Dear Exhibitor, This is your copy of the Exhibitors Manual for the forthcoming Chemspec India 2017 exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed for a successful show. Please complete and return all the order forms to the various addresses mentioned on the respective forms latest by March 15, 2017, as this will ensure a trouble free build up to the exhibition. The manual is designed to ensure that you have a record of the items ordered. We suggest your Stand Manager has a copy of this manual at the show to confirm details should any problems arise. Its retention after the show will enable you to check invoices against the original orders. Remember the manual should be read in conjunction with the official ‘Rules and Regulation’ a copy of which is attached to your booking confirmation. If you have any queries, please do not hesitate to contact us. Yours faithfully, Krunal Goda +91-9004005520 [email protected] APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE, Goregaon (E), Mumbai Maharashtra, INDIA Koelnmesse YA Tradefair Pvt. Ltd., # 1102, 11th Floor, DLH Park, Near MTNL Office, S.V.Road, Goregaon (W), Mumbai-400062, Maharashtra, INDIA Tel : +91-22-28715200; Fax : +91-22-28715222, [email protected]; www.koelnmesse-india.com

Transcript of APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been...

Page 1: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

Dear Exhibitor,

This is your copy of the Exhibitors Manual for the forthcoming Chemspec India 2017 exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed for a successful show.

Please complete and return all the order forms to the various addresses mentioned on the respective forms latest by March 15, 2017, as this will ensure a trouble free build up to the exhibition.

The manual is designed to ensure that you have a record of the items ordered. We suggest your Stand Manager has a copy of this manual at the show to confirm details should any problems arise. Its retention after the show will enable you to check invoices against the original orders.

Remember the manual should be read in conjunction with the official ‘Rules and Regulation’ a copy of which is attached to your booking confirmation.

If you have any queries, please do not hesitate to contact us.

Yours faithfully,

Krunal Goda +91-9004005520 [email protected]

APRIL 25-26, 2017Hall 1, Bombay Exhibition Centre

NSE, Goregaon (E), MumbaiMaharashtra, INDIA

Koelnmesse YA Tradefair Pvt. Ltd.,# 1102, 11th Floor, DLH Park, Near MTNL Office,S.V.Road, Goregaon (W), Mumbai-400062, Maharashtra, INDIATel : +91-22-28715200; Fax : +91-22-28715222,[email protected]; www.koelnmesse-india.com

Page 2: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

2

CONTENTS

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Information Page

number

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Important Contact Details 3-4

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

VISA Application 5

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

General Information 6-13

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Form 1 – Advertisement / Sponsorship Form 16

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Form 2 – Invitation Tickets 17

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Form 3 – Exhibitor Badges 18

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Form 4 – Fascia Board / Shell Scheme 19

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Form 5 – Bare Space Contractor Terms 20

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Form 6 – Furniture 21-22

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Form 7 – Stand Constructioin and Decoratioin 23

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Form 8 – Lighting and Electricals (for Stall) 24

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Form 9 – Power Supply for Machinery / Equipment 25

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Form 10 – Internet 26

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Form 11 – Computers and Audio Visual Equipment 27

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Form 12 – Manpower / Stand Hostesses / Stand Cleaning 28

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Exhibtion Terms & Conditions 29-41

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Page 3: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

3

Dear Exhibitors,

Please note important contact details

ORGANISER:

Martin Clarke Vijay Raghavan Exhibition Executive Director

Mack Brooks Exhibitions Ltd Chemical Weekly Romeland House, 602-B, Godrej Coliseum, Romeland Hill, St Albans K.J. Somaiya Hospital Road, Hertfordshire AL3 4ET, UK. Sion (East), Mumbai - 400 022, INDIA Tel : +44 (0) 1727 814400 Tel : +91-22-2404 4477 Direct: +44 (0) 1727 814468 Fax : +91-22-2404 4450 Fax: +44 (0) 1727 814401 E-mail: [email protected] E-mail: [email protected]

OPERATIONS:

Krunal Goda 09004005520 Koelnmesse YA Tradefair Pvt. Ltd., # 1102, 11th Floor, DLH Park, Near MTNL Office, S.V. Road, Goregaon (W), Mumbai - 400062 Maharashtra, INDIA Tel : +91-22-28715207; Fax : +91-22-28715222, [email protected] www.koelnmesse-india.com

OFFICIAL FREIGHT FORWARDER:

Darayus Palia,DJG Exhibition Freight Services Ltd. R.E. Rogers (INDIA) Pvt. Ltd.,Unit 34, Grace Business Center, Willow Lane, 501/502, Midas, Sahar Plaza Complex,Mitcham, Surrey, UK Mathuradas Vasanji Road, Andheri(E), Mumbai-59, INDIA.Tel: +44 (0) 208 646 4200 Tel : +91-22-28203823 / 24 / 25Fax: +44 (0) 208 646 6090 Fax : +91-22-28208942; Mobile: +91-9821052536E-mail: [email protected] E-mail : [email protected] URL : www.rogersworldwide.com

TRAVEL & ACCOMODATION AGENT:

Ms. Felia CardozoAmbassador Holidays India Pvt. Ltd.14, Embassy Center, Nariman Point, Mumbai - 400021Tel: +91-22-30281805-821; Fax: +91-22-22875846E-mail: [email protected];E-mail: [email protected];E-mail: [email protected]: www.discoveriesindia.com

Page 4: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

4

OFFICIAL STAND CONTRACTOR:

Pavilions & Interiors (I) Pvt. Ltd.S.No.53/6-8; Madanayakanahalli,B/h Swami Service Station, Tumkur Road,Bangalore-562123 INDIATel: +91-80-23715333;Fax: +91-80-23715444E-mail: [email protected];E-mail: [email protected]: www.pavilionsinteriors.comContact: Praveen Balan; Mobile: +91-9845108042

DESIGN COMPANIES:

Art WorksMr. Robert Joseph WBA, Above Vijay Tyre Service,Next to Navgraha Hotel, Amar Mahal,Chembur, Mumbai - 400 089Mobile: +91-9821615898 E-mail: [email protected]

Span Exhibiton DesignMr. Devendu 13-B, Hindustan Kohinoor Industrial ComplexLBS Marg, Vikhroli (West), Mumbai - 400 083Telefax: +91-22-25772478E-mail: [email protected]

INSTA Exhibitions Pvt. Ltd.Ms. Sneha GhosalkarB-602 Pramukh Plaza, Cardinal Gracious Rd,Chakala, Andheri (E), Mumbai-400099Ph: +91-22-26860371, 26861964Tel : +91-22-40649200, Extn.: 224Fax: +91-22-28251836E-mail: [email protected] : www.insta-group.comMobile: +91-9323125764

Page 5: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

5

VISA INVITATION LETTER FOR VISA APPLICATIONCAPITAL LETTERS PLEASE

Company Name: .…………………………………………………………………………………………….......................

Stand No : ……………………………………………..………………………………………………......................

Address : …………………………………………………………………..…………………………......................

………………………………………………………………………………………………......................

Tel : ……………………………… Fax : ……………………………… E-mail : ………………………….....................

Contact : …………………………………………………………………………………………………….........................

––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Application Form for Invitation Letter for Visa purposes

Please complete ALL the details below. An invitation letter will be issued to the requesting person. Please duplicate this form for each person.

Signature ………………………………………. Date…………………………………

PLEASE RETURN FORM TO :

Mr. Tata RaoChemical Weekly

602, B-Wing, Godrej Coliseum, Behind Everard Nagar, K.J. Somaiya Hospital Road, Sion (E), Mumbai - 400 022, INDIA

Tel.: +91-22-2404 4477, Fax: +91-22-2404 4450Email: [email protected]

NAME OF PERSON–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

DATE OF BIRTH–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

PASSPORT NUMBER–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

DATE OF ISSUE–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

PLACE OF ISSUE–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

DATE OF EXPIRY–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

NAME AND ADDRESS OF COMPANYIF DIFFERENT TO ABOVE.

Page 6: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

6

GENERAL INFORMATION

1. VENUE Hall 1, Bombay Exhibition Centre, NSE, NESCO Complex, off. W. E. Higway, Goregaon (E), Mumbai - 400063, Maharashtra, INDIA Tel : +91-22-66450123 Fax : +91-22-66450101 www.nesco.in/bec.html

2. DATE APRIL 25-26, 2017

Please note all the heavy equipment weighing more than 2000 kgs must arrive at the Ground by 08:00 am on Sunday 23rd April, 2017.

Contractor / Construction Move-in Period

Sunday, Apr 23, 2017 08:00 am -10:00 pm Move in of certified heavy / large exhibits. Space only Exhibitors and special design stand contractors. (official freight forwarders only)

Monday, Apr 24, 2017 08:00 am - 08:00 pm Shell Scheme Stand Exhibitors & Contractors

All construction work must be finished by 08:00 pm on Monday April 24, 2017.

Contractors / Exhibitors are required to work within these move-in and work completion deadline periods. If contractors / exhibitors wish to work beyond these hours they should contact the onsite organiser office before 06:00 pm on April 24, 2017. The penalty charges are INR (`) 10,000 / hour (08:00 pm to 12:00 midnight only)

Issue of Badges

Sunday, Apr 23, 2017 08:00 am - 06:00 pm Issuing of Service Badges. All the stand contractors need to take Service Badges for the whole team while taking the possesion of the stall.

Monday, Apr 24, 2017 12:00 noon - 06:00 pm Exhibitor Registration / Issuing of Exhibitor Badges

Exhibition Opening Hours

Day & Date For Exhibitors For Visitors

Tuesday, Apr 25, 2017 09:00 am - 06:30 pm 10:00 am - 06:00 pm

Wednesday, Apr 26, 2017 09:00 am - 05:30 pm 10:00 am - 05:00 pm

Dismantling / Move-out Period

Wednesday, Apr 26, 2017 5:30 pm to 11:59 pm on Move-out all exhibits Wednesday, Apr 26

Page 7: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

7

3. ADMISSION

EXHIBITORS :

Exhibitors may access the exhibition hall one hour before the show starts and half an hour after the show closes, on each day, to service their booths and equipment, during exhibition days.

