APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning Phoenix, Arizona December 16, 2010
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    218
  • download

    1

Transcript of APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS...

Page 1: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

APS/SRP Stakeholder MeetingFor Transmission Planning

FERC Order 890 OATT Attachment K

(APS Attachment E)

APS Transmission PlanningSRP Transmission PlanningPhoenix, ArizonaDecember 16, 2010

Page 2: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

1. Welcome, Introductions, and Meeting Overview2. Status of Action Items-6/24/10 Joint APS/SRP 4th Quarter Public Planning Meeting 3. SRP Planning

a. SRP Planning Calendar & Methodologyb. Proposed SRP Ten-Year Plan c. SRP Transmission Projects for Renewable Generationd. Interconnection Requests and Transmission Service Requestse. Requests Received for Economic Planning Studiesf. Stakeholders invited to submit requests for additional transmission studiesg. Comments/Questions

4. APS Planninga. APS Planning Calendar & Methodologyb. APS Ten-Year Plan and Renewable Transmission Projects Draftc. 2010 Study Assumptionsd. Interconnection Requests and Transmission Service Requestse. Requests received for Economic Planning Studiesf. Stakeholders invited to submit requests for additional transmission studiesg. Comments/Questions

5. Current Activities Update6. Stakeholder Questions/Comments7. Action Items

2

Agenda

2December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 3: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

3

Welcome

Introductions

Meeting Overview

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 4: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

4

2. Status of Action Items APS/SRP will try to find a way to provide Joint

Participant information in some other way than being part of queues. Ownership information, unless otherwise made public such

as though a public filing, belongs to each individual owners: SRP has no right or duty to post such data on the SRP OASIS.

Request APS and SRP to explore the possibility of coordinating Stakeholder meetings with Resource meetings. Ongoing

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 5: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

5

3.a. SRP Planning Calendar & Methodology

WECC/TEPPC/WestConnect Planning Calendar

SRP Planning CalendarPlanning Process/Methodology

5December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 6: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

6

2010 Synchronized Study Plan

J an Feb Mar Apr May J un J ul Aug Sep Oct Nov Dec

WestConnectStudy results

TEPPCResults including

Economics studies

SWAT Study results

WECCTEPPC

Economic Studies Submittal

Deadlinefor 2010

10yr Planning studies Filing

w/ACC

BTA study results

Even # years

Base Cases Preparation For

10yr Plan 10yr Plan Study results

Study Work

10yr plansSubregional SWAT groupsWestconnect GroupWECC PCCWECC-TEPPC

J an

WECC PCC / WECC - TEPPC / WESTCONNECT

Deadline for submitting request for 2011

Economic Studies WECC / TEPPC

WECC / TEPPCEconomic Studies

Submittal Deadlinefor 2011

WECC/PCC Annual Study Program

Completed

2nd Qtr Stakeholder

Meeting

4th Qtr Stakeholder

Meeting

WestConnect Plan Approved

SWAT Study Plans

Approved

66December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 7: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

7

Jan.

Feb.

Mar.

Apr.

May

Jun.

Jul.

Aug.

Sep.

Oct.

Nov.

Dec.

10yr Plan – Filed with ACC by Jan. 31 10yr. Plans filed by others

SRP Corporate Load Forecast

Stakeholder Input

SRP Corporate Load Forecast – Post Summer

Sep. 1 – Network Transmission Customers and all other Transmission Customers Load &

Resource Forecast

10yr. Plan – New load forecast sensitivity

WestConnect Coordinated base case

development

Develop 10yr base cases from AZ seed cases

10yr. Plan study effort – Determination of projects, timings, and scope

4th Quarter Stakeholder Meeting – Review draft of current 10yr plan, discussion Economic Study

requests, receive stakeholder input

Planning Calendar for Ten-Year Planning CycleSRP Transmission Planning – 10 Yr

Plan

Arizona Utilities coordinated seed case development – from WestConnect cases

2nd Quarter Stakeholder Meeting – Stakeholder input on studies, request study alternatives,

updates on current projects

Other Subregional Coordination

Activities Throughout the Year

· APS/SRP Coordination Meeting

· SRP/WAPA Coordination Meeting

· WestConnect Meetings· SWAT Meetingso CATS-EHVo CATS-HVo CRTo AZ/NMo SATSo Renewableso Short-circuit Working

Group

Oct. 31 – Deadline to submit Economic Study Requests for 4th Quarter Meeting review

7December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 8: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

8

What Type of Study?1

Does Transmission Provider’s system

meetNERC/WECC

criteria?

