AR88
-
Upload
yasser-el-sammak -
Category
Documents
-
view
34 -
download
22
description
Transcript of AR88
![Page 1: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/1.jpg)
New AR: View AR | AR without Proprietary
History | States | Assignment | Timetracking
AR Text Search | More | CARES HomeAssistance Request 1-5581126
Customer Ticket N/A
Short MCRRH not reachable after integration of 1st U900 site, all
Description troubleshooting done from integration and feild team but the RRH
are not reachable.
Current Feb 19- Issues has been resolved , the RRH is reachable now
Summary with the proper software .Awaiting AR closure confirmation
State Closed : Solution/Service Provided
Outage No
Severity 2
Priority 3
Service Request Remote Technical Support
Request Type Defect
Sub-Type Software
Category Software
Internal Yes
Assignment Events
Product
Product 9926 DBS-WCDMA
![Page 2: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/2.jpg)
Version LR13.3.W
No Change Request is linked to this AR
Product Location
Site Abu Dhabi AE - Alcatel-Lucent MENA JLT-
Instance 9926DBS WCDMA-AUH : In Service
Site Company Emirates Telecommunications Corporation
City Abu Dhabi
Country United Arab Emirates
Contact
Name Karim IBRAHIM ABD EL NABY
Company Alcatel-Lucent : Open on behalf of Customer
Phone 971 56 354 4568 Email [email protected]
Request Method Email-Eng
Dates
Occurred 11-Feb-2015 00:20 Time now 29-Aug-2015 12:40 (GMT+4)
Reported 11-Feb-2015 00:20 AR Created 11-Feb-2015 00:28
Service Start 11-Feb-2015 00:20
Next Customer Contact 26-Feb-2015 10:30
Responded 11-Feb-2015 00:21 Respond Target 11-Feb-2015 01:20 SA - Calculated
Restored 11-Feb-2015 00:26 Restore Target 15-Feb-2015 16:56 SA - Calculated
Resolved 13-Feb-2015 16:10 Resolve Target 12-Apr-2015 17:01 SA - Calculated
Targets for Restore & Resolve were extended by 16 hours
to account for Pending time
Closed 23-Feb-2015 09:52
Last Modified 23-Jun-2015 16:02 Modified By archive
Entitlement
![Page 3: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/3.jpg)
Agreement 242895 (OXIA 627085)
Covered Service TS 24x7 (Gold, Wireless Mobile Access)
Script This request is entitled to service.
People
Owner TSCd-WLS-WCDMA-IN : pthota
Assignee CloQ-WLS-WCDMA-vGlobal : pthota
Referred 1 NorP-WLS-WCDMA-vGlobal : gauravarora
Referred 2 EtPP-WLS-WCDMA-vGlobal : gauravarora
Referred 3 TEC-MoA-WCDMA_BTS : clouvier
Referred 4 TEC-WLS-WCDMA-BTS : dpasha
Resolve Group EtPP-WLS-WCDMA-vGlobal
Submitter igawrych
Description
Attachments
Incoming E-mail from Karim (Karim)** CTR ** IBRAHIM ABD EL NABY
Workflow Status: Handled by an agent
Subject: RE: Etisalat UAE/MC-RRH not reachable after integration for first U900
site
Contact: Karim (Karim)** CTR ** IBRAHIM ABD EL NABY
From: "IBRAHIM ABD EL NABY, Karim (Karim)** CTR **"
To: ALU Support <[email protected]>
Cc: "BERIDY, AHMED (AHMED)" <[email protected]>, "KHEDR,
MAHMOUD (MAHMOUD)" <[email protected]>, "ALI, YASSER
(YASSER)** CTR **" <[email protected]>, "ABDEL-HALIM, SAYED
(SAYED)" <[email protected]>, "MERAD, ABDESSAMAD
(ABDESSAMAD)" <[email protected]>, "OKASHA, TAHER (TAHER)"
![Page 4: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/4.jpg)
Sent on: 10 luty 2015 21:19:50 CET
Hello, 9926 DBS-WCDMA
--
BR
Karim
M: +97156 354 4568
-----Original Message-----
From: [email protected] [[email protected]]
Received: Wednesday, 11 Feb 2015, 12:12am
To: IBRAHIM ABD EL NABY, Karim (Karim)** CTR ** [[email protected]]
CC: BERIDY, AHMED (AHMED) [[email protected]]; KHEDR, MAHMOUD
(MAHMOUD) [[email protected]]; ALI, YASSER (YASSER)** CTR **
[[email protected]]; ABDEL-HALIM, SAYED (SAYED)
[[email protected]]; MERAD, ABDESSAMAD (ABDESSAMAD)
[[email protected]]; OKASHA, TAHER (TAHER)
Subject: Re: Etisalat UAE/MC-RRH not reachable after integration for first U900 site
Dear Sir, I have been trying to proceed you request, but I need your assistance
here. Could you please double chec the Product Instance/ THe one provided below
seems not to work.
![Page 5: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/5.jpg)
Kind regards,
Anita Iwaniuk
ALCATEL-LUCENT
GLOBAL WELCOME CENTER
Visit OnLine Customer Support for Contact details
On 10.02.15 21:02, Karim (Karim)** CTR ** IBRAHIM ABD EL NABY wrote:
Hello,
Short Description : MCRRH not reachable after integration U900 site.
Current Summary : MCRRH not reachable after integration of 1st U900 site, all troubleshooting done from integration and feild team but the RRH are not reachable.
Contact Surname : Karim
Contact Given Name : Ibrahim
Contact Phone :+971 56 354 4568
Contact Company : Alcatel-Lucent
Company : Emirates Telecommunications Corporation
Contract Number : OXIA 627085
Region : EMEA
Country : United Arab Emirates
City : Abu Dhabi
Site : ETISALAT ABU DHABI
Product Instance : 9926 D4U NodeB
Logs :
![Page 6: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/6.jpg)
Severity : 2
Priority : 3
Product Version : LR13.3W
Outage : No
Internal/External: :Internal
--
BR
Karim
M: +97156 354 4568
Attachments
Showing Investigation and Proprietary logs together in time order Show separately
Investigation Log and Proprietary Log
1. 11-Feb-2015 00:33 ALCATEL-LUCENT PROPRIETARY igawrych
Outgoing E-mail to Karim (Karim)** CTR ** IBRAHIM ABD EL NABY
Workflow Status: Queued
Subject: Re: RE: Etisalat UAE/MC-RRH not reachable after integration for first
U900 site / 1-5581126
Contact: Karim (Karim)** CTR ** IBRAHIM ABD EL NABY
Agent: igawrych
From: [email protected]
To: "IBRAHIM ABD EL NABY, Karim (Karim)** CTR **"
![Page 7: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/7.jpg)
Cc: "BERIDY, AHMED (AHMED)" <[email protected]>, "KHEDR, MAHMOUD
(MAHMOUD)" <[email protected]>, "ALI, YASSER (YASSER)** CTR **"
<[email protected]>, "ABDEL-HALIM, SAYED (SAYED)"
<[email protected]>, "MERAD, ABDESSAMAD (ABDESSAMAD)"
<[email protected]>, "OKASHA, TAHER (TAHER)"
Bcc:
Sent on:
Dear Customer,
Thank you for contacting the Alcatel-Lucent Welcome Center.
Your request has been processed and the ticket number for your reference is AR
1-5581126
Please reference that number when contacting Alcatel-Lucent for follow-up.
An Alcatel-Lucent representative will contact you regarding your request.
Kind Regards,
Izabela Gawrychowska
ALCATEL-LUCENT
GLOBAL WELCOME CENTER
![Page 8: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/8.jpg)
Visit OnLine Customer Support for Contact details
2. 11-Feb-2015 00:38 pthota
Update to Current Summary: Feb 11 : Under Investigation
3. 11-Feb-2015 00:42 pthota
Update to Current Summary: Feb 11 : Awaiting Receive Log Files / Technical Info
4. 11-Feb-2015 17:18 pthota
Update to Current Summary: Feb 11 : This AR has been escalated, This is first U900
site integration, deployment issue. MCRRH is not reachable. Suspecting
configuration issue.
5. 11-Feb-2015 17:18 ALCATEL-LUCENT PROPRIETARY pthota
We are escalating this AR, Please find below escalation note Kindly do the needful.
1.Problem Description
MC-RRH not reachable after integration for first U900
Node B Ip is (10.235.158.68)
![Page 9: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/9.jpg)
site name ET_AR_U_229_MohawagaU900
2.Activities performed by customer
First New integration
3.Preliminary analysis
All hardware has been changed, except RRH.
Still alarm is seen as RRH not reachable.
=============================================================
Following is the issue seen for this UAE node B MC RRH, Required your support
to debug this issue.
=============================================================
Present issue in this UAE Node B MC RRH seen:
New MC-RRH 900 (MC-RRH2x40-09) not been detected by the eCCM in release LR13.3
Following are the SW and HW NodeB data:
1) The NodeBs are loaded with UNB1330BC01 ( LR13.3W)
2) The NodeBs HW is d4U 9926 ( eCCM + 2eCEM) + 4 MC-RRH 900MHz
![Page 10: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/10.jpg)
3) This issue is seen in all nodebs and 4 MC-RRH 900 taken for test; on all of them
we have seen the same behavior
4) The MCRRH configured in 3G Mode only.
The investigation done so far has showed the following symptoms:
1) From IMT log we have seen the below Errors....
