Aquired structure prep

19
STRUCTURE FIRE CONTROL INSTRUCTOR1 ACQUIRED ACQUIRED STRUCTURE STRUCTURE PREPARATION PREPARATION

Transcript of Aquired structure prep

Page 1: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR1

ACQUIRED ACQUIRED STRUCTURE STRUCTURE

PREPARATIONPREPARATION

Page 2: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTORSTRUCTURE FIRE CONTROL INSTRUCTOR 22

TERMINAL PERFORMANCE TERMINAL PERFORMANCE OBJECTIVEOBJECTIVE

The student, working as a member of a The student, working as a member of a team, shall conduct a pre-fire survey of team, shall conduct a pre-fire survey of a structure and prepare it for use in live a structure and prepare it for use in live

fire training evolutions, so that the fire training evolutions, so that the structure is rendered safe for use.structure is rendered safe for use.

Page 3: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR3

ENABLING OBJECTIVESENABLING OBJECTIVES

Identify and describe all permits required for Identify and describe all permits required for use in training in an acquired structure.use in training in an acquired structure.

Describe and demonstrate pre-burn planning Describe and demonstrate pre-burn planning procedures for an acquired structure.procedures for an acquired structure.

Describe and demonstrate proper procedures Describe and demonstrate proper procedures for making an acquired structure and the for making an acquired structure and the surrounding area safe for training.surrounding area safe for training.

Page 4: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR4

PERMITS & NOTIFICATIONSPERMITS & NOTIFICATIONS

Written documentation from owner:Written documentation from owner:Permission to burn structurePermission to burn structureClear titleClear titleCertificate of insurance cancellationCertificate of insurance cancellationAcknowledgement of post-burn property Acknowledgement of post-burn property

conditioncondition Local burn permitLocal burn permit Permission to use fire hydrantsPermission to use fire hydrants

Page 5: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR5

PERMITS & NOTIFICATIONSPERMITS & NOTIFICATIONS

DispatchersDispatchers Law Enforcement AgenciesLaw Enforcement Agencies NeighborsNeighbors EPDEPD

Page 6: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTORSTRUCTURE FIRE CONTROL INSTRUCTOR 66

LIABILITY INSURANCELIABILITY INSURANCE

Your department may want Your department may want to obtain liability insurance to obtain liability insurance

to cover damage to other to cover damage to other property. property.

Page 7: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR7

PRE-BURN PRE-BURN PLANNINGPLANNING

Page 8: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR8

PRE-BURN PLANPRE-BURN PLANSite plan drawingSite plan drawing

Building planBuilding plan

Floor planFloor plan

CP locationCP location

Apparatus positionsApparatus positions

Hose line positionsHose line positions

Emergency escape routesEmergency escape routes

Emergency evacuation assembly areaEmergency evacuation assembly area

Ingress/egress routes for emergency vehiclesIngress/egress routes for emergency vehicles

Page 9: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR9

PRE-BURN PLANNINGPRE-BURN PLANNING

Determine water supply Determine water supply requirementsrequirementsObtain apparatusObtain apparatusEstablish separate water Establish separate water sourcessourcesObtain weather reportsObtain weather reportsDesignate & mark Designate & mark parking areasparking areasEstablish operations area Establish operations area & mark perimeter& mark perimeterEstablish Establish communicationscommunications

Page 10: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR10

RENDERING SITE SAFERENDERING SITE SAFE

Inspect building for Inspect building for structural integritystructural integrityEnsure utilities Ensure utilities disconnecteddisconnectedRemove wall, ceiling Remove wall, ceiling & floor coverings& floor coveringsPatch holes in walls Patch holes in walls & ceilings& ceilingsRemove exceptional Remove exceptional weight from aboveweight from above

Page 11: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR11

RENDERING SITE SAFERENDERING SITE SAFE

Pre-cut ventilation Pre-cut ventilation openingsopenings

Remove windows & Remove windows & cover openingscover openings

Ensure doors Ensure doors function or removefunction or remove

Check/operate Check/operate building componentsbuilding components

Make stairways safeMake stairways safe

Page 12: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR12

RENDERING SITE SAFERENDERING SITE SAFE

Check chimney Check chimney stabilitystability

Remove fuel tanksRemove fuel tanks

Remove unnecessary Remove unnecessary debrisdebris

Make porches/steps Make porches/steps safesafe

Fence off ground Fence off ground openingsopenings

Page 13: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR13

RENDERING SITE SAFERENDERING SITE SAFE

Cover holes in walls/ceilings Cover holes in walls/ceilings

Check Cabinets for unsafe contentsCheck Cabinets for unsafe contents

Page 14: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR14

RENDERING SITE SAFERENDERING SITE SAFE

Clearly mark all burn roomsClearly mark all burn rooms

Clearly mark all sides of buildingClearly mark all sides of building

Page 15: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR15

RENDERING SITE SAFERENDERING SITE SAFE

Clearly mark all exitsClearly mark all exits

Page 16: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR16

RENDERING SITE SAFERENDERING SITE SAFE

Cover windows and doors so that rapid Cover windows and doors so that rapid egress can still be achievedegress can still be achieved

Page 17: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR17

RENDERING SITE SAFERENDERING SITE SAFE

Eliminate toxic weed, Eliminate toxic weed, hives & verminhives & vermin

Remove hazardous Remove hazardous vegetationvegetation

Protect exposuresProtect exposures

Prepare fire setsPrepare fire sets

Page 18: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR18

ENABLING OBJECTIVE REVIEWENABLING OBJECTIVE REVIEW

We have identified and describes all permits We have identified and describes all permits required for use in training in an acquired required for use in training in an acquired structure.structure.

We have described and demonstrated pre-burn We have described and demonstrated pre-burn planning procedures for an acquired structure.planning procedures for an acquired structure.

We have described and demonstrated proper We have described and demonstrated proper procedures for making an acquired structure procedures for making an acquired structure and the surrounding area safe for training.and the surrounding area safe for training.

Page 19: Aquired structure prep

STRUCTURE FIRE CONTROL INSTRUCTOR19

END OF SECTION END OF SECTION

ONON ACQUIRED ACQUIRED

STRUCTURE STRUCTURE PREPARATIONPREPARATION