No

Does Transmission Provider’s system meet local reliability criteria?

Yes

Transmission Provider determines facilities

needed with Stakeholder input

No

Transmission Provider coordinates with Sub-

Regional Planning Group

Yes

Economic Reliability

Transmission Provider

Evaluation

Regional

TEPPC evaluates with Stakeholder

input

Transmission Provider Economic

Study

Customer Choice of Study at Customer’s

expense

Local2

TEPPC determines high priority, performs

study

High priority

Not high priority

TEPPC determines not

high priority

Study results documented in a report and reviewed

by Customer and Transmission Provider

Transmission Provider determines facilities

needed with Stakeholder input

1. Generator Interconnection Request studies are performed pursuant to the Large Generator Interconnection Procedure contained in the Transmission Provider’s Open Access Transmission Tariff (OATT). Transmission Service Requests are also performed pursuant to OATT procedures.

2. All requests for economic planning studies received by the Transmission Provider are forwarded to TEPPC for inclusion in the TEPPC Master List. TEPPC will evaluate only those requests that have regional impacts.

Transmission Planning Process

Exhibit 1 – SRP Attachment K

8December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 9: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

9

3.a SRP Planning - Calendar & MethodologyAssumptions and MethodologyTypes of Studies PerformedProposed 2011–2020 Ten Year Plan

9December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 10: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

10

3.a 2011-2020 Study Assumptions/Methodology Coordinated Base Cases (Seed Cases)

NERC Compliance Studies 2013 – APS/SRP 2013 coordinated case 2017 – APS/SRP 2017 coordinated case

BTA Studies 2020 – WECC 2020 HS coordinated case

69kV transmission models incorporated Most up-to-date forecasts for peak summer

loads10December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 11: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

11

NERC Compliance Studies Cases 2013 & 2017 Summer Peak & Off-peak Cases 2013 & 2017 Off-peak Cases are Low Load (winter

conditions) and High Import (shoulder cases with low generation in the Phoenix Metro Area).

Following analysis are conducted: Thermal analysis Post-Transient Transient Stability

3.a 2011-2020 Study Assumptions/Methodology

11December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 12: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

Planning MethodologyNERC STANDARD Type of Studies Completed

TPL-001 (N-0) Thermal Transient Stability Post-transient

2013 Peak X

2013 Low Load X

2013 High Import X

2017 Peak X

2017 Low Load X

2017 High Import X

2017 All-in X

TPL-002 (N-1) Thermal Transient Stability Post-transient

2013 Peak X X X

2013 Low Load X X X

2013 High Import X X X

2017 Peak X X X

2017 Low Load X X X

2017 High Import X X X

12December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 13: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

Planning MethodologyNERC STANDARD Type of Studies Completed

TPL-003 (N-2) Thermal Transient Stability Post-transient

2013 Bus outages X X X

2013 Contingency of towers X X X

2013 Stuck breaker X X X

2013 Common Corridor X X X

2013 N-1-1 X X X

2017 Bus outages X X X

2017 Contingency of towers X X X

2017 Stuck breaker X X X

2017 Common Corridor X X X

2017 N-1-1 X X X

TPL-004 (N-X) Thermal Transient Stability Post-transient

2013 Substations with generation X X

2013 Common Corridor/Substation without generation

X X

13December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Note: TPL-003 studies were performed on Peak, Low Load & High Import cases

Page 14: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

14

3.bSRP Ten Year Plan Projects

2011-2020

Draft

14December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 15: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

FUTURE LINES

EXISTING LINES

FUTURE 500kV SUBSTATION

EXISTING 500kV SUBSTATIONSALT RIVER PROJECT

500kV SYSTEM

NEVADA

WESTWING

KYRENE

SILVERKING

CORONADO

CHOLLA(APS)

MEAD

McCULLOUGH

MARKETPLACE

BROWNING

HASSAYAMPARUDDPALO VERDE

PINAL WESTABEL2020

2011

2014

JOJOBA

SAGUARO

(TBD, place holder for CATS only,

no current SRP plans)

SANTA ROSA2014

2014

TBD

TBD

MORGAN(APS)

Sun Valley (APS)2014

NAVAJO GS

2014

2016

SUGARLOAF (APS)