2015-02-11 07:34:59:204:4417C425 497.1142408229 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/504 (BOARD/5) RAISED 2015-02-11 07:34:59 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 07:34:59:430:44EF5429 497.1156535337 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/504 (BOARD/5) CLEARED 2015-02-11 07:34:59 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 07:35:12:850:76EDB5E9 497.1995290089 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) RAISED 2015-02-11 07:35:12 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 07:35:13:079:77C755B3 497.2009552307 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) CLEARED 2015-02-11 07:35:13 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 07:50:34:587:E0AA839E 510.3769271198 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) RAISED 2015-02-11 07:50:34 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 07:50:34:815:E183E45E 510.3783517278 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) CLEARED 2015-02-11 07:50:34 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:04:36:870:226A2C37 523.577383479 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) RAISED 2015-02-11 08:04:36 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:04:37:102:23476760 523.591882080 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) CLEARED 2015-02-11 08:04:37 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:06:26:460:BAAB3B88 524.3131784072 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) RAISED 2015-02-11 08:06:26 OPTICAL BOARD SFP TRANSCEIVER RX LOS
![Page 11: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/11.jpg)
2015-02-11 08:06:26:688:BB84A487 524.3146032263 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) CLEARED 2015-02-11 08:06:26 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:19:58:673:8C65F964 536.2355493220 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) RAISED 2015-02-11 08:19:58 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:19:58:907:8D45264B 536.2370119243 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) CLEARED 2015-02-11 08:19:58 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:20:59:301:6E414AB8 537.1849772728 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/504 (BOARD/5) RAISED 2015-02-11 08:20:59 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:20:59:527:6F18C227 537.1863893543 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/504 (BOARD/5) CLEARED 2015-02-11 08:20:59 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:21:48:187:245E840A 538.610173962 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) RAISED 2015-02-11 08:21:48 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:21:48:415:2537F711 538.624424721 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) CLEARED 2015-02-11 08:21:48 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:35:20:468:F65A2F6B 549.4133105515 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) RAISED 2015-02-11 08:35:20 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:35:20:702:F7394D61 549.4147727713 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) CLEARED 2015-02-11 08:35:20 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:37:09:896:8E00B459 551.2382410841 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) RAISED 2015-02-11 08:37:09 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:37:10:124:8EDA228D 551.2396660365 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) CLEARED 2015-02-11 08:37:10 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:50:42:263:604E3921 563.1615739169 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) RAISED 2015-02-11 08:50:42 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:50:42:497:612D6B8D 563.1630366605 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) CLEARED 2015-02-11 08:50:42 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:51:40:271:38671BCC 564.946281420 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/504 (BOARD/5) RAISED 2015-02-11 08:51:40 OPTICAL BOARD SFP TRANSCEIVER RX LOS
![Page 12: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/12.jpg)
2015-02-11 08:51:40:497:393E6923 564.960391459 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/504 (BOARD/5) CLEARED 2015-02-11 08:51:40 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:52:31:625:F7B5D5B5 564.4155889077 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) RAISED 2015-02-11 08:52:31 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 08:52:31:853:F88F3B5B 564.4170136411 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) CLEARED 2015-02-11 08:52:31 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:06:04:060:CA442474 576.3393463412 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) RAISED 2015-02-11 09:06:04 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:06:04:292:CB21654D 576.3407963469 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) CLEARED 2015-02-11 09:06:04 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:07:02:020:A22F08F3 577.2720991475 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/504 (BOARD/5) RAISED 2015-02-11 09:07:02 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:07:02:246:A3068737 577.2735114039 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/504 (BOARD/5) CLEARED 2015-02-11 09:07:02 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:07:53:322:614C62F9 578.1632396025 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) RAISED 2015-02-11 09:07:53 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:07:53:550:6225D24A 578.1646645834 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) CLEARED 2015-02-11 09:07:53 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:21:25:835:34250A69 590.874842729 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) RAISED 2015-02-11 09:21:25 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:21:26:067:35024119 590.889340185 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) CLEARED 2015-02-11 09:21:26 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:22:23:789:C0A4162 591.201998690 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/504 (BOARD/5) RAISED 2015-02-11 09:22:23 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:22:24:015:CE1C9F7 591.216123895 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/504 (BOARD/5) CLEARED 2015-02-11 09:22:24 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:23:15:011:CADB466C 591.3403368044 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) RAISED 2015-02-11 09:23:15 OPTICAL BOARD SFP TRANSCEIVER RX LOS
![Page 13: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/13.jpg)
2015-02-11 09:23:15:238:CBB4ACE4 591.3417615588 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) CLEARED 2015-02-11 09:23:15 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:38:36:741:349222C7 605.881992391 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) RAISED 2015-02-11 09:38:36 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:38:36:969:356B8CE9 605.896240873 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) CLEARED 2015-02-11 09:38:36 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:52:06:812:FE51E07E 616.4266778750 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) RAISED 2015-02-11 09:52:06 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:52:07:044:FF2F93EC 616.4281308140 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/501 (BOARD/5) CLEARED 2015-02-11 09:52:07 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:53:04:710:D601AA91 617.3590433425 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/504 (BOARD/5) RAISED 2015-02-11 09:53:04 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:53:04:936:D6D92917 617.3604556055 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/504 (BOARD/5) CLEARED 2015-02-11 09:53:04 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:53:58:490:9E5A9066 618.2656735334 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) RAISED 2015-02-11 09:53:58 OPTICAL BOARD SFP TRANSCEIVER RX LOS
2015-02-11 09:53:58:718:9F339406 618.2670957574 [MsgSeq/37b394b0] OIM TRANSCEIVER COMPONENT/502 (BOARD/5) CLEARED 2015-02-11 09:53:58 OPTICAL BOARD SFP TRANSCEIVER RX LOS
LOCALCELL/2291 (BTS CELL/0) RAISED 2015-02-10 22:11:59 BTS INCORRECTLY EQUIPPED
+-> Manuf Info ASCII = No CEM or No TX Path or No RX Path
+-> Manuf Info BIN = 4e 6f 20 43 45 4d 20 6f 72 20 4e 6f 20 54 58 20 50 61 74 68
20 6f 72 20 4e 6f 20 52 58 20 50 61
74 68 00
LOCALCELL/2292 (BTS CELL/1) RAISED 2015-02-10 22:11:59 BTS INCORRECTLY EQUIPPED
+-> Manuf Info ASCII = No CEM or No TX Path or No RX Path
![Page 14: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/14.jpg)
+-> Manuf Info BIN = 4e 6f 20 43 45 4d 20 6f 72 20 4e 6f 20 54 58 20 50 61 74 68
20 6f 72 20 4e 6f 20 52 58 20 50 61
74 68 00
LOCALCELL/2293 (BTS CELL/2) RAISED 2015-02-10 22:11:59 BTS INCORRECTLY EQUIPPED
+-> Manuf Info ASCII = No CEM or No TX Path or No RX Path
+-> Manuf Info BIN = 4e 6f 20 43 45 4d 20 6f 72 20 4e 6f 20 54 58 20 50 61 74 68
20 6f 72 20 4e 6f 20 52 58 20 50 61
74 68 00
LOCALCELL/2297 (BTS CELL/3) RAISED 2015-02-10 22:11:59 BTS INCORRECTLY EQUIPPED
+-> Manuf Info ASCII = No CEM or No TX Path or No RX Path
+-> Manuf Info BIN = 4e 6f 20 43 45 4d 20 6f 72 20 4e 6f 20 54 58 20 50 61 74 68
20 6f 72 20 4e 6f 20 52 58 20 50 61
74 68 00
LOCALCELL/2294 (BTS CELL/4) RAISED 2015-02-10 22:11:59 BTS INCORRECTLY EQUIPPED
+-> Manuf Info ASCII = No CEM or No TX Path or No RX Path
+-> Manuf Info BIN = 4e 6f 20 43 45 4d 20 6f 72 20 4e 6f 20 54 58 20 50 61 74 68
20 6f 72 20 4e 6f 20 52 58 20 50 61
74 68 00
LOCALCELL/2295 (BTS CELL/5) RAISED 2015-02-10 22:11:59 BTS INCORRECTLY EQUIPPED
+-> Manuf Info ASCII = No CEM or No TX Path or No RX Path
+-> Manuf Info BIN = 4e 6f 20 43 45 4d 20 6f 72 20 4e 6f 20 54 58 20 50 61 74 68
20 6f 72 20 4e 6f 20 52 58 20 50 61
74 68 00
![Page 15: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/15.jpg)
LOCALCELL/2296 (BTS CELL/6) RAISED 2015-02-10 22:11:59 BTS INCORRECTLY EQUIPPED
+-> Manuf Info ASCII = No CEM or No TX Path or No RX Path
+-> Manuf Info BIN = 4e 6f 20 43 45 4d 20 6f 72 20 4e 6f 20 54 58 20 50 61 74 68
20 6f 72 20 4e 6f 20 52 58 20 50 61
74 68 00
LOCALCELL/2298 (BTS CELL/7) RAISED 2015-02-10 22:11:59 BTS INCORRECTLY EQUIPPED
+-> Manuf Info ASCII = No CEM or No TX Path or No RX Path
+-> Manuf Info BIN = 4e 6f 20 43 45 4d 20 6f 72 20 4e 6f 20 54 58 20 50 61 74 68
20 6f 72 20 4e 6f 20 52 58 20 50 61
74 68 00
Faults for Ecem256.10 10
Faults for RemoteUnknownBoard 34
BOARD/41 (BOARD/704577537) RAISED 2015-02-10 22:11:59 CCM-SLAVE LINK
BOARD/41 (BOARD/704577537) RAISED 2015-02-10 22:11:59 TRANSMIT PARITY ERROR
BOARD/41 (BOARD/704577537) RAISED 2015-02-10 22:11:59 TRANSMIT LOSS OF EVEN SECOND
Faults for RemoteUnknownBoard 35
BOARD/31 (BOARD/536805377) RAISED 2015-02-10 22:11:59 CCM-SLAVE LINK
BOARD/31 (BOARD/536805377) RAISED 2015-02-10 22:11:59 TRANSMIT PARITY ERROR
BOARD/31 (BOARD/536805377) RAISED 2015-02-10 22:11:59 TRANSMIT LOSS OF EVEN SECOND
Faults for RemoteUnknownBoard 36
BOARD/21 (BOARD/369033217) RAISED 2015-02-10 22:11:59 CCM-SLAVE LINK
BOARD/21 (BOARD/369033217) RAISED 2015-02-10 22:11:59 TRANSMIT PARITY ERROR
![Page 16: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/16.jpg)
BOARD/21 (BOARD/369033217) RAISED 2015-02-10 22:11:59 TRANSMIT LOSS OF EVEN SECOND
Faults for RemoteUnknownBoard 37
BOARD/11 (BOARD/201261057) RAISED 2015-02-10 22:11:59 CCM-SLAVE LINK
BOARD/11 (BOARD/201261057) RAISED 2015-02-10 22:11:59 TRANSMIT PARITY ERROR
BOARD/11 (BOARD/201261057) RAISED 2015-02-10 22:11:59 TRANSMIT LOSS OF EVEN SECOND
RRH/720897 (REMOTE RADIO HEAD/11) RAISED 2015-02-10 22:11:59 RRH NOT REACHABLE
RRH/1376257 (REMOTE RADIO HEAD/21) RAISED 2015-02-10 22:11:59 RRH NOT REACHABLE
RRH/2031617 (REMOTE RADIO HEAD/31) RAISED 2015-02-10 22:11:59 RRH NOT REACHABLE
RRH/2686977 (REMOTE RADIO HEAD/41) RAISED 2015-02-10 22:11:59 RRH NOT REACHABLE
2) The optical fiber link is up ( green LEDs) on the MC-RHH as well as on the eCMM
ports, however the RRH is not reachable.
