Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method...
Transcript of Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method...
![Page 1: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/1.jpg)
Expert Arboricultural planning, advice and care since 1998
Arborist Reports, Landscape Design, Flora and Fauna Surveys,
Biodiversity and Ecological Impact Assessments & Bushfire Protection Assessment Services
Arboricultural Impact Appraisal and Method Statement
84 Centenary Drive Strathfield, NSW
Prepared for
Strathfield Golf Club
4 February 2016
by Andrew Scales Dip. Horticulture / Dip. Arboriculture AQF5 PO Box 5085, Elanora Heights NSW 2101
E: [email protected] M: 0417 250 420
![Page 2: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/2.jpg)
Page 2 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
Summary
The proposed development is to reconfigure the layout of the fairways and greens within the subject site. I have inspected all the trees that will be directly impacted and list their details in Appendix 2. General comments and management will be provided for all remaining trees. Based on this information, I provided guidance on the constraints these trees impose on the use of the site. Eighty-nine high category trees, one-hundred and twelve low category trees and five Groups of trees, of mostly low category, will be lost because of this proposal. The proposed changes may adversely affect remaining trees if appropriate protective measures are not taken. However, if adequate precautions to protect the retained trees are specified and implemented through the arboricultural method statement included in this report, the development proposal will have no adverse impact on the contribution of trees to local amenity or character.
![Page 3: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/3.jpg)
Page 3 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
Table of Contents
Page
1 INTRODUCTION 4
2 THE LAYOUT DESIGN 5
3 ARBORICULTURAL IMPACT APPRAISAL 7
4 ARBORICULTURAL METHOD STATEMENT 9
5 HOW TO USE THIS REPORT 11
6 OTHER CONSIDERATIONS 13
7 BIBLIOGRAPHY 13
8 DISCLAIMER 14
Appendices
1 Qualifications and experience 15
2 Tree schedule and explanatory notes 16
3 Tree AZ categories 25
4 Tree protection fencing and signs – Illustrative specification
26
5 Root zone and trunk protection – Illustrative specification
27
6 General guidance for working in TPZ 28
7 Schedule of works and responsibilities 32
8 Tree management plan 33
![Page 4: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/4.jpg)
Page 4 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
1. INTRODUCTION 1.1 Instruction: I am instructed by Golf by Design to inspect selected trees at 84
Centenary Drive, Strathfield and to provide an arboricultural report to accompany a development application. This report investigates the impact of the proposed development on trees and provides the following guidelines for appropriate tree management and protective measures:
a schedule of the relevant trees to include basic data and a condition assessment;
an appraisal of the impact of the proposal on trees and any resulting impact that has on local character and amenity;
a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained
1.2 Purpose of this report: This report provides an analysis of the impact of the
development proposal on trees with additional guidance on appropriate management and protective measures. Its primary purpose is for the council to review the tree information in support of the planning submission and use as the basis for issuing a planning consent or engaging in further discussions towards that end. Within this planning process, it will be available for inspection by people other than tree experts so the information is presented to be helpful to those without a detailed knowledge of the subject.
1.3 Qualifications and experience: I have based this report on my site
observations and the provided information, and I have come to conclusions in the light of my experience. I have experience and qualifications in arboriculture, and include a summary in Appendix 1.
1.4 Documents and information provided: Golf by Design provided me with
copies of the following documents:
Tree Removal Plan, Dwg No. 1407-02-01, by Golf by Design dated 25 January 2016; and
Landscape Plan, Dwg No. 1407-11-02, by Golf by Design dated 2 February 2016.
1.5 Scope of this report: This report is concerned with one-hundred and ninety-
one trees located directly within the proposed works areas. It takes no account of other trees, shrubs or groundcovers within the site unless stated otherwise. It includes a preliminary assessment based on the site visit and the documents provided, listed in 1.4 above.
![Page 5: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/5.jpg)
Page 5 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
2. THE LAYOUT DESIGN 2.1 Tree AZ method of tree assessment: The TreeAZ assessment method
determines the worthiness of trees in the planning process. TreeAZ is based on a systematic method of assessing whether individual trees are important and how much weight they should be given in management considerations. Simplistically, trees assessed as potentially important are categorised as ‘A’ and those assessed as less important are categorised as ‘Z’. Further explanation of TreeAZ can be found in Appendix 3.
In the context of new development, all the Z trees are discounted as a material
constraint in layout design. All the A trees are potentially important and they dictate the design constraints. This relatively simple constraints information is suitable for use by the architect to optimise the retention of the best trees in the context of other material considerations.
2.2 Site visit and collection of data 2.2.1 Site visit: I carried out an unaccompanied site visit on 29 January 2016 and 3
February 2016. All my observations were from ground level and I estimated all dimensions unless otherwise indicated. Aerial inspections, root or soil analysis, exploratory root trenching and internal diagnostic testing was not undertaken as part of this assessment. The weather at the time of the inspections was clear and dry with good visibility.
2.2.2 Brief site description: 84 Centenary Drive is located in the residential suburb
of Strathfield (refer figure 1). The site is on the eastern and western side of Centenary Drive. The property consists of the Strathfield Golf Club. A variety of indigenous and coniferous trees are scattered throughout the site and around the site boundaries.
Figure 1: The location of the subject site (www.googlemaps.com).
![Page 6: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/6.jpg)
Page 6 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
2.2.3 Collection of basic data: I inspected each tree and have collected information on species, height, diameter, maturity and potential for contribution to amenity in a development context. I have recorded this information in the tree schedule included, with explanatory notes, in Appendix 2. Each tree was then allocated to one of four categories (AA, A, Z or ZZ), which reflected its suitability as a material constraint on development.
2.2.4 Identification and location of the trees: I have illustrated the locations of the
significant trees on the Tree Management Plan (Plan TMP01) included as Appendix 8. This plan is for illustrative purposes only and it should not be used for directly scaling measurements.
2.2.5 Advanced interpretation of data: Australian Standard Protection of trees on
development sites (AS4970-2009), recommends that the trunk diameter measurement for each tree is used to calculate the tree protection zone (TPZ), which can then be interpreted to identify the design constraints and, once a layout has been consented, the exclusion zone is to be protected by barriers.
2.3 The use of the tree information in layout design: Following my inspection of
the trees, the information listed in Appendix 2 was used to provide constraints guidance based on the locations of all the A trees. All the Z trees were discounted because they were not considered worthy of being a material constraint. This guidance identified two zones of constraint based on the following considerations:
The tree protection zone (TPZ) is an area where ground disturbance must be carefully controlled. The TPZ was established according to the recommendations set out in AS4970-2009 and is the radial offset distance of twelve (x12) times the trunk diameter. In principle, a maximum encroachment of 10% is acceptable within the TPZ and a high level of care is needed during any activities that are authorised within it if important trees are to be successfully retained.
The structural root zone (SRZ) is a radial distance from the centre of a tree’s trunk, where it is likely that structural, woody roots would be encountered. The distance is calculated on trunk flare diameter at ground level. The SRZ may also be influenced by natural or built structures, such as rocks and footings. The SRZ only needs to be calculated when major encroachment (>10%) into a TPZ is proposed.
![Page 7: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/7.jpg)
Page 7 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
3. ARBORICULTURAL IMPACT APPRAISAL 3.1 Summary of the impact on trees: I have assessed the impact of the proposal
on trees by the extent of disturbance in TPZs and the encroachment of structures into the SRZ (as set out briefly in 2.3 above and more extensively in Appendix 2). All the trees that may be affected by the development proposal are listed in Table 1
Table 1: Summary of existing trees and trees that will be affected by development
Impact Reason Important trees Unimportant trees
AA A Z ZZ
Trees to be removed
Construction and/or level variations within TPZ
112 1, 2, 3, 4, 5, 6, 7, 14, 15, 22, 23, 25, 28, 31, 33, 34, 35, 37, 39, 40, 44, 46, 49, 50, 52, 53, 54, 55, 57, 58, 59, 66, 67, 71, 72, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 100, 102, 103,
104, 105, 106, 116, 117, 123, 126, 136, 137, 138,
139, 140, 141, 141a, 141b, 141c, 143, 150,
151, 157, 169, 170, 171, 175, 176, 177, 178, 180,
181, 193
8, 9, 10, 11, 12, 16, 17, 18, 19, 20, 21, 24, 32, 36, 38, 41, 42, 43, 45, 47, 51, 60, 61, 62, 63, 64, 65, 68, 69, 70, 73, 74, 76, 95, 96, 98, 99, 101, 107, 108, 109,
110, 111, 113, 114, 115, 118, 119, 120, 121, 124, 127, 128, 129, 130, 131, 132, 133, 134, 135, 142,
144, 145, 145a, 146, 147, 148, 149, 152, 153, 154, 155, 156, 158, 159, 160, 161, 162, 163, 164, 165, 166, 167, 168, 173, 174, 182, 183, 184, 185, 186, 187, 188, 189, 190, 191, 192, 194, 195, 196, 197,
198, 199, 200, 201, 202, A, B, C, D, E
13, 56, 75,
122, 125, 172, 179
Retained trees that may be affected through disturbance to TPZs
Removal of existing landscaping and/or installation of new landscaping
48 26, 27, 29, 30, 97
3.2 Detailed impact appraisal 3.2.1 Category AA and A trees to be lost: The proposed development will
necessitate the removal of eighty-nine high category trees. These trees are considered moderate to high significance and display good health and condition. In order to compensate for loss of amenity, consideration should be given to replacement planting within the site following works.
3.2.2 Category Z and ZZ trees to be removed: The proposed development will
necessitate the removal of one-hundred and twelve trees, plus five Groups of trees, A, B, C, D and E, of low and very low retention value. None of these trees are considered significant or worthy of special measures to ensure their preservation. It should be noted that Trees 24, 63, 75, 118, 119, 120, 121, 158, 159, 163, 164, 172, 173 and 179 are exempt from Strathfield Council’s Tree Preservation Order.
![Page 8: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/8.jpg)
Page 8 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
3.3 Proposals to mitigate any impact 3.3.1 Protection of retained trees: The successful retention of the remaining trees
within the site, including Trees 26, 27, 29, 30, 48 and 97, will depend on the quality of the protection and the administrative procedures to ensure protective measures remain in place throughout the development. An effective way of doing this is through an arboricultural method statement that can be specifically referred to in the planning condition. An arboricultural method statement for this site is set out in detail in Section 4.