MOENKOPI

YAVAPAI

PINNACLE PEAK (APS)

RS20TBD

PINAL CENTRAL2014

2014

NORTH GILA (APS)

2014

TBD

TBD

2021

2021

15

2014

TORTOLITA(TEP)

CentralNew Mexico

SUNZIA (SPG)

2015

DUGAS(APS)

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

DELANY 2013

Page 16: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

16

2011: Browning-Pinal Central 500kV (it will be

energized as Randolph-Browning 230kV until 2014)

2013: Palo Verde-Delany 500kV2014: Delany-Sun Valley 500kV Hassayampa-N.Gila 500kV line Pinal West-Pinal Central 500kV Pinal Central 500/230kV substation2016: Sun Valley-Morgan 500kV2021: Pinal Central-Abel #2 500kV

SALT RIVER PROJECT500kV SYSTEM

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 17: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

SALT RIVER PROJECTEASTERN 230kV SYSTEM

GOLDFIELDTHUNDERSTONE

SANTAN

TBDBALL/RS17

TBDTBD

TBD

BROWNING

RS21

TBD

2011ABEL/RS22

TBD

DINOSAUR

RS23TBD

RS20LOOP IN

TBDTBD

TBD

TBD

TBD

PFISTER/RS24

2019

TBDROGERS

DESERT BASIN

PINAL CENTRAL2014

2014

TO SILVERKING

PINNACLE PEAK

To CORBELL

To SCHRADER

CATSHV03TBD

EXISTING 230kV SUBSTATIONS

FUTURE 230kV CIRCUIT

EXISTING 230kV CIRCUIT

FUTURE 230kV SUBSTATIONS

GENERATING STATION

DOUBLE CIRCUIT, PHASE TIED LINE

2014

2019

2019

RANDOLPH SWITCHYARD

2011

TO SILVERKING

2019

2019

17December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

BRANDOWTBD

TBD

2014

Page 18: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

18

2011: Dinosaur-Abel-Randolph 230kV 2014: Desert Basin-Pinal Central 230kV line Pinal Central - Randolph 230kV line2019: Pfister(RS24) 230/69kV substation Abel-Pfister(RS24)-Schrader 230kV Abel-Pfister(RS24)-Santan 230kV

SALT RIVER PROJECTEASTERN 230kV SYSTEM

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 19: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

BRANDOW

WARD

CORBELL

ALEXANDER

WESTWING

KYRENEANDERSON

WHITETANKS

ORME

SRPPINNACLE PEAK

PAPAGO

LIBERTY(W.A.P.A.)

AGUAFRIA

DEERVALLEY

(APS)

ROGERS

TO APSOCOTILLO

TO APSPINNACLE PEAK

TO W.A.P.A.PINNACLE PEAK

W.A.P.A.

W.A.P.A.

W.A.P.A.

KNOX

SCHRADER

RUDD

TBDTBD

TBD RS26TBD

TBD

SALT RIVER PROJECTWESTERN 230kV SYSTEM

TBD

BALL/RS17

SANTAN

THUNDERSTONE

To BROWNING

To PFISTER/RS24

EXISTING 230kV SUBSTATIONS

FUTURE 230kV CIRCUIT

EXISTING 230kV CIRCUIT

FUTURE 230kV SUBSTATIONS

GENERATING STATION

DOUBLE CIRCUIT, PHASE TIED LINE

To GOLDFIELD

19December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

RS25TBD

Page 20: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

GENERATING STATION

EXISTING LINE

FUTURE LINE

115kV

MIAMI

PINAL

SUPERIOR

SPURLOCK

MOONSHINE

ELLISON

FRAZIER

ROOSEVELT

TBD

TBD

RAYMORRIS

KEARNY

NEW HAYDEN

EXISTING SUBSTATION

HAYDEN

STEWARTMOUNTAIN

MORMONFLAT

HORSEMESA

GOLDFIELD230kV

OAKFLAT

PINTOVALLEY

KNOLL

TO APACHE(AEPCO)

TOTHUNDERSTONE

COOLIDGE(W.A.P.A.)