Approval should be obtained from Organiser for working or entry, other than the prescribed hours.

4. EXHIBITION HALL SPECIFICATION

Hall height available Maximum Height of the hall 6 meters

Floor loading capacity 2 MT/sqm

Prior information has to be given to organiser regarding heavy exhibits. The delivery schedule must be adhered to avoid any delay in build up.

Permissible height for stand construction 4 mt (subject to prior approval from the organiser)

5. EXHIBITOR BADGES

Exhibitor Badges will be provided with both personal and company names printed on them. Please see Form 03 and state exact names to be printed on your badges. These will not be sent out before the show but can be collected from the Registration Desk during build-up.

6. EXHIBITOR REGISTRATION Registration of Exhibitors will start from April 24, 2017 at 12:00 noon at the exhibition venue. All

exhibitors are requested to go to the registration desk and collect their badges before going to their respective stalls. They can also get additional badges if required.

7. EXHIBITION CATALOGUE

The official catalogue is designed both as a guide and as an invaluable reference directory and will be in great demand not only during, but also after the Exhibition. Please complete your company’s profile and editorial on the Exhibitior Services section of the website www.chemspecindia.com

For advertising in the exhibition catalouge, please fill Form-1 and return by March 20, 2017.

8. FIRST AID

In the event of any accidents please contact the Organiser’s Office.

Page 8: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

8

9. FLORAL DECORATIONS

Plants and cut flowers for the decoration of stands can be ordered from the officially appointed contractor who will be available on site on build-up days.

10. ADDITIONAL FURNITURE ORDERS

The official stall contractor will supply additional requirements as mentioned in Form 6 & 7.

11. ELECTRICITY

Supply voltage : Single phase, alternating at 220 V, 50 Hz (+10%). Three phase, neutral alternating at 415 V, 50 Hz (+10%).

Exhibitors must inform the organiser about their power requirements by filling up the relevant form. Please refer Form 8 & 9.

Exhibitors requiring different voltages and frequencies or special connections to equipment must arrange for their own transformers, converters or boosters.

Fluctuations mentioned are only for reference. Exhibitors with SENSITIVE EQUIPMENT should make arrangements for a stabiliser. Organiser cannot guarantee uninterrupted power suply. Any failure in regular power supply during the exhibition or during the installation, due to technical or unforseen reasons, will not qualify for refund of money or any act of omission.

Supply of electricity will be switched off, at source, 30 minutes after the show closes each day. Only specially installed 24 hrs connection will remain on.

Only licensed electrical contractors can carry out work at stands. They should also submit a completion report and file it at the organiser office, after completion of all wiring and connections. Actual connected load for all machines and equipment are to be mentioned. Accessibility for operations and repairs are to be maintained. Main supply point will not be covered. Please use approved equipment and wiring for operational safety. These will be inspected by the electrical engineer appointed by organiser and only after this approval will power be released.

All electrical installation and equipment will comply with the Government of India regulations. Only organiser is authorised to make the electrical mains installation work.

The rates for power consumption are understood for show days and one day prior to opening, including testing. Exhibitors may apply for temporary power load, at an extra cost. Please refer Form 8.

INTERNET :

Internet have to be applied for in advance. Please refer Form 10.

12. EXHIBITOR - STAND CONDITIONS

Exhibitor’s booth must be fully manned during the show time.Exhibitors are not allowed to participate in any other activities,which can cause any problem to visitor/ exhibitor.

All activities of the Exhibitor and his staff must be confined to the booth only. No advertising/ canvassing is allowed elsewhere in the exhibition hall.

Page 9: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

9

13 . WORKING EXHIBITS & DEMONSTRATION

SAFETY FIRST

The following measures must be strictly observed, failing which, the organiser reserves the right to terminate the operation and demonstration of the working exhibits. Please note that this is done to avoid damage or injury, in the interest of safety.

Inform the organiser in writing of any working machinery to be exhibited, with a brief description of its operation and the demonstration intended to be carried out.

Provide safety conditions and standards as per international norms.

Working exhibits to be fully manned.

Sound generated should not disturb or interfere other exhibitors.

If there is any form of effluence from the working of the exhibits, arrangements will have to be made for its disposal. No disposal of fumes and exhaust gases will be permitted inside the hall.

The disposal, drainage of acids, petroleum products, hazardous chemicals, oils, lubricants and any other enviroment polluting substances must be taken care by the respective exhibitor.

Laser, X-ray, and smoke / fire emitting devices will be permitted only after approval from the Organiser and the local fire department. Please inform in advance of any such requirement.

In the event of any dispute between exhibitors, the Organiser reserves the right to arbitrate.

The following items are not allowed in this Exhibition :

a) Internal Combustion Engines f) Welding

b) Radio-active substances g) Inflammable Items

c) Hazardous or poisonous gases h) Explosive items

d) Weapons or fire arms i) Hot air ballons

e) Open flames j) Neon lights

14. LIABILITIES AND INSURANCE

Exhibitors should posses a valid insurance policy covering theft, public liability, damage to property and effects personal injury, and any other such consequential risks with respect of their participation in this exhibition.

15. FIRE PRECAUTION

Exhibitors displaying exhibits, which require chemical / foam extinguishers, must provide such fire fighting equipment in their booth at their own expenses.

All passage must be kept clear. Aisles or back of booths shall not be used as storage space.

Fire exits and access to fire fighting equipments shall be unobstructed.

Page 10: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

10

16. DILAPIDATION :

Exhibitors are responsible for the costs of making good or replacing any damages or dilapidation to the exhibition premises, whether caused by themselves, their agents, contractors or any other persons employed or engaged by them or their agents or contractors, on their behalf.

17. STAND CLEANING :

The Organiser will provide for general cleaning in the exhibition halls, which includes carpet / floor cleaning and refuse disposal, daily after the show closes. Exhibitors with lockable rooms are requested to place the waste paper baskets outside for collection, prior to their departure.

The exhibitor is responsible for cleaning of his own stand, exhibits and displays. Stand cleaning services may be ordered through the relevant forms.

18. PUBLICITY

Any projection of cyber light or similar equipment must be kept within the stall limits. No part of the hall or other booths may be used for the same.

19. AUTHORITY ON THE PREMISES

In the event of any dispute on site, ORGANISER reserves the right to arbitrate. As the organiser, the decision taken by ORGANISER shall be final.

20. ON SITE FREIGHT HANDLING :

Only the officially appointed freight forwarder is permitted to work in the Hall and handle the on site equipment. You may use your forwarder to deliver the goods to the hall doors only. This regulation will be strictly enforced and is necessary for reasons of insurance, security, safety and control and for protection against damage to the exhibition.

In the interest of an efficient, well coordinated move in and move out of goods, no private trucks, fork lifts or handling equipments (trolley, lift jacks etc) will be allowed inside the exhibition halls. All such equipments will be provided and controlled by the freight forwarder.

Facilities for loading / unloading, unpacking / repacking, transportation of goods to booths, cargo handling equipment, skilled labour, removal and storage of empties will be available at the site through the official clearing and freight forwarding agency.

21. DELIVERY / REMOVAL OF EXHIBITS :

No delivery or removal of exhibits or other equipment during the exhibition open hours is permitted. Such delivery, removal, replenishment of stocks may only be carried out before opening hours or after closing hours. Exhibitors have to obtain a EXIT PASS from the Organiser to enable the taking out of any material during or after the show.

Page 11: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

11

If the Exhibitor requires use of a forklift, truck or crane, then a layout, drawn to scale, should be supplied to the forwarder. This is in order to position all equipment, early during build up period, as entry of lifting equipment, after an advanced stage of construction, is difficult.

22. BARE SPACE STALL / ARCHITECHTURAL CONTROLS

Exhibitors taking bare space sites are required to submit the layout plan at least 20 days before the start of the event.

Exhibitors are at liberty to employ a stand contractor of their choice to carry out the construction and erection of their stand.

Exhibitors, their agents or contractors should satisfy themselves on the first morning of construction that the site marked out on the floor confirms to the dimension shown on their plan and booking confirmation.

All assembly work to be carried out on the protective covering only, without damaging the floor. The exhibitor is directly responsible for the same and would need to compensate for any damage. Exhibitors providing their own displays must ensure that these are completely finished including pre-mounting of exhibits before delivery to the exhibition halls.

It is the responsibility of the exhibitors who have booked “space only” sites to supply, erect and decorate free standing single clad partitioning to the periphery of their sites when they adjoin an adjacent stand. The minium height of the partitioning must be 2.5 m of which above 2.5 metres must be of double-sided. No logos to be any closer than 1metre from the back of the stand.

Stands above 2.5 metres in height are required to have written approval from Koelnmesse YA Tradefair Pvt. Ltd. to ensure no violation of safety laws.

23. SHELL SCHEME STAND SPECIFICATION

Shell Scheme Stand construction shall be done by the Official Stand Contractor. Please refer Form 4.

24. STORAGE

There is no provision for the storage of packing materials within the exhibition halls. Exhibitors must make their own arrangements for the removal of all packaging materials, cartons, crates, etc. Exhibitors are not permitted to store packaging materials on, or in the vicinity of any exhibition stand.

25. CANCELLATION TERMS

Because your withdrawl will cost us loss & further costs in reselliing the stand, the organiser is entitled to charge cancellation fees as set out below. These are intended purely to compensate us, and once paid, we will acknowledge that you have no further liabilities to us in connection to this exhibition. Fee required to make total payment up to the following percentage :

25% 10 months before opening show date.

50% 8 months before opening show date.

