AR - University of Melbourne · library studio hall workspace workspace workspace workspace...

1
LIBRARY STUDIO HALL WORKSPACE WORKSPACE WORKSPACE WORKSPACE WORKSPACE AIRLOCK MACHINE WORKSHOP WORKSPACE AMENITIES AMENITIES AMENITIES AMENITIES Masson Road Building Redmond Barry LARGE LECTURE THEATRE LIBRARY B138 B117 B202 G29 G24 G23 SPACE WORKSHOP BENCH 135 132 124 233 221 219 344 329 WORKSPACE 334 437 423 425 WORKSPACE 429 STAIR 3 (EXTERNAL) ENTRY FOYER UFAD / MECH. PLENUM 02 4311 218 RL 65.500 500 900 1000 500 500 3 5 ° 950 450 133 000C R07 PLANT PLANT PLANT R06 R05 500 900 1000 500 500 3 5 ° 950 450 A B C D E F G H 9000 3000 8250 7250 3000 9000 7500 CCC 3502 BBB 3501 AAA 3500 L01 +48.50m L02 +52.50m L03 +56.50m L04 +60.50m L05 +64.50m G01 +43.40m G01 +42.65 G01 +41.30m B01 +38.50m B01 +37.20m B01 +36.00m B02 +34.68m B02 - SSL +34.56m PARAPET +65.50m FCL +63.40m 1000 1100 2900 1100 2900 FCL +59.40m 1100 2900 FCL +55.40m 1100 2900 FCL +51.40m B01 +37.50m B01 +38.00m 980 4450 4000 4000 4000 4000 5100 4900 1300 2520 PARAPET +68.95m PARAPET +69.93m 2242 Project No. Drawing No. FILENAME - $FILE$ Date Drwn Co-Ord Chck Revision Title AND DRAWINGS COPYRIGHT OF THIS DRAWING IS VESTED IN WARDLE DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACT, SPECIFICATIONS BY THE CONSULTANT. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED. THIS SHALL NOT COMMENCE PRIOR TO THE RETURN OF UNAMENDED SHOP DRAWINGS SIGNED ALL SHOP DRAWINGS SHALL BE SUBMITTED TO THE SUPERINTENDENT AND MANUFACTURE CONTRACTORS SHALL VERIFY JOB DIMENSIONS BEFORE ANY JOB COMMENCES. Rev Amd Date Revision Description Issue Scale THIS DRAWING IS AN UNCONTROLLED COPY UNLESS STAMPED OTHERWISE +1 617 442 6232 Facsimile +1 888 442 1417 Email Telephone 1920 Washington Street No.2 Boston Massachusetts 02118 USA [email protected] NADAAA 0913 AR Project Client Parkville Campus University of Melbourne Building and Planning Faculty of Architecture Tel : +61 3 8662 0400 www.johnwardlearchitects.com ABN 83 006 814 268 © 2012 John Wardle Architects 25 Rokeby Street, Collingwood, Victoria 3066 Australia FOR CONSTRUCTION General Notes REFER ARCHITECTURAL DRAWINGS: AR6550-AR6554 SCREEN DETAILS AR1552-AR1557 SCREEN SETOUT AR1512-AR1517 PRECAST SETOUT AR1502-AR1507 FACADE SETOUT - - - 3505 A 1:100 @ A0 1:200 @ A2 GENERAL ARRANGEMENT SECTION F Sept 2011 SG - 07.10.11 PRELIMINARY DD 01 SG - PRELIMINARY DD 02 02.11.11 SG - DESIGN DEVELOPMENT ISSUE 22.12.11 03 SG - 20.01.12 DD UPDATE 04 SG - 24.02.12 FINAL DD ISSUE 05 06 SG - 25% CD ISSUE 20.04.12 06 6102 05 6102 03 6114 01 6204 02 6106 03 6204 02 6114 01 6114 05 6114 04 6114 SG - 01.06.12 50% CD ISSUE 07 SIM. SG - 08 08.06.12 50% CD ISSUE - UPDATE 09 SG - 75% CD ISSUE 13.07.12 10 SG 90% CD ISSUE - 10.08.12 09 3554 SG - 07.09.12 100% CD - TENDER ISSUE 11 02 6204 SIM. 06 6104 05 6104 SG - 21.03.13 PRECAST REVIEW 12 SG 13 VALUE MANAGEMENT ISSUE 28.03.13 SG A ISSUED FOR CONSTRUCTION 10.01.14

Transcript of AR - University of Melbourne · library studio hall workspace workspace workspace workspace...

