1 RG SHIPYARDS

Transcript of Apresentação Engevix Institucional - NBCC Presentation_NBCC site.pdf · Celso Parisi & Roberto...

1

RG SHIPYARDS

A BRAZILIAN

COMPANY CASE

Celso Parisi & Roberto Gaensly

LEADERSHIP

Leader in the rankings of the O Empreiteiro [The Contractor] magazine along several consecutive years.

The largest CONSULTING ENGINEERING Company in Brazil

Ranking of the 500 Largest Companies in the Construction Field – “O Empreiteiro” Magazine

Category: Projects & Consulting

Classification as per Gross Sales Revenue

DIVERSIFIED COMPANY

The largest CONSULTING ENGINEERING Company in Brazil

Projects for more than 60% of the Brazilian

hydroelectric park.

Performance in the construction and operation

of hydroelectric power plants – Large and Small

Hydroelectric Power Plants, reaching more than

60,000 MW of generation.

Monjolinho Hydroelectric Power Plant, which has capacity for

generating 74 MW

5

EVOLUTION - 1965 TO 2013

1965 – Fundada no Rio de Janeiro como Engevix S.A. Estudos e Projetos de Engenharia.

1972 – Aquisição da empresa pelo Grupo Rossi.

1997 – Aquisição pelos atuais sócios Cristiano Kok, Gerson Almada e José Antunes Sobrinho.

Gestão de 64 projetos do Plano de expansão

da COSIPA.

…1970’s Engenharia Consultiva principalmente nos setores de Energia e Infra-Estrutura.

…1980’s Gerenciamento de Projetos e inicio da atuação no setor de indústria.

Reforma do forno da AÇOMINAS.

…1990’s Engenharia, Suprimentos e Construção (EPC).

…2000’s EPC’s maiores, O&M e investimentos em energia renovável.

…2010’s O&G Off-Shore, Construção Naval e Novos Investimentos para o futuro.

Construção de 8 FPSO para plataformas e 3 parques eólicos com

90Mw.

De uma empresa de Engenharia Consultiva…

…Para um dos maiores atores no mercado de Serviços de Engenharia nos setores de Energia, Óleo e Gás, Indústria e Infa-Estrutura no Brasil.

…2013’s… Construção do Estaleiro Rio Grande 2, 3 Navios Sonda e o Pórtico de 2000t.

ETG – Cacimbas UHE - Monel

5

DIRECTORS:

Commercial:

Alessandro Carraro Antonio Droghetti

Technical/Engineering:

Silvano Albertoni Luiz Bianchi Osmar Tessmer Yoshiaki Fujimori Marco Aurélio Fernandes Eduardo Minoru Nagao Carlos Eduardo Albero Sérgio Capellão