75% 6 months before opening show date.

100% with in 6 months before opening show date.

Page 12: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

12

The date of cancellation shall be the date when the organiser receives the notice sent by the exhibitor. If the exhibitor fails to turn up for setting up the stall or cancels the participation at the last moment, the organiser shall utilize the stall in any manner they deem fit and the exhibitor forfeits all money paid.

26. DISPUTES

Any dispute will be subject to Mumbai Jurisdiction.

27. LOST PROPERTY

Articles found should be handed to the organisers. The organiser accepts no responsibility for articles lost or damaged in any way.

28. PHOTOGRAPHY

The organisers reserve the right to take photographs / video films of any exhibit for publicity in their own publications. Nobody shall be allowed to undertake photography without prior permission of the organiser. Exhibitors can take photographs of their own stand only.

29. INFORMATION ON SHIPPING FOR THE EXHIBITORS :

Goods entering under the ATA Carnet will be exempt from guarantee requirements. Exhibitors are requested to ship their good in good time so as to avoid any delays in clearance. The word “RUSH EXHIBITION GOODS” on all packing materials will be helpful, particularly with rail traffic.

Materials can be sent via ATA Carnet or Embassy Guarantee or Bank Guarantee. Exhibits can be cleared through Indian Customs without payment of Customs Duty, against any of these instruments.

A facility for duty free temporary import of exhibits is available only to foreign exhibitors who remit the space rent in foreign exchange or Indian agents paying in equivalent Indian rupees.

Detailed information on arrival deadlines, documentation, requirements, packing instructions and other relevant information for both Indian and foreign exhibitors can be obtained from any RE Rogers office.

R E Rogers will offer the exhibitors, information and assistance in respect of re-export. It is suggested that exhibitors discuss their requirements and enter into comprehensive arrangements.

Handling of heavier exhibit cases will have to be entrusted to the approved agencies only. At the time of movement of exhibits, it is suggested that exhibitors adhere to the programme prepared by R E Rogers.

30. CONSIGNEE

All consignment must be shipped prepaid and consigned as per instructions from the official freight forwarder. On NO account should cargo be shipped to any other party. Please contact the forwarder

Page 13: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

13

for the consignee details.

31. YOUR CHECKLIST TO THE SHOW

All forms have to be returned to the contact address given by the March 15, 2017.

Please fill out the summary of forms and send it to avoid confusion.

Orders will be processed only upon receipt of full payment.

Orders received after the deadline will entail a 30% surcharge. Further, these orders are also subject to availability.

Organiser will send a confirmation note / invoice upon receipt of the order. Please contact us if you do not hear within two weeks of placement of the order.

Cancellation of orders on site will not be entertained and the full price shall apply.

All items offered are on rental basis, inclusive of delivery, installation, standby maintenance and removal. Exhibitors will be liable for items ordered, upon delivery until return.

The price mentioned in the manual is exclusive of tax. Taxes applicable will be paid by the exhibitor.

32. SPONSORSHIP OPPORTUNITIES

There are a wide range of sponsorship opportunities available that will enable you to promote your company in the lead up to the show. Please refer Form 01 for further details.

SERVICES AVAILABLE ON SITE

Organeser’s office for all information, additional orders and grievances.

Travel desk.

Cafeteria.

Business center with telephone, photo copy machine, computers and internet services.

First aid.

Internet cafe.

Visitor seating areasFor Local Transport:

1) Easy Cab - 022-43 43 43 43

2) Meru Cab - 022-44 22 44 22

3) Mega Cab - 022-42 42 42 42

4) TAB - 022-63 63 63 63

5) OLA Cab - 022-33 55 33 55

6) Priyadarshini Taxi - 022-433 33 999 (only for Women)

Page 14: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

14

REQUEST FORMSKindly Complete and Return by March 15, 2017

Page 15: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

15

CONDITIONING FOR CATALOGUE ENTRY

Overall size:297 mm height, 210 mm width

Language:English

Printed Page size:265 mm height, 180 mm width:1/1/page

Materials accepted:For B&W Advertisements: Soft copy (high resolution - pdf, eps, cdr).For Colour Advertisements: Soft copy (high resolution CMYK colour format - pdf & cdr).

Screen to be used:133 lpi (For 4 Colour Advertisements)90 lpi (For B & W Advertisements)

GENERAL CONDITIONS:

Any verbal agreements made when placing orders for advertisements must be noted on the order form.

Orders for entries in the catalogue are not confirmed by the publishing house.

All insertions can be published correctly if perfect advertisement material are provided to the Organiser.

Page 16: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

16

Kindly Send the duly filled in Form to: Tara Rao, Chemical Weekly 602-B, Godrej Coliseum, K.J. Somaiya Hospital Road, Sion (East), Mumbai - 400 022, INDIA Tel : +91-22-2404 4477, Fax : +91-22-2404 4450, E-mail: [email protected]

FORM 01 – ADVERTISEMENT / SPONSORSHIP FORMKindly Complete and Return by March 20, 2017

Exhibitor :________________________________________________________________________________________ Stand # :__________

Contact Person: _____________________________________________________________________ Phone No. ______________________

We confirm the following (Tick as applicable).

All payments to be made through DD in favour of “ChemSpec India Expo P. Ltd.”, Payable at Mumbai

Place :

Date: Authorised Signatory with Company Stamp

Sponsorships

Visitor Bag Sponsor (One Side) BOOKED

Lawnyards / Badges BOOKED

Registration Area BOOKED

Gateway Flag Pole (per flag) BOOKED

Internet Cafe Rs. 1,25,000 / £ 1500 + Service Tax @ 15%

Pillar Cladding - 2 sides (for 10 pillars) Rs. 1,25,000 / £ 1500 + Service Tax @ 15%

ChemProTech & Chemspec Cafetaria Rs. 1,00,000 / £ 1200 + Service Tax @ 15% (per sponsor - Max 3 sponsors)

Exhibitor Get-together (per sponsor - Max 3 sponsors) Rs. 1,00,000 / £ 1200 + Service Tax @ 15%

Pathway Hoardings - (12 Nos) Per Hoarding Rs. 25,000 / £ 275 + Service Tax @ 15%

Cover Positions

Front Gate Fold Rs. 55,000 / £ 550

Inside Front (SC) Rs. 25,000 / £ 275

Inside Back Cover (TC) Rs. 22,000 / £ 250

Back Cover Rs. 27,500 / £ 300

Advertising - Inside Positions

Full Page (Colour) Rs. 22,000 / £ 250

Full Page (B & W) Rs. 11,500 / £ 125

Half Page Colour Rs. 12,000 / £ 125

Half Page (B & W) Rs. 6,000 / £ 75

All advertisement material should be supplied as high resolution 4 colour pdf’s. If this is not possible then a high resolution tif, jpeg, eps or cdr file, with all fonts embedded, woulb be acceptable. They must be at the exact sizes stated above. No other formats are acceptable.

Advertisement Size :

Full Page Size 297 mm X 210 mm with 3mm bleed on all 4 sides

Full Page Size 265 mm X 180 mm No bleed

Half Page Size 130 mm X 180 mm No bleed

Page 17: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

17

25 Tickets

50 Tickets

100 Tickets

150 Tickets

200 Tickets

Additional Quantity

Kindly Send the duly filled in Form to: Tara Rao, Chemical Weekly 602-B, Godrej Coliseum, K.J. Somaiya Hospital Road, Sion (East), Mumbai - 400 022, INDIA Tel : +91-22-2404 4477, Fax : +91-22-2404 4450, E-mail: [email protected]

Place :

Date: Authorised Signatory with Company Stamp

FORM 02 – INVITATION TICKETSKindly Complete and Return by March 15, 2017

Exhibitor :________________________________________________________________________________________ Stand # :__________

Contact Person: _____________________________________________________________________ Phone No. ______________________

Please indicate the number of Invitation Tickets required by you in the space below.

Page 18: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

18

S.No. Name Designation

FORM 03 – EXHIBITOR BADGESKindly Complete and Return by March 15, 2017

Exhibitor :________________________________________________________________________________________ Stand # :__________

Contact Person: _____________________________________________________________________ Phone No. _______________________

On receipt of this form, badges will be processed and can be collected from the registration desk on the last day of built-up. They will not be sent out prior to the show.

PLEASE USE BLOCK LETTERS.

Kindly Send the duly filled in Form to: Krunal Goda, Koelnmesse YA Tradefair Pvt. Ltd., #1102, 11th Floor, DLH Park, Near MTNL Office, S.V.Road, Goregaon (W), Mumbai-400062, INDIA Tel: +91-22-28715207; Fax: +91-22-28715222; [email protected]; [email protected]

Place :

Date: Authorised Signatory with Company Stamp

Page 19: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

19

Note: This form is applicable to exhibitors who have registered for Shell Scheme Package.

A: Floor covering: Shell scheme includes grey needle punch carpet. Additional rental cost to change the carpet colour as per available colours are Rs.150 / 3 GBP per sqm. Your colour preference for the carpet to be changed is _______________.

Note: Liability for ordered items remain with the exhibitor untill the end of the show. As stock is limited, late orders cannot be assured.

Any late orders accepted after the March 15, 2017 will attract a 30% surcharge. Ordered items will be delivered only after receipt of payment.

All items are on a rental basis. Service Tax at 15% will be extra, as per Service Tax Act.

B: Each Shell Scheme exhibition stand is inclusive of a Fascia Board showing the company name in English. Please indicate below the name you wish to appear on your Fascia Board.

Please write / type in BLOCK LETTERS. (maximum number of letters - 24)

C: Electrical & furniture entitlement, as per area of stand:

Item Area in sqm

9-12 15 18

Partition walls, Carpet, grey, Fascia, white laminated 330 mm high, with company name in English

Counter 1 1 2

Standard Chairs, grey plastic 3 4 6

Spotlights, 100W 3 5 6

Power point, 5 Amp, up to 500W 1 1 2

Wastepaper Basket 1 1 2

D: Corner stands will be built with 2 open sides and adjoining stands will be built without a centre wall unless otherwise specified to a stand contractor.