3) The SFP ordering codes installed in the MC-RRH and eCCM side are the following:
1AB187280063
4) From IMT log:
REDHCP INFO [redhcp.c/DHCP_client_callback()#151] : Enter DHCP_client_callback
REDHCP INFO [redhcp.c/DHCP_client_callback()#171] : In DHCP_client_callback: The
![Page 17: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/17.jpg)
MAC address of rrh/cem is 00:11:3f:e8:c2:30
REDHCP ERROR [redhcp.c/DHCP_opt_analysis()#413] : dhcp client options error :
OPT_UNKOWN 0x1, Length Recognized 0
REDHCP ERROR [redhcp.c/DHCP_client_callback()#178] : Unknow dhcp client type...
udhcpd: User callback return an error... Offer abandonned.
5) All Logs attached in AR.
1) Snapshot
2) IMT log
6) As per the Kosovo AR 1-5405549, we have asked to replace the RRH, waiting for
the customer reply on this.
6.Expectations from TEC team
Required your support to debug this issue.
Thanks,
Praveen.
6. 11-Feb-2015 21:57 ALCATEL-LUCENT PROPRIETARY pthota
Time Tracking Entry Added - IR01-TSA1
![Page 18: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/18.jpg)
7. 11-Feb-2015 21:59 ALCATEL-LUCENT PROPRIETARY pthota
Time Tracking Entry Added - IR01-TSA3
8. 12-Feb-2015 09:16 ALCATEL-LUCENT PROPRIETARY pthota
From RRH Local login we can see below Error repeating....attached this log also to
AR.
-> ipdhcpc[vdev5] :: DHCP timeout in SELECTING state
ipdhcpc_tmo_cb : SEND DISCOVER
ipdhcpc_output_request : send discover : tei: c2
ipdhcpc_output : ADD VENDOR OPTIONS TO DISCOVER
ipdhcpc_option_callback - call to add vendor options
mcRrhDhcpClientOptionHook - add vendor options: 123
mcRrhDhcpClientOptionHook :: DISCOVER TEI = 194
I have requested for M logs from NodeB, Once i receive it. I will forward the logs.
9. 12-Feb-2015 12:47 sunilkd
1. RRH was continuously sending DHCP discovery but it did not get answer from ndoeB.
value = 0 = 0x0
![Page 19: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/19.jpg)
-> ipdhcpc[vdev5] :: DHCP timeout in SELECTING state
ipdhcpc_tmo_cb : SEND DISCOVER
ipdhcpc_output_request : send discover : tei: c2
ipdhcpc_output : ADD VENDOR OPTIONS TO DISCOVER
ipdhcpc_option_callback - call to add vendor options
mcRrhDhcpClientOptionHook - add vendor options: 123
mcRrhDhcpClientOptionHook :: DISCOVER TEI = 194
ipdhcpc[vdev5] :: DHCP timeout in SELECTING state
ipdhcpc_tmo_cb : SEND DISCOVER
ipdhcpc_output_request : send discover : tei: c2
ipdhcpc_output : ADD VENDOR OPTIONS TO DISCOVER
ipdhcpc_option_callback - call to add vendor options
mcRrhDhcpClientOptionHook - add vendor options: 123
mcRrhDhcpClientOptionHook :: DISCOVER TEI = 194
ipdhcpc[vdev5] :: DHCP timeout in SELECTING state
ipdhcpc_tmo_cb : SEND DISCOVER
ipdhcpc_output_request : send discover : tei: c2
ipdhcpc_output : ADD VENDOR OPTIONS TO DISCOVER
ipdhcpc_option_callback - call to add vendor options
mcRrhDhcpClientOptionHook - add vendor options: 123
mcRrhDhcpClientOptionHook :: DISCOVER TEI = 194
ipdhcpc[vdev5] :: DHCP timeout in SELECTING state
ipdhcpc_tmo_cb : SEND DISCOVER
ipdhcpc_output_request : send discover : tei: c2
ipdhcpc_output : ADD VENDOR OPTIONS TO DISCOVER
ipdhcpc_option_callback - call to add vendor options
mcRrhDhcpClientOptionHook - add vendor options: 123
mcRrhDhcpClientOptionHook :: DISCOVER TEI = 194
![Page 20: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/20.jpg)
ipdhcpc[vdev5] :: DHCP timeout in SELECTING state
2. There was an alarm in nodeB. SFP was not atcive state.
pltf/641[MsgSeq ]CoreAbstract#2401 2015-02-11 20:32:52:510:4A9C508B WAR 000
00:17:00, <038f000b> :RmtBoard.037..$Board never reached L3$
pltf/641[status_ind] xcob_u.c#639 2015-02-11 20:33:08:997:8807FD62 WAR 000
00:17:16, <90047100> :SFP00: sfp_state = 0x00; tx_state = 0x00; tx_status =
0x00; rx_los = 0x01
pltf/641[MsgSeq ]CoreOpticalI#1076 2015-02-11 20:33:09:001:880B414F WAR 000
00:17:16, <03e4000a> :CpriItf.19.00.$
pltf/641[cpri inter] cpri_u.c#827 2015-02-11 20:33:09:031:88278AE8 WAR 000
00:17:16, <90047700> :To_NSYNC() Link1
pltf/641[status_ind] xcob_u.c#639 2015-02-11 20:33:09:215:88D7E114 WAR 000
00:17:16, <90047100> :SFP00: sfp_state = 0x00; tx_state = 0x00; tx_status =
0x00; rx_los = 0x00
pltf/641[cpri inter] cpri_u.c#897 2015-02-11 20:33:39:049:F7FB5BC6 WAR 000
00:17:46, <90047700> :LinkStable_To_SYNC() Link1
pltf/641[cpri inter] cpri_u.c#1433 2015-02-11 20:33:39:049:F7FB7D21 WAR 000
00:17:46, <90047700> :ReportToReproxy() Link1 State: Up
pltf/641[cpri inter] cpri_u.c#937 2015-02-11 20:33:43:051:06E4371D WAR 000
00:17:50, <90047700> :LinkStable_Keep() Link1 CPRI NSYNC at LinkStable_WD
timeout, Link Alive
![Page 21: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/21.jpg)
pltf/641[cpri inter] cpri_u.c#1433 2015-02-11 20:33:43:052:06E47263 WAR 000
00:17:50, <90047700> :ReportToReproxy() Link1 State: Down
3. CCM was not able to detect frame format.
REDHCP ERROR [redhcp.c/DHCP_opt_analysis()#413] : dhcp client options error :
OPT_UNKOWN 0x1, Length Recognized 0
4. Therefore, we need to check type of SFP used and it vendor type.
10. 12-Feb-2015 22:51 ALCATEL-LUCENT PROPRIETARY pthota
Time Tracking Entry Added - IR01-TSA3
11. 13-Feb-2015 13:20 ALCATEL-LUCENT PROPRIETARY pthota
Time Tracking Entry Added - IR01-TSA1
12. 13-Feb-2015 16:05 sunilkd
This is UNB, nodeB software. I want binary in MC-RRH. Generally, software that
was loaded into MC-RRH is 2g mode. We need to make it 3G mode. It can be download
UNB1330C203 from ALU server and pick up x0o_xxc0.ecr file after unzip and untar.
If some issue getting files, let me know. I will download and send it tomorrow.
![Page 22: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/22.jpg)
For me it will take 7hrs to download:
Following are the procedure.
Tools:
(1) WFTP
(2) telnet tools
Prepare,
1. Connect MCRRH and PC with Ethernet cable.
Ethernet Card is required in your test PC, you should configure the IP address and
mask as following:
2. Copy x0o_xxc0.ecr.file to D:\ in PC.
3. Open WFTP. Set wftp as below,
4 Check WFTP Configuration
After step 3, you need to telnet MCRRH,
Then execute "ls".
