Transcript of APTA Manual for the Development of Urban Rail System Safety Program Plans Rail Safety Committee Mid...
APTA Manual for the Development of Urban Rail
System Safety Program PlansRail Safety Committee Mid Year Meeting December
2011Linda Meadow [email protected]
Urban Rail DefinitionLight Rail
Commuter Rail
Subway
Trolley
High Speed Rail
Maglev
Funicular
Existing SSPP ManualPublished in June, 2001
23 Elements, including Security
Summary of New Urban Rail Manual
Removed all References to Security
Format based on APTA Manual for Commuter Rail SSPP(May-15-2006)
Based on Continuous Improvement Concepts
Quantifiable Objectives
Accountability
22 Elements grouped into 4 categories
More detailed than existing SSPP Manual
Includes Interface with Risk Management and Quality Control
Summary of New Urban Rail Manual
4 Safety CategoriesSafety Management and Administrative
RequirementsSafety Program ImplementationSafety Engineering Techniques and AnalysisSafety Assurance
Safety Management and Administration
Planning Phase of System Safety Program Plan: Elements 1-7Policy StatementPurpose and ScopeGoals Identifiable and Attainable ObjectivesSystem Description/Organizational StructurePlan Control and UpdateSafety Contract Requirements
Safety Contract Requirements
Element 7Services
Facilities, Equipment and Materials
Construction Management
Safety Program Implementation
Goals and Objectives are implemented through Policies and Procedures: Elements 8-16Facilities Maintenance and InspectionVehicle Maintenance, Inspection and RepairRules and Procedures ReviewTraining and CertificationEmergency Planning and ResponseWorkplace Safety ProgramPassenger and Public SafetyRail Corridor Operational StudyEnvironmental Management Programs
Workplace Safety ProgramsElement 13
Safety Culture
Employee Safety Programs
Contractor Safety Coordination
Fitness for DutyDrug and AlcoholFatigueMedical Monitoring
Passenger and Public Safety Programs
Element 14Passenger Operational Environment
Safe Walking Paths through Parking LotsSlip and Fall PotentialPlatform CrowdingPlatform GapTrain Door Control ProceduresProper Escalator Use
Public Safety ProgramsPublic Outreach
Rail Corridor Operational Study
Element 15Highway-Rail Grade Crossings
Trespassing and Intrusion
Joint Freight Operations
Guideway Evacuation
Environmental Management ProgramsElement 16
Hazardous Materials Management
Hazardous Waste Management
Waste Minimization and Pollution Prevention
Environmental Outreach
Safety Engineering Techniques and Analysis
Identification, Measurement and Control of System Risk: Elements 17-20Hazard Management ProcessAccident/Incident Reporting and InvestigationSafety Data Acquisition and AnalysisLoss Prevention and Control
Fire Safety AnalysisCasualty Management Review
Safety AssuranceMargin of Safety is Maintained over System Life:
Elements 21-22System Change Management Internal Safety Management
System Change ManagementElement 21
Configuration ManagementStandards/Design ControlSystem Modification-New Processes/EquipmentQuality Assurance/Quality Control InterfaceSafety CertificationDocument Control
Internal Safety ManagementElement 22
Internal Audit Process
Advantages of Urban Rail SSPP Manual
Grouping of elements into safety categories makes SSPP easier to implement and fosters accountability
New format facilitates internal and external safety audits
Interfaces with risk management and quality control are discussed
Safety tasks are more defined – i.e. rail corridor operational studies, public outreach programs