TOSILVER KING

500kVSILVERKING230

ASARC0

TBD

TBD(230kV)

SEE DETAIL

DETAIL

SUPERIOR230KV

SUPERIOR115KV

FUTURE SUBSTATION

SALT RIVER PROJECTEASTERN MINING

AREA SYSTEM

CARREL

BONNEYBROOK(APS)

230kVTBD

RS20

TBD(230kV)

TBD(230kV)

TRASK

CARLOTTA

20December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 21: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

Electric System Additions/Upgrades

Equipment Year

Abel 1st 230/69kV transformer 2011

Kyrene 3rd 500/230kV transformer 2012

Rudd 1st 230/69kV transformer 2013

Pinal Central 1st & 2nd 500/230kV transformers 2014

Schrader 3rd 230/69kV transformer 2015

Pfister (RS-24) 1st 230/69kV transformer 2019

21December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 22: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

SRP Changes from 2010 to 2011

500kV Projects 2015 SunZia Project

Delayed from 2013/2014 2021 Pinal Central – Abel #2

Delayed from 2020

230kV Projects 2019 Pfister(RS24) 230kV Transmission Project

Delayed from 2018/2019 TBD RS26 230kV Project

Delayed from 2014

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting 22

Page 23: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

23

Pinal West – Pinal Central 500kV line Pinal Central – Tortolita 500kV line Palo Verde – Delany 500kV line

3.c. SRP Planning – Transmission Projects for Renewable Generation

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 24: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

24December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 25: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

25

Generation Interconnection Requests Transmission Interconnection Requests Transmission Service Requests Economic Study Requests

SRP Planning - Study Requests

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 26: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

26

Generation Interconnection Requests listed at the next slide are for SRP solely owned transmission.

The generation interconnecting in SRP’s queue is:

4 Natural Gas Projects 2011 MW

3 Wind Projects 1200 MW

10 Solar Projects 245 MW

3.d. SRP Planning – Study Requests

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 27: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

27

4 Natural Gas projects - 2516 MW2 Wind projects - 900 MW

The joint interconnection requests are listed on SRP OASIS website @ http://www.oatioasis.com/SRP/index.html

December 16, 2010 APS & SRP 4th Quarter Stakeholder MeetingThe joint interconnection requests are listed on SRP OASIS website @ http://www.oatioasis.com/SRP/index.html

Page 28: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

28

Currently there are no Transmission Interconnection Requests under study

3.d. SRP Planning - Study Requests

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 29: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

29

Currently there are no Transmission Service Requests under study

3.d. SRP Planning - Study Requests

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 30: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

30

Currently there are no Economic Study Requests

3.e. SRP Planning - Study Requests

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 31: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

31

SRP invites Stakeholders to submit request for additional transmission studies

3.f. Stakeholders Requests

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 32: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

32

3.g. SRP Planning – Comments & Questions

Stakeholder comments/questions on 2010 Study Results or 2011 Study Requests

Requests can be made at any time to:[email protected]

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 33: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

APS & SRP 4th Quarter Stakeholder Meeting 33

4.a. APS Planning Calendar & Methodology

WECC/TEPPC/WestConnect Planning Calendar

APS Planning CalendarPlanning Process/Methodology

33December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 34: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

34

2010 Synchronized Study Plan

J an Feb Mar Apr May J un J ul Aug Sep Oct Nov Dec

WestConnectStudy results

TEPPCResults including

Economics studies

SWAT Study results

WECCTEPPC

Economic Studies Submittal

Deadlinefor 2010

10yr Planning studies Filing

w/ACC

BTA study results

Even # years

Base Cases Preparation For

10yr Plan 10yr Plan Study results

Study Work

10yr plansSubregional SWAT groupsWestconnect GroupWECC PCCWECC-TEPPC

J an

WECC PCC / WECC - TEPPC / WESTCONNECT

Deadline for submitting request for 2011

Economic Studies WECC / TEPPC

WECC / TEPPCEconomic Studies

Submittal Deadlinefor 2011

WECC/PCC Annual Study Program

Completed

2nd Qtr Stakeholder

Meeting

4th Qtr Stakeholder

Meeting

WestConnect Plan Approved

SWAT Study Plans

Approved

3434December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 35: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

35

Jan.

Feb.

Mar.

Apr.

May

Jun.

Jul.

Aug.

Sep.

Oct.

Nov.

Dec.