If WFTP config correct, you will get lots of file name and one of them is
"x0o_xxc0.ecr". Otherwise, You need to check wftp configuration & Doesn't
continue to do step 5.
5.Update origin software:
1) telnet to McRRH with 192.168.0.x :
username: newclass
password: nc_tmxda
2) check ftp server: following command can show content of sharing dir on ftp server
![Page 23: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/23.jpg)
Cmd: ls
3) change McRRH to ALFS mode for downloading and reboot.
Cmd: Select_ALFS_SW
Cmd: reboot
4) unprotect McRRH flash
Cmd: Flash_Bypass_HW_Protection 0x0F1E2D3C4B5A6978LL
5) download MCRRH software from ftp server according to your need.
Cmd(update origin software): dlpe "ORIGIN","x0o_xxc0.ecr","ECR"
6) change McRRH to normal mode.
Cmd: Select_SCP_SW
7) Check preloading result
Cmd: swShow 0,-1
8) Activate to origin partition
Cmd: Package_Activate 0
Package 000
Regards,
Sunil
13. 13-Feb-2015 16:08 sunilkd
Update to Current Summary: issue is resolved
14. 13-Feb-2015 16:08 ALCATEL-LUCENT PROPRIETARY sunilkd
Time Tracking Entry Added - TSA4 diagnosis + TEC support
![Page 24: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/24.jpg)
15. 13-Feb-2015 16:14 ALCATEL-LUCENT PROPRIETARY gauravarora
From: ARORA, Gaurav (Gaurav)** CTR **
Sent: vendredi 13 février 2015 13:06
To: MERAD, ABDESSAMAD (ABDESSAMAD); THOTA, Praveen-K (Praveen-K)** CTR **; LU, Wei
I (Wei); WEBER, Hubert (Hubert); HUA, JIANNAN (JIANNAN); DAS, Sunil (Sunil)** CTR
**; DAOU, CYRIL (CYRIL); CHEN, Eric (Eric)
Cc: COPOS, BOGDAN (BOGDAN); MORVAN, FREDERIC (FREDERIC); KHEDR, MAHMOUD (MAHMOUD);
HELMI, OSAMA (OSAMA); MAGED, FADY (FADY); METWALLY, AMR (AMR); JACKYRA, GREGORY
(GREGORY); BIALOBRODA, ROLAND (ROLAND); OKASHA, TAHER (TAHER); TURCU, ADRIAN
(ADRIAN); LARRETA, RAQUEL (RAQUEL); SEBIRE, SYLVIA (SYLVIA); SIDANER, ERWAN
(ERWAN); URVOY, Alexandre (Alexandre); IBRAHIM, MAHMOUD (MAHMOUD); HEENS, MATTHIEU
(MATTHIEU); Yin, Xiuzhe (Rona); INDIA-WCDMA-CdTSC-TEAM
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Hi Abdessamad,
As per your message on call invitation , you have mentioned that the problem has
been resolved with the new software.
16. 13-Feb-2015 16:15 ALCATEL-LUCENT PROPRIETARY gauravarora
![Page 25: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/25.jpg)
From: MERAD, ABDESSAMAD (ABDESSAMAD)
Sent: Friday, February 13, 2015 5:39 PM
To: ARORA, Gaurav (Gaurav)** CTR **; THOTA, Praveen-K (Praveen-K)** CTR **; LU,
Wei I (Wei); WEBER, Hubert (Hubert); HUA, JIANNAN (JIANNAN); DAS, Sunil (Sunil)**
CTR **; DAOU, CYRIL (CYRIL); CHEN, Eric (Eric)
Cc: COPOS, BOGDAN (BOGDAN); MORVAN, FREDERIC (FREDERIC); KHEDR, MAHMOUD (MAHMOUD);
HELMI, OSAMA (OSAMA); MAGED, FADY (FADY); METWALLY, AMR (AMR); JACKYRA, GREGORY
(GREGORY); BIALOBRODA, ROLAND (ROLAND); OKASHA, TAHER (TAHER); TURCU, ADRIAN
(ADRIAN); LARRETA, RAQUEL (RAQUEL); SEBIRE, SYLVIA (SYLVIA); SIDANER, ERWAN
(ERWAN); URVOY, Alexandre (Alexandre); IBRAHIM, MAHMOUD (MAHMOUD); HEENS, MATTHIEU
(MATTHIEU); Yin, Xiuzhe (Rona); INDIA-WCDMA-CdTSC-TEAM
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Hi Sunil,
Correct, the MC-RRH is reachable and problem solved. Now the team is performing
the integration of the site.
I will call for a separate meeting for a global review of the case (the feature we
are implementing is wo. 2G dependency so this should not happen and we should not
need 2G Sumx / my view)
Thanks a lot for your support
![Page 26: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/26.jpg)
17. 13-Feb-2015 16:23 gauravarora
Update to Current Summary: Feb 13- Issues has been resolved , the RRH is
reachable now with the proper software .Awaiting AR closure confirmation
18. 13-Feb-2015 16:23 ALCATEL-LUCENT PROPRIETARY gauravarora
From: ARORA, Gaurav (Gaurav)** CTR **
Sent: Friday, February 13, 2015 5:50 PM
To: IBRAHIM ABD EL NABY, Karim (Karim)** CTR **
Cc: KHEDR, MAHMOUD (MAHMOUD); MERAD, ABDESSAMAD (ABDESSAMAD); INDIA-WCDMA-CdTSC-TEAM
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Hi Karim ,
May we close this AR now as the problem has been resolved.
19. 16-Feb-2015 09:46 ALCATEL-LUCENT PROPRIETARY gauravarora
Time Tracking Entry Added - IR01-TSA1
20. 16-Feb-2015 09:47 ALCATEL-LUCENT PROPRIETARY gauravarora
![Page 27: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/27.jpg)
Time Tracking Entry Added - IR01-TSA1
21. 16-Feb-2015 09:50 ALCATEL-LUCENT PROPRIETARY gauravarora
Time Tracking Entry Added - IR01-TSA1
22. 19-Feb-2015 10:43 pthota
Update to Current Summary: Feb 19- Issues has been resolved , the RRH is
reachable now with the proper software .Awaiting AR closure confirmation
23. 23-Feb-2015 09:52 ALCATEL-LUCENT PROPRIETARY pthota
From: THOTA, Praveen-K (Praveen-K)** CTR **
Sent: Thursday, February 12, 2015 2:53 PM
To: MERAD, ABDESSAMAD (ABDESSAMAD); KHEDR, MAHMOUD (MAHMOUD); ARORA, Gaurav
(Gaurav)** CTR **
Cc: INDIA-WCDMA-CdTSC-TEAM; BERIDY, AHMED (AHMED); IBRAHIM ABD EL NABY, Karim
(Karim)** CTR **; ALI, YASSER (YASSER)** CTR **; FU, Jian Jun (Nick); ABDEL-HALIM,
SAYED (SAYED); EL-FAKHARANY, HISHAM (HISHAM); OKASHA, TAHER (TAHER);
INDIA-WCDMA-BE-TEAM; WAGDY MANSOUR, AYMAN (AYMAN)** CTR **; JACKYRA, GREGORY
(GREGORY); Sun, Qi Feng (Qi Feng)** CTR **; IBRAHIM, MAHMOUD (MAHMOUD); EL KHOLY,
MOHAMED (MOHAMED)** CTR **; EL-MIDANY, AHMED (AHMED); BIALOBRODA, ROLAND (ROLAND);
COPOS, BOGDAN (BOGDAN); TALAAT, REMON (REMON); DAOU, CYRIL (CYRIL); KUMAR, NAVNEET
![Page 28: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/28.jpg)
(NAVNEET); MAGED, FADY (FADY); GODA, Ahmed (Ahmed)** CTR **; AMAYO, EFOSA (EFOSA);
CHARBONNIER, DOMINIQUE (DOMINIQUE); MORVAN, FREDERIC (FREDERIC); DAS, Sunil
(Sunil)** CTR **; PASHA, D Hussain (D Hussain)** CTR **
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
++ TEC
Hi Karim,
Please find below TEC response for this issue. Please download the NodeB software
and use below procedure to transfer it to RRH. Please let us know if you face any
issue.
This is UNB, nodeB software. I want binary in MC-RRH. Generally, software that
was loaded into MC-RRH is 2g mode. We need to make it 3G mode. It can be download
UNB1330C203 from ALU server and pick up x0o_xxc0.ecr file after unzip and untar.
If some issue getting files, let me know. I will download and send it tomorrow.
For me it will take 7hrs to download:
Following are the procedure.
Tools:
(1) WFTP
![Page 29: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/29.jpg)
(2) telnet tools
Prepare,
1. Connect MCRRH and PC with Ethernet cable.
Ethernet Card is required in your test PC, you should configure the IP address and
mask as following:
2. Copy x0o_xxc0.ecr.file to D:\ in PC.
3. Open WFTP. Set wftp as below,
4 Check WFTP Configuration
After step 3, you need to telnet MCRRH,
Then execute "ls".
If WFTP config correct, you will get lots of file name and one of them is
"x0o_xxc0.ecr". Otherwise, You need to check wftp configuration & Doesn't
continue to do step 5.
5.Update origin software:
1) telnet to McRRH with 192.168.0.x :
username: newclass
password: nc_tmxda
2) check ftp server: following command can show content of sharing dir on ftp server
Cmd: ls
3) change McRRH to ALFS mode for downloading and reboot.
Cmd: Select_ALFS_SW
Cmd: reboot
4) unprotect McRRH flash
Cmd: Flash_Bypass_HW_Protection 0x0F1E2D3C4B5A6978LL
![Page 30: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/30.jpg)
5) download MCRRH software from ftp server according to your need.