Kindly Send the duly filled in Form to: Krunal Goda, Koelnmesse YA Tradefair Pvt. Ltd., #1102, 11th Floor, DLH Park, Near MTNL Office, S.V.Road, Goregaon (W), Mumbai-400062, INDIA Tel: +91-22-28715207; Fax: +91-22-28715222; [email protected]; [email protected]

Place :

Date: Authorised Signatory with Company Stamp

FORM 04 – FASCIA BOARD / SHELL SCHEMEKindly Complete and Return by March 15, 2017

Exhibitor :________________________________________________________________________________________ Stand # :__________

Contact Person: _____________________________________________________________________ Phone No. _______________________

Page 20: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

20

Kindly Send the duly filled in Form to: Krunal Goda, Koelnmesse YA Tradefair Pvt. Ltd., #1102, 11th Floor, DLH Park, Near MTNL Office, S.V.Road, Goregaon (W), Mumbai-400062, INDIA Tel: +91-22-28715207; Fax: +91-22-28715222; [email protected]; [email protected]

FORM 05 – BARE SPACE CONTRACTORS TERMSKindly Complete and Return by March 15, 2017

Exhibitor :________________________________________________________________________________________ Stall # :__________

Contact Person: _____________________________________________________________________ Phone No. ______________________

Please give us your stall contractor details:

Contractor: ________________________________________________________________________________________________

Address:_________________________________________________________________________________________________

_________________________________________________________________________________________________________

State:_________________________________________Country:____________________________Pin code:_______________

Phone:_____________________________________ E-mail:______________________________________________________

Contact Person:___________________________________________________________ Mobile No. ______________________

Service Badge Nos.:________________ (please use Form -3)

Place :

Date: Authorised Signatory with Company Stamp

Inform the following important information to your stall contractor:

Stall fabrication activities should be carried out as per the approved designs by the organizer.

In the course of construction of the stall, stall contractors should take the best possible safety measures and will be held responsible for any kind of injury caused to personnel because of their activities

Stall contractors should not cause any damage to any of the structures in the venue premises during the construction / exhibition / dismantling period. If any such damage is done, they should bear the necessary penalty levied by the venue authorities

Stall contractors should use good quality electrical fixtures.

Stall Contractors will be responsible for any kind of damage occurred due to electrical fixtures done by them.

Stall Contractors should not create any kind of inconvenience to contractors / exhibitors of neighboring stalls.

Stall Contractors should strictly follow the schedule for construction and dismantling periods as set by the organizers

Stall construction work should be finished by 8:00 pm on April 24, 2017

Stall contractors who wish to work beyond 8:00 pm (up to 11:00 pm only) on April 24, 2017 should contact the onsite organizer office before 06:00 pm on April 24, 2017 to inform the same. Subject to the approval from the organizers, penalty charges of INR 10,000/- /hour /stand (from 8:00 pm to 11:00 pm only)

Stall contractors should make sure the all the stall material should be cleared from the exhibition hall latest by 11:59 pm on 26th April 2017 (NO EXTENSION WILL BE PERMITTED)

Stall contractors should deposit a cheque / DD of Rs. 30,000 in favor of Koelnmesse YA Tradefair Pvt. Ltd. with the organizers at the time of taking the possession of the stall as security deposit which will be refunded to them after the completion of the exhibition if they have not violated the rules.

Page 21: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

21

FORM 06 – FURNITURE AND ACCESSORIESKindly Complete and Return by March 15, 2017

Exhibitor :________________________________________________________________________________________ Stand # :__________

Contact Person: _____________________________________________________________________ Phone No. _______________________

Kindly Send the duly filled in Form to: Krunal Goda, Koelnmesse YA Tradefair Pvt. Ltd., #1102, 11th Floor, DLH Park, Near MTNL Office, S.V.Road, Goregaon (W), Mumbai-400062, INDIA Tel: +91-22-28715207; Fax: +91-22-28715222; [email protected]; [email protected]

All payments to be made through DD in favour of “ChemSpec India Expo P. Ltd.”, Payable at Mumbai

Place :

Date: Authorised Signatory with Company Stamp

Note: Liability for ordered items remain with the exhibitor untill the end of the show. As stock is limited, late orders cannot be assured.

Any late orders accepted after the March 15, 2017 will attract a 30% surcharge. Ordered items will be delivered only after receipt of payment.

All items are on a rental basis. Service Tax at 15% will be extra, as per Service Tax Act.

Sub-Total-1 Sub-Total-2

Total (Sub-Total-1 + Sub-Total-2)

Add Service Tax* @ 15%

Grand Total

01 Visitor Chair 500 11

02 Fibre Chair 400 9

03 VIP Sofa Double 3600 78

04 Round Table 900 21

05 Round Table (Glasstop) 1200 26

06 Bar Stool 900 21

07 Glass Showcase 4250 95

08 Glass Showcase(Slim) 3600 78

09 Glass Counter 3000 65

S. Item Price Qty. Amt.

No. INR GBP

S. Item Price Qty. Amt.

No. INR GBP

10 Centre Table 1200 26

11 Counter 1000 22

12 Lockable Counter 2500 54

13 Display Podium 1000 22

14 Literature Stand 600 16

15 Square Meeting Table 900 21

16 Shelf (Glass) 500 11

17 Shelf (Wooden) 800 19

18 Wastepaper Basket 100 2

Page 22: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

22

IMAGESFurniture and Accessories & Electricals

Visitor Chair Fibre Chair Round Table Dia H 70cm 75cm

Round Table (Gla ss top) Dia H 90cm 75cm

Bar Stool (Adjustable)H - 50cm

Glass Show Case W H D100cm 200cm 50cm

Show Case (Slim) W H D50cm 200cm 50cm

Counter Table W H D100cm 75cm 50cm

Lockable Counter W H D 100cm 75cm 50cm

Glass Counter W H D 100cm 100cm 50cm

Centre Table

Podium W H D 50cm 70cm 50cm

Literature StandSquare Table W H D70cm 70cm 70cm

Arm Spot Light Metal Halide Socket Out Let

VIP Sofa Double

Shelf (Wooden)Shelf (Glass)

Page 23: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

23

S.No. Items Unit Price Quantity Amount

INR GBP

1 System wall panel, 2.5m X 1.0m 1500 26

2 System wall panel, 2.5m X 0.5m 700 16

3 System door 3500 60

4 Needle punch carpet, per square meter 150 3

5 White laminated fascia board, per meter run 1500 26

Total

Add Service Tax @ 15%

Grand Total

FORM 07 – STAND CONSTRUCTION AND DECORATIONKindly Complete and Return by March 15, 2017

Exhibitor :________________________________________________________________________________________ Stand # :__________

Contact Person: _____________________________________________________________________ Phone No. _______________________

Kindly Send the duly filled in Form to: Krunal Goda, Koelnmesse YA Tradefair Pvt. Ltd., #1102, 11th Floor, DLH Park, Near MTNL Office, S.V.Road, Goregaon (W), Mumbai-400062, INDIA Tel: +91-22-28715207; Fax: +91-22-28715222; [email protected]; [email protected]

All payments to be made through DD in favour of “ChemSpec India Expo P. Ltd.”, Payable at Mumbai

Place :

Date: Authorised Signatory with Company Stamp

Note: Liability for ordered items remain with the exhibitor untill the end of the show. As stock is limited, late orders cannot be assured.

Any late orders accepted after the March 15, 2017 will attract a 30% surcharge. Ordered items will be delivered only after receipt of payment.

All items are on a rental basis. Service Tax at 15% will be extra, as per Service Tax Act.

Page 24: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

24

FORM 08 – LIGHTING AND ELECTRICALS (for Stall)Kindly Complete and Return by March 15, 2017

Exhibitor :________________________________________________________________________________________ Stand # :__________

Contact Person: _____________________________________________________________________ Phone No. _______________________

Kindly Send the duly filled in Form to: Krunal Goda, Koelnmesse YA Tradefair Pvt. Ltd., #1102, 11th Floor, DLH Park, Near MTNL Office, S.V.Road, Goregaon (W), Mumbai-400062, INDIA Tel: +91-22-28715207; Fax: +91-22-28715222; [email protected]; [email protected]

All payments to be made through DD in favour of “ChemSpec India Expo P. Ltd.”, Payable at Mumbai

Place :

Date: Authorised Signatory with Company Stamp

Note: Liability for ordered items remain with the exhibitor untill the end of the show. As stock is limited, late orders cannot be assured.

Any late orders accepted after the March 15, 2017 will attract a 30% surcharge. Ordered items will be delivered only after receipt of payment.

All items are on a rental basis. Service Tax at 15% will be extra, as per Service Tax Act.

