AR - University of Melbourne · library studio hall workspace workspace workspace workspace...

of 1 /1
LIBRARY STUDIO HALL WORKSPACE WORKSPACE WORKSPACE WORKSPACE WORKSPACE AIRLOCK MACHINE WORKSHOP WORKSPACE AMENITIES AMENITIES AMENITIES AMENITIES Masson Road Building Redmond Barry LARGE LECTURE THEATRE LIBRARY B138 B117 B202 G29 G24 G23 SPACE WORKSHOP BENCH 135 132 124 233 221 219 344 329 WORKSPACE 334 437 423 425 WORKSPACE 429 STAIR 3 (EXTERNAL) ENTRY FOYER UFAD / MECH. PLENUM 02 4311 218 RL 65.500 500 900 1000 500 500 3 5 ° 950 450 133 000C R07 PLANT PLANT PLANT R06 R05 500 900 1000 500 500 3 5 ° 950 450 A B C D E F G H 9000 3000 8250 7250 3000 9000 7500 CCC 3502 BBB 3501 AAA 3500 L01 +48.50m L02 +52.50m L03 +56.50m L04 +60.50m L05 +64.50m G01 +43.40m G01 +42.65 G01 +41.30m B01 +38.50m B01 +37.20m B01 +36.00m B02 +34.68m B02 - SSL +34.56m PARAPET +65.50m FCL +63.40m 1000 1100 2900 1100 2900 FCL +59.40m 1100 2900 FCL +55.40m 1100 2900 FCL +51.40m B01 +37.50m B01 +38.00m 980 4450 4000 4000 4000 4000 5100 4900 1300 2520 PARAPET +68.95m PARAPET +69.93m 2242 Project No. Drawing No. FILENAME - $FILE$ Date Drwn Co-Ord Chck Revision Title AND DRAWINGS COPYRIGHT OF THIS DRAWING IS VESTED IN WARDLE DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACT, SPECIFICATIONS BY THE CONSULTANT. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED. THIS SHALL NOT COMMENCE PRIOR TO THE RETURN OF UNAMENDED SHOP DRAWINGS SIGNED ALL SHOP DRAWINGS SHALL BE SUBMITTED TO THE SUPERINTENDENT AND MANUFACTURE CONTRACTORS SHALL VERIFY JOB DIMENSIONS BEFORE ANY JOB COMMENCES. Rev Amd Date Revision Description Issue Scale THIS DRAWING IS AN UNCONTROLLED COPY UNLESS STAMPED OTHERWISE +1 617 442 6232 Facsimile +1 888 442 1417 Email Telephone 1920 Washington Street No.2 Boston Massachusetts 02118 USA [email protected] NADAAA 0913 AR Project Client Parkville Campus University of Melbourne Building and Planning Faculty of Architecture Tel : +61 3 8662 0400 www.johnwardlearchitects.com ABN 83 006 814 268 © 2012 John Wardle Architects 25 Rokeby Street, Collingwood, Victoria 3066 Australia FOR CONSTRUCTION General Notes REFER ARCHITECTURAL DRAWINGS: AR6550-AR6554 SCREEN DETAILS AR1552-AR1557 SCREEN SETOUT AR1512-AR1517 PRECAST SETOUT AR1502-AR1507 FACADE SETOUT - - - 3505 A 1:100 @ A0 1:200 @ A2 GENERAL ARRANGEMENT SECTION F Sept 2011 SG - 07.10.11 PRELIMINARY DD 01 SG - PRELIMINARY DD 02 02.11.11 SG - DESIGN DEVELOPMENT ISSUE 22.12.11 03 SG - 20.01.12 DD UPDATE 04 SG - 24.02.12 FINAL DD ISSUE 05 06 SG - 25% CD ISSUE 20.04.12 06 6102 05 6102 03 6114 01 6204 02 6106 03 6204 02 6114 01 6114 05 6114 04 6114 SG - 01.06.12 50% CD ISSUE 07 SIM. SG - 08 08.06.12 50% CD ISSUE - UPDATE 09 SG - 75% CD ISSUE 13.07.12 10 SG 90% CD ISSUE - 10.08.12 09 3554 SG - 07.09.12 100% CD - TENDER ISSUE 11 02 6204 SIM. 06 6104 05 6104 SG - 21.03.13 PRECAST REVIEW 12 SG 13 VALUE MANAGEMENT ISSUE 28.03.13 SG A ISSUED FOR CONSTRUCTION 10.01.14

Embed Size (px)

Transcript of AR - University of Melbourne · library studio hall workspace workspace workspace workspace...