Cmd(update origin software): dlpe "ORIGIN","x0o_xxc0.ecr","ECR"
6) change McRRH to normal mode.
Cmd: Select_SCP_SW
7) Check preloading result
Cmd: swShow 0,-1
8) Activate to origin partition
Cmd: Package_Activate 0
Package 000
==================================================================================
========================
Thanks and Regards,
Praveen Thota
+91 96899 18050
-------- Original message --------
From: "AMAYO, EFOSA (EFOSA)" <[email protected]>
Date: 12/02/2015 20:33 (GMT+05:30)
To: "THOTA, Praveen-K (Praveen-K)** CTR **"
<[email protected]>, "MERAD, ABDESSAMAD (ABDESSAMAD)"
<[email protected]>, "KHEDR, MAHMOUD (MAHMOUD)"
<[email protected]>, "ARORA, Gaurav (Gaurav)** CTR **"
Cc: INDIA-WCDMA-CdTSC-TEAM <[email protected]>, "BERIDY, AHMED
(AHMED)" <[email protected]>, "IBRAHIM ABD EL NABY, Karim
![Page 31: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/31.jpg)
(Karim)** CTR **" <[email protected]>, "ALI, YASSER (YASSER)**
CTR **" <[email protected]>, "FU, Jian Jun (Nick)"
<[email protected]>, "ABDEL-HALIM, SAYED (SAYED)"
<[email protected]>, "EL-FAKHARANY, HISHAM (HISHAM)"
<[email protected]>, "OKASHA, TAHER (TAHER)"
<[email protected]>, INDIA-WCDMA-BE-TEAM
<[email protected]>, "WAGDY MANSOUR, AYMAN (AYMAN)** CTR
**" <[email protected]>, "JACKYRA, GREGORY (GREGORY)"
<[email protected]>, "Sun, Qi Feng (Qi Feng)** CTR **"
<[email protected]>, "IBRAHIM, MAHMOUD (MAHMOUD)"
<[email protected]>, "EL KHOLY, MOHAMED (MOHAMED)** CTR **"
<[email protected]>, "EL-MIDANY, AHMED (AHMED)"
<[email protected]>, "BIALOBRODA, ROLAND (ROLAND)"
<[email protected]>, "COPOS, BOGDAN (BOGDAN)"
<[email protected]>, "TALAAT, REMON (REMON)"
<[email protected]>, "DAOU, CYRIL (CYRIL)"
<[email protected]>, "KUMAR, NAVNEET (NAVNEET)"
<[email protected]>, "MAGED, FADY (FADY)"
<[email protected]>, "GODA, Ahmed (Ahmed)** CTR **"
<[email protected]>, "CHARBONNIER, DOMINIQUE (DOMINIQUE)"
<[email protected]>, "MORVAN, FREDERIC (FREDERIC)"
<[email protected]>, "DAS, Sunil (Sunil)** CTR **"
<[email protected]>, "PASHA, D Hussain (D Hussain)** CTR **"
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
![Page 32: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/32.jpg)
Hello Praveen
Do we upgrade the nodeb SW to UNB1330C203 also as UNB1330BC01 is currently
running
Thanks & Br,
Efosa
+2348058097463
+971507533570
From: DAS, Sunil (Sunil)** CTR **
Sent: Thursday, February 12, 2015 7:07 PM
To: AMAYO, EFOSA (EFOSA); THOTA, Praveen-K (Praveen-K)** CTR **; MERAD, ABDESSAMAD
(ABDESSAMAD); KHEDR, MAHMOUD (MAHMOUD); ARORA, Gaurav (Gaurav)** CTR **
Cc: INDIA-WCDMA-CdTSC-TEAM; BERIDY, AHMED (AHMED); IBRAHIM ABD EL NABY, Karim
(Karim)** CTR **; ALI, YASSER (YASSER)** CTR **; FU, Jian Jun (Nick); ABDEL-HALIM,
SAYED (SAYED); EL-FAKHARANY, HISHAM (HISHAM); OKASHA, TAHER (TAHER);
INDIA-WCDMA-BE-TEAM; WAGDY MANSOUR, AYMAN (AYMAN)** CTR **; JACKYRA, GREGORY
(GREGORY); Sun, Qi Feng (Qi Feng)** CTR **; IBRAHIM, MAHMOUD (MAHMOUD); EL KHOLY,
MOHAMED (MOHAMED)** CTR **; EL-MIDANY, AHMED (AHMED); BIALOBRODA, ROLAND (ROLAND);
COPOS, BOGDAN (BOGDAN); TALAAT, REMON (REMON); DAOU, CYRIL (CYRIL); KUMAR, NAVNEET
(NAVNEET); MAGED, FADY (FADY); GODA, Ahmed (Ahmed)** CTR **; CHARBONNIER,
DOMINIQUE (DOMINIQUE); MORVAN, FREDERIC (FREDERIC); PASHA, D Hussain (D Hussain)**
CTR **
![Page 33: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/33.jpg)
Subject: Re: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
It is not needed as you will pick up only one file.
Sent from Samsung tablet
From: IBRAHIM ABD EL NABY, Karim (Karim)** CTR **
Sent: Thursday, February 12, 2015 8:56 PM
To: DAS, Sunil (Sunil)** CTR **; AMAYO, EFOSA (EFOSA); THOTA, Praveen-K
(Praveen-K)** CTR **; MERAD, ABDESSAMAD (ABDESSAMAD); KHEDR, MAHMOUD (MAHMOUD);
ARORA, Gaurav (Gaurav)** CTR **
Cc: INDIA-WCDMA-CdTSC-TEAM; BERIDY, AHMED (AHMED); ALI, YASSER (YASSER)** CTR **;
FU, Jian Jun (Nick); ABDEL-HALIM, SAYED (SAYED); EL-FAKHARANY, HISHAM (HISHAM);
OKASHA, TAHER (TAHER); INDIA-WCDMA-BE-TEAM; WAGDY MANSOUR, AYMAN (AYMAN)** CTR **;
JACKYRA, GREGORY (GREGORY); Sun, Qi Feng (Qi Feng)** CTR **; IBRAHIM, MAHMOUD
(MAHMOUD); EL KHOLY, MOHAMED (MOHAMED)** CTR **; EL-MIDANY, AHMED (AHMED);
BIALOBRODA, ROLAND (ROLAND); COPOS, BOGDAN (BOGDAN); TALAAT, REMON (REMON); DAOU,
CYRIL (CYRIL); KUMAR, NAVNEET (NAVNEET); MAGED, FADY (FADY); GODA, Ahmed (Ahmed)**
CTR **; CHARBONNIER, DOMINIQUE (DOMINIQUE); MORVAN, FREDERIC (FREDERIC); PASHA, D
Hussain (D Hussain)** CTR **
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
![Page 34: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/34.jpg)
Hello Sunil,Praveen,
We downloaded the recommended SW, but we can find the file you mentioned, please
advise urgently.
Thanks,
--
BR,
Karim
M: +971 (0)56-354-4568
From: DAS, Sunil (Sunil)** CTR **
Sent: jeudi 12 février 2015 16:50
To: IBRAHIM ABD EL NABY, Karim (Karim)** CTR **; AMAYO, EFOSA (EFOSA); THOTA,
Praveen-K (Praveen-K)** CTR **; MERAD, ABDESSAMAD (ABDESSAMAD); KHEDR, MAHMOUD
(MAHMOUD); ARORA, Gaurav (Gaurav)** CTR **; CHEN, WU (WU)
Cc: INDIA-WCDMA-CdTSC-TEAM; BERIDY, AHMED (AHMED); ALI, YASSER (YASSER)** CTR **;
FU, Jian Jun (Nick); ABDEL-HALIM, SAYED (SAYED); EL-FAKHARANY, HISHAM (HISHAM);
OKASHA, TAHER (TAHER); INDIA-WCDMA-BE-TEAM; WAGDY MANSOUR, AYMAN (AYMAN)** CTR **;
JACKYRA, GREGORY (GREGORY); Sun, Qi Feng (Qi Feng)** CTR **; IBRAHIM, MAHMOUD
(MAHMOUD); EL KHOLY, MOHAMED (MOHAMED)** CTR **; EL-MIDANY, AHMED (AHMED);
BIALOBRODA, ROLAND (ROLAND); COPOS, BOGDAN (BOGDAN); TALAAT, REMON (REMON); DAOU,
![Page 35: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/35.jpg)
CYRIL (CYRIL); KUMAR, NAVNEET (NAVNEET); MAGED, FADY (FADY); GODA, Ahmed (Ahmed)**
CTR **; CHARBONNIER, DOMINIQUE (DOMINIQUE); MORVAN, FREDERIC (FREDERIC); PASHA, D
Hussain (D Hussain)** CTR **
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Karim,
If you have SUMX board, you can use it with UNB software.
If you don't have SUMX, we need that particular file from R&D server. I am not
able to access R&D server at China. Let me add R&D lead.
Chen WU,
For your benefit and understanding, here is brief description of the issue.
1. The customer is integrating new MCRRH 900. It came with 2G software. When
they integrated, MC RRH was not able to establish L3 connectivity. Since the
customer will use MCRRH in 3G, we need to convert MC RRH into 3G mode. Current
running software in RRH module is as below.
