmation

    8.3 Soil investigation tender report submitted. Tenderer to revise quotation. Depending on

    Client's signature for engagement.

    9.0 Planner Matters

    9.1 ABC confirmed on MPPD on OSC 3.0 execution

    9.2 ABC provided development guideline on road widening and set back advised by MPPD

    10.0 Land Surveyor Matters

    10.1 TUV suggested project site required land surrender and re-alienation

    11.0 Landscape Architect Matters

    11.1 XYZ negotiating with consultant

    12.0 Other Matters

    12.1 Meeting ends at 4.30pm

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering

    Prepare presentation drawings

    9.0 9.0 9.0

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    OTHER:

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and

    systems Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers

    Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contract

    OTHER:

    Total: 0.0 0.0 9.0 9.0 9.0 0.0 27.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Lot 58602, Jalan Changkat Hartamas, Sri Hartamas, Kuala Lumpur

    LNL Architects Sdn Bhd WONG JIA XIN

    Ar. Looi Mun Kit, Helmy 1101G13277

    3 storey and 1 basement Bungalow KO Lee

    CNY leave

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc

    You might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK8 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering 9.0 9.0 9.0 7.0 9.0

    Prepare presentation drawings

    Aware of site conditions: Site

    Visit, Study and Measure 2.0

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    OTHER:

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and

    systems Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers

    Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contract

    OTHER:

    Total: 9.0 9.0 9.0 9.0 9.0 0.0 45.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Sub-lot 477, Sebahagian lot 826, Country Heights Damansara

    LNL Architects Sdn Bhd WONG JIA XIN

    Ar. Looi Mun Kit, Allen,Guo Yi 1101G13277

    4 storey Dato' Chen Bungalow

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc

    You might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK2 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering 9.0 9.0 9.0 9.0 9.0

    Prepare presentation drawings

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    OTHER:

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and

    systems Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers

    Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contract

    OTHER:

    Total: 9.0 9.0 9.0 9.0 9.0 0.0 45.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Sub-lot 477, Sebahagian lot 826, Country Heights Damansara

    LNL Architects Sdn Bhd WONG JIA XIN

    Ar. Looi Mun Kit, Allen,Guo Yi 1101G13277

    4 storey Dato' Chen Bungalow Modelling

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc

    You might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK3 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering 9.0 9.0 9.0 9.0

    Prepare presentation drawings

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    OTHER: Site Cleaning

    9.0

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and

    systems Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers

    Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contract

    OTHER:

    Total: 9.0 9.0 9.0 9.0 9.0 0.0 45.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Sub-lot 477, Sebahagian lot 826, Country Heights Damansara

    LNL Architects Sdn Bhd WONG JIA XIN

    Ar. Looi Mun Kit, Allen,Guo Yi 1101G13277

    4 storey Dato' Chen Bungalow Modelling

    Site Cleaning James Liew Bungalow

    Jalan Desa, Taman Desa, Kuala Lumpur

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc

    You might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK4 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering

    Prepare presentation drawings

    PH PH 9.0 9.0 9.0

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    OTHER:

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and

    systems Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers

    Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contract

    OTHER:

    Total: 0.0 0.0 9.0 9.0 9.0 0.0 27.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Lot 58602, Jalan Changkat Hartamas, Sri Hartamas, Kuala Lumpur

    LNL Architects Sdn Bhd WONG JIA XIN

    Ar. Looi Mun Kit, Helmy 1101G13277

    3 storey and 1 basement Bungalow KO Lee

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc

    You might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK5 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering

    Prepare presentation drawings

    9.0 9.0 9.0 3.0 9.0

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    6.0

    OTHER:

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and

    systems Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers

    Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contract

    OTHER:

    Total: 9.0 9.0 9.0 9.0 9.0 0.0 45.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Lot 58602, Jalan Changkat Hartamas, Sri Hartamas, Kuala Lumpur

    LNL Architects Sdn Bhd WONG JIA XIN

    Ar. Looi Mun Kit, Helmy 1101G13277

    3 storey and 1 basement Bungalow KO Lee

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc

    You might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK6 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering

    Prepare presentation drawings

    9.0 9.0 PH PH PH

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    OTHER:

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and

    systems Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers

    Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contract

    OTHER:

    Total: 9.0 9.0 0.0 0.0 0.0 0.0 18.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Lot 58602, Jalan Changkat Hartamas, Sri Hartamas, Kuala Lumpur

    LNL Architects Sdn Bhd WONG JIA XIN

    Ar. Looi Mun Kit, Helmy 1101G13277

    3 storey and 1 basement Bungalow KO Lee

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc

    You might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK7 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering

    Prepare presentation drawings

    9.0 9.0 9.0

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    OTHER:

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and

    systems Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers

    Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contract

    OTHER:

    Total: 0.0 0.0 9.0 9.0 9.0 0.0 27.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Lot 58602, Jalan Changkat Hartamas, Sri Hartamas, Kuala Lumpur

    LNL Architects Sdn Bhd WONG JIA XIN

    Ar. Looi Mun Kit, Helmy 1101G13277

    3 storey and 1 basement Bungalow KO Lee

    CNY leave

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc

    You might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK8 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering

    Prepare presentation drawings

    9.0 9.0 9.0 9.0 9.0

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    OTHER:

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and

    systems Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers

    Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contract

    OTHER:

    Total: 9.0 9.0 9.0 9.0 9.0 0.0 45.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Lot 58602, Jalan Changkat Hartamas, Sri Hartamas, Kuala Lumpur

    LNL Architects Sdn Bhd WONG JIA XIN

    Ar. Looi Mun Kit, Helmy 1101G13277

    3 storey and 1 basement Bungalow KO Lee

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etc

    You might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK1 Page 11