  • LIBRARY

    STUDIO HALL

    WORKSPACEWORKSPACE

    WORKSPACE

    WORKSPACE WORKSPACE

    AIRLOCK

    MACHINE WORKSHOP

    WORKSPACE

    AMENITIES

    AMENITIES

    AMENITIES

    AMENITIES

    Masson Road

    BuildingRedmond Barry

    LARGE LECTURE THEATRE LIBRARY

    B138B117B202

    G29G24 G23

    SPACEWORKSHOP BENCH

    135

    132

    124

    233

    221 219

    344

    329

    WORKSPACE

    334

    437

    423

    425WORKSPACE

    429

    STAIR 3

    (EXTERNAL)ENTRY

    FOYER

    UFAD / MECH. PLENUM

    02

    4311

    218

    RL 65.500

    500

    900

    1000

    500

    500

    35°

    950

    450

    133

    000CR07

    PLANTPLANTPLANTR06R05

    500

    900

    1000

    500

    500

    35°

    950

    450

    A B C D E F G H9000300082507250300090007500

    CCC

    3502

    BBB

    3501

    AAA

    3500

    L01 +48.50m

    L02 +52.50m

    L03 +56.50m

    L04 +60.50m

    L05 +64.50m

    G01 +43.40m

    G01 +42.65

    G01 +41.30m

    B01 +38.50m

    B01 +37.20m

    B01 +36.00m

    B02 +34.68m

    B02 - SSL +34.56m

    PARAPET +65.50m

    FCL +63.40m

    1000

    1100

    2900

    1100

    2900

    FCL +59.40m

    1100

    2900

    FCL +55.40m

    1100

    2900

    FCL +51.40m

    B01 +37.50m

    B01 +38.00m

    980

    4450

    4000

    4000

    4000

    4000

    5100

    4900

    1300

    2520

    PARAPET +68.95m

    PARAPET +69.93m

    2242

    Project No.

    Drawing No.

    FILENAME - $FILE$

    Date Drwn Co-Ord Chck

    Revision

    Title

    AND DRAWINGS COPYRIGHT OF THIS DRAWING IS VESTED IN WARDLE

    DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACT, SPECIFICATIONS

    BY THE CONSULTANT. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED. THIS

    SHALL NOT COMMENCE PRIOR TO THE RETURN OF UNAMENDED SHOP DRAWINGS SIGNED

    ALL SHOP DRAWINGS SHALL BE SUBMITTED TO THE SUPERINTENDENT AND MANUFACTURE

    CONTRACTORS SHALL VERIFY JOB DIMENSIONS BEFORE ANY JOB COMMENCES.

    Rev Amd DateRevision DescriptionIssue

    Scale

    THIS DRAWING IS AN UNCONTROLLED COPY UNLESS STAMPED OTHERWISE

    +1 617 442 6232

    Facsimile

    +1 888 442 1417

    Email

    Telephone

    1920 Washington

    Street No.2

    Boston

    Massachusetts

    02118 USA [email protected]

    NADAAA

    0913

    AR

    Project

    Client

    Parkville Campus

    University of Melbourne

    Building and Planning

    Faculty of Architecture

    Tel : +61 3 8662 0400 www.johnwardlearchitects.com

    ABN 83 006 814 268© 2012 John Wardle Architects

    25 Rokeby Street, Collingwood, Victoria 3066 Australia

    FOR CONSTRUCTION

    General Notes

    REFER ARCHITECTURAL DRAWINGS:

    AR6550-AR6554SCREEN DETAILS

    AR1552-AR1557SCREEN SETOUT

    AR1512-AR1517PRECAST SETOUT

    AR1502-AR1507FACADE SETOUT

    - - -

    3505 A

    1:100 @ A0

    1:200 @ A2

    GENERAL ARRANGEMENT

    SECTION F

    Sept 2011

    SG - 07.10.11PRELIMINARY DD01

    SG -PRELIMINARY DD02 02.11.11

    SG -DESIGN DEVELOPMENT ISSUE 22.12.1103

    SG - 20.01.12DD UPDATE04

    SG - 24.02.12FINAL DD ISSUE05

    06 SG -25% CD ISSUE 20.04.12

    06

    6102

    05

    6102

    03

    6114

    01

    6204

    02

    6106

    03

    6204

    02

    6114

    01

    6114

    05

    6114

    04

    6114

    SG - 01.06.1250% CD ISSUE07

    SIM.

    SG -08 08.06.1250% CD ISSUE - UPDATE

    09 SG -75% CD ISSUE 13.07.12

    10 SG 90% CD ISSUE - 10.08.12

    09

    3554

    SG - 07.09.12100% CD - TENDER ISSUE11

    02

    6204

    SIM.

    06

    6104

    05

    6104

    SG - 21.03.13PRECAST REVIEW12

    SG13 VALUE MANAGEMENT ISSUE 28.03.13

    SGA ISSUED FOR CONSTRUCTION 10.01.14