Package 000 Memory Bank : 0
Version : ORIGIN (Running Software)
State : VALID
![Page 36: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/36.jpg)
-------------------------------------------------------------------
SW Area Start Address : 0xF0040000
Add. Package Hdr Addr : 0xF0040000 (ECR Format)
SW Package Address : 0xF0040600
SW Area End Address : 0xF17FFFFF
-------------------------------------------------------------------
ECR File Header
File Name : X0O0AZS2.02S
Unit ID : TRE
Sub-Unit ID : RRFW60
Date : 2012-01-13 17:17:08
File Size (bytes) : 9577769
File Number : 4700
-------------------------------------------------------------------
Package Header
SW Package Name : x0o_azs2.bin
Date : 2012-01-13 17:17:04
Total File Length : 13554988 (0x00CED52C)
FCS32 Checksum : 0xF6B70DBB
Number of Components : 16
===================================
2. We need to download x0o_xxc0.ecr to MC RRH. I could not locate in R&D
server. May I request you to send the file to local team?
3. I share the procedure to follow as below.
Tools:
![Page 37: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/37.jpg)
(1) WFTP
(2) telnet tools
Prepare,
1. Connect MCRRH and PC with Ethernet cable.
Ethernet Card is required in your test PC, you should configure the IP address and
mask as following:
2. Copy x0o_xxc0.ecr.file to D:\ in PC.
3. Open WFTP. Set wftp as below,
4 Check WFTP Configuration
After step 3, you need to telnet MCRRH,
Then execute "ls".
If WFTP config correct, you will get lots of file name and one of them is
"x0o_xxc0.ecr". Otherwise, You need to check wftp configuration & Doesn't
continue to do step 5.
5.Update origin software:
1) telnet to McRRH with 192.168.0.x :
username: newclass
password: nc_tmxda
2) check ftp server: following command can show content of sharing dir on ftp server
Cmd: ls
3) change McRRH to ALFS mode for downloading and reboot.
Cmd: Select_ALFS_SW
Cmd: reboot
4) unprotect McRRH flash
![Page 38: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/38.jpg)
Cmd: Flash_Bypass_HW_Protection 0x0F1E2D3C4B5A6978LL
5) download MCRRH software from ftp server according to your need.
Cmd(update origin software): dlpe "ORIGIN","x0o_xxc0.ecr","ECR"
6) change McRRH to normal mode.
Cmd: Select_SCP_SW
7) Check preloading result
Cmd: swShow 0,-1
8) Activate to origin partition
Cmd: Package_Activate 0
Package 000
Regards,
Sunil
From: MERAD, ABDESSAMAD (ABDESSAMAD)
Sent: Thursday, February 12, 2015 9:27 PM
To: DAS, Sunil (Sunil)** CTR **; IBRAHIM ABD EL NABY, Karim (Karim)** CTR **;
AMAYO, EFOSA (EFOSA); THOTA, Praveen-K (Praveen-K)** CTR **; KHEDR, MAHMOUD
(MAHMOUD); ARORA, Gaurav (Gaurav)** CTR **; CHEN, WU (WU)
Cc: INDIA-WCDMA-CdTSC-TEAM; BERIDY, AHMED (AHMED); ALI, YASSER (YASSER)** CTR **;
FU, Jian Jun (Nick); ABDEL-HALIM, SAYED (SAYED); EL-FAKHARANY, HISHAM (HISHAM);
OKASHA, TAHER (TAHER); INDIA-WCDMA-BE-TEAM; WAGDY MANSOUR, AYMAN (AYMAN)** CTR **;
JACKYRA, GREGORY (GREGORY); Sun, Qi Feng (Qi Feng)** CTR **; IBRAHIM, MAHMOUD
(MAHMOUD); EL KHOLY, MOHAMED (MOHAMED)** CTR **; EL-MIDANY, AHMED (AHMED);
BIALOBRODA, ROLAND (ROLAND); COPOS, BOGDAN (BOGDAN); TALAAT, REMON (REMON); DAOU,
![Page 39: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/39.jpg)
CYRIL (CYRIL); KUMAR, NAVNEET (NAVNEET); MAGED, FADY (FADY); GODA, Ahmed (Ahmed)**
CTR **; CHARBONNIER, DOMINIQUE (DOMINIQUE); MORVAN, FREDERIC (FREDERIC); PASHA, D
Hussain (D Hussain)** CTR **
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Importance: High
Hello Sunil,
I did same and also did not find the file in x0o_xxc0.ecr in the set (attached
the description file)
We do not have Sumx (and will not be able to plan for it) as the Etisalat is 3G
only.
We need your urgent support to deliver the file asap.
Is it mandatory to do it on site or can it be done remotely?
Also, we neeed your confirmation that the global NB SW willnot change at this
stage,we communicated LR13.3.7 EP1
Waiting your support and feedback the soonest as the team is still on site waiting
for the file
Thanks
![Page 40: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/40.jpg)
Best Regards
Abdessamad MERAD
Wireless 3G Technical Project Manager
RBC / EMEA
FR : +33(0)646486904
From: DAS, Sunil (Sunil)** CTR **
Sent: jeudi 12 février 2015 17:15
To: MERAD, ABDESSAMAD (ABDESSAMAD); IBRAHIM ABD EL NABY, Karim (Karim)** CTR **;
AMAYO, EFOSA (EFOSA); THOTA, Praveen-K (Praveen-K)** CTR **; KHEDR, MAHMOUD
(MAHMOUD); ARORA, Gaurav (Gaurav)** CTR **; CHEN, WU (WU)
Cc: INDIA-WCDMA-CdTSC-TEAM; BERIDY, AHMED (AHMED); ALI, YASSER (YASSER)** CTR **;
FU, Jian Jun (Nick); ABDEL-HALIM, SAYED (SAYED); EL-FAKHARANY, HISHAM (HISHAM);
OKASHA, TAHER (TAHER); INDIA-WCDMA-BE-TEAM; WAGDY MANSOUR, AYMAN (AYMAN)** CTR **;
JACKYRA, GREGORY (GREGORY); Sun, Qi Feng (Qi Feng)** CTR **; IBRAHIM, MAHMOUD
(MAHMOUD); EL KHOLY, MOHAMED (MOHAMED)** CTR **; EL-MIDANY, AHMED (AHMED);
BIALOBRODA, ROLAND (ROLAND); COPOS, BOGDAN (BOGDAN); TALAAT, REMON (REMON); DAOU,
CYRIL (CYRIL); KUMAR, NAVNEET (NAVNEET); MAGED, FADY (FADY); GODA, Ahmed (Ahmed)**
CTR **; CHARBONNIER, DOMINIQUE (DOMINIQUE); MORVAN, FREDERIC (FREDERIC); PASHA, D
Hussain (D Hussain)** CTR **
![Page 41: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/41.jpg)
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Hi Abdessamad,
It surprised me when Karim told me that sumx board was not planned. MC-RRH always
comes with 2G software from factory. It needs to be converted to 3G if it needs to
be used for 3G. SUMX board not is only used for 2G+3G but also used to convert
MC-RRH 2G to 3G 1st time.
Since you don't have sumx, we have to use below procedure to convert 2G to 3G. it
can't be done remotely. Person should be at site with Laptop.
I requested Chen HU, in copy already to send the file or help us to recover from
this issue. I will follow up tomorrow morning. It is late night for him now.
Regards,
Sunil
De : MERAD, ABDESSAMAD (ABDESSAMAD)
Envoyé : Thursday, February 12, 2015 8:31 PM
À : DAS, Sunil (Sunil)** CTR **; IBRAHIM ABD EL NABY, Karim (Karim)** CTR **;
AMAYO, EFOSA (EFOSA); THOTA, Praveen-K (Praveen-K)** CTR **; KHEDR, MAHMOUD
(MAHMOUD); ARORA, Gaurav (Gaurav)** CTR **; CHEN, WU (WU)
Cc : INDIA-WCDMA-CdTSC-TEAM; BERIDY, AHMED (AHMED); ALI, YASSER (YASSER)** CTR **;
![Page 42: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/42.jpg)
FU, Jian Jun (Nick); ABDEL-HALIM, SAYED (SAYED); EL-FAKHARANY, HISHAM (HISHAM);
OKASHA, TAHER (TAHER); INDIA-WCDMA-BE-TEAM; WAGDY MANSOUR, AYMAN (AYMAN)** CTR **;
JACKYRA, GREGORY (GREGORY); Sun, Qi Feng (Qi Feng)** CTR **; IBRAHIM, MAHMOUD
(MAHMOUD); EL KHOLY, MOHAMED (MOHAMED)** CTR **; EL-MIDANY, AHMED (AHMED);
BIALOBRODA, ROLAND (ROLAND); COPOS, BOGDAN (BOGDAN); TALAAT, REMON (REMON); DAOU,
CYRIL (CYRIL); KUMAR, NAVNEET (NAVNEET); MAGED, FADY (FADY); GODA, Ahmed (Ahmed)**
CTR **; CHARBONNIER, DOMINIQUE (DOMINIQUE); MORVAN, FREDERIC (FREDERIC); PASHA, D
Hussain (D Hussain)** CTR **
Objet : RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Importance : Haute
Hi Sunil,
- The feature is GA since last year and I'm surprised this 3G only path is not
considered by SC, I might not have global view but I see this AS an issue in the
delivery that need to be addressed asap (on top of our issue)
- We have in Etisalat 2G site collocated for almost all sites so we need to
understand clearly what will be the use of 2G in our 3G only case (target):
o What is the MOP exactly, connect the MC-RRH to Sumx only ?
o Connection will be using same fiber as we have to connect the CCM (MM /
specification provided already by khedr)? Same port on the RRH (cpri?)