Shareholders Vice-Presidents Directors

CEO Cristiano Kok

VPE – Power Engineering

& Management Lailton Xavier

VPF Finance, Relations with Investors & Administration

Edson Bouer

VPI - Industry José Carlos Lopes

VPN Infrastructure &

Construtions Wilson Vieira

Board of Directors

Executive Directors Gerson Almada

Executive Director José Antunes Sobrinho

Office in Brasilia Santo Bertin

Human Resources Artur Mausbach

Quality Carlo Filippini

Information Technology Ciro Schmitt

ORGANIZATIONAL STRUCTURE

7

JACKSON GROUP

8

ECONOMIC GROUP: Corporate Structure

VPE – Power Engineering & Management

Lailton Xavier

MAIN CLIENTS AS PER BUSINESS FIELD

VPI - Industry José Carlos Lopes

MAIN CLIENTS AS PER BUSINESS FIELD

VPN – Infrastructure & Buildings Wilson Vieira

MAIN CLIENTS AS PER BUSINESS FIELD

SERRA DO NAVIO

MANAUS

ARIPUANÃ

CAUCAIA

BRASÍLIA CACHOEIRA ALTA

CAÇU ALÉM PARAÍBA

BARUERI

ARAUCÁRIA

BARRACÃO

FLORIANÓPOLIS

CURITIBA

GOV VALADARES LINHARES

VILA VELHA

MACAÉ

RIO DE JANEIRO

B. HORIZONTE

SALVADOR

RECIFE

Representation Offices

GLOBAL PRESENCE

Main Contracts

Fortaleza Airport

Mario Covas Highway Ring -

Federal Auto Highway

System of Metropolitan Railway

Electric Power Industry

Cacimbas III

Station of Natural Gas Compression - TBG

Itaipu HPP– 14,000MW

PERFORMANCE FIELDS

Tucurui HPP – 8,700MW

Itá HPP – 1,450MW

Campos Novos HPP - 880MW

Infrastructure

The Alzir dos Santos Antunes Hydroelectric Power Plant is the first hydroelectric power plant whole conceived, built and being the property of the Engevix Group.

Having 74 MW of generation power, it is located at the Passo Fundo River, in Rio Grande do Sul State, and it was built in a record period for power plants of this size – 28 months of works; it has two Francis type generating units, with nominal power of 37 MW and 70 cu m/s of water swallowing. Clamping dam of reinforced concrete that has 420 m length and maximum 80 m height, and a side spillway of free threshold; it is a symbol of the entrepreneurial spirit of the Engevix Group.

Hydroelectric Generation

ELECTRIC POWER

The three aeolian electric

power plants, located at Brotas de Macaúbas – Bahia State, have capacity for generating 90 MW. The total planned investment is the amount of R$ 395.8 million.

The implantation is in charge of Engevix.

Aeolian Generation

ELECTRIC POWER

ELECTRIC POWER

Competence in Whole Undertakings of Substations and Transmission Lines

Contract with AES Uruguaiana Empreendimentos to implant the substation of the Uruguaiana Thermoelectric Power Plant (600 MW) and two transmission lines of 230 kV, interconnecting to the Uruguaiana Substation (4.5 km) and to the Alegrete Substation (140.0 km) and all of the interconnections with the Alegrete and Uruguaiana Substations. (1999)

Undertakings of SC Energia and RS Energia (Engevix - 10% equity interest):

Implantation of the Campos Novos-Blumenau transmission lines in 525 kVA, 375 km and the Campos Novos-Santa Rita transmission lines in 525 kVA, 257 km, in a consortium with Schain Engenharia S/A.

ETAU - Empresa Transmissora do Alto Uruguai: Engevix implanted 187 km of transmission lines interconnecting Campos Novos-Barra Grande-Lagoa Vermelha-Santa Marta, with tension of 230 kV.

BAESA - Barra Grande Energética: implantation of the Barra Grande Substation and its interconnection lines with the Barra Grande Hydroelectric Power Plant and, for SC Energia, it implanted the Biguaçu Sectioning Substation (525 kV).

INFRASTRUCTURE

Presence in various segments of the economy, rendering Engineering services for

infrastructure works of Governments and private companies

HIGHWAYS RAILWAYS

CITY SUBWAYS AND

SUBURBAN TRAINS

AIRPORTS PORTS SEWERAGE

BUILDINGS

Experience in projects for the basic sewerage sector

Performance in the following undertakings referred to the sewerage field

Management and Overseeing of the works regarding water supply systems and sanitary sewerage systems in the cities of Vale do Paraíba and Caraguatatuba in Sao Paulo State.

Management of the PARANASAN Program all over the Paraná State, having financing from Japan.

Management of the sewerage program of the Manaus igarapés [narrow riverbank between two islands or an island and the mainland].

Basic Sewerage

INFRASTRUCTURE

History of success with some of

the Company Clients in the

railway sector

Particularly pointing out the participation in the

following projects:

Project of the 210 km stretch at the East-West Railway, that links

the Goiás State to Sao Paulo, and fitting projects at the Carajás

Railway

Supervision of the implantation works for the North-South Railway

in Tocantins State

Management of works and assemblies for the enlargement of the

Workshops and the Terminals of Ponta da Madeira and Carajás, in

the Maranhão State

Railway

INFRASTRUCTURE

INFRASTRUCTURE

Participation in major works

• Modernization projects for the System of Metropolitan Trains in Sao

Paulo City, with emphasis on the Downtown Integration Project.