Page 1: AR - University of Melbourne · library studio hall workspace workspace workspace workspace workspace airlock machine workshop workspace amenities amenities amenities amenities masson

LIBRARY

STUDIO HALL

WORKSPACEWORKSPACE

WORKSPACE

WORKSPACE WORKSPACE

AIRLOCK

MACHINE WORKSHOP

WORKSPACE

AMENITIES

AMENITIES

AMENITIES

AMENITIES

Masson Road

BuildingRedmond Barry

LARGE LECTURE THEATRE LIBRARY

B138B117B202

G29G24 G23

SPACEWORKSHOP BENCH

135

132

124

233

221 219

344

329

WORKSPACE

334

437

423

425WORKSPACE

429

STAIR 3

(EXTERNAL)ENTRY

FOYER

UFAD / MECH. PLENUM

02

4311

218

RL 65.500

500

900

1000

500

500

35°

950

450

133

000CR07

PLANTPLANTPLANTR06R05

500

900

1000

500

500

35°

950

450

A B C D E F G H9000300082507250300090007500

CCC

3502

BBB

3501

AAA

3500

L01 +48.50m

L02 +52.50m

L03 +56.50m

L04 +60.50m

L05 +64.50m

G01 +43.40m

G01 +42.65

G01 +41.30m

B01 +38.50m

B01 +37.20m

B01 +36.00m

B02 +34.68m

B02 - SSL +34.56m

PARAPET +65.50m

FCL +63.40m

1000

1100

2900

1100

2900

FCL +59.40m

1100

2900

FCL +55.40m

1100

2900

FCL +51.40m

B01 +37.50m

B01 +38.00m

980

4450

4000

4000

4000

4000

5100

4900

1300

2520

PARAPET +68.95m

PARAPET +69.93m

2242

Project No.

Drawing No.

FILENAME - $FILE$

Date Drwn Co-Ord Chck

Revision

Title

AND DRAWINGS COPYRIGHT OF THIS DRAWING IS VESTED IN WARDLE

DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACT, SPECIFICATIONS

BY THE CONSULTANT. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED. THIS

SHALL NOT COMMENCE PRIOR TO THE RETURN OF UNAMENDED SHOP DRAWINGS SIGNED

ALL SHOP DRAWINGS SHALL BE SUBMITTED TO THE SUPERINTENDENT AND MANUFACTURE

CONTRACTORS SHALL VERIFY JOB DIMENSIONS BEFORE ANY JOB COMMENCES.

Rev Amd DateRevision DescriptionIssue

Scale

THIS DRAWING IS AN UNCONTROLLED COPY UNLESS STAMPED OTHERWISE

+1 617 442 6232

Facsimile

+1 888 442 1417

Email

Telephone

1920 Washington

Street No.2

Boston

Massachusetts

02118 USA [email protected]

NADAAA

0913

AR

Project

Client

Parkville Campus

University of Melbourne

Building and Planning

Faculty of Architecture

Tel : +61 3 8662 0400 www.johnwardlearchitects.com

ABN 83 006 814 268© 2012 John Wardle Architects

25 Rokeby Street, Collingwood, Victoria 3066 Australia

FOR CONSTRUCTION

General Notes

REFER ARCHITECTURAL DRAWINGS:

AR6550-AR6554SCREEN DETAILS

AR1552-AR1557SCREEN SETOUT

AR1512-AR1517PRECAST SETOUT

AR1502-AR1507FACADE SETOUT

- - -

3505 A

1:100 @ A0

1:200 @ A2

GENERAL ARRANGEMENT

SECTION F

Sept 2011

SG - 07.10.11PRELIMINARY DD01

SG -PRELIMINARY DD02 02.11.11

SG -DESIGN DEVELOPMENT ISSUE 22.12.1103

SG - 20.01.12DD UPDATE04

SG - 24.02.12FINAL DD ISSUE05

06 SG -25% CD ISSUE 20.04.12

06

6102

05

6102

03

6114

01

6204

02

6106

03

6204

02

6114

01

6114

05

6114

04

6114

SG - 01.06.1250% CD ISSUE07

SIM.

SG -08 08.06.1250% CD ISSUE - UPDATE

09 SG -75% CD ISSUE 13.07.12

10 SG 90% CD ISSUE - 10.08.12

09

3554

SG - 07.09.12100% CD - TENDER ISSUE11

02

6204

SIM.

06

6104

05

6104

SG - 21.03.13PRECAST REVIEW12

SG13 VALUE MANAGEMENT ISSUE 28.03.13

SGA ISSUED FOR CONSTRUCTION 10.01.14