S.No. Item Unit Price Quantity Amount

INR GBP

01 Standard Long Arm Spot Light - 75W 500 11

02 Socket Out Let 500 11

For lighting only (including consumption)

03 Single phase neutral, alternating at 220 V, 50 Hs, supply for the entire show period, including one day buildup, inclusive of cables and switch, laid up to a point in the booth, cost per Kw. 2,300 40

04 Three phase neutral, alternating at 415V, 50 Hz, supply for the entire show period, including one day buildup, inclusive of cables and switch, laid up to a point in the booth, cost per kW 2,500 44

Temporary Connection (including consumption)

05 Temporary Connection during build up (1kW) 2,000 40

Total

Add Service Tax* @ 15%

Grand total

Page 25: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

25

S.No. Item Unit Price Quantity Amount

INR GBP

Machine / Equipment (including consumption)

01 Single phase neutral, alternating at 220v, 50 Hz, 2,300 40 supply for the entire show period, including one day buildup, cost per KW (price included with connection charges)

02 Three phase neutral, (TPN) alternating at 415V, 50Hz, 2,500 44 supply for the entire show period, including one day buildup, cost per KW (price included with connection charges)

Temporary Connection (including consumption)

03 Temporary Connection during build up (1kW) 2,000 40

Total

Add Service Tax @ 15%

Grand Total

FORM 09 – POWER SUPPLY FOR MACHINERY / EQUIPEMENTKindly Complete and Return by March 15, 2017

Exhibitor :________________________________________________________________________________________ Stand # :__________

Contact Person: _____________________________________________________________________ Phone No. ______________________

Kindly Send the duly filled in Form to: Krunal Goda, Koelnmesse YA Tradefair Pvt. Ltd., #1102, 11th Floor, DLH Park, Near MTNL Office, S.V.Road, Goregaon (W), Mumbai-400062, INDIA Tel: +91-22-28715207; Fax: +91-22-28715222; [email protected]; [email protected]

All payments to be made through DD in favour of “ChemSpec India Expo P. Ltd.”, Payable at Mumbai

Place :

Date: Authorised Signatory with Company Stamp

Note: Liability for ordered items remain with the exhibitor untill the end of the show. As stock is limited, late orders cannot be assured.

Any late orders accepted after the March 15, 2017 will attract a 30% surcharge. Ordered items will be delivered only after receipt of payment.

All items are on a rental basis. Service Tax at 15% will be extra, as per Service Tax Act.

Page 26: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

26

S.No. Connection Unit Price Quantity Amount

(General Browsing Speed) I N R GBP

1 Internet connection (WiFi) 1,500 26

Total

Add Service Tax @ 15%

Grand Total

Note : This price is exclusive of computers and peripherals.

FORM 10 – INTERNETKindly Complete and Return by March 15, 2017

Exhibitor :________________________________________________________________________________________ Stand # :__________

Contact Person: _____________________________________________________________________ Phone No. ______________________

Kindly Send the duly filled in Form to: Krunal Goda, Koelnmesse YA Tradefair Pvt. Ltd., #1102, 11th Floor, DLH Park, Near MTNL Office, S.V.Road, Goregaon (W), Mumbai-400062, INDIA Tel: +91-22-28715207; Fax: +91-22-28715222; [email protected]; [email protected]

All payments to be made through DD in favour of “ChemSpec India Expo P. Ltd.”, Payable at Mumbai

Place :

Date: Authorised Signatory with Company Stamp

Note: Liability for ordered items remain with the exhibitor untill the end of the show. As stock is limited, late orders cannot be assured.

Any late orders accepted after the March 15, 2017 will attract a 30% surcharge. Ordered items will be delivered only after receipt of payment.

All items are on a rental basis. Service Tax at 15% will be extra, as per Service Tax Act.

Page 27: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

27

FORM 11 – COMPUTERS AND AUDIO / VISUAL EQUIPMENTKindly Complete and Return by March 15, 2017

Exhibitor :________________________________________________________________________________________ Stand # :__________

Contact Person: _____________________________________________________________________ Phone No. ______________________

All payments to be made through DD in favour of “ChemSpec India Expo P. Ltd.”, Payable at Mumbai

Place :

Date: Authorised Signatory with Company Stamp

Note: Liability for ordered items remain with the exhibitor untill the end of the show. As stock is limited, late orders cannot be assured.

Any late orders accepted after the March 15, 2017 will attract a 30% surcharge. Ordered items will be delivered only after receipt of payment.

All items are on a rental basis. Service Tax at 15% will be extra, as per Service Tax Act.

Kindly Send the duly filled in Form to: Krunal Goda, Koelnmesse YA Tradefair Pvt. Ltd., #1102, 11th Floor, DLH Park, Near MTNL Office, S.V.Road, Goregaon (W), Mumbai-400062, INDIA Tel: +91-22-28715207; Fax: +91-22-28715222; [email protected]; [email protected]

S.No. Item Unit Price/Day No. of Quantity Amount

INR GBP days

1 Laptop 1,500 26

2 Data Projector 5,000 95

3 Palsma - 42” 2,500 54

4 DVD Player 800 19

Total

Add Service Tax @ 15%

Grand Total

Page 28: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

28

S.No. Category Rate No. of Dates Amount Specific skills that

I N R GBP People From to are required

01 Stand hostess, 2,500 43 English speaking per day

02 Security guard, 1000 22 Please specify day or 12 hour shift night shifts.

03 Stand cleaning, 50 1 With vaccum cleaners per sqm. for show and clearing of period wastebaskets.

04 Collection/disposal Will be Please contact of waste materials/ quoted as Technical Department samples and by- per with details of waste products of demo- material or by products. nstration/working of machines.

Total

Add Service Tax @ 15%

Grand Total

FORM 12 – MANPOWER / STAND HOSTESES / STAND CLEANINGKindly Complete and Return by March 15, 2017

All payments to be made through DD in favour of “ChemSpec India Expo P. Ltd.”, Payable at Mumbai

Place :

Date: Authorised Signatory with Company Stamp

Kindly Send the duly filled in Form to: Krunal Goda, Koelnmesse YA Tradefair Pvt. Ltd., #1102, 11th Floor, DLH Park, Near MTNL Office, S.V.Road, Goregaon (W), Mumbai-400062, INDIA Tel: +91-22-28715207; Fax: +91-22-28715222; [email protected]; [email protected]

Exhibitor :________________________________________________________________________________________ Stand # :__________

Contact Person: _____________________________________________________________________ Phone No. ______________________

Note: Liability for ordered items remain with the exhibitor untill the end of the show. As stock is limited, late orders cannot be assured.

Any late orders accepted after the March 15, 2017 will attract a 30% surcharge. Ordered items will be delivered only after receipt of payment.

All items are on a rental basis. Service Tax at 15% will be extra, as per Service Tax Act.

Page 29: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

29

EXHIBITION TERMS AND CONDITIONS

1. DEFINITIONS

In these Terms and Conditions the following definitions apply:-

“the Exhibition Space Contract” means the Organisers’ form of agreement for the allotment of a stand at the Exhibition;

“the Authorities” means the relevant local, county and other public authorities and bodies relevant to the Exhibition;

“the Contract” means the Exhibition Space Contract, these Terms and Conditions and the Exhibitors’ Manual (where is this available from);

“the Exhibitor” means the person, firm or company agreeing to take a stand at the Exhibition under the Exhibition Space Contract;

“the Exhibitors’ Manual” means the manual produced by the Organisers in relation to the Exhibition;

“the Licence Fee” means the amount shown as the total price payable by the Exhibitor in the Exhibition Space Contract;

“the Organisers” means Mack Brooks Exhibitions Ltd.;

“the Venue” means the venue where the Exhibition will take place.

2. RULES & REGULATIONS

The Exhibitor must comply with the requirements of all Authorities and where applicable with all rules and regulations issued by the owner of the Venue in force at the time of the Exhibition.

The Exhibitor undertakes to comply with the obligations and duties contained or referred to in the Contract including (without limitation) those contained or to be contained in the Exhibitors’ Manual. Exemptions from any of these obligations and duties may be granted at the Organisers’ discretion. No exemption given by the Organisers will be effective unless in writing.

The Contract comprises these Terms and Conditions, the Exhibition Space Contract and the Exhibitors’ Manual) except as varied in writing signed by the parties.

3. STAND ALLOTMENT

(a) A stand will be held as let for 21 days after the date shown on the Exhibition Space Contract issued by the Organisers for that stand, subject to these Terms and Conditions. If the signed Exhibition Space Contract together with the deposit is not received by the Organisers within that period, the Organisers may allocate the stand elsewhere without notice to the Exhibitor.

(b) The Contract constitutes a licence to exhibit and not a tenancy. The Organisers reserve the right at any time to make such alterations in the floor plan of the Exhibition as may in their opinion be necessary in the best interests of the Exhibition as a whole and to alter either or both of the shape and size of the space allotted to the Exhibitor. If, as a result, the space allotted to the Exhibitor shall be reduced, a proportionate allowance will be made to the Exhibitor by adjustment of the Licence Fee. No alteration to the space allotted will impose on the Exhibitor any greater Licence Fee than that undertaken in the Exhibition Space Contract.

Page 30: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

30

(c) The Organisers further reserve the right at any time to substitute for the stand allotted a different stand.

(d) Allotment of space by the Organisers shall not imply that they accept the proposed exhibits, and the Exhibitor must ensure that exhibits on the allotted stand comply with these Terms and Conditions. The Organisers reserve the right to exclude and/or require to be removed any exhibit which in their opinion is not germane to the Exhibition. The decision of the Organisers as to the eligibility of the exhibits will be absolutely final and binding.

(e) The Contract is personal to the Exhibitor and may not be assigned, subcontracted or sublet by him. Neither may the Exhibitor, without having first obtained the consent in writing of the Organisers:-

(i) have or display on the stand or at the Exhibition the goods of any other person, firm or company; or

(ii) display or permit to be displayed on the stand or at the Exhibition the name or mark of any other person, firm or company or literature or other items relating to the goods or services of any such other person, firm or company.

(f) Notwithstanding the allocation of a stand to the Exhibitor, the Organisers reserve the right to forbid the Exhibitor to erect or occupy that or any other stand if, on the date of the opening of the Exhibition, there is subsisting any material breach of the obligations of the Exhibitor under the Contract including (without limitation) failure to pay any instalment of the Licence Fee or if there then remains outstanding any notice served by the Organisers under Rule 5(b) or Rule 6 of these Terms and Conditions .

4. CANCELLATION OF THE CONTRACT BY THE EXHIBITOR

The Exhibitor may cancel the Contract, by giving not less than 30 days’ notice to expire not later than the next cancellation date. Such notice must be given in writing and sent by recorded delivery to the Organisers. The Organisers shall be entitled to retain or (if not already paid) require payment forthwith of the deposit together with any further payment due under the cancellation dates and fees listed in this clause.