3.3.2 Undertaking works within 5 metres from the base of a retained tree: There
are many other trees within the site that could potentially be adversely affected through disturbance to their TPZs. Where proposed work comes within 5 meters from a retained tree, appropriate protective measures must be properly specified and controlled through a detailed arboricultural method statement (refer Section 4). Tree sensitive construction methods must be implemented to avoid and minimise impacts from any proposed major encroachment.
3.3.3 New planting: In the context of the loss of trees, considerations for new
planting should be implemented. The new trees should have the potential to reach a significant height without excessive inconvenience and be sustainable into the long term, significantly improving the potential of the site to contribute to local amenity and character.
3.3.4 Summary of the impact on local amenity: Eighty-nine high category trees,
one-hundred and twelve low category trees and five Groups of trees, of low category, will be lost because of this proposal. The proposed changes may adversely affect remaining trees if appropriate protective measures are not taken. However, if adequate precautions to protect the retained trees are specified and implemented through the arboricultural method statement included in this report, the development proposal will have no adverse impact on the contribution of trees to local amenity or character.
![Page 9: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/9.jpg)
Page 9 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
4. ARBORICULTURAL METHOD STATEMENT 4.1 Introduction 4.1.1 Terms of reference: The impact appraisal in Section 3 identified the potential
impacts on trees caused by proposed development. Section 4 is an arboricultural method statement setting out management and protection details that must be implemented to secure successful tree retention. It has evolved from Australian Standard AS4970-2009 Protection of trees on development sites.
4.1.2 Plan TMP01: Plan TMP01 in Appendix 8 is illustrative and based entirely on
provided information. This plan should only be used for dealing with the tree issues and all scaled measurements must be checked against the original submission documents. The precise location of all protective measures must be confirmed at the pre-commencement meeting before any demolition or construction activity starts. Its base is the existing land survey, which has the proposed layout superimposed so the two can be easily compared. It shows the existing trees numbered, with high categories (A) highlighted in green triangles and low categories (Z) highlighted in blue rectangles. It also shows the locations of the proposed protective measures.
4.2 Tree protection with fencing 4.2.1 Protection fencing: Tree protection fencing must comply with AS4970 (section
4.3) recommendations. An illustrative guide is included as Appendix 4. The approximate location of the barriers and the TPZs is illustrated on plan TMP01. The precise location of the fencing must be agreed with the project Arborist before any development activity starts.
4.3 Precautions when working in TPZs: Any work in TPZs must be done with
care as set out in Appendix 6. On this site, special precautions must be taken near all retained trees as illustrated on plan TMP01 and summarised below:
Modification of new greens and fairway construction or level variations within TPZ: The retained trees may be adversely affected by the demolition and construction works. Any adverse impact must be minimised by following the guidance set out in Appendix 6.
Installation of new soft landscaping: All landscaping activity within TPZs has the potential to cause severe damage and any adverse impact must be minimised by following the guidance set out in Section 7 of Appendix 6.
Installation of new services or upgrading of existing services: It is often difficult to clearly establish the detail of services until the construction is in progress. Where possible, it is proposed to use the existing services into the site and keep all new services outside TPZs.
![Page 10: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/10.jpg)
Page 10 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
However, where existing services within TPZs require upgrading or new services have to be installed in TPZs, great care must be taken to minimise any disturbance. Trenchless installation should be the preferred option but if that is not feasible, any excavation must be carried out by hand according to the guidelines set out in Section 6 of Appendix 6. If services do need to be installed within TPZs, consultation must be obtained from the project Arborist and/or council before any works are carried out.
4.4 Other tree related works 4.4.1 Site storage, cement mixing and washing points: All site storage areas,
cement mixing and washing points for equipment and vehicles must be outside TPZs unless otherwise agreed with the project Arborist and/or council. Where there is a risk of polluted water run-off into TPZs, heavy-duty plastic sheeting and sandbags must be used to contain spillages and prevent contamination.
4.4.2 Pruning: Any pruning that is required to accommodate hoardings, scaffolding
or to accommodate the unloading/loading of vehicles and has been approved by Council shall be carried out by a qualified Arborist (AQF3) and must be in accordance with AS4373 Australian Standards ‘Pruning of Amenity Trees’.
4.5 Programme of tree protection and supervision 4.5.1 Overview: Tree protection cannot be reliably implemented without arboricultural
input. The nature and extent of that input varies according to the complexity of the issues and the resources available on site. For this site, a summary of the level of arboricultural input that is likely to be required is set out in Appendix 7. The project arborist must be instructed to work within this framework to oversee the implementation of the protective measures and management proposals set out in this arboricultural method statement.
The framework in Appendix 7 must form the basis for the discharge of planning
conditions through site visits by the project arborist. These supervisory actions must be confirmed by formal letters circulated to all relevant parties. These permanent records of each site visit will accumulate to provide the proof of compliance and allow conditions to be discharged as the development progresses. The developer must instruct the project arborist to comply with the supervision requirements set out in this document before any work begins on site.
4.5.2 Phasing of arboricultural input: Trees can only be properly budgeted for and
factored into the developing work programmes if the overall project management takes full account of tree issues once consent is confirmed. The project arborist must be involved in the following phases of the project management:
![Page 11: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/11.jpg)
Page 11 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
1. Administrative preparation before work starts on site: It is normal for a development proposal to vary considerably from the expectations before consent as the detailed planning of implementation evolves. The early instruction of the project arborist ensures that tree issues are factored into the complexities of site management and can often help ease site pressures through creative approaches to tree protection. Pre-commencement discussions between the project arborist and the developer’s team is an effective means of managing the tree issues with difficult constraints.
2. Pre-commencement site meeting: A pre-commencement meeting must be
held on site before any of the demolition and construction work begins. This must be attended by the site manager and the project arborist. Any clarifications or modifications to the consented details must be recorded and circulated to all parties in writing. This meeting is where the details of the programme of tree protection will be agreed and finalised by all parties, which will then form the basis of any supervision arrangements between the project arborist and the developer.
3. Site supervision: Once the site is active, the project arborist must visit at an
interval agreed at the pre-commencement site meeting. The supervision arrangement must be sufficiently flexible to allow the supervision of all sensitive works as they occur. The project arborist’s initial role is to liaise with developer to ensure that appropriate protective measures are designed and in place before any works start on site. Once the site is working, that role will switch to monitoring compliance with arboricultural conditions and advising on any tree problems that arise or modifications that become necessary.
4.6 Site management: It is the developer’s responsibility to ensure that the details
of this arboricultural method statement and any agreed amendments are known and understood by all site personnel. Copies of the agreed documents must be kept on site at all times and the site manager must brief all personnel who could have an impact on trees on the specific tree protection requirements. This must be a part of the site induction procedures and written into appropriate site management documents.
![Page 12: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/12.jpg)
Page 12 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
5. HOW TO USE THIS REPORT 5.1 Limitations: It is common that the detail of logistical issues such as site storage
and the build programme are not finalised until after consent is issued. As this report has been prepared in advance of consent, some of its content may need to be updated as more detailed information becomes available once the post-consent project management starts. Although this document will remain the primary reference in the event of any disputes, some of its content may be superseded by authorised post-consent amendments.
5.2 Suggestions for the effective use of this report: Section 4 of this report,
including the relevant appendices, is designed as an enforcement reference. It is constructed so the council can directly reference the detail in a planning condition. Referencing the report by name and relating conditions to specific subsections is an effective means of reducing confusion and facilitating enforcement in the event of problems during implementation. More specifically, the following issues should be directly referenced in the conditions for this site:
1. Pre-commencement meeting 4.5
2. Protection fence 4.2.1 and Appendix 4
3. Ground protection 4.2.2 and Appendix 5
4. Removal of surfacing/structures 4.3 and Appendix 6 (Section 4)
5. Installation of surfacing/structures 4.3 and Appendices 6 (Section 5)
6. Services 4.3 and Appendix 6 (Section 6)
7. Landscaping 4.3 and Appendix 6 (Section 7)
8. Programming of tree protection 4.5 and Appendix 7
9. Arboricultural supervision 4.5 and Appendix 7
Each of the above matters shall be supervised by the project arborist and the
relevant conditions can only be discharged once that supervision has been confirmed in writing to the relevant parties. The last column of the table in Appendix 7 is to be used so that the various supervision issues can be recorded as they are confirmed by supervision letters. It is intended to act as a summary quick-reference to help keep track of the progress of the supervision.
![Page 13: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/13.jpg)
Page 13 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
6. OTHER CONSIDERATIONS 6.1 Trees subject to statutory controls: The subject trees, excluding Trees 24,
63, 75, 118, 119, 120, 121, 158, 159, 163, 164, 172, 173 and 179, are legally protected under Strathfield Council’s Tree Preservation Order, it will be necessary to consult the council before any pruning or removal works other than certain exemptions can be carried out. The works specified above are necessary for reasonable management and should be acceptable to the council. However, tree owners should appreciate that the council may take an alternative point of view and have the option to refuse consent.
7. BIBLIOGRAPHY 7.1 List of references: Australian Standard AS4373-2007 Pruning of Amenity Trees. Standards Australia. Australian Standard AS4970-2009 Protection of trees on development sites. Standards Australia. Barrell, J (2009) Draft for Practical Tree AZ version 9.02 A+NZ Barrel Tree Consultancy, Bridge House, Ringwood BH24 1EX Brooker, M. Kleinig, D (1999) Field guide to eucalypts – South eastern Aust. Blooming Books, Hawthorn Vic. Matheny, N.P. & Clark, J.R. (1998) Trees & Development: A Technical Guide to
Preservation of Trees During Land Development International Society ofArboriculture, Savoy, Illinois. Mattheck, Dr. Claus R., Breloer, Helge (1995) The Body Language of Trees - A
Handbook for Failure Analysis; The Stationery Office, London. England. Robinson, L (1994) Field Guide to the Native Plants of Sydney Kangaroo Press, Kenthurst NSW
![Page 14: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/14.jpg)
Page 14 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
8. DISCLAIMER 8.1 Limitations on use of this report:
This report is to be utilized in its entirety only. Any written or verbal submission, report or presentation that includes statements taken from the findings, discussions, conclusions or recommendations made in this report, may only be used where the whole of the original report (or a copy) is referenced in, and directly attached to that submission, report or presentation.
ASSUMPTIONS
Care has been taken to obtain all information from reliable sources. All data has been verified insofar as possible: however, Naturally Trees can neither guarantee nor be responsible for the accuracy of information provided by others.
Unless stated otherwise:
Information contained in this report covers only those trees that were examined and reflects the condition of those trees at time of inspection: and
The inspection was limited to visual examination of the subject trees without dissection, excavation, probing or coring. There is no warranty or guarantee, expressed or implied, that problems or deficiencies of the subject trees may not arise in the future.
Yours sincerely
Andrew Scales Arboriculture Australia #2136 Dip. Horticulture / Arboriculture Mobile: 0417 250 420
![Page 15: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/15.jpg)
Page 15 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
APPENDIX 1 Brief qualifications and experience of Andrew Scales
1. Qualifications:
Associate Diploma Horticulture Northern Sydney Institute of TAFE 1995-1998 Certificate in Tree Surgery Northern Sydney Institute of TAFE 1998 Associate Diploma Arboriculture Northern Sydney Institute of TAFE 1999-2006
2. Practical experience: Being involved in the arboricultural/horticultural industry
for in excess of 10 years, I have developed skills and expertise recognized in the industry. Involvement in the construction industry and tertiary studies has provided me with a good knowledge of tree requirements within construction sites.
As director of Naturally Trees, in this year alone I have undertaken hundreds of arboricultural consultancy projects and have been engaged by a range of clients to undertake tree assessments. I have gained a wide range of practical tree knowledge through tree removal and pruning works.
3. Continuing professional development:
Visual Tree Assessment (Prof. Dr. Claus Mattheck) Northern Sydney Institute of TAFE 2001
Wood Decay in Trees (F.W.M.R.Schwarze) Northern Sydney Institute of TAFE 2004
Visual Tree Assessment (Prof. Dr. Claus Mattheck) Carlton Hotel, Parramatta NSW 2004
Tree A-Z / Report Writing (Jeremy Barrell) Northern Sydney Institute of TAFE 2006
Up by Roots – Healthy Soils and Trees in the Built Environment (James Urban)
The Sebel Parramatta NSW 2008
Tree Injection for Insect Control (Statement of Attainment)
Northern Sydney Institute of TAFE 2008
Quantified Tree Risk Assessment (QTRA) Registered Licensee #1655
South Western Sydney Institute TAFE 2011
Practitioners Guide to Visual Tree Assessment South Western Sydney Institute TAFE 2011
Quantified Tree Risk Assessment (QTRA) Registered Licensee #1655
Richmond College NSW TAFE 2014
4. Current professional memberships:
Arboriculture Australia – (Registered Consulting & Practising Arborist #2136)
![Page 16: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/16.jpg)
Page 16 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
APPENDIX 2 Tree schedule
NOTE: Colour annotation is AA & A trees with green background; Z & ZZ trees with blue background; trees to be removed in red text.
No. Genus species Height Spread DBH TPZ Foliage
% Age
class Defects/Comment Location Services Significance
Tree AZ
1 Melaleuca quinquenervia 10 5 300 3.6 80% M Nil Grass Nil M A1
2 Melaleuca quinquenervia 10 5 300 3.6 80% M Nil Grass Nil M A1
3 Melaleuca quinquenervia 10 5 300 3.6 80% M Nil Grass Nil M A1
4 Lophostemon confertus 6 5 300 3.6 90% M Nil Grass Nil M A1
5 Melaleuca quinquenervia 10 5 450 5.4 80% M Nil Grass Nil M A1
6 Lophostemon confertus 14 10 600 7.2 80% M Nil Grass Nil M A1
7 Lophostemon confertus 6 5 300 3.6 90% M Nil Grass Nil M A1
8 Cupressus sp. 8 4 350 4.2 60% O Co-dominant Grass Nil L Z1
9 Araucaria heterophylla 7 4 250 3.0 90% S Nil Grass Nil L Z1
10 Araucaria heterophylla 7 4 250 3.0 90% S Nil Grass Nil L Z1
11 Melaleuca linariifolia 5 4 250 3.0 60% M Co-dominant Garden bed Nil L Z1
12 Lophostemon confertus 7 4 350 4.2 60% M Heavily pruned Garden bed Nil M Z10
13 Eucalyptus sp. 20 14 700 8.4 0% O Borer Garden bed Nil H ZZ4
14 Lophostemon confertus 8 8 500 6.0 90% M Nil Grass Nil M A1
15 Lophostemon confertus 6 5 300 3.6 90% M Nil Grass Nil M A1
16 Callistemon sp. 4 4 100 2.0 70% M Nil Grass Nil L Z1
17 Callistemon sp. 4 4 100 2.0 70% M Nil Grass Nil L Z1
18 Callistemon sp. 4 4 100 2.0 70% M Nil Grass Nil L Z1
19 Eucalyptus microcorys 6 4 150 2.0 80% S Nil Grass Nil L Z1
20 Podocarpus elatus 5 5 200 2.4 80% S Nil Grass Nil L Z1
21 Podocarpus elatus 6 4 300 3.6 80% M Nil Grass Nil L Z1
22 Melaleuca quinquenervia 12 6 600 7.2 80% M Nil Grass Nil H A1
23 Melaleuca quinquenervia 7 6 300 3.6 80% M Nil Grass Nil M A1
24 Tristaniopsis laurina 3 3 100 2.0 60% S Nil Grass Nil L Z1
![Page 17: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/17.jpg)
Page 17 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
No. Genus species Height Spread DBH TPZ Foliage
% Age
class Defects/Comment Location Services Significance
Tree AZ
25 Melaleuca quinquenervia 12 6 600 7.2 80% M Nil Grass Nil H A1
26 Melaleuca quinquenervia 12 6 600 7.2 80% M Nil Grass Nil H A1
27 Melaleuca quinquenervia 12 6 600 7.2 80% M Nil Grass Nil H A1
28 Melaleuca quinquenervia 12 6 600 7.2 80% M Nil Grass Nil H A1
29 Eucalyptus sideroxylon 9 6 250 3.0 90% M Nil Grass Nil M A1
30 Melaleuca quinquenervia 12 6 600 7.2 80% M Nil Grass Nil H A1
31 Populus deltoides 24 20 900 10.8 80% M Co-dominant Garden bed Nil H A2
32 Eucalyptus paniculata 6 3 150 2.0 80% S Nil Grass Nil L Z1
33 Eucalyptus microcorys 14 12 450 5.4 90% M Nil Grass Nil H A1
34 Melaleuca quinquenervia 7 5 300 3.6 80% M Nil Grass Nil M A1
35 Eucalyptus sideroxylon 9 5 250 3.0 80% M Nil Grass Nil M A1
36 Lagunaria patersonia 5 5 150 2.0 80% M Nil Grass Nil L Z3
37 Eucalyptus paniculata 10 5 250 3.0 80% M Nil Grass Nil M A1
38 Eucalyptus paniculata 6 3 150 2.0 80% S Nil Grass Nil L Z1
39 Melaleuca quinquenervia 8 7 300 3.6 80% M Nil Grass Nil M A1
40 Eucalyptus paniculata 10 5 250 3.0 80% M Nil Grass Nil M A1
41 Melaleuca quinquenervia 5 5 200 2.4 80% M Nil Grass Nil L Z1
42 Sapium sebiferum 5 4 100 2.0 90% S Nil Grass Nil L Z1
43 Eucalyptus paniculata 8 4 150 2.0 80% S Nil Grass Nil L Z1
44 Melaleuca quinquenervia 10 8 450 5.4 80% M Nil Grass Nil M A1
45 Pinus radiata 9 7 350 4.2 80% M Nil Grass Nil M Z3
46 Eucalyptus microcorys 10 5 250 3.0 90% M Nil Grass Nil M A1
47 Melaleuca quinquenera 14 10 500 6.0 60% O Dieback Grass Nil M Z4
48 Corymbia citriodora 22 20 600 7.2 90% M Nil Grass Nil H AA1
49 Melaleuca quinquenervia 14 9 600 7.2 80% M Nil Grass Nil H A1
50 Ficus microcarpa' hillii' 16 14 450 5.4 90% M Nil Grass Nil H A1
51 Melaleuca quinquenervia 9 8 400 4.8 70% M Failure of co-dominant stems Grass Nil M Z9
52 Lophostemon confertus 7 6 400 4.8 80% M Nil Grass Nil M A1
53 Eucalyptus microcorys 12 10 350 4.2 80% M Nil Grass Nil M A1
![Page 18: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/18.jpg)
Page 18 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
No. Genus species Height Spread DBH TPZ Foliage
% Age
class Defects/Comment Location Services Significance
Tree AZ
54 Melaleuca quinquenervia 9 7 400 4.8 80% M Nil Grass Nil M A1
55 Casuarina cunninghamiana 16 8 450 5.4 70% M Co-dominant Grass Nil M A1
56 Casuarina cunninghamiana 9 5 300 3.6 60% O Failured central leader Grass Nil M ZZ5
57 Melaleuca quinquenervia 9 7 300 3.6 80% M Nil Grass Nil M A1
58 Casuarina cunninghamiana 16 8 450 5.4 70% M Co-dominant Grass Nil M A1
59 Eucalyptus scoparia 18 10 450 5.4 80% M Nil Grass Nil H A1
60 Callistemon sp. 4 3 100 2.0 60% O Nil Grass Nil L Z1
61 Casuarina cunninghamiana 7 4 200 2.4 70% S Nil Grass Nil L Z1
62 Casuarina cunninghamiana 16 10 450 5.4 80% M Included bark Grass Nil H Z9
63 Callistemon sp. 4 3 100 2.0 60% M Nil Grass Nil L Z1
64 Lagunaria patersonia 14 10 400 4.8 80% M Nil Grass Nil M Z3
65 Quercus robur 7 7 250 3.0 70% M Nil Grass Nil L Z1
66 Melaleuca quinquenervia 9 7 300 3.6 80% M Nil Grass Nil M A1
67 Melaleuca quinquenervia 9 7 300 3.6 80% M Nil Grass Nil M A1
68 Eucalyptus paniculata 8 5 150 2.0 90% S Nil Grass Nil L Z1
69 Eucalyptus paniculata 9 6 150 2.0 90% S Nil Grass Nil L Z1
70 Melaleuca quinquenervia 5 5 300 3.6 70% M Nil Grass Nil L Z1
71 Eucalyptus paniculata 12 7 300 3.6 80% M Nil Grass Nil M A1
72 Eucalyptus paniculata 12 7 300 3.6 80% M Nil Grass Nil M A1
73 Melaleuca quinquenervia 6 5 350 4.2 80% M Nil Grass Nil M Z1
74 Grevillea robusta 5 3 100 2.0 80% S Nil Grass Nil L Z3
75 Grevillea robusta 3 3 100 2.0 0% S Nil Grass Nil L ZZ4
76 Grevillea robusta 5 3 100 2.0 80% S Nil Grass Nil L Z3
77 Melaleuca quinquenervia 8 8 450 5.4 80% M Nil Grass Nil M A1
78 Melaleuca quinquenervia 6 5 250 3.0 80% M Nil Grass Nil M A1
79 Melaleuca quinquenervia 8 8 450 5.4 80% M Nil Grass Nil M A1
80 Melaleuca quinquenervia 8 8 450 5.4 80% M Nil Grass Nil M A1
81 Melaleuca quinquenervia 8 8 450 5.4 80% M Nil Grass Nil M A1
82 Eucalyptus saligna 16 8 350 4.2 70% M Nil Grass Nil M A1
![Page 19: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/19.jpg)
Page 19 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
No. Genus species Height Spread DBH TPZ Foliage
% Age
class Defects/Comment Location Services Significance
Tree AZ
83 Eucalyptus sideroxylon 10 7 250 3.0 80% M Nil Grass Nil M A1
84 Melaleuca quinquenervia 12 10 600 7.2 80% M Nil Grass Nil M A1
85 Melaleuca quinquenervia 12 10 600 7.2 80% M Nil Grass Nil M A1
86 Eucalyptus paniculata 10 5 250 3.0 80% M Nil Grass Nil M A1
87 Melaleuca quinquenervia 8 8 450 5.4 80% M Nil Grass Nil M A1
88 Melaleuca quinquenervia 8 8 450 5.4 80% M Nil Grass Nil M A1
89 Melaleuca quinquenervia 8 8 450 5.4 80% M Nil Grass Nil M A1
90 Casuarina cunninghamiana 14 7 300 3.6 70% M Nil Grass Nil M A1
91 Casuarina cunninghamiana 14 7 300 3.6 70% M Nil Grass Nil M A1
92 Casuarina cunninghamiana 14 7 300 3.6 70% M Nil Grass Nil M A1
93 Casuarina cunninghamiana 14 7 300 3.6 70% M Nil Grass Nil M A1
94 Casuarina cunninghamiana 14 7 300 3.6 70% M Nil Grass Nil M A1
95 Callistemon sp. 5 3 100 2.0 70% M Nil Grass Nil L Z1
96 Callistemon sp. 5 3 100 2.0 70% M Nil Grass Nil L Z1
97 Eucalyptus botryoides 10 9 400 4.8 70% M Failures Grass Nil M A2
98 Callistemon sp. 5 3 100 2.0 70% M Nil Grass Nil L Z1
99 Callistemon sp. 5 3 100 2.0 70% M Nil Grass Nil L Z1
100 Melaleuca quinquenervia 8 8 450 5.4 80% M Nil Grass Nil M A1
101 Callistemon sp. 5 3 100 2.0 70% M Nil Grass Nil L Z1
102 Eucalyptus microcorys 12 10 300 3.6 80% M Nil Grass Nil M A1
103 Eucalyptus microcorys 12 10 300 3.6 80% M Nil Grass Nil M A1
104 Lophostemon confertus 12 10 500 6.0 90% M Nil Grass Nil H A1
105 Lophostemon confertus 12 10 500 6.0 90% M Nil Grass Nil H A1
106 Lophostemon confertus 12 10 500 6.0 90% M Nil Grass Nil H A1
107 Pinus radiata 14 12 600 7.2 50% O Dieback Grass Nil M Z4
108 Casuarina cunninghamiana 9 3 150 2.0 80% S Nil Grass Nil L Z1
109 Casuarina cunninghamiana 9 3 150 2.0 80% S Nil Grass Nil L Z1
110 Casuarina cunninghamiana 9 3 150 2.0 80% S Nil Grass Nil L Z1
111 Melaleuca quinquenervia 6 6 300 3.6 80% M Nil Grass Nil L Z1
![Page 20: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/20.jpg)
Page 20 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
No. Genus species Height Spread DBH TPZ Foliage
% Age
class Defects/Comment Location Services Significance
Tree AZ
112 Eucalyptus microcorys 18 14 600 7.2 80% M Co-dominant Grass Nil H AA1
113 Eucalyptus microcorys 4 3 100 2.0 90% S Nil Grass Nil L Z1
114 Eucalyptus microcorys 4 3 100 2.0 90% S Nil Grass Nil L Z1
115 Eucalyptus sideroxylon 5 3 150 2.0 70% S Nil Grass Nil L Z1
116 Melaleuca quinquenervia 14 9 450 5.4 80% M Co-dominant Grass Nil M A1
117 Melaleuca quinquenervia 8 7 300 3.6 80% M Nil Grass Nil M A1
118 Callistemon sp. 3 3 100 2.0 70% M Nil Grass Nil L Z1
119 Callistemon sp. 3 3 100 2.0 70% M Nil Grass Nil L Z1
120 Callistemon sp. 3 3 100 2.0 70% M Nil Grass Nil L Z1
121 Callistemon sp. 3 3 100 2.0 70% M Nil Grass Nil L Z1
122 Eucalyptus sp. 12 9 300 3.6 0% O Nil Grass Nil M ZZ4
123 Eucalyptus microcorys 9 6 300 3.6 70% M Nil Grass Nil M A1
124 Eucalyptus robusta 9 5 200 2.4 80% M Included bark Garden bed Nil M Z5
125 Melaleuca armillaris 5 6 250 3.0 60% O Cavity Grass Nil L ZZ9
126 Lophostemon confertus 10 7 300 3.6 90% M Nil Garden bed Nil M A1
127 Acacia parramattensis 6 3 100 2.0 70% S Borer Grass Nil L Z1
128 Eucalyptus sp. 6 3 100 2.0 90% S Nil Grass Nil L Z1
129 Eucalyptus sp. 6 3 100 2.0 90% S Nil Grass Nil L Z1
130 Eucalyptus microcorys 7 3 200 2.4 80% S Nil Grass Nil L Z1
131 Eucalyptus microcorys 5 3 150 2.0 80% S Nil Grass Nil L Z1
132 Melaleuca armillaris 4 3 100 2.0 70% S Nil Grass Nil L Z1
133 Eucalyptus microcorys 5 4 250 3.0 90% S Nil Grass Nil L Z1
134 Eucalyptus microcorys 5 4 250 3.0 90% S Nil Grass Nil L Z1
135 Lophostemon confertus 6 3 200 2.4 80% S Nil Grass Nil L Z1
136 Melaleuca quinquenervia 7 7 250 3.0 70% M Nil Grass Nil M A1
137 Lophostemon confertus 6 6 200 2.4 80% M Nil Grass Nil M A1
138 Lophostemon confertus 12 9 400 4.8 80% M Nil Grass Nil M A1
139 Lophostemon confertus 12 9 400 4.8 80% M Nil Grass Nil M A1
140 Lophostemon confertus 12 9 400 4.8 80% M Nil Grass Nil M A1
![Page 21: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/21.jpg)
Page 21 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
No. Genus species Height Spread DBH TPZ Foliage
% Age
class Defects/Comment Location Services Significance
Tree AZ
141 Lophostemon confertus 12 9 400 4.8 80% M Nil Grass Nil M A1
141a Lophostemon confertus 12 9 400 4.8 80% M Nil Grass Nil M A1
141b Lophostemon confertus 12 9 400 4.8 80% M Nil Grass Nil M A1
141c Lophostemon confertus 12 9 400 4.8 80% M Nil Grass Nil M A1
142 Pinus radiata 10 9 400 4.8 70% M Nil Grass Nil M Z3
143 Melaleuca quinquenervia 8 8 450 5.4 80% M Nil Grass Nil M A1
144 Cupressus sp. 12 3 300 3.6 70% M Nil Grass Nil M Z3
145 Callistemon sp. 5 3 100 2.0 70% M Nil Grass Nil L Z1
145a Lophostemon confertus 5 3 100 2.0 70% M Nil Grass Nil L Z1
146 Casuarina cunninghamiana 7 5 250 3.0 70% M Co-dominant, Poor form Grass Nil L Z12
147 Liquidambar styraciflua 7 4 200 2.4 90% S Nil Grass Nil L Z3
148 Eucalyptus sideroxylon 7 4 200 2.4 80% S Failured central leader Grass Nil L Z5
149 Eucalyptus nicholii 5 5 250 3.0 80% M Nil Grass Nil L Z1
150 Eucalyptus nicholii 10 10 400 4.8 70% M Nil Grass Nil M A1
151 Eucalyptus nicholii 10 10 400 4.8 70% M Nil Grass Nil M A1
152 Eucalyptus nicholii 10 10 400 4.8 70% O Splits on trunk Grass Nil M Z9
153 Eucalyptus microcorys 6 3 200 2.4 90% S Nil Grass Nil L Z1
154 Podocarpus elatus 5 4 150 2.0 80% S Nil Grass Nil L Z1
155 Callistemon sp. 5 4 150 2.0 60% M Nil Grass Nil L Z1
156 Callistemon sp. 5 4 150 2.0 60% M Nil Grass Nil L Z1
157 Eucalyptus microcorys 12 10 400 4.8 90% M Nil Grass Nil M A1
158 Melaleuca linariifolia 3 2 100 2.0 80% S Nil Grass Nil L Z1
159 Melaleuca linariifolia 3 2 100 2.0 80% S Nil Grass Nil L Z1
160 Melaleuca linariifolia 4 3 100 2.0 80% S Nil Grass Nil L Z1
161 Melaleuca linariifolia 4 3 100 2.0 80% S Nil Grass Nil L Z1
162 Melaleuca linariifolia 4 3 100 2.0 80% S Nil Grass Nil L Z1
163 Melaleuca linariifolia 3 2 100 2.0 80% S Nil Grass Nil L Z1
164 Melaleuca linariifolia 3 2 100 2.0 80% S Nil Grass Nil L Z1
165 Melaleuca linariifolia 4 3 100 2.0 80% S Nil Grass Nil L Z1
![Page 22: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/22.jpg)
Page 22 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
No. Genus species Height Spread DBH TPZ Foliage
% Age
class Defects/Comment Location Services Significance
Tree AZ
166 Callistemon sp. 5 5 100 2.0 80% M Nil Garden bed Nil L Z1
167 Callistemon sp. 5 5 100 2.0 80% M Nil Garden bed Nil L Z1
168 Eucalyptus sp. 3 3 100 2.0 80% S Epicormic growth Grass Nil L Z1
169 Eucalyptus microcorys 14 12 450 5.4 80% M Nil Grass Nil H A1
170 Eucalyptus microcorys 12 9 300 3.6 80% M Nil Grass Nil M A1
171 Eucalyptus microcorys 14 12 450 5.4 80% M Nil Grass Nil H A1
172 Eucalyptus sp. 3 3 100 2.0 0% S Nil Grass Nil L ZZ4
173 Eucalyptus sp. 3 3 100 2.0 80% S Nil Grass Nil L Z1
174 Pinus radiata 4 5 250 3.0 60% M Failures Grass Nil L Z3
175 Eucalyptus microcorys 9 5 250 3.0 80% S Nil Grass Nil M A1
176 Casuarina cunninghamiana 16 6 350 4.2 80% M Nil Grass Nil M A1
177 Casuarina cunninghamiana 16 6 350 4.2 80% M Nil Grass Nil M A1
178 Casuarina cunninghamiana 16 6 350 4.2 80% M Nil Grass Nil M A1
179 Eucalyptus microcorys 2 0 300 3.6 0% M Stump only Grass Nil L ZZ4
180 Eucalyptus microcorys 9 5 250 3.0 80% S Nil Grass Nil M A1
181 Eucalyptus microcorys 12 9 300 3.6 80% M Nil Grass Nil M A1
182 Melaleuca quinquenervia 9 9 400 4.8 80% M Nil Grass Nil M A1
183 Melaleuca quinquenervia 8 6 400 4.8 80% M Nil Grass Nil L Z1
184 Callistemon sp. 5 4 250 3.0 80% M Nil Grass Nil L Z1
185 Melaleuca quinquenervia 7 5 300 3.6 80% M Nil Grass Nil L Z1
186 Eucalyptus sp. 5 3 100 2.0 860% S Nil Grass Nil L Z1
187 Callistemon sp. 5 4 250 3.0 80% M Nil Grass Nil L Z1
188 Callistemon sp. 5 4 250 3.0 80% M Nil Grass Nil L Z1
189 Callistemon sp. 5 4 250 3.0 80% M Nil Grass Nil L Z1
190 Callistemon sp. 5 4 250 3.0 80% M Nil Grass Nil L Z1
191 Eucalyptus sp. 8 4 250 3.0 70% M Nil Grass Nil L Z1
192 Eucalyptus sp. 5 4 150 2.0 70% M Nil Grass Nil L Z1
193 Liquidambar styraciflua 10 6 400 4.8 80% M Nil Grass Nil M A1
194 Casuarina cunninghamiana 12 4 200 2.4 70% M Slender habit Natural ground Nil L Z1
![Page 23: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/23.jpg)
Page 23 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
No. Genus species Height Spread DBH TPZ Foliage
% Age
class Defects/Comment Location Services Significance
Tree AZ
195 Casuarina cunninghamiana 12 4 200 2.4 70% M Slender habit Natural ground Nil L Z1
196 Casuarina cunninghamiana 12 4 200 2.4 70% M Slender habit Natural ground Nil L Z1
197 Casuarina cunninghamiana 12 4 200 2.4 70% M Slender habit Natural ground Nil L Z1
198 Casuarina cunninghamiana 12 4 200 2.4 70% M Slender habit Natural ground Nil L Z1
199 Eucalyptus botryoides 9 3 200 2.4 70% S Nil Natural ground Nil L Z10