![Page 43: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/43.jpg)
o What are exactly the actions that will be done on the 2G BTS?
o What is the impact on 2G BTS of such action, any disruptive impact?
o Can all those actions be done remotely?
o Once the AP is completed on 2G side, we will just have to reconnect to the CCM
and start 3G only I&C?
o Please keep in mind a lot of tower sites were RRH should be at 100m high, so the
fiber position change (2G to 3G BTS) should be done on BTS fiber end..otherwise
field operation might be very complex
thanks
Best Regards
Abdessamad MERAD
Wireless 3G Technical Project Manager
RBC / EMEA
FR : +33(0)646486904
From: DAOU CYRIL
Sent: 2015?2?13? 14:46
To: DAS SUNIL; BIALOBRODA ROLAND; MERAD ABDESSAMAD; OKASHA TAHER; TURCU ADRIAN;
LARRETA RAQUEL; SEBIRE SYLVIA; SIDANER ERWAN; URVOY Alexandre; IBRAHIM MAHMOUD;
HEENS MATTHIEU; YIN Rona; THOTA PRAVEEN-K; LU Wei I
![Page 44: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/44.jpg)
Cc: COPOS BOGDAN; MORVAN FREDERIC; KHEDR MAHMOUD; HELMI OSAMA; MAGED FADY;
METWALLY AMR; JACKYRA Gregory
Subject: TR: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Importance: High
Reducing mailing list and adding our Supply Chain and Delops colleagues.
I am really surprised with below issue faced in UAE.
I am even more surprised when I heard that this issue was faced with our
colleagues in Qatar and no action was taken internally in the company to solve
this issue and avoid it for other projects.
We need to understand the root cause of below issue and tackle it once for all in
order not to face it again on any other projects in the future.
Dear Supply Chain and Delops folks,
Issue Description:
For Etisalat UAE, we have ordered more than 3000 units of 3G U900 MCRRH that was
translated into below part number (RMXA09 - 3BK28706CB) in our engineering
catalogue.
Sales Doc. Material Item Description items2
1011213289 FP_MF02_MAT_ALC510 MCRRH for U900 (*) Bill
1011213289 3BK28706CB 515 RMXA09 - MC-RRH 2PAx40-09 log
![Page 45: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/45.jpg)
According to our local technical team and our technical support colleagues, the
above shipped RMXA09 came only with 2G software from factory whereas we have
ordered it as a 3G U900.
In order to work in 3G (U900), our support is saying that we now need to visit
each site and upgrade locally a 3G firmware for each RMXA09 that needs to be
converted to 3G.
I will let you imagine the huge workload and hassle we will have to face now
on-site in order to upgrade all shipped RMXA09 (more than 3000 units!!!) in order
to get the 3G U900 mode!!!!
I urge you to take immediate action to avoid this issue in the future.
The cost of this on-site retrofit will need to be assessed and bared by WCDMA PU
or SC as a cost of non quality.
Best Regards,
CYRIL DAOU, PMP
SENIOR PROJECT MANAGER
CUSTOMER DELIVERY META
M: +971 562 683 546 (UAE)
M: +33 6 87 66 14 82 (France)
www.alcatel-lucent.com
From: LU Wei I [mailto:[email protected]]
Sent: Friday, February 13, 2015 1:04 PM
![Page 46: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/46.jpg)
To: WEBER, Hubert (Hubert); HUA, JIANNAN (JIANNAN); DAS, Sunil (Sunil)** CTR **;
DAOU, CYRIL (CYRIL); CHEN, Eric (Eric)
Cc: COPOS, BOGDAN (BOGDAN); MORVAN, FREDERIC (FREDERIC); KHEDR, MAHMOUD (MAHMOUD);
HELMI, OSAMA (OSAMA); MAGED, FADY (FADY); METWALLY, AMR (AMR); JACKYRA, GREGORY
(GREGORY); BIALOBRODA, ROLAND (ROLAND); MERAD, ABDESSAMAD (ABDESSAMAD); OKASHA,
TAHER (TAHER); TURCU, ADRIAN (ADRIAN); LARRETA, RAQUEL (RAQUEL); SEBIRE, SYLVIA
(SYLVIA); SIDANER, ERWAN (ERWAN); URVOY, Alexandre (Alexandre); IBRAHIM, MAHMOUD
(MAHMOUD); HEENS, MATTHIEU (MATTHIEU); Yin, Xiuzhe (Rona); THOTA, Praveen-K
(Praveen-K)** CTR **
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Involve Weber Hubert and PCT leader Hua Jiannan.
@ Hubert
In attached mail of last time, you list several actions to resolve the RRH900
original SW problem.
All inputs from R&D were available at that time, and these actions expected to
done by 14w38.
Could you confirm the status of these actions?
BRs
![Page 47: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/47.jpg)
LuWei
From: THOTA, Praveen-K (Praveen-K)** CTR **
Sent: vendredi 13 février 2015 09:07
To: LU, Wei I (Wei); WEBER, Hubert (Hubert); HUA, JIANNAN (JIANNAN); DAS, Sunil
(Sunil)** CTR **; DAOU, CYRIL (CYRIL); CHEN, Eric (Eric)
Cc: COPOS, BOGDAN (BOGDAN); MORVAN, FREDERIC (FREDERIC); KHEDR, MAHMOUD (MAHMOUD);
HELMI, OSAMA (OSAMA); MAGED, FADY (FADY); METWALLY, AMR (AMR); JACKYRA, GREGORY
(GREGORY); BIALOBRODA, ROLAND (ROLAND); MERAD, ABDESSAMAD (ABDESSAMAD); OKASHA,
TAHER (TAHER); TURCU, ADRIAN (ADRIAN); LARRETA, RAQUEL (RAQUEL); SEBIRE, SYLVIA
(SYLVIA); SIDANER, ERWAN (ERWAN); URVOY, Alexandre (Alexandre); IBRAHIM, MAHMOUD
(MAHMOUD); HEENS, MATTHIEU (MATTHIEU); Yin, Xiuzhe (Rona); INDIA-WCDMA-CdTSC-TEAM
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
++ India L2 team.
Thanks and Regards,
Praveen Thota
+91 96899 18050
From: MERAD, ABDESSAMAD (ABDESSAMAD)
Sent: Friday, February 13, 2015 4:01 PM
To: THOTA, Praveen-K (Praveen-K)** CTR **; LU, Wei I (Wei); WEBER, Hubert
![Page 48: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/48.jpg)
(Hubert); HUA, JIANNAN (JIANNAN); DAS, Sunil (Sunil)** CTR **; DAOU, CYRIL
(CYRIL); CHEN, Eric (Eric)
Cc: COPOS, BOGDAN (BOGDAN); MORVAN, FREDERIC (FREDERIC); KHEDR, MAHMOUD (MAHMOUD);
HELMI, OSAMA (OSAMA); MAGED, FADY (FADY); METWALLY, AMR (AMR); JACKYRA, GREGORY
(GREGORY); BIALOBRODA, ROLAND (ROLAND); OKASHA, TAHER (TAHER); TURCU, ADRIAN
(ADRIAN); LARRETA, RAQUEL (RAQUEL); SEBIRE, SYLVIA (SYLVIA); SIDANER, ERWAN
(ERWAN); URVOY, Alexandre (Alexandre); IBRAHIM, MAHMOUD (MAHMOUD); HEENS, MATTHIEU
(MATTHIEU); Yin, Xiuzhe (Rona); INDIA-WCDMA-CdTSC-TEAM
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Dear all,
To update:
- We received the MC-RRH file
- Local team is on the way to the site and should arrive shortly
- We will let you know the results asap
thanks
Best Regards
Abdessamad MERAD
Wireless 3G Technical Project Manager
RBC / EMEA
![Page 49: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/49.jpg)
FR : +33(0)646486904
From: ARORA, Gaurav (Gaurav)** CTR **
Sent: vendredi 13 février 2015 13:06
To: MERAD, ABDESSAMAD (ABDESSAMAD); THOTA, Praveen-K (Praveen-K)** CTR **; LU, Wei
I (Wei); WEBER, Hubert (Hubert); HUA, JIANNAN (JIANNAN); DAS, Sunil (Sunil)** CTR
**; DAOU, CYRIL (CYRIL); CHEN, Eric (Eric)
Cc: COPOS, BOGDAN (BOGDAN); MORVAN, FREDERIC (FREDERIC); KHEDR, MAHMOUD (MAHMOUD);
HELMI, OSAMA (OSAMA); MAGED, FADY (FADY); METWALLY, AMR (AMR); JACKYRA, GREGORY
(GREGORY); BIALOBRODA, ROLAND (ROLAND); OKASHA, TAHER (TAHER); TURCU, ADRIAN
(ADRIAN); LARRETA, RAQUEL (RAQUEL); SEBIRE, SYLVIA (SYLVIA); SIDANER, ERWAN
(ERWAN); URVOY, Alexandre (Alexandre); IBRAHIM, MAHMOUD (MAHMOUD); HEENS, MATTHIEU
(MATTHIEU); Yin, Xiuzhe (Rona); INDIA-WCDMA-CdTSC-TEAM
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Hi Abdessamad,
As per your message on call invitation , you have mentioned that the problem has
been resolved with the new software.
Thanks and regards
Gaurav Arora
![Page 50: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/50.jpg)
+91 9503055691
From: MERAD, ABDESSAMAD (ABDESSAMAD)
Sent: Friday, February 13, 2015 5:39 PM
To: ARORA, Gaurav (Gaurav)** CTR **; THOTA, Praveen-K (Praveen-K)** CTR **; LU,
Wei I (Wei); WEBER, Hubert (Hubert); HUA, JIANNAN (JIANNAN); DAS, Sunil (Sunil)**
CTR **; DAOU, CYRIL (CYRIL); CHEN, Eric (Eric)
Cc: COPOS, BOGDAN (BOGDAN); MORVAN, FREDERIC (FREDERIC); KHEDR, MAHMOUD (MAHMOUD);
HELMI, OSAMA (OSAMA); MAGED, FADY (FADY); METWALLY, AMR (AMR); JACKYRA, GREGORY
(GREGORY); BIALOBRODA, ROLAND (ROLAND); OKASHA, TAHER (TAHER); TURCU, ADRIAN
(ADRIAN); LARRETA, RAQUEL (RAQUEL); SEBIRE, SYLVIA (SYLVIA); SIDANER, ERWAN
(ERWAN); URVOY, Alexandre (Alexandre); IBRAHIM, MAHMOUD (MAHMOUD); HEENS, MATTHIEU
(MATTHIEU); Yin, Xiuzhe (Rona); INDIA-WCDMA-CdTSC-TEAM
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Hi Sunil,
Correct, the MC-RRH is reachable and problem solved. Now the team is performing
the integration of the site.