10yr Plan – Filed with ACC by Jan. 31 10yr. Plans filed by others

APS Corporate Load Forecast

Stakeholder Input

APS Corporate Load Forecast – Post Summer

Sep. 1 – Network Transmission Customers and all other Transmission Customers Load &

Resource Forecast

10yr. Plan – New load forecast sensitivity

WestConnect Coordinated base case

development

Develop 10yr base cases from AZ seed cases

10yr. Plan study effort – Determination of projects, timings, and scope

4th Quarter Stakeholder Meeting – Review draft of current 10yr plan, discussion Economic Study

requests, receive stakeholder input

Planning Calendar for Ten-Year Planning CycleAPS Transmission Planning – 10 Yr

Plan

Arizona Utilities coordinated seed case development – from WestConnect cases

2nd Quarter Stakeholder Meeting – Stakeholder input on studies, request study alternatives,

updates on current projects

Other Subregional Coordination

Activities Throughout the Year

· APS/SRP Coordination Meeting

· APS/WAPA Coordination Meeting

· WestConnect Meetings· SWAT Meetingso CATS-EHVo CATS-HVo CRTo AZ/NMo SATSo Renewableso Short-circuit Working

Group

Oct. 31 – Deadline to submit Economic Study Requests for 4th Quarter Meeting review

35December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 36: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

36

What Type of Study?1

Does Transmission Provider’s system

meetNERC/WECC

criteria?

No

Does Transmission Provider’s system meet local reliability criteria?

Yes

Transmission Provider determines facilities

needed with Stakeholder input

No

Transmission Provider coordinates with Sub-

Regional Planning Group

Yes

Economic Reliability

Transmission Provider

Evaluation

Regional

TEPPC evaluates with Stakeholder

input

Transmission Provider Economic

Study

Customer Choice of Study at Customer’s

expense

Local2

TEPPC determines high priority, performs

study

High priority

Not high priority

TEPPC determines not

high priority

Study results documented in a report and reviewed

by Customer and Transmission Provider

Transmission Provider determines facilities

needed with Stakeholder input

1. Generator Interconnection Request studies are performed pursuant to the Large Generator Interconnection Procedure contained in the Transmission Provider’s Open Access Transmission Tariff (OATT). Transmission Service Requests are also performed pursuant to OATT procedures.

2. All requests for economic planning studies received by the Transmission Provider are forwarded to TEPPC for inclusion in the TEPPC Master List. TEPPC will evaluate only those requests that have regional impacts.

Transmission Planning Process

Exhibit 1 – APS Attachment E

36December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 37: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

37

4.b. APS Ten Year Plan Projects 2011-2020

Draft-Plans not finalized until mid/end of

January

37December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 38: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

38

2010: Morgan 500/230kV substation (In-

Service) Morgan-Pinnacle Peak 500kV &

230kV lines (In-Service)2012: Youngs Canyon 345/69kV

substation2013: Delany-Palo Verde 500kV line2014: Delany-Sun Valley 500kV line Hassayampa-N.Gila 500kV line D. Basin-Pinal Central 230kV line Pinal Central-Sundance 230kV line Mazatzal 345/69kV substation Bagdad 115kV relocation2015: TS12 230/69kV substation2016: Sun Valley-Morgan 500kV line

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 39: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

3939December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 40: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

4040December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

2010: Morgan-Raceway

230kV (in-service)2010-2011: Raceway-Pinnacle

Peak 230kV (in-service)

2013: Scatter Wash

230/69kV substation

2014: Sun Valley-Trilby

Wash 230kV2015: Trilby Wash-Palm

Valley 230kV

Page 41: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

414141December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 42: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

424242December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

2014: Palo Verde Hub-North Gila

500kV #2 line North Gila-TS8 230kV line

Page 43: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

Project Name Previous in-service date

New in-service date

Scatter Wash 230/69kV substation 2012 2013

Mazatzal 345/69kV substation 2013 2014

TS12 230/69kV substation 2012 2015

Delany-Palo Verde 500kV line 2012 2013

* It should be noted that in-service dates shown in this table are based on load projects, not potential interconnections. New generation interconnections may accelerate the in-service date.

43

Project Timing Changes-Preliminary 2010 to 2011 changes

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 44: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

44

1) Palo Verde to Delany 500kV

2) Palo Verde to North Gila 500kV

3A) Palo Verde to Valley Load (Liberty)

3B) Gila Bend to Valley Load (Liberty)

4) Delany to Blythe 500kV

4.b. APS Planning – Transmission Projects for Renewable Generation

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 45: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

45December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 46: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

46

4.c. 2010/2011 Study Assumptions

Coordinated Base Cases (Seed Cases)2012 - SATS 2012 case2015 - WECC 2015HS2020 - 2020 WestConnect case

69kV transmission models incorporatedMost up-to-date forecasts for peak

summer loads

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 47: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

47

Summer Peak casesTPL-001 & TPL-002

Thermal analysis (All 10 years)Post-Transient (All 10 years)Transient Stability (2013 & 2019)

TPL-003 & TPL-004 (2013 & 2019) Maximum Load Serving Capability for Phx & Yuma

(All 10 years)TPL-001 & TPL-002 Thermal and Post Transient

Low Load case (2014)Thermal, Transient Stability, & Post TransientTPL-001 thru TPL-004

4.c. 2010 NERC/WECC Reliability Studies

4747December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 48: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

484848

2010 NERC/WECC Studies

48December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

APS TPL Planning Methodology: Summer

NERC STANDARD STUDIES COMPLETED 

TPL -001(n-0) Thermal Transient Stability Post Transient

2013 SIL X    

2013 PEAK X    

2019 SIL X    

2019 PEAK X     

TPL-002 (n-1)      

2013 SIL (Lines, xfmrs, gens) X   X

2013 PEAK (Lines, xfmrs, gens) X X X

2013 MLSC (Lines, xfmrs, gens) X   X

2019 SIL (Lines, xfmrs, gens) X   X

2019 PEAK (Lines, xfmrs, gens) X X X

2019 MLSC (Lines, xfmrs, gens) X   X 

TPL-003 (n-2)      

2013 Stuck Breaker/Breaker Failure X X X

2013 N-1-1 X X X

2013 Bus Section X X X

2019 Stuck Breaker/Breaker Failure X X X

2019 N-1-1 X X X

2019 Bus Section X X X 

TPL-004 (n-xx)      

2013 Major Substations With/Without Generation X X X

2013 Stuck Breaker/Breaker Failure X X X

2013 Common Corridor X X X

2019 Major Substations With/Without Generation X X X

2019 Stuck Breaker/Breaker Failure X X X

2019 Common Corridor X X X

Page 49: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

494949

2010 NERC/WECC Studies

49December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

APS TPL Planning Methodology: WINTER SEASON - Low load

NERC STANDARD STUDIES COMPLETED 

TPL -001(n-0) Thermal Transient Stability Post Transient

2013 WINTER - Low load X    

 

TPL-002 (n-1)      

2013 TRANSMISSION LINE X X X

2013 XFMR X   X

2013 GENERATION X   X

2013 REACTORS X   X

 

TPL-003 (n-2)      

2013 Stuck Breaker X X X

2013 N-1-1 X X X

 

TPL-004 (n-xx)      

2013 Loss of All Generation Units at a Station

X X X

2013 Common Corridor X X X

Page 50: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

50

Generation Interconnection requestsAPS OASIS contains Generation

Interconnection Queue (as of 12/8/10)http://www.oatioasis.com/azps/index.html69 Solar projects - 7105 MW14 Wind projects - 3463.9MW2 Others (Coal, NG, Biomass, etc.) - 1402 MW

4 Transmission Interconnection RequestsCurrently 3 Transmission Service

Requests waiting to begin studyCurrently no Economic Study Requests

4.d. Interconnection & Study Requests

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 51: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

51

4.e&f. Stakeholder Study Requests

Study requests can be taken at today’s meeting

Study requests can be made at any time to:[email protected]

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 52: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

52

4.g. Comments & Question

Comments??????

Questions!!!!!!!!!!

52December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 53: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

5. Current Activities Updates

NERC Compliance Reliability Standard MOD-029 – Rated System Path Methodology

53December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 54: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

54

6. Stakeholder Questions and Comments

Open discussion

Reference Material WestConnect –

http://www.westconnect.com/documents_results.php?categoryid=85 APS OASIS –

http://www.oatioasis.com/azps/index.html SRP OASIS –

http://www.oatioasis.com/srp/index.html

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting

Page 55: APS/SRP Stakeholder Meeting For Transmission Planning FERC Order 890 OATT Attachment K (APS Attachment E) APS Transmission Planning SRP Transmission Planning.

55

7. Action Items

Review any action items identified for follow up Information addressing action items to be posted

on APS and/or SRP OASIS and WestConnect website

December 16, 2010 APS & SRP 4th Quarter Stakeholder Meeting