Cancellation dates and Fees.

Initial deposit 25% non-refundable plus the appropriate cancellation fee shown below:

25% 10 months before opening show date. 50% 8 months before opening show date. 75% 6 months before opening show date. 100% with in 6 months before opening show date.

For the avoidance of doubt, but save as set out in clause 6 below, the above dates and fees cannot be changed and do not relate to, and are not affected by, any payment plan that may have been agreed by the Exhibitor with the organisers for the purpose of assisting the Exhibitor with payment for their Exhibition stand space.

5. PAYMENT

(a) The Exhibitor shall pay the Licence Fee to the Organisers by the instalments and by the dates set out in the payment schedule on the Exhibition Space Contract.

(b) If the Exhibitor fails to pay any Instalment on the due date for payment, the Organisers may at any time thereafter either:-

Page 31: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

31

(i) by notice to the Exhibitor declare the balance remaining unpaid of the Licence Fee immediately payable, whereupon the Exhibitor shall pay such balance to the Organisers forthwith on demand; or

(ii) terminate the Contract forthwith by notice to the Exhibitor served at any time after the due date in clause 4 for payment.

(c) If the Organisers terminate the Contract under Rule 5(b)(ii), the Exhibitor shall pay to the Organisers forthwith on demand by way of agreed liquidated damages for the loss of the Exhibitor’s booking under the Contract (but without prejudice to the Organisers’ other rights hereunder) a sum calculated as follows:-

(i) the Licence Fee less such parts thereof as may have already been paid to the Organisers; and

(ii) interest payable under Rule 5(e);

(d) If the Contract is terminated by the Organisers under Rule 5(b)(ii), the Organisers shall further, against the sum payable under Clause 5(c), allow to the Exhibitor an amount equal to the net sum received by the Organisers from the reallocation of the stand allocated to the Exhibitor (after the deduction of all costs expended in relation to the reallocation of the stand) if such reallocation is made to an intending Exhibitor not otherwise exhibiting at the Exhibition. This allowance shall not exceed the balance of the Licence Fee unpaid and shall be allowed only after receipt by the Organisers of the sums due under Rule 5(c).

(e) The Exhibitor shall pay to the Organisers on demand interest on all sums overdue, from the due date for payment set out in clause 4 until actual payment is made, at the rate of 2% per annum over Barclays Bank plc’s base rate from time to time, as well after as before any judgement.

(f) The Licence Fee is inclusive of value-added tax and may be varied by the Organisers at any time to take account of any increase or decrease in the rate of value-added tax applicable to the Contract and payments to be made thereunder.

(g) By way of security for any sums from time to time due hereunder to the Organisers from the Exhibitor, the Organisers shall have a lien on all goods and other items of the Exhibitor from time to time in the possession of the Organisers or under their control. The Organisers shall be entitled, after giving notice to the Exhibitor, to sell all or any such goods or other items and to apply the proceeds of sale first in payment of the costs of sale and secondly in satisfaction or part satisfaction of such sums and the Organisers shall account to the Exhibitor for any balance remaining of such proceeds of sale.

(h) We reserve the right to pass any outstanding debt by an Exhibitor over to our Legal Collections Agency. In this instance the full cost of the recovery of this money by the said Legal Collections Agency will be passed on in full to the Exhibitor and form part of the outstanding debt.

6. ALTERATION OF EXHIBITION DATES

The Organiser reserves the right to alter the Exhibition Dates as set out in the Exhibition Space Contract at any time provided that:

(i) any alteration does not result in the Exhibition being moved by more than 12 (twelve) months; and

(ii) no alteration is made to the dates within 120 (one hundred and twenty) days of the first open day of the Exhibition.

Page 32: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

32

In the event of an alteration of the Exhibition Dates, the Organisers may change to the cancellation dates set out in clause 4 and the instalments and dates for payment set out in the payment schedule of the Exhibition Space Contract [and will notify the Exhibitor accordingly

7. BREACH OF CONTRACT

(a) Without prejudice to their rights under Rule 5(b), the Organisers may terminate the Contract forthwith by notice to the Exhibitor:-

(i) If the Exhibitor shall in the opinion of the Organisers become or threaten to become insolvent or shall commence or suffer the commencement of proceedings against it by reason of insolvency; or

(ii) if the Exhibitor shall fail to make payment of any Instalment on or before the due date for payment; or

(iii) if the Exhibitor shall be in breach of any other of its obligations under the Contract and, if the breach is capable of remedy, shall have failed to remedy the breach within 14 days after the service of notice upon it by the Organisers specifying the breach complained of and requiring it to be so remedied.

(b) Termination under this Clause or Clause 5 shall be without prejudice to the rights of the parties in respect of any antecedent breach of contract or to those provisions of the Contract intended to subsist after termination.

(c) If the Contract is terminated by the Organisers, the Organisers shall be entitled (without prejudice to their other rights) to:-

(i) require the Exhibitor to remove forthwith from the Venue all property of the Exhibitor or its contractors at a time stated by the Organisers or, at risk and cost of the Exhibitor, to remove such property and deliver or dispatch it to the address of the Exhibitor given in the Exhibition Space Contract; and

(ii) erect on the stand a board or other device carrying the name, title and/or marks of the Exhibitor.

(d) The Exhibitor shall reimburse to the Organisers on demand all legal and other costs incurred by the Organisers in connection with the termination of the Contract or the enforcement of the Organisers’ rights hereunder and any costs incurred by the Organisers in the dressing, furnishing or alteration of the stand vacated by the Exhibitor in order to maintain an orderly and visually pleasing Exhibition.

8. CANCELLATION OF EXHIBITION

(a) If the Exhibition is abandoned, cancelled or suspended in whole or in part by reason of war, fire, national emergency, labour dispute, strike, lockout, civil disturbance, inevitable accident, the non-availability of the Exhibition premises, or any other cause not within the control of the Organisers whether ejusdem generis or not, the Organisers shall be under no obligation to repay the whole or part of the Licence Fee, and shall be under no liability to the Exhibitor in respect of any such abandonment, cancellation or suspension. In such event, the Organisers reserve the right to change the Venue for the Exhibition and to substitute the new Venue for the Venue named in the Exhibition Space Contract.

If the Organisers come to believe at any time up to 14 days before the Exhibition that the holding of the Exhibition is unprofitable for the Organisers or not in the best interests of the industry concerned, the Organisers may cancel the Exhibition. If the Organisers cancel the Exhibition

Page 33: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

33

under this subclause, the Organisers shall promptly notify the Exhibitor of cancellation and shall within 30 days refund to the Exhibitor such part of the Licence Fee as may then have been paid, in full settlement of the Exhibitor’s rights against the Organisers under the Contract or otherwise in relation to the Exhibition.

9. FAILURE OF SERVICES

The Organisers will endeavour to ensure the supply of the services of the Venue and of those mentioned in the Exhibitors’ Manual but as the supply of such services is not within the control of the Organisers they shall not incur any liability to an Exhibitor for any loss or damage if any such services shall wholly or partially fail or cease to be available nor shall the Exhibitor be entitled to any allowance in respect of the Licence Fee due or paid under the Contract.

10. INTELLECTUAL PROPERTY RIGHTS

The Organisers will not be liable for any damages, costs or other liabilities, the Exhibitor, his servants or agents may sustain in respect of the infringement of any intellectual property rights of the Exhibitor arising out of his participation in the Exhibition.

11. RIGHTS OF ORGANISERS AND VENUE OWNERS

The Organisers and the owners of the Venue or of interests therein and those authorised by them respectively have the right to enter the Venue at any time to execute works, repairs and alterations and for other purposes. No compensation will be payable to the Exhibitor for damage, loss or inconvenience so caused.

12. AMENDMENTS, APPLICATIONS AND INTERPRETATION OF THE TERMS AND CONDITIONS

(a) The Organisers reserve the right to add to, alter or expunge any of these Terms and Conditions at any time.

(b) In the event of any dispute as to the interpretation of these Terms and Conditions as a result of their translation into a foreign language, the English version shall be taken as authentic.

(c) Each Exhibitor must bring to the notice of all agents or contractors employed by him such of the provisions of these Terms and Conditions as may affect such agents or contractors, and any claim arising from the failure of the Exhibitor to give such notice shall be the sole responsibility of the Exhibitor concerned.

(d) The Contract shall be constructed in accordance with and governed by English law and the parties submit to the exclusive jurisdiction of the English Courts.

(e) All agreements, consents, notices, individual permits and special arrangements must be in writing, signed by the party or parties giving the same and, in the case of service on the Exhibitor, may be served by posting the same by first class post to the address given on the Allotment Form or by sending the same by facsimile transmission to the fax number so given. Any communication so transmitted shall be deemed to be served on the day of transmission provided that a signed copy of the fax is sent by first class post on the same day to the person to be served. Any communication sent by first class post shall be deemed to be served on the day following the date of posting.

Page 34: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

34

THE EXHIBITION

13. OPENING HOURS

(a) The Exhibition will be open to visitors daily for the period and during the opening hours stated in the Exhibitors Manual.

(b) All dust covers must be removed and stands ready for display purposes by the readiness time stated in the Exhibitors Manual on each open day. No exhibits shall be removed from their positions until the close of the Exhibition without the Organisers’ permission in writing, nor shall any stand be covered up or closed during the Exhibition before the official closing time.

13.A ADMISSION TO THE EXHIBITION

(a) The Organisers reserve the right to expel from or refuse to admit to the Exhibition premises any person at any time notwithstanding that person’s possession of an official pass or ticket.

(b) The Organisers will issue official tickets of admission and no other form of admission ticket will be valid.