• Studies for the System of Metropolitan Trains in San José Capital City

in the Costa Rica Republic.

• Inspection and Supervision of the Works for the Salvador Capital City

Subway.

• Supervision of the works for the revitalization of the railway network,

and Supervision and Control of the civil works for construction and

reconstruction of stations belonging to the “Turquesa” line of the Sao

Paulo City Company of Metropolitan Trains.

• Supervision of the Civil Engineering Projects for the stations and the

permanent railway of the A, C and F lines of the Sao Paulo State

Company of Metropolitan Railways.

Metropolitan Subway and Suburban Train

Participation in the development of

projects for the highway modal

system Approximately 600 km of highways construction, additions of new lanes, in

addition to recovery and modernization of the existing highways

Projects for the Mário Covas Highway Ring, Southern and Eastern stretches,

characterized by a high-level highway, express type, with full control of

accesses.

Inspection and Supervision of the Lot of Land 2 works, Southern Stretch of the

Mário Covas Highway Ring.

Management of the Development Program of the Sao Paulo City Strategic

Metropolitan Highway System, covering the Jacu-Pêssego Highway Complex,

the New Tietê City Boundary Highway, and the Recovery Programs for General

Highways and Neighbouring Highways of Sao Paulo, being funded by the Inter-

American Development Bank.

Recovery of the railway network of Santa Catarina State, hit by the floods, and

of several highways all over the Brazil territory.

Highways

Mário Covas Highway Ring

INFRASTRUCTURE

INFRASTRUCTURE

Participation in the development of

projects for the highway modal

system

Consulting and advisory services for the Monitoring Commission for the Services Concessions and Permissions of Sao Paulo State Government, giving support to the Inspection of the Operational Services, Environment and Preservation of the Lot Routine awarded to the CCR-VIAOESTE [Western Highway], which covers the Castelo Branco, Raposo Tavares, José Ermírio de Moraes and Celso Charuri Highways and the lot awarded to the CCR-Rodoanel Oeste [Western Highway Ring]

Project for enlargement of the operational capacity regarding the aisleway of the São Sebastião Port, encompassing the construction of addition al lanes for the SP 099 - Tamoios Highway, and the New Transposition of the Caraguatatuba Hills, won by submitting proposals for specialized works that require bridges in the range of 500 m length and tunnels up to 3,000 m

Projects for improvement, expansion and recovery of the railway network of Sao Paulo State, projects for addition of highway lanes, construction of new highway stretches and intersection devices at special class highways and neighbouring highways

Highways

Extensive participation in the

modernization of Brazil

airports

Development of projects

Technological Upgradings

Enlargements or new terminals and runways

Inspection and management of works

Participation in the projects of 30 airports, encompassing the

main ones in Brazil

Airports

Santarém Terminal

Rio de Janeiro (Galeão)

Florianópolis

Santarém

Belo Horizonte (Confins)

Fortaleza

Natal

Macaé

Curitiba

Brasília

São Paulo (Congonhas)

INFRASTRUCTURE

Extensive experience in the sector that

will have to receive high public and

private investments along the

incoming years

Main projects

Ports

Manaus

Belém

Salvador

Ilhéus

Itaqui

Fortaleza

Areia Branca

Recife

Maceió

Oceanic Terminal (Angola)

INFRASTRUCTURE

Competence and experience in

construction projects

Performance in the sector of dwelling buildings and those ones

related to infrastructure projects.

Development of projects, planning, management and

inspection of works.

Active participation in various successful undertakings, getting

the benefits from the somewhat booming economy and the

expansion of the civil construction sector.