200 Eucalyptus botryoides 9 3 200 2.4 70% S Nil Natural ground Nil L Z10
201 Callistemon sp. 6 3 150 2.0 70% M Nil Natural ground Nil L Z1
202 Callistemon sp. 6 3 150 2.0 70% M Nil Natural ground Nil L Z1
A Eucalyptus botryoides (x6) 6 3 200 2.4 80% S Nil Natural ground Nil L Z1
B Eucalyptus sp. (x2) 6 4 200 2.4 70% S Nil Natural ground Nil L Z1
C Acacia parramattensis (x12) 9 3 120 2.0 70% S Slender habit Natural ground Nil L Z1
D Acacia parramattensis (x6) Eucalyptus sp. (x2)
9 12
3 6
150 200
2.0 2.4
70% 70%
S S
Slender habit Nil
Natural ground Natural ground
Nil Nil
L L
Z1 Z10
E Eucalyptus botryoides (x9) Casuarina cunninghamiana (x3)
9 9
5 3
250 250
3.0 3.0
70% 70%
M M
Nil Nil
Natural ground Natural ground
Nil Nil
L L
Z1 Z1
![Page 24: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/24.jpg)
Page 24 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
Explanatory Notes
• Measurements/estimates: All dimensions are estimates unless otherwise indicated. Measurements taken with a tape or clinometer are indicated with a ‘*’. Less reliable estimated dimensions are indicated with a '?'.
• Species: The species identification is based on visual observations and the botanical name. In some instances, it may be difficult to quickly and accurately identify a particular tree without further detailed investigations. Where there is some doubt of the precise species of tree, it is indicated with a '?' after the name in order to avoid delay in the production of the report. The botanical name is followed by the abbreviation sp if only the genus is known. The species listed for groups and hedges represent the main component and there may be other minor species not listed.
• Tree number: relates to the reference number used on site diagram/report. • Height: Height is estimated to the nearest metre. • Spread: The average crown spread is visually estimated to the nearest metre from the outermost tips of the live lateral branches. • DBH: These figures relate to 1.4m above ground level and are recorded in millimetres. If appropriate, diameter is measured with a diameter tape.
‘M’ indicates trees or shrubs with multiple stems. • Foliage Cover: Percent of estimated live foliage cover for particular species range. • Age class: • TPZ: The Tree Protection Zone (TPZ) is the radial offset distance of twelve times the trunk diameter in meters. • Tree AZ: See reference for Tree AZ categories in Appendix 3. • Significance: A tree’s significance/value in the landscape takes into account its prominence from a wide range of perspectives. This includes, but
is not limited to neighbour hood perspective, local perspective and site perspective. The significance of the subject trees has been categorized into three groups, such as: High, Moderate or Low significance.
Y Young = recently planted S Semi-mature (<20% of life expectancy) M Mature (20-80% of life expectancy) O Over-mature (>80% of life expectancy)
![Page 25: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/25.jpg)
Page 25 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
APPENDIX 3 TreeAZ Categories (Version 9.02 A+NZ)
Z Category Z: Unimportant trees not worthy of being a material constraint
Local policy exemptions: Trees that are unsuitable for legal protection for local policy reasons including size,
proximity and species
Z1 Young or insignificant small trees, i.e. below the local size threshold for legal protection, etc
Z2 Too close to a building, i.e. exempt from legal protection because of proximity, etc
Z3 Species that cannot be protected for other reasons, i.e. scheduled noxious weeds, out of character in a setting of acknowledged importance, etc
High risk of death or failure: Trees that are likely to be removed within 10 years because of acute health issues
or severe structural failure
Z4 Dead, dying, diseased or declining
Z5 Severe damage and/or structural defects where a high risk of failure cannot be satisfactorily reduced by reasonable remedial care, i.e. cavities, decay, included bark, wounds, excessive imbalance, overgrown and vulnerable to adverse weather conditions, etc
Z6 Instability, i.e. poor anchorage, increased exposure, etc
Excessive nuisance: Trees that are likely to be removed within 10 years because of unacceptable impact on
people
Z7 Excessive, severe and intolerable inconvenience to the extent that a locally recognised court or tribunal would be likely to authorise removal, i.e. dominance, debris, interference, etc
Z8 Excessive, severe and intolerable damage to property to the extent that a locally recognised court or tribunal would be likely to authorise removal, i.e. severe structural damage to surfacing and buildings, etc
Good management: Trees that are likely to be removed within 10 years through responsible management of the
tree population
Z9 Severe damage and/or structural defects where a high risk of failure can be temporarily reduced by reasonable remedial care, i.e. cavities, decay, included bark, wounds, excessive imbalance, vulnerable to adverse weather conditions, etc
Z10 Poor condition or location with a low potential for recovery or improvement, i.e. dominated by adjacent trees or buildings, poor architectural framework, etc
Z11 Removal would benefit better adjacent trees, i.e. relieve physical interference, suppression, etc
Z12 Unacceptably expensive to retain, i.e. severe defects requiring excessive levels of maintenance, etc
NOTE: Z trees with a high risk of death/failure (Z4, Z5 & Z6) or causing severe inconvenience (Z7 & Z8) at the time of assessment and need an urgent risk assessment can be designated as ZZ. ZZ trees are likely to be unsuitable for retention and at the bottom of the categorisation hierarchy. In contrast, although Z trees are not worthy of influencing new designs, urgent removal is not essential and they could be retained in the short term, if appropriate.
A Category A: Important trees suitable for retention for more than 10 years and
worthy of being a material constraint A1 No significant defects and could be retained with minimal remedial care
A2 Minor defects that could be addressed by remedial care and/or work to adjacent trees
A3 Special significance for historical, cultural, commemorative or rarity reasons that would warrant extraordinary efforts to retain for more than 10 years
A4 Trees that may be worthy of legal protection for ecological reasons (Advisory requiring specialist assessment)
NOTE: Category A1 trees that are already large and exceptional, or have the potential to become so with minimal maintenance, can be designated as AA at the discretion of the assessor. Although all A and AA trees are sufficiently important to be material constraints, AA trees are at the top of the categorisation hierarchy and should be given the most weight in any selection process.
TreeAZ is designed by Barrell Tree Consultancy (www.treeaz.com/tree_az/)
![Page 26: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/26.jpg)
Page 26 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
APPENDIX 4 Tree protection fencing and signs - Illustrative specification
Protective fencing: Protective 1.8m high fencing should be installed at the location illustrated on the Tree Management Plan before any site works start. All uprights should be fixed in position for the duration of the development activity. The fixings must be able to withstand the pressures of everyday site work.
Inside the protective fencing, the following rules must be strictly observed:
• No vehicular access • No fires
• No storage of excavated debris, building materials or fuels • No mixing of cement
• No excessive cultivation for landscape planting • No service installation or excavation
Once erected, protective fencing must not be removed or altered without consulting first with the project Arborist.
Shade cloth or similar should be attached to reduce the transport of dust, other particulate matter and liquids into the protected area and signage must be attached to outside of fencing.
Signage: All signs are to provide clear and readily accessible information to indicate that a TPZ has been established. Signage identifying the TPZ must be attached to outside of fencing and be visible from within the development site.
Signage example:
Legend 1. Chain wire mesh panels with shade cloth (if required) attached, held in place with concrete feet. 2. Alternative plywood or wooden paling fence panels. This fencing material also prevents building materials
or soil entering the TPZ. 3. Mulch installation across surface of TPZ (at the discretion of the project arborist). No excavation,
construction activity, grade changes, surface treatment or storage of materials of any kind is permitted within the TPZ.