14. PASSES

No Exhibitor will be admitted to the Exhibition without producing to the gate officials the Exhibitor’s pass issued to him by the Organisers, who reserve the right, at their discretion, to withdraw the pass issued to any person if complaints have been received concerning that person’s conduct.

15. GANGWAYS

It is the responsibility of the Exhibitor to ensure that gangways in front of the allocated stand are kept free from obstruction during the whole of the time the building is open for the purpose of the Exhibition.

16. DIRECTIONAL SIGNS

The Organisers reserve the right to affix stand numbers or directional signs on any stands in any position.

17. ADVERTISING IN THE VENUE

The Exhibitor is not allowed to place or affix advertisements anywhere in the building except on the allotted stand. Exhibitors should only distribute matter in relation to their own goods. Such matter may only be distributed from the allotted stand. Distribution of such matter from gangways or any areas outside the allotted stand is not permitted.

18. OFFICIAL CATALOGUE

An official catalogue will be issued. The Organisers will not accept responsibility for any omission, misquotations or other errors which may occur in the compilation of the catalogue.

EXHIBITING

19. ELIGIBILITY OF EXHIBITS

(a) Exhibits must fall within the defined scope of the Exhibition and may represent all forms of materials, machinery, plant equipment and ancillary services related to the Exhibition as approved by the Organisers and Authorities. Exhibitors may be asked to provide details of the types of products or service they intend to display.

Page 35: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

35

(b) Exhibitors are not allowed to sub-let the stand allotted to them nor to permit the stand to be utilised by any other person or company without the Organisers prior consent in writing.

(c) Where Exhibitors wish to use borrowed equipment on the allotted stand to demonstrate their own products, the display of the name of the firm lending the equipment is not permitted without the written consent of the Organisers, unless that firm is also exhibiting.

20. CONDUCT OF EXHIBITORS

Every Exhibitor shall ensure that the allotted stand is open to view and staffed by competent representatives during the Exhibition hours. In the event of an Exhibitor failing to open the allotted stand or uncover exhibits thereon, the Organisers may do so or arrange for the stand and exhibits to be removed and the Exhibitor shall be liable for any charges that may thereby be incurred. The Organisers will not be liable for any losses, including consequential losses, sustained by the Exhibitor as a result of this action.

Exhibitors and all persons for whom they may be considered responsible in any way whatsoever, must conduct themselves in such a manner as shall not be objectionable to any other Exhibitor, Exhibitor’s employee, visitor or the Organisers, and shall not create any disturbance or obstruction. Any person who does not comply with these requirements shall be liable, at the discretion of the Organisers, to be removed from the Exhibition buildings and refused re-admission during the period of the Exhibition.

Exhibitors must conduct their business only from their stand and must not, under any circumstances, canvas visitors in the aisles, or in any other areas. Exhibitors should only distribute advertising matter in relation to their own goods. Such matter may only be distributed from the allotted stand. Distribution of such matter from gangways or any areas outside the allotted stand is not permitted.

No item of stand stock sold during the Exhibition may be removed before the Exhibition is finished, without the written permission of the Organisers.

21. WORKING MACHINERY AND EXHIBITS

Moving machinery shall, at the expense of the Exhibitor, be installed and protected to the satisfaction of the Organisers, the Venue and the Authorities. If such machinery shall, in the opinion of the Organisers, be too noisy or cause annoyance to other Exhibitors or to visitors, it shall be switched off on request by the Organisers.

No motors, engines, furnaces, contrivances or power-driven machinery may be exhibited in operation without adequate protection against fire risks and without the written permission of the Organisers. Such permission may be withheld or withdrawn at any time should such operating exhibits be of a nature likely to cause danger, annoyance or inconvenience to other Exhibitors or visitors.

Safety devices may be removed only when the machines are not in operation and not connected to the source of power and only for the purpose of showing a visitor the design and construction of the uncovered part or parts. In such a case, however, the safety devices which are removed must be placed immediately beside the machine.

22. VIDEO AND CINEMATOGRAPH DISPLAYS AND AMPLIFIERS

(a) Cinematographs and Photographic slides may not be used without the written consent of the Organisers. Where permission is granted, the following conditions will apply:-

(i) Non-flammable film must be used.

(ii) The projector housing and covering must be of non-flammable material in accordance with the requirements of the Authorities and the Venue.

Page 36: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

36

(b) Where sound film or video is used, adequate soundproofing must be carried out so that no annoyance is caused to Exhibitors and visitors on adjacent stands.

(c) Any seating must be in accordance with the all applicable regulations of the relevant Authorities.

(d) The placing of the equipment shall be arranged in such a way the obstruction of gangways is not caused by persons viewing the display.

NB. See also 35(f)

23. DEMONSTRATIONS

(a) All efforts to advertise, promote sales and operate exhibits must be conducted so as not to cause any danger, annoyance or inconvenience to other Exhibitors and visitors. Any practice resulting in a complaint from a fellow Exhibitor or visitor which, in the opinion of the Organisers exposes them to annoyance or danger will be prohibited.

(b) No competitions or the like may be held without the written permission of the Organisers.

24. LIABILITY

(a) The Exhibitor exhibits entirely at its own risk and the Organisers accept no liability, whether in contract or in tort (including negligence), to the Exhibitor arising out of or in connection with the Exhibition or the acts or omissions of the Organisers or its officers, servants, subcontractors, agents or visitors in relation thereto save as regards the contractual obligations of the Organisers hereunder. In particular (but without limitation) the Organisers do not accept responsibility for the performance by any Exhibition contractor in carrying out his obligations to the Exhibitor or for any other act or omission of any such contractor, whether or not the contractor has been appointed as the exclusive provider of any class of goods or services to the Exhibitor.

(b) All conditions and warranties, express or implied, statutory or otherwise, in relation to the performance by the Organisers of its obligations hereunder are hereby excluded except as expressly stated herein. The Exhibitor acknowledges that, in entering into the Contract, it has not relied upon any representation made by or on behalf of the Organisers not contained in the Contract.

(c) The liability of the Organisers, whether in contract or in tort (including negligence), and any liability the Organisers may have for the acts or omissions of its officers and servants in relation to such contractual obligations, arising out of or in connection with the performance of its contractual obligations hereunder shall not exceed one half of the Licence Fee actually paid by the Exhibitor to the Organisers under the Contract. The Organisers shall in no event be liable for any indirect or consequential loss of profit.

(d) The Organisers have no liability to the Exhibitor for the performance by other persons at the Exhibition of their obligations to the Organisers.

(e) The Exhibitor shall hold harmless and indemnify the Organisers from and against all actions, proceedings, losses, claims, demands and liabilities (including costs on an indemnity basis) suffered or incurred by the Organisers arising out of or in connection with any act or omission of the Exhibitor or its officers, servants, contractors, agents or visitors.

(f) The provisions of this clause shall not apply to exclude or restrict the liability of the Organisers for death or personal injury resulting from negligence of the Organisers.

Page 37: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

37

25. INSURANCE

(a) It is the responsibility of the Exhibitor to ensure that it takes out and maintains insurance to cover its losses or liabilities arising out of or in connection with the Exhibition including:

(i) insurance of the Exhibitor’s property;

(ii) liability for injury sustained by employees or third parties.

(iii) liability for loss or destruction of or damage to property of the Venue, the Organisers and any third party; and

(iii) insurance against losses arising out of the cancellation of the Exhibition due to causes beyond the control of the Organisers.

(b) The Organisers have arranged for insurance to be made available to persons exhibiting at the Exhibition by the party named in the Exhibition Space Contract , such insurance to be at the request and cost of the person requiring insurance.

(c) It is noted that the Exhibitors’ Manual may include further provisions regarding the insurance obligations of the Exhibitor.

26. CHARACTER OF EXHIBITS

The Organisers reserve the right to refuse accommodation for any exhibit the character of which, in the opinion of the Organisers and/or the Venue is unsuitable or unsafe for the site allocated to the Exhibitor or might constitute a health/safety hazard.

27. DANGEROUS MATERIALS OR EXHIBITS

(a) No naked lights, oil lamps or temporary gas or electrical fittings may be used in the Exhibition building, unless agreed in writing by the Organisers in conjunction with the Venue and/or the Authorities.

(b) No petrol, dangerous gases or highly flammable substances are allowed in the building, unless agreed in writing by the Organisers in conjunction with the Venue and/or Authorities.

(c) The Exhibitor must conform to the conditions concerning explosives and dangerous combustible materials as laid down by the Authorities.

(d) The Exhibitor shall do nothing to jeopardise the current insurance policies or the licences of the Venue or the Organisers and the Exhibitor shall in all cases comply with any requirements of the Fire Officer or other Authorities concerned.

(e) Non-flammable material must be used for lamp shades. Celluloid or any other highly flammable exhibits may only be shown under special conditions approved by the Organisers and then only in limited quantities.

(f) Equipment involving the use of lasers may not be exhibited without the prior written agreement of the Organisers. Such laser installations must comply with Guidance Note P.M. 19 “Use of Lasers for Display Purposes” from the Health and Safety Executive. A rehearsal before the Exhibition opens may also be required.

(g) Sources of ionising radiations (e.g. X Ray equipment or any radio-active materials), shall not be brought on to the premises except with the prior consent of the Organisers and the Authorities, and shall comply with “Code of Practice for the Display of Sources of Ionising Radiation at Exhibitions.”

Page 38: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

38

28. FIRE PRECAUTIONS

The Exhibitor shall observe the following provisions:-

(a) Fireproofing. All display material must be made from fireproofed materials to the satisfaction of the Authorities. Cloth materials used in the decoration of stands must be non-flammable and stretched against solid backing. Counter backs and curtains shall be cut off at least 150 mm (six inches) clear of the floor.