Buildings

INFRASTRUCTURE

INDUSTRY

Important examples of the Engineering utilization for achieving significant

results referred to value addition to the undertakings of their Clients

Resende Steelmaker

Petrosix

Project

INDUSTRY

Project of detailing performed as the "fast-track“ system

Participation of the Votorantim team and the ones of

the main vendors at the ENGEVIX offices, in Rio de

Janeiro

Areas:

Resende Siderurgical Mill

• Architecture and

Urbanism

• Mechanical Matters

• Tubing

• Public Services

• Electric Matters

• Automation

• Team involved devoted

350,000 man-hours

• Instrumentation, Civil Engineering

and Geotechnics

• Earthwork

• Foundations

• Reinforced Concrete Structures

• Metallic Structures

• 9,000 documents.

INDUSTRY

Technical and executive supports to the Client

Purpose

Getting the necessary licenses for the connection of the Main Substation of the Plant to the 500 kV transmission line of Furnas

Governmental Bodies

ONS - National Operator of the Electric System

MME - Ministry of Mines and Energy

ANEEL - National Agency Electric Power Regulatory Agency

Technical Management for the Implantation of the Substation

Resende Steelmaking

INDUSTRY

Contract with Petrobras International - June 2008

Focus

Upgrading the Petrosix technology for oil production as from the bituminous schist

Scope

Conceptual project

Feasibility Study - production of 50,000 barrels per day

International Evolution

United States - project finished and showing the technical and economic-financial feasibility for its continuation

Morocco - geological data point out the need of a better geological study and the expansion of the reserves

Jordan – the study will be finished in the future

Petrosix Project

INDUSTRY

Study in Utah (USA)

Hydrotreatment (HDT) and additive processing in order to diminish the viscosity

It allows the bombing thru the petroleum pipeline, along 275 km

It makes possible taking out the sulphur that the crude petroleum contains, aimed at complying with the environmental legislation and the commercial quality that is accepted in the domestic market

Utah Project

It supported the opening of one of the major, worldwide, underground mines for schist mining works

Capacity of 27.7 million tons/year

Petrosix Project

INDUSTRY

History of Success in the segment of Oil and Gas

Engevix Performance: Development of the area of Projects and Procurement

Refineries

Landulfo Alves, in the Bahia State (system of acid waters)

Manaus

Paulínia (HDTD Unit)

Platforms for production of oil at the coast of Rio Grande do Norte and Ceará States

Contract with Petrobras for the Module II implantation regarding the Cacimbas gas processing zone.

Oil and Gas

INDUSTRY

The consistency of the

Project proves the

Excellency

Projects for the infrastructure implantation of the Cacimbas Natural Gas Treatment Unit (UTGC) - Linhares-Espírito Santo State - started in 2005

Phases of the Project: Development of the Executive Project

Supply of units of equipment and materials

Civil construction

Electromechanical assembly

Conditioning / Commissioning

Pre-operation technical assistance

Start-up and assisted operations.

Oil and Gas – Cacimbas Incentive Zone

INDUSTRY

The consistency of the Project

proves the Excellency Performance in the following contracts:

Peroá 2 - enlargement of the Phase I regarding the Cacimba Incentive Pole - production capacity of 5.5 million cu.m.

Phase II Module composed of one Unit for Processing of Natural Gas (UPGN

[Portuguese sigla]) and a

Unit for Processing of Natural Gas Condensate (UPCGN) denominated "on site" and part of it is called "off-site“

Production capacity of 3.5 million cu.m

Phase III Two modules, each one composed of a UPGN and a UPCGN - "on site" and

"off-site" interconnecting the two new modules and all of the other existing parts for the receiving, the processing and the flowing off of products (natural gas, GLP and C5+) at the Cacimbas Gas Processing Incentive Pole, integrating the system of supervision and control

Production capacity of 7 million cu.m.

Oil and Gas – Cacimbas Incentive Zone

INDUSTRY

The consistency of the Project

proves the Excellency

In January 2010, the total of 21 million man-hours accumulated without accidents involving sick leaves, was reached; it is a milestone for Engevix and Petrobras.

Total processing capacity of the Incentive Zone

16 millions of gas cu.m.

15,000 barrels per day of petroleum condensate (oleo linked to the gas)

Supplying fields

Land level, from the Norