Aquatic Decommissioning presentation for Acteon event - 20 May 2015 (VP)

19
Recovery and disposal management of umbilical’s and flexibles Pushing forward in reverse

Transcript of Aquatic Decommissioning presentation for Acteon event - 20 May 2015 (VP)

Recovery and disposal management of umbilical’s and flexibles

Pushing forward in reverse

Industry’s preferred partner for handling flexible products

• Globally renowned for laying and retrieving flexible and semi‐rigid products• Unparalleled track record in:

• Shallow and deepwater operations• Off and onshore installations• Transpooling• Recovery and decommissioning projects

Modular drive systems    |    Tensioners    |    Carousel    |    Installation reels

More than equipment suppliers…

• Engineered solutions • Deck layouts and packing drawings• Structural checks• Compliance to regulations • Offshore procedures

• Operation management• Offshore personnel• Equipment preparation• Logistics• Interface management• Supplier integration• Disposal management of scrap product

…with 40 years of offshore experience, our peoplemake the difference

Traditional flexible pipe installation

Innovative flexible pipe recovery

The End

Any Questions?

Our project experience in Decommissioning

Anasuria Project

Case Study: North Sea Anasuria project

Decommissioning project for a major Operator including recovery, cutting and disposal of a dynamic umbilical .

Phase 1

• Detailed engineering

• Offshore recovery procedures

• Disposal management planning

Phase 2

• Supply of personnel and equipment

• Offshore recovery of a 6” umbilical

• Transport reel + product to WallsendDisposal Site

Phase 3

• NORM testing

• Flushing and nitrogen purging

• Off‐spooling of used product

• Cutting product

• Waste management control

• Recycling product

Phase 2 Offshore Campaign: Dynamic control umbilical

Length 955 ft

OD 6.5“ 

Material Polyurethane coating w/ armour wire sheath

Static MBR 6.4 ft

Dynamic MBR 8.1 ft

Nominal Weight in Air 40.2 lb/ft

End Terminations Static UTA

Phase 2 Offshore Campaign: Deck layout

400te Power Reel Drive with Tracks

15te Tensioner

Lay Ramp

8.5m Reel

Lay ramp 400te reel drive system with tracks

15te tensioner

8.5m Installation reel

Phase 2 Offshore Campaign: Full spread of equipment

Phase 3 Onshore Campaign: Contamination and testing

• NORM testing conducted prior to offloading

• A 33 foot umbilical section was collected behind the bend stiffener for product testing

Phase 3 Onshore Campaign: Planning

Reel + Product 15te Tensioner150te PRDCutting area with fluid containment

Phase 3 Onshore Campaign: Execution

15te tensioner Cutting area with fluid containment kit

Reel

Phase 3 Onshore Campaign: Flushing and purging

• Injection of potable water and gaseous nitrogen displacing umbilical fluid into waste tanks

6” Umbilical Contents 

Lines 1 to 5  Castrol Brayco SV/3

Lines 6 & 7 Mi‐SWACO Methanol

Line 8 Scale Inhibitor 

Lines 9 & 10  Corrosion Inhibitor 

E1 & E2 Power Cores

E3 & E4 Signal Cores

Phase 3 Onshore Campaign: Cutting and disposal

• Significant safety precautions to ensure no personnel injury or environmental pollution

• Plastic sheeting is applied at cut ends to capture any remain fluids

Results and Value Proposition

• Executed both the offshore and onshore campaigns safely for our people and the environment

• Developed capability to offer turnkey solution for disposal with an integrated supply chain 

• Capable of managing multiple interfaces on behalf of the customer

• Received licensing to perform disposal at Peterhead site for future projects.

Case Study: Recovery of bundled systems

• 9 different bundled line types• Limited deck space• Full contamination control

500te RDS w/ tracks

200te RDS

50Te Tensioner

Control Umbilical

6” ProdRiser

2” ID GasLift Riser

200te RDS

Level Winder

Handling Area

• It’s 40 years of accumulated expertise and working together to achieve smarter solutions

• It’s taking safety seriously and never cutting corners• It’s a commitment to being the best and a passion for quality• It’s maintaining a progressive outlook and answering future needs before they 

arise• It’s rapidly delivering dependable solutions and getting the job done, whatever it 

takes.