ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

17
ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri

Transcript of ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

Page 1: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

ARAPUAlex Wijaya

Danang Yudha Prakasa

Siti Fauziah Nirmala Putri

Page 2: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

GOAL

to assess and reconfigure the processes employed within Action Research to improve responsiveness and efficiency.

Page 3: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

CASE OVERVIEW

• Action Response is a London-based charity dedicated to providing fast responses to critical situations throughout the world

• The charity receives requests for cash aid usually from an intermediary charity and looks to process the request quickly and provide funds where they are needed, when they are needed

Page 4: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

TWO KEY ISSUE

• 1. There are complaints about the speed of their response.

• 2. Costs are beginning to spiral.

Page 5: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

WHAT OBJECTIVES SHOULD THE ARAPU PROCESS BE TRYING

TO ACHIEVE?

Page 6: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

WHAT OBJECTIVES SHOULD THE ARAPU PROCESS BE TRYING

TO ACHIEVE?

• the very basic aim of the charity is to provide short-term aid.

• Therefore, unless the process can turn around applications fast, it is failing to fulfil its primary aim.

Page 7: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

WHAT IS THE MAIN PROBLEM WITH THE CURRENT ARAPU PROCESS?

we need to know • how many claims each stage has to process• how many people are available at each stage• how long each person is available for processing • how long on average each claim takes to process

Page 8: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

300/week Received and Stored by 4 Clerks

Applications are in line of processing

Opening and checking post

Opening and checking process

Coding Process by

5 clerks

Inputting data

Secretary’s desks

Assessing applications by

7 assessors

Proceed applications

100/week

Waiting for committee meets on Thursday

Committee ratification

Ratified

Accepted Declined

payment

Store application

s

Store application

s

Store For Dispatch

Dispatch Process

payment

Recycle

Page 9: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

• If we take the average 300 applications per week, and recycle 100 after the assessment stage, how much ‘value-added ’ work is being done at each stage?

receipt stage• The time needed for each application is 10 minutes and the value-added workload is 400 ×

10 minutes of work (4000 minutes), which is 66.67 hours.

coding stage• The time needed for each application is 20 minutes and the value-added workload is 400 ×

20 minutes of work (8000 minutes), which is 133.33 hours.

assessment stage• The time needed for one-third of the applications is 10 minutes, and for the other two-

thirds is 60 minutes. The average work time of (1/3 × 10) + (2/3 × 60) is 43.33 minutes and the valueadded workload is 400 × 43.33 minutes of work (17,332 minutes), which is 288.87 hours.

Page 10: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

• The payment stage gets 150 applications per week (half of the 300 that emerge from the assessors). The time needed for each application is 50 minutes and the value-added workload is150 × 50 minutes of work (7500 minutes), which is 125 hours.

• The decline stage gets 150 applications per week (half of the 300 that emerge from the assessors). The time needed for each application is 30 minutes and the value-added workload is 150 × 30 minutes of work (4500 minutes), which is 75 hours.

• The dispatch stage gets 300 applications per week. The time needed for each application is10 minutes and the value-added workload is 300 × 10 minutes of work (3000 minutes), which is 50 hours.

Page 11: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

• throughput time = work in progress × cycle time

• The whole process output is 300 claims processed per week and from the sample taken by Susan N’tini, there are around 2000 claims in process at any given time

• The cycle time of the whole process is (35 / 300) = 0.1167 hours

• Throughput time = 2000 × 0.1167 = 233.33 hours = 33.33 days

> 20 days

Page 12: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

HOW COULD THE ARAPU PROCESS BE IMPROVED?

Page 13: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

SIMULATION

• 300 applications per week

• cycle time is 35 / 300 = 0.1167 hours

• work in progress of 1200,

• throughput time 0.1167 × 1200 = 140.04 hours (20 days)

Page 14: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

HOW COULD THE ARAPU PROCESS BE IMPROVED?

Internet-based services

Page 15: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

THE STAGES OF PRODUCT/SERVICE DESIGN

Page 16: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

SIMULATION

• processing 400 applications per week (Assessing stage)

• took 43.33 minutes x 400 = 17332 minutes (288.87 hours)

• 288.87 / 35 = 8.25 Assessors

WITHOUT RECYCLING

• 43.33 × 300 =12999 minutes (216.65 hours)

• 216 / 35 = 6.19 assessors

Page 17: ARAPU Alex Wijaya Danang Yudha Prakasa Siti Fauziah Nirmala Putri.

THANK YOU