(b) Flammable Goods. Explosives or highly flammable substances may not be exhibited or brought into the Exhibition unless agreed in writing by the Organisers beforehand, but celluloid or articles mainly consisting of that material may be shown in glass showcases or otherwise protected from risk of fire in an approved manner.

(c) Naked Lights. No naked lights or lamps may be used during the period of the Exhibition or the periods of fitting up and dismantling, except when permission is given in writing by the Organisers after obtaining the approval of the Authorities and the Venue.

(d) Fire Extinguishers. Fire Extinguishers are distributed throughout the Venue to meet statutory requirements. If required, Exhibitors must agree to have an Extinguisher in a prominent position on their stand. Exhibitors must acquaint themselves with the position of the nearest fire alarm station in the Exhibition building.

An Exhibitor committing a breach of any of the afore-mentioned provisions will be liable for all claims, loss and damage thereby caused and will indemnify the Company in respect thereof.

SERVICES

29. PHOTOGRAPHS

An official Photographer will be appointed for Exhibitors who desire their stands or goods photographed. No other Photographer will be allowed to take photographs, draw, copy or reproduce any stand or article in the Venue without the permission of the Organisers.

30. CATERING

All food and drink for serving on stands or to be consumed within the Venue must be obtained from the official Venue Caterer.

31. CLEANING

Exhibitors are responsible to the Organisers for seeing that their stand is maintained in a clean state throughout the period of the Exhibition. Exhibitors may not carry out their own stand cleaning and accordingly such stand cleaning will be carried out by the official Stand Cleaning Contractor. Cleaning of the stand is free of charge but cleaning of exhibits is extra. Cleaning charges for multi-storied stands are available on request.

32. OTHER SERVICES

Other than Site-only stand construction and Shell stand interiors, Exhibitors may only use the official Contractors appointed by the Organisers for the services they may require. The Organisers reserve the right to change or appoint additional official Contractors as may be found necessary.

Page 39: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

39

STAND DESIGN & CONSTRUCTION

33. SHELL STANDS

(i) The stands, which will be provided by the Organisers, will be in accordance with the specification given in the Exhibitors’ Manual which will be sent to all Exhibitors. The conditions governing all additional construction work are also contained in the Exhibitors’ Manual.

(ii) All additional stand fitting must be contained within the Shell stand structure, i.e. no fittings may exceed the height specified by the Organisers.

34. SPACE-ONLY SITES

(a) Exhibitors must make their own arrangements for stand design and construction. All stands on Space-only sites will be subject to the approval of the Organisers, although the Exhibitor has freedom of design and choice of stand fitting contractor provided that the contractor selected is party to the terms of the Working Rule Agreement for the Exhibition Industry currently in force.

(b) Special permission must be obtained from the Authorities through the Organisers where an Exhibitor intends to:-

(i) Erect a multi-storied stand

(ii) Erect any stand of such construction or containing any area where:-

(a) Provision is made for a closely seated audience.

(b) Any part of the stand or exhibit exceeds (variable information) m in height.

(c) The travel distance from any part of a stand to an open side or exit or to a gangway on the stand is greater than 10 m.

(d) Foundation or cutting of the floor is required.

NB. Approval has to be given by the appropriate Authorities for the design, and for the structure. Approval of one does not imply approval of the other. Approval for the structure is conditional upon satisfactory inspection on site. In either case three copies of plans with structural calculations must be submitted to the Organisers, for distribution to the Authorities. Exhibitors are reminded that they must satisfy the Organisers that the erection and demolition of the stands can be safely carried out within the allotted time.

(c) All standfitting is backed-up to present a clean appearance from gangways and adjoining stands. The Exhibitor erecting a stand over 2.5 m in height is responsible for ensuring that the rear of any dividing walls over this height is backed-up and decorated where visible from adjoining stands.

(d) Long runs of walling should be avoided, particularly along open perimeters of stands. All such walling should be set back 1m from the perimeter of the stand; such walling should not be longer than 3m without either a 1m gap or a 1m see through panel.

(e) Full dimensional drawings showing all constructional details and positions and dimensions of machinery exhibits must be submitted to the Organisers for approval before any work is put to hand.

Page 40: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

40

For stands between 2.5 m (i.e. Shell stand height) and 4 m in height, drawings must be submitted in duplicate to the Organisers two months prior to the opening of the Exhibition.

(f) The Organisers reserve the right to prevent work being carried out by, or on behalf of, any Exhibitor who has not complied with the se Terms and Conditions, including the requirement to submit stand design drawings in accordance with the terms above.

(g) A stand number panel which must be of the uniform design (as specified by the Organisers) is to be displayed to each open side of the stand.

(h) Only those modular systems which are being manufactured in accordance with the Working Rule Agreement for the Industry are acceptable.

35. ALL STANDS

(a) The approval of the Organisers, which will not be withheld unnecessarily, must be obtained for enclosed stands. Special attention should be given to the exterior design of partially or totally enclosed stands and generally, exteriors should have walls relieved by display items. Walls may not be left in plain colours and displays or other promotional items attached to stand walls must not project over the frontages of the space taken by the Exhibitor.

(b) The Organisers may, at the expense of the Exhibitor, remove or alter anything in, on or forming part of any stand, if, in their opinion, it is desirable to do so in the interests of the Exhibition.

(c) All electrical installations must be carried out by the Contractor appointed by the Organisers for the area in which the stand is situated.

(d) Where illuminated fascia boards are used on stands, the lighting thereof shall be of sufficient power to light the fascia board only, and must not cause any spill of light on to neighbouring stands. No flashing lights will be permitted other than for safety reasons. The Organisers reserve the right to disconnect the electrical supply to any illuminated fascia which, in their opinion, is causing a nuisance to any other Exhibitor.

(e) The Exhibitor will be responsible for any charges of the Authority should the stand design require such attention.

(f) Exhibitors wishing to utilise any sound amplification equipment must seek permission of the Organisers and if necessary provide full details of the equipment to be employed.

(g) Exhibitors must check that dimensions and positioning of their stand are correct before commencing construction as the stand sizes are approximate. The Organisers accept no responsibility or liability for small variations in the layout.

36. DELIVERY OF EXHIBITS

Deliveries must be arranged to ensure that all exhibits (other than those which are small or have special values) are installed and arranged by 18.00 hours on the day before the Exhibition opens.

Exhibitors must comply with the Build-up Timetable and Delivery Schedule published in the Exhibitors’ Manual.

In no circumstances will the Organisers accept or sign for any goods, exhibits or other material on behalf of an Exhibitor.

Page 41: APRIL 25-26, 2017 Hall 1, Bombay Exhibition Centre NSE ... · exhibition. The manual has been designed to help you plan, co-ordinate and administer the various services that are needed

41

37. REMOVAL OF EXHIBITS

All exhibitors and other property of the Exhibitor, his servants, agents, employees and contractors, must be removed from the Exhibition premises before the time and date specified in the Exhibitors Manual and the Organisers shall be entitled, if, in their reasonable opinion, the Exhibitor will be unable for any reason to comply with this condition, to remove and despatch such exhibits and property at the risk and expense of the Exhibitor to the address of the Exhibitor stated on the Contract.

Immediately after the Exhibition closes, Exhibitors will be permitted to remove portable exhibits and personal effects from their stands under the supervision of authorised members of their staff. Portable exhibits should be removed that evening to ensure their safety.

Exhibitors, their agents or contractors, are responsible for the complete removal from the Venue and outside areas of all goods and materials used by them, together with all rubbish. Should any Exhibitor, agent or contractor fail to remove any exhibit, stand, wires, ropes, or any rubbish within the time stipulated, then the Exhibitor shall indemnify the Organisers in respect of any claim thereby occasioned for failure to give possession of any part of the Venue on the due date, and the Organisers shall be entitled but not obliged to remove such materials as they consider necessary. The Exhibitor shall be liable for all loss and costs thereby occasioned. The Organisers reserve the right to specify the time at which individual stands and exhibits shall be removed. Notwithstanding instructions issued specifically for the closing night of the Exhibition, the security of exhibits, stands, furniture, etc during the remaining days of the demolition period is wholly the responsibility of the Exhibitor, his agent or contractor and the Organisers will not be responsible for any loss or damage that occurs.

38. DILAPIDATIONS

Exhibitors are responsible for the cost of making good, restoring or renewing in all cases of damage or dilapidation to the Venue or any part thereof, whether caused by themselves, their agents or contractors or by any person or persons employed or engaged on their behalf by any such agent or contractor.

Exhibitors occupying Shell stands are also responsible for the cost of making good, restoring or renewing any damage or dilapidation to Shell stand structures, floor coverings, light fittings, or any part thereof, whether caused by themselves, their agents or contractors or by any person or persons employed or engaged on their behalf by any such agent or contractor. The cost of making good damage will be assessed by the Shell stand Contractor and charged to the Exhibitor. The Organisers in conjunction with the Venue, will inspect every site before erection and after demolition of the stand.

Dilapidations include (by way of example only) marks caused by paint, distemper, mortar or any other adhesive substance, bolt, screw or nail holes; battens, boarding, or any other material or substance attached or adhering to walls, floors or any parts of the building; loose wire or other things left behind. The cost of making good will be assessed by the Venue and charged to the Exhibitor by the Organisers. In their own interests, Exhibitors should satisfy themselves as to the condition of their site, both before erection and after clearance.

39. LABOUR DISPUTES

If the Organisers shall be of the opinion that any stand fitting, constructional or display work brought into the Exhibition or carried out at the Exhibition is being or may be or is proposed to be or has been carried out in such a manner or upon such terms or by such persons that there is a risk of a strike or stoppage of work by any persons or of any industrial dispute or labour difficulties the Organisers in their absolute discretion may, if the work is being or may be or is proposed to be carried out, require the Exhibitor to stop or not to carry out the work or to cause it to be carried out in a different manner and in any event the Organisers may terminate the licence of any Exhibitor by immediate notice to the said Exhibitor.