I will call for a separate meeting for a global review of the case (the feature we
are implementing is wo. 2G dependency so this should not happen and we should not
![Page 51: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/51.jpg)
need 2G Sumx / my view)
Thanks a lot for your support
Best Regards
Abdessamad MERAD
Wireless 3G Technical Project Manager
RBC / EMEA
FR : +33(0)646486904
From: DAS, Sunil (Sunil)** CTR **
Sent: vendredi 13 février 2015 13:13
To: MERAD, ABDESSAMAD (ABDESSAMAD); ARORA, Gaurav (Gaurav)** CTR **; THOTA,
Praveen-K (Praveen-K)** CTR **; LU, Wei I (Wei); WEBER, Hubert (Hubert); HUA,
JIANNAN (JIANNAN); DAOU, CYRIL (CYRIL); CHEN, Eric (Eric)
Cc: COPOS, BOGDAN (BOGDAN); MORVAN, FREDERIC (FREDERIC); KHEDR, MAHMOUD (MAHMOUD);
HELMI, OSAMA (OSAMA); MAGED, FADY (FADY); METWALLY, AMR (AMR); JACKYRA, GREGORY
(GREGORY); BIALOBRODA, ROLAND (ROLAND); OKASHA, TAHER (TAHER); TURCU, ADRIAN
(ADRIAN); LARRETA, RAQUEL (RAQUEL); SEBIRE, SYLVIA (SYLVIA); SIDANER, ERWAN
(ERWAN); URVOY, Alexandre (Alexandre); IBRAHIM, MAHMOUD (MAHMOUD); HEENS, MATTHIEU
(MATTHIEU); Yin, Xiuzhe (Rona); INDIA-WCDMA-CdTSC-TEAM
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
![Page 52: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/52.jpg)
integration for first U900
Yes, you don't need sumx board however, you need to upgrade all MC-RRH before
integration.
Regards,
Sunil
From: MERAD ABDESSAMAD
Sent: 2015?2?15? 18:50
To: DAS SUNIL; ARORA Gaurav; THOTA PRAVEEN-K; LU Wei I; Weber Hubert; HUA Jiannan
Cc: OKASHA TAHER; KHEDR MAHMOUD; IBRAHIM ABD EL NABY KARIM
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Hello Sunil/all,
Good news from field, we tested also the commissioning using Sumx as first step
(to unlock 3G) and it works
Can you please support to answer below field team request:
Can we have simple technical MOP procedure for this action ? to be taken on the
sites that already on air for 2G & for those new sites that are still not
integrated in order to share this document with the SC teams.
"Dears,
![Page 53: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/53.jpg)
Good news.
Regarding SUMX19" connection to U900 MCRRH900 it worked at site 2309.
Commissioner connected the MCRRH to the SUMX & configured the MCRRH to work
for 3G U900 then connected back to Nodeb it is appearing normally with 3G Nodeb
individually.
Dear support team,
Can we have simple technical MOP procedure for this action ? to be taken on the
sites that already on air for 2G & for those new sites that are still not
integrated in order to share this document with the SC teams.
"
thanks
Best Regards
Abdessamad MERAD
Wireless 3G Technical Project Manager
RBC / EMEA
FR : +33(0)646486904
From: LU Wei I [mailto:[email protected]]
Sent: Montag, 16. Februar 2015 03:15
To: MERAD, ABDESSAMAD (ABDESSAMAD); DAS, Sunil (Sunil)** CTR **; ARORA, Gaurav
![Page 54: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/54.jpg)
(Gaurav)** CTR **; THOTA, Praveen-K (Praveen-K)** CTR **; WEBER, Hubert (Hubert);
HUA, JIANNAN (JIANNAN)
Cc: OKASHA, TAHER (TAHER); KHEDR, MAHMOUD (MAHMOUD); IBRAHIM ABD EL NABY, Karim
(Karim)** CTR **; CHEN, Eric (Eric)
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Hi, all
The key point for MCRRH to work in 3G only mode is the original SW version (should
be xxc0).
SUMX has the ability to update MCRRH original SW in case the 2G BTS package
include the correct one.
So maybe for some MCRRH which are running in 2G world now, they already have the
correct version.
Suppose your commission step with SUMX as below
1) Connect MCRRH to SUMX
2) configured the MCRRH to work for 3G U900 (how do you configure this? It's not
needed from R&D's view)
3) Disconnect from SUMX and connect MCRRH to BBU
The inner action to make MCRRH workable in 3G should be "SUMX update MCRRH
original SW to xxc0".
And this update should happen after MCRRH operational in SUMX side.
![Page 55: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/55.jpg)
The problem is if the 2G side BTS load doesn't include correct MCRRH original SW,
it won't work.
In summary, if MCRRH's original SW is not xxc0, below two choice are both OK:
- use laptop to update via DEBUG port
- use SUMX with correct BTS load to update then disconnect
After that, you'd better use swShow to confirm MCRRH load version.
BRs
LuWei
From: WEBER, Hubert (Hubert)
Sent: Monday, February 16, 2015 1:58 PM
To: LU, Wei I (Wei); MERAD, ABDESSAMAD (ABDESSAMAD); DAS, Sunil (Sunil)** CTR **;
ARORA, Gaurav (Gaurav)** CTR **; THOTA, Praveen-K (Praveen-K)** CTR **; HUA,
JIANNAN (JIANNAN)
Cc: OKASHA, TAHER (TAHER); KHEDR, MAHMOUD (MAHMOUD); IBRAHIM ABD EL NABY, Karim
(Karim)** CTR **; CHEN, Eric (Eric); BOUCHARD, HENRI-JEAN (HENRI-JEAN); DAO DUY,
PHILIPPE (PHILIPPE)
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
All,
the problem with the MC-RRH 900 origin SW is widely known.
![Page 56: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/56.jpg)
Commissioning of MC-RRH900 is documented in IEH523 - Section 301.
The procedure how to check MC-RRH900 origin SW and update it is documented in
IEH523 - Section 302.
Please see attached link to fetch IEH523 from docushare: http://docushare.web.alcatel-lucent.com/dsweb/View/Collection-1014646
Beste Gruesse / Best regards / Cordialement
Hubert Weber, PMP
ALCATEL-LUCENT DEUTSCHLAND AG
Thurn & Taxis Str.10
90411 Nürnberg
Telefon: (+49) 911 526 5363
Mobil: (+49) 171 3038349
From: THOTA, Praveen-K (Praveen-K)** CTR **
Sent: Friday, February 20, 2015 4:38 PM
To: WEBER, Hubert (Hubert); LU, Wei I (Wei); MERAD, ABDESSAMAD (ABDESSAMAD); DAS,
Sunil (Sunil)** CTR **; ARORA, Gaurav (Gaurav)** CTR **; HUA, JIANNAN (JIANNAN)
Cc: OKASHA, TAHER (TAHER); KHEDR, MAHMOUD (MAHMOUD); IBRAHIM ABD EL NABY, Karim
(Karim)** CTR **; CHEN, Eric (Eric); BOUCHARD, HENRI-JEAN (HENRI-JEAN); DAO DUY,
PHILIPPE (PHILIPPE)
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
![Page 57: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/57.jpg)
integration for first U900
Hi Karim,
Kindly, if there is no other queries about the reported AR, we would like to close
this AR. Thanks to confirm the same.
Thanks and Regards,
Praveen Thota
+91 96899 18050
From: IBRAHIM ABD EL NABY, Karim (Karim)** CTR **
Sent: Sunday, February 22, 2015 1:39 PM
To: THOTA, Praveen-K (Praveen-K)** CTR **; WEBER, Hubert (Hubert); LU, Wei I
(Wei); MERAD, ABDESSAMAD (ABDESSAMAD); DAS, Sunil (Sunil)** CTR **; ARORA, Gaurav
(Gaurav)** CTR **; HUA, JIANNAN (JIANNAN)
Cc: OKASHA, TAHER (TAHER); KHEDR, MAHMOUD (MAHMOUD); CHEN, Eric (Eric); BOUCHARD,
HENRI-JEAN (HENRI-JEAN); DAO DUY, PHILIPPE (PHILIPPE)
Subject: RE: URGENT // RE: AR 1-5581126//Etisalat UAE/MC-RRH not reachable after
integration for first U900
Hello Praveen,
You can close the AR, thanks,
Thanks,
![Page 58: AR88](https://reader035.fdocuments.in/reader035/viewer/2022062221/563db7dc550346aa9a8ea538/html5/thumbnails/58.jpg)
--
BR,
Karim
M: +971 (0)56-354-4568
Time Tracking Entry Added - IR01-TSA1
Resolution
Karim,
You can download directly to you PC.
Server: ftp.lucent.com
Login: nodeb
Password: nodeb22
Path: /MCRRH900/origSW_xxc0
It was confirmed by local team that RRH was reachanble and integrated with latest
3G original software.
End of Assistance Request 1-5581126
New AR: View AR | AR without Proprietary | OLCS
History | States | Assignment | Timetracking
AR Text Search | More | CARES Home