4. Bracing is permissible within the TPZ. Installation of supports should avoid damaging roots.
(Naturally Trees- reproduced under copyright Licence number 1009-c095)
![Page 27: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/27.jpg)
Page 27 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
APPENDIX 5 Root zone and trunk protection - Illustrative specification
Root zone protection: Where necessary, access through the TPZ can be achieved by laying aggregate and timber boards (or similar) over the root zone to protect roots. The ground beneath the boarding should be left undisturbed and should be protected with a porous geo-textile fabric covered with sand or mulch.
Detail of ground protection (modified from BS 5837-2005).
Trunk protection: Where fencing cannot be installed, the vertical trunk of exposed trees shall be protected by the placement of 3.6m lengths of 50 x 100mm hardwood timbers, spaced vertically, at 150mm centres and secured by 2mm wire at 300mm wide spacing over suitable protective padding material e.g. Jute Matting. The trunk protection shall be maintained intact until the completion of all work on site.
Detail of trunk protection.
![Page 28: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/28.jpg)
Page 28 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
APPENDIX 6 General guidance for working in TPZ
1 PURPOSE OF THIS GUIDANCE
This guidance sets out the general principles that must be followed when working within a TPZ. Where more detail is required, it will be supplemented by illustrative specifications in other appendices in this document (refer Appendix 4 and 5).
This guidance is based on the Australian Standards (2009) AS4970: Protection of Trees on Construction Sites.
Once the site works start, this guidance is specifically for the site personnel to help them understand what has been agreed and explain what is required to fully meet their obligations to protect trees. All personnel working in TPZs must be properly briefed about their responsibilities towards important trees based on this guidance.
This guidance should always be read in conjunction with the Tree Management Plan (TMP01) illustrating the areas where specific precautions are necessary. Each area where precautions are required is explained on the plan as identified on the legend. All protective measures should be installed according to the prevailing site conditions and agreed as satisfactory by the Project Arborist before any demolition or construction work starts.
2 TREE PROTECTION 2.1 Tree Protection Zone (TPZ)
The TPZ is a radial setback, extending outwards from the centre of the trunk, where disturbance must be minimised if important trees are to be successfully retained. The TPZ area is illustrated on the Tree Management Plan (TMP01) accompanying this guidance.
The TPZ is a radial setback extending outwards from the centre of the trunk equal to the DBH x 12.
This area shall be protected by tree protective fencing (refer Appendix 4).
Any part of the TPZ outside of the tree protective fencing area must be isolated from the work operations by protective barriers and/or root zone protection for the duration of the work (refer Appendix 5).
The Project Arborist shall approve the extent of the TPZ prior to commencement of works.
The TPZ shall be mulched to a depth of 90mm with approved organic mulch e.g. leaf and wood chip where possible.
Supplementary watering shall be provided in dry periods to reduce water or construction stress, particularly to those trees which may incur minor root disturbance.
The following activities shall be excluded within the TPZ:
Excavation, compaction or disturbance of the existing soil.
The movement or storage of materials, waste or fill.
Soil level changes
Disposal/runoff of waste materials and chemicals including paint, solvents, cement slurry, fuel, oil and other toxic liquids
Movement or storage of plant, machinery, equipment or vehicles.
Any activity likely to damage the trunk, crown or root system. 2.2 Arboricultural supervision
Any work within TPZs requires a high level of care. Qualified arboricultural supervision is essential to minimise the risk of misunderstanding and misinterpretation. Site personnel must be properly briefed before any work starts. Ongoing work must be inspected regularly and, on completion, the work must be signed off by the Project Arborist to confirm compliance by the contractor.
![Page 29: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/29.jpg)
Page 29 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
2.3 Tree protection fencing, root zone and trunk protection
Prior to site establishment, tree protection fencing and root zone and trunk protection shall be installed to establish the TPZ for trees to be retained in accordance with site conditions. These protective barriers shall be maintained entire for the duration of the construction program (refer Appendix 4 and 5).
Tree protection fencing and trunk and root zone protection shall be removed following completion of construction. The mulch layer in the TPZ shall be retained and replenished where required to maintain a 75mm thickness
2.4 Pruning
All pruning work required (including root pruning) should be in accordance with Australian Standard No 4373-1996 - Pruning of Amenity Trees.
2.5 Tree Damage
In the event of damage to a tree or the TPZ, the Project Arborist shall be engaged to inspect and provide advice on remedial action. This should be implemented as soon as practicable and certified by the Project Arborist.
2.6 Post construction maintenance
In the event of any tree deteriorating in health after the construction period, the Project Arborist shall be engaged to provide advice on any remedial action. Remedial action shall be implemented as soon as practicable and certified by the Project Arborist.
3 EXCAVATION AND FILL IN TPZ 3.1 Excavation within TPZ
If excavation within the TPZ is required the following shall be applied to preserve tree root systems:
Excavation within TPZ must be carried out under the instruction and supervision of the Project Arborist.
A root mapping exercise is to be undertaken and certified by the Project Arborist. Root mapping shall be undertaken by either ground penetrating radar, air spade, water laser or by hand excavation using hand tools, taking care not to damage the bark and wood of any roots.
The purpose of the root mapping shall be to locate woody structural roots greater than 40mm in diameter. Where possible, flexible clumps of smaller roots, including fibrous roots, should be retained if they can be displaced temporarily or permanently beyond the excavation without damage.
If digging by hand, a fork shall be used to loosen the soil and help locate any substantial roots.
Once roots have been located, the trowel shall be used to clear the soil away from them without damaging the bark.
Exposed roots to be removed shall be cut cleanly with a sharp saw or secateurs.
Roots temporarily exposed shall be protected from direct sunlight, drying out and extremes of temperature by appropriate covering.
3.2 Fill within TPZ
Placement of fill material within the Tree Protection Zone of trees to be retained should be avoided where possible. However, where fill cannot be avoided:
All fill material to be placed within the TPZ should be approved by Project Arborist and consist of a course, gap-graded material to provide aeration and percolation to the root zone. Materials containing a high percentage of ‘fines’ is unacceptable for this purpose.
The fill material should be consolidated with a non-vibrating roller to minimise compaction of the underlying soil.
No fill material should be placed in direct contact with the trunk.
![Page 30: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/30.jpg)
Page 30 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
4 DEMOLITION OF SURFACING/STRUCTURES IN TPZ 4.1 Definitions of surfacing and structures
For the purposes of this guidance, the following broad definitions apply:
• Surfacing: Any hard surfacing used as a vehicular road, parking or pedestrian path including tarmac, solid stone, crushed stone, compacted aggregate, concrete and timber decking.
• Structures: Any man-made structure above or below ground including service pipes, walls, gate piers, buildings and foundations. Typically, this would include drainage structures, services, car-ports, bin stores and concrete slabs that support buildings.
4.2 Demolition and access
Roots frequently grow adjacent to and beneath existing surfacing/structures so great care is needed during access and demolition. Damage can occur through physical disturbance of roots and/or the compaction of soil around them from the weight of machinery or repeated pedestrian passage. This is not generally a problem whilst surfacing/structures are in place because they spread the load on the soil beneath and further protective measures are not normally necessary. However, once they are removed and the soil below is newly exposed, damage to roots becomes an issue and the following guidance must be implemented:
No vehicular or repeated pedestrian access into TPZ permitted unless on existing hard surfacing or root zone protection.
Regular vehicular and pedestrian access routes must be protected from compaction with temporary root zone protection as set out in Appendix 5.
Where a TPZ is exposed by the work, it must be protected as set out in AS4970 until there is no risk of damage from the development activity.
4.3 Removal of surfacing/structures
Removing existing surfacing/structures is a high-risk activity for any adjacent roots and the following guidance must be observed:
Appropriate tools for manually removing debris may include a pneumatic breaker, crow bar, sledgehammer, pick, mattock, shovel, spade, trowel, fork and wheelbarrow.
Machines with a long reach may be used if they can work from outside the TPZ or from protected areas within the TPZ.
Debris to be removed from the TPZ manually must be moved across existing hard surfacing or temporary root zone protection in a way that prevents compaction of soil. Alternatively, it can be lifted out by machines provided this does not disturb the TPZ.
Great care must be taken throughout these operations not to damage roots.
5 INSTALLATION OF SURFACING/STRUCTURES IN TPZ
5.1 Basic principles: New surfacing/structures in a TPZ are potentially damaging to trees because they may disturb the soil and disrupt the existing exchange of water and gases in and out of it. Adverse impact on trees can be reduced by minimising the extent of these changes within the TPZ.
Surfacing: Suitable surfacing should be relatively permeable to allow water and gas movement, load spreading to avoid localised compaction and require little or no excavation to limit direct damage. The actual specification of the surfacing is an engineering issue that needs to be considered in the context of the bearing capacity of the soil, the intended loading and the frequency of loading. The detail of product and specification are beyond the scope of this guidance and must be provided separately by the appropriate specialist.
Structures: Where possible structures are to be constructed above ground level on piled supports and redirecting water to where it is needed. The detailed design and specification of such structures is an engineering issue that should be informed and guided by the Project Arborist. Conventional strip foundations in the TPZ for any significant structure may cause excessive root loss and are unlikely to be acceptable. However, disturbance can be significantly reduced by supporting the above ground part of the structures on small diameter piles/piers or
![Page 31: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/31.jpg)
Page 31 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
cast floor slabs set above ground level. The design should be sufficiently flexible to allow the piles to be moved if significant roots are encountered in the preferred locations.
5.2 Establishing the depth of roots
The precise location and depth of roots within the soil is unpredictable and will only be known when careful digging starts on site. Ideally, all new surfacing within a TPZ should be no-dig, i.e. requiring no excavation whatsoever, but this is rarely possible on undulating surfaces.
New surfacing normally requires an evenly graded sub-base layer, which can be made up to any high points with granular, permeable fills such as crushed stone or sharp sand. This sub-base must not be compacted as would happen in conventional surface installation. Some limited excavation is usually necessary to achieve this and need not be damaging to trees if carried out carefully and large roots are not cut.
Tree roots and grass roots rarely occupy the same soil volume at the top of the soil profile, so the removal of a turf layer up to 50mm is unlikely to be damaging to trees. It may be possible to dig to a greater depth depending on local conditions but this would need to be assessed by the Project Arborist.
6 SERVICES IN TPZ
For the purposes of this guidance, services are considered as structures. Excavation to upgrade existing services or to install new services within a TPZ may damage retained trees and should only be chosen as a last resort. In the event that excavation emerges as the preferred option, the decision should be reviewed by the Project Arborist before any work is carried out. If excavation is agreed, all digging should be done carefully and follow the guidance set out in 3.1 above.
7 SOFT LANDSCAPING IN TPZ
For the purposes of this guidance, soft landscaping includes the re-profiling of existing soil levels and covering the soil surface with new plants or an organic covering (mulch). It does not include the installation of solid structures or compacted surfacing.
Soft landscaping activity after construction can be extremely damaging to trees.
No significant excavation or cultivation shall occur within the TPZ (e.g. planting holes). Where new designs require levels to be increased to tie in with new structures or surrounding ground level, good quality and relatively permeable top soil should be used for the fill. It should be firmed into place but not over compacted in preparation for turfing or careful shrub planting.
All areas close to tree trunks should be kept at the original ground level and have a mulched finish rather than grass to reduce the risk of mowing damage.
![Page 32: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/32.jpg)
Page 32 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
APPENDIX 7 Schedule of works and responsibilities
Hold Point
Task Responsibility Certification Timing of Inspection
1 Indicate clearly (with spray paint) trees approved for removal only
Principal Contractor
Project Arborist
Prior to demolition and site establishment
2 Establishment of tree protection fencing and additional root, trunk and/or branch protection
Principal Contractor
Project Arborist
Prior to demolition and site establishment
3 Supervise all excavations works proposed within the TPZ
Principal Contractor
Project Arborist
As required prior to the works proceeding adjacent to the tree
4 Inspection of trees by Project Arborist
Principal Contractor
Project Arborist
As required during construction period
5 Final inspection of trees by Project Arborist
Principal Contractor
Project Arborist
Prior to the issue of Occupation Certificate
![Page 33: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/33.jpg)
Page 33 of 33
Report on trees at 84 Centenary Drive, Strathfield for Strathfield Golf Club Ref: Strathfield Golf Club_AIA and MS.doc – 04/02/16 Naturally Trees Arboricultural Consulting © www.naturallytrees.com.au
APPENDIX 8 Tree management plan
-refer attached Tree Management Plan, Dwg No. TMP01,
by Naturally Trees dated 4 February 2016
![Page 34: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/34.jpg)
19.4
4
19.6
6
19.9
8
19.9
5
19.9
3
19.9
5
19.8
5
20.1
3
19.9
4
19.8
0
19.5
1
19.4
7
20.3
6
21.4
4
21.7
1
22.1
8
22.4
822.6
2
23.0
8
23.7
4
24.2
4
24.7
0
24.9
7
25.3
3
25.6
5
GARDEN
27.92
24.20
24.91
25.42
25.5225
.84
24.12
24.03
24.83
24.9
0
24.73
22.84
22.57
22.25
BITUMEN
CAR
PARK
BITUMEN
CAR
PARK
PALING
FENCE
STEEL
POST
AND
WIRE
MESH
BITUMEN CAR
PARK
BITUMEN
DRIVEWAY
DIS
ABLE
D
CAR
SPAC
E
BIT
UM
EN
DR
IVE
WA
Y
WIRE
FENCE
MESH
BITUMEN
CAR
PARK
20.19
20.38
20.30
20.50
20.57
20.98
20.85
20.35
20.2
6
20.60
20.4
6
20.42
20.28
20.1
3
19.9
9
19.90
20.10
19.6
4
19.7
4
19.75
19.11
20.14
20.1
0
19.9
5
19.7
2
19.5
5
19.44
19.3
9
20.20
20.2219
.9
5
20.1
8
20.25
20.44
20.73
21.0
8
21.3
9
21.8
8
22.30
22.9
6
23.1
5
24.1
7
24.1
2
23.68
23.44
METAL
FENCE
METAL
METAL
FENCE
METAL
FENCE
META L
FEN
CE
PALING
FENC
E
META
L
FENCE
BITUM
EN
COURTBASKETBAL
L
FOOTPATH
CONCRETE
META
L
FENC
E
META L
FEN
CE
META
L
FENC
E
META
L
FEN
CE
FENCE
20.2
9
20.3
4
24.1
5
21.5
721
.4
9
26.2
2
ME
TA
L FE
NC
E
ME
TAL
FE
NC
E
CONC.
ME
TA
L P
OS
TH
IGH
WIR
E M
ES
H F
EN
CE
MET
AL
CO
LOU
RBO
ND
FEN
CE
CO
NC
RETE
FO
OTP
ATH
MET
AL
MES
H
FEN
CE
CONCRETE
CONC
CONC
CO
NC
CONC
16.6
1
16.6
3
16.7
3
16.9
7
17.0
0
17.0
3
17.0
7
17.1
2
17.0
7
17.0
9
17.2
5
17.4
2
18.0
5
18.0
1
18.1
3
18.1
5
18.2
0
18.1
2
18.0
8
18.0
6
17.9
8
17.9
2
18.3
9
19.5
919
.6
3
19.2
8
18.8
5
18.8
4
18.7
9
19.1
0 19.1
0
18.9
9
18.9
7
18.9
5
18.8
8
18.9
1
18.8
9
18.7
8
18.8
218
.8
1
18.6
0
18.7
4
19.0
3
19.4
4
19.4
8
19.8
3
20.2
1
20.2
7
20.3
3
21.3
6
21.2
8
21.6
2
21.6
7
21.7
9
21.6
2
21.6
8
21.7
8
23.4
8
23.5
6
METAL
MESH
METAL
FENCE
MESH
FENCE
METAL
ME
SH
FEN
CE
METAL
ME
SH
FENCE
ME
TAL
ME
SH
FEN
CE
METAL
ME
SH
FENCE
GATE
UNSEALED
PATH
UN
S
EA
L
ED
PA
TH
ME
TA
L
MESH
FE
NC
E
ME
TA
L
MESH
FE
NC
E
GATE
EDGE
OF
FOLIAGE
CONCRETE
PATH
PATH UNDER BRIDGE
CONCRETE
PATH
UN
S
EA
L
ED
PATH
UNSEALED
PATH
UN
SE
AL
ED
PA
TH
EDGE
OF
FOLIAGE
EDG
E
OF
FOLIAGE
CO
NC
CONC
R
ET
E
PA
T
H
EDGE
OF
FOLIAGE
EDGE
OF
FOLIAGE
EDG
E
EDGE
OF
OF
FOLIA
GE
FOLIA
GE
UNSEALED PATH
UNSEALED
PATH
UNSE
ALED
PATH
UN
SEALE
D
PATH
UN
SE
ALE
D
PA
T
H
UNSEALE
D
PATH
CO
NC
RE
TE
PA
TH
ED
GE
OF
FOLIA
GE
ED
GE
OF
FOLIA
GE BRID
GE
UN
SE
ALE
DPAT
H
EDGE
OF
FOLIAGE
ED
GE
OF
FOLIAGE
UNSEALED
PA
TH
CO
NC
RETE
PATH
EDGE
OF
FOLI
AGE
2
10
14
111312
15
16
17
Trees worthy of being a constraint
Trees not worthy of being a constraint
Protective fencing and TPZ area within
Proposed layout
LEGEND:
X
X
X
X
Category AA
Category A
Category Z
Category ZZ
Tree to be removed
NOTE: This drawing to be reproduced in colour only
Existing layout
1
2
3
45
6
7
8
9
10
111213
14
15
16
1718
19
20
21
2223
24
25
26
27
28
29
30
31
32
33
3435
36
3738
39
40
41
42
43
44
45
46
47
48
49
50
5152
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
7778
79
8081
8283
84
85
86
87
88
8990
91 92
93 94
95
96
97
98
99
100101
102103
104
105
106
107
108
109
110
111112
113
114115
116
117118
119
120
121
122
123
124
125
126127
128
129
130
131
132
133
134
135
136
137
138
139
140
141142
145
144
143
141a
141b145a
141c
146
147148
149150
151
152
153
154
155
156
157
158159
160
161
162
163
164
165
166167
168
169 170
171172
173174
175
176177
178
179180181
183
184
185
186
Sheet 1 Sheet 2
Sheet 3 Sheet 4
Sheet 5 Sheet 6
0 5 10 M
182
187
188 189
190
191
192
193
194 195
196 197
198
199
200
202
201
GROUP E
GROUP A
GROUP B
GROUP C
GROUP D
Trees worthy of being a constraint
Trees not worthy of being a constraint
Protective fencing and TPZ area within
Proposed layout
LEGEND:
X
X
X
X
Category AA
Category A
Category Z
Category ZZ
Tree to be removed
Existing layout
Naturally Trees Arboricultural Consulting PO Box 5085, Elanora Heights NSW 2101 AustraliaT: 0417 250 420 W: www.naturallytrees.com.au
PROJECT
CLIENT
DRAWING
DWG # REV
DATE
SCALE @ A1
DRAWN
NOTE DO NOT SCALE FROM DRAWING. USE FIGURED DIMENSIONS ONLY.CHECK ALL DIMENSIONS ON SITE BEFORE ANY MANUFACTURE OR CONSTRUCTION
Tree Management Plan
84 Centenary Drive, Strathfield NSW
Strathfield Golf Club
04/02/16
1:400
ASSht-1
TMP01Cover Sheet
Group of similar trees
![Page 35: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/35.jpg)
CONC
18.8
4
18.8
8
18.9
1
18.8
9
18.7
8
18.8
218
.8
1
18.6
0
18.7
4
19.0
3
19.4
4
19.4
8
19.8
3
20.2
1
20.2
7
20.3
3
21.3
6
21.2
8
21.6
2
21.6
7
21.7
9
21.6
2
21.6
8
21.7
8
METAL
MESH
METAL
FENCE
MESH
FENCE
GATE
UNSEALED
PATH
UN
S
EA
LE
D
PA
TH
METAL
MESH
FEN
CE
ME
TAL
MESH
FEN
CE
GATE
EDGE
OF
FOLIAGE
CONCRETE
PATH
PATH UNDER BRIDGE
CONCRETE
PATH
UN
SE
AL
ED
PATH
UNSEALED
PAT
H
EDGE
OF
FOLIAGE
EDGE
OF
EDGE
OF
FOLIAGE
10
1454
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
147148
149150
151
152
153
154
155
156
157
158159
160
161
162
163
164
165
166167
168
169 170
171172
173174
175
176177
178
179180181
191
192
193
GROUP D
Naturally Trees Arboricultural Consulting PO Box 5085, Elanora Heights NSW 2101 AustraliaT: 0417 250 420 W: www.naturallytrees.com.au
PROJECT
CLIENT
DRAWING
DWG # REV
DATE
SCALE @ A1
DRAWN
NOTE DO NOT SCALE FROM DRAWING. USE FIGURED DIMENSIONS ONLY.CHECK ALL DIMENSIONS ON SITE BEFORE ANY MANUFACTURE OR CONSTRUCTION
Tree Management Plan
84 Centenary Drive, Strathfield NSW
Strathfield Golf Club
04/02/16
1:400
ASSht-2
TMP01Sheet 1 of 6
Trees worthy of being a constraint
Trees not worthy of being a constraint
Protective fencing and TPZ area within
Proposed layout
LEGEND:
X
X
X
X
Category AA
Category A
Category Z
Category ZZ
Tree to be removed
Existing layout
0 10m
Group of similar trees
![Page 36: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/36.jpg)
CO
NC
18.1
3
18.3
9
19.5
919
.6
3
19.2
8
18.8
5
18.7
9
19.1
0 19.1
0
18.9
9
18.9
7
18.9
5
18.8
8
18.9
1
18.8
9
18.7
8
FENCE
METAL
ME
SH
FENCE
FOLIAGEC
ON
C
14146
172
173174
175
Naturally Trees Arboricultural Consulting PO Box 5085, Elanora Heights NSW 2101 AustraliaT: 0417 250 420 W: www.naturallytrees.com.au
PROJECT
CLIENT
DRAWING
DWG # REV
DATE
SCALE @ A1
DRAWN
NOTE DO NOT SCALE FROM DRAWING. USE FIGURED DIMENSIONS ONLY.CHECK ALL DIMENSIONS ON SITE BEFORE ANY MANUFACTURE OR CONSTRUCTION
Tree Management Plan
84 Centenary Drive, Strathfield NSW
Strathfield Golf Club
04/02/16
1:400
ASSht-3
TMP01Sheet 2 of 6
Trees worthy of being a constraint
Trees not worthy of being a constraint
Protective fencing and TPZ area within
Proposed layout
LEGEND:
X
X
X
X
Category AA
Category A
Category Z
Category ZZ
Tree to be removed
Existing layout
0 10m
Group of similar trees
![Page 37: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/37.jpg)
22.84
22.57
22.25
BITUMEN
DRIVEWAY
DR
IVEW
AY
WIRE
FENCE
MESH
BITUMEN
CAR
PARK
CONC.
23.4
8
23.5
6
UNSEALED
PATHUN
SE
AL
ED
PAT
H
FOLIAGE
EDGE
OF
FOLIAGE
CO
NC
CONC
RE
TE
PATH
FOLIAGE
EDGE
OF
FOLIAGE
EDGE
EDGE
OF
OF
FOLIAG
E
FOLIAG
E
UNSEALED PATH
1312
1517
32
33
3435
36
3738
39
40
41
42
43
44
45
46
47
48
49
50
5152
53
54
57
66
68
69
70
71
72
73
74
75
76
7778
79
8081
82
83
84
85
86
87
88
8990
91 92
93 94
95
96
97
98
99
100101
102103
108
109
110
111112
113
114115
116
117118
119
120
121
122
123
124
125
142
145
144
143
183
184
185
186
182
187
188 189
190
GROUP A
GROUP B
GROUP C
Naturally Trees Arboricultural Consulting PO Box 5085, Elanora Heights NSW 2101 AustraliaT: 0417 250 420 W: www.naturallytrees.com.au
PROJECT
CLIENT
DRAWING
DWG # REV
DATE
SCALE @ A1
DRAWN
NOTE DO NOT SCALE FROM DRAWING. USE FIGURED DIMENSIONS ONLY.CHECK ALL DIMENSIONS ON SITE BEFORE ANY MANUFACTURE OR CONSTRUCTION
Tree Management Plan
84 Centenary Drive, Strathfield NSW
Strathfield Golf Club
04/02/16
1:400
ASSht-4
TMP01Sheet 3 of 6
Trees worthy of being a constraint
Trees not worthy of being a constraint
Protective fencing and TPZ area within
Proposed layout
LEGEND:
X
X
X
X
Category AA
Category A
Category Z
Category ZZ
Tree to be removed
Existing layout
0 10m
Group of similar trees
![Page 38: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/38.jpg)
CONC
CONC
16.7
3
16.9
7
17.0
0
17.0
3
17.0
7
17.1
2
17.0
7
17.0
9
17.2
5
17.4
2
18.0
5
18.0
1
18.1
3
18.1
5
18.2
0
18.1
2
18.0
8
18.0
6
17.9
8
17.9
2
FENCE
METAL
ME
SH
FENCE
METAL
ME
SH
FENCE
METAL
ME
SH
FENCE
CO
NC
OF
OF
FOLIAG
E
FOLIAG
E
UNSEALED PATH
UNSEALED
PATH
UNSE
ALED
PATH
UNSE
ALED
PATH
UN
SE
ALE
D
PATH
UNSEALE
D
PATH
CO
NC
RE
TE
PA
TH
ED
GE
OF
FOLIAGE
ED
GE
OF
FOLIAGE BRID
GE
EDGE
OF
FOLIAGE
1113
100
101
102103
104
105
106
107
108
109
126127
128
129
130
131
132
133
134
135
136
137
138
139
140
141142
145
144
143
141a
141b145a
141c
146
183
184
185
186
182
187
188 189
190
194 195
199
200
202
201
GROUP E
Naturally Trees Arboricultural Consulting PO Box 5085, Elanora Heights NSW 2101 AustraliaT: 0417 250 420 W: www.naturallytrees.com.au
PROJECT
CLIENT
DRAWING
DWG # REV
DATE
SCALE @ A1
DRAWN
NOTE DO NOT SCALE FROM DRAWING. USE FIGURED DIMENSIONS ONLY.CHECK ALL DIMENSIONS ON SITE BEFORE ANY MANUFACTURE OR CONSTRUCTION
Tree Management Plan
84 Centenary Drive, Strathfield NSW
Strathfield Golf Club
04/02/16
1:400
ASSht-5
TMP01Sheet 4 of 6
Trees worthy of being a constraint
Trees not worthy of being a constraint
Protective fencing and TPZ area within
Proposed layout
LEGEND:
X
X
X
X
Category AA
Category A
Category Z
Category ZZ
Tree to be removed
Existing layout
0 10m
Group of similar trees
![Page 39: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/39.jpg)
27.92
24.20
24.91
25.42
25.5225
.84
24.12
24.03
24.83
24.9
0
24.73
BITUMEN
CAR
PARK
BITUMEN
CAR
PARK
PALING
FENCE
STEEL
POST
AND
WIRE
MESH
BITUMEN CAR
PARK
DRIVEWAY
DISABLED
CAR
SPACE
BITU
ME
N
DR
IVEW
AY
20.50
20.57
20.98
20.25
20.44
20.73
21.0
8
21.3
9
21.8
8
22.30
22.9
6
23.1
5
24.1
7
24.1
2
23.68
23.44
METAL
FENCE
METAL
METAL
FENCE
METAL
MET
A L
FENC E
PALING
METAL
FENCE
20.2
9
24.1
5
21.5
721
.4
9
26.2
2
MET
AL
FEN
CE
MET
AL
FENC
E
16
1
2
3
45
6
7
23
24
25
26
27
28
29
30
Naturally Trees Arboricultural Consulting PO Box 5085, Elanora Heights NSW 2101 AustraliaT: 0417 250 420 W: www.naturallytrees.com.au
PROJECT
CLIENT
DRAWING
DWG # REV
DATE
SCALE @ A1
DRAWN
NOTE DO NOT SCALE FROM DRAWING. USE FIGURED DIMENSIONS ONLY.CHECK ALL DIMENSIONS ON SITE BEFORE ANY MANUFACTURE OR CONSTRUCTION
Tree Management Plan
84 Centenary Drive, Strathfield NSW
Strathfield Golf Club
04/02/16
1:400
ASSht-6
TMP01Sheet 5 of 6
Trees worthy of being a constraint
Trees not worthy of being a constraint
Protective fencing and TPZ area within
Proposed layout
LEGEND:
X
X
X
X
Category AA
Category A
Category Z
Category ZZ
Tree to be removed
Existing layout
0 10m
Group of similar trees
![Page 40: Arboricultural Impact Appraisal and Method Statement · a preliminary arboricultural method statement setting out appropriate protective measures and management for trees to be retained](https://reader030.fdocuments.in/reader030/viewer/2022012906/5b7434577f8b9aa01f8bc845/html5/thumbnails/40.jpg)
20.19
20.38
20.30
20.50
20.57
20.98
20.35
20.10
19.6
4
19.7
4
19.75
19.11
20.20
20.2219
.9
5
20.1
8
20.25
20.44
20.73
21.0
8
21.3
9
METAL
FENCE
METAL
FENCE
MET
A L
FENC E
PALING
BITUMEN
BASKETBALL
METAL
MET
A L
FENC E
METAL
META
L
FENCE
20.2
9
20.3
4
21.5
721
.4
9
MET
AL
FEN
CE
MET
AL
FENC
E
ME
TAL
PO
ST
HIG
H
WIR
E M
ES
H FE
NC
E
MET
AL
COLO
URBOND
FENCE
CONC
RETE
FO
OTP
ATH
MET
AL
MES
H
FENCE
CONCRETE
16.6
3
16.7
3
FENCE
CO
NC
RE
TE
PA
TH
FOLIAGE BRID
GE
UN
SE
ALE
D
PATH
EDGE
OF
FOLIAGE
ED
GE
OF
FOLIAGE
UNSEALED
PA
TH
CONCRETE
PATH
EDGE
OF
FOLI
AGE
16
8
9
10
111213
14
15
16
1718
19
20
21
2223
24
25
26
27
28
29
30
31
104
105
106
194 195
196 197
198
Naturally Trees Arboricultural Consulting PO Box 5085, Elanora Heights NSW 2101 AustraliaT: 0417 250 420 W: www.naturallytrees.com.au
PROJECT
CLIENT
DRAWING
DWG # REV
DATE
SCALE @ A1
DRAWN
NOTE DO NOT SCALE FROM DRAWING. USE FIGURED DIMENSIONS ONLY.CHECK ALL DIMENSIONS ON SITE BEFORE ANY MANUFACTURE OR CONSTRUCTION
Tree Management Plan
84 Centenary Drive, Strathfield NSW
Strathfield Golf Club
04/02/16
1:400
ASSht-7
TMP01Sheet 6 of 6
Trees worthy of being a constraint
Trees not worthy of being a constraint
Protective fencing and TPZ area within
Proposed layout
LEGEND:
X
X
X
X
Category AA
Category A
Category Z
Category ZZ
Tree to be removed
Existing layout
0 10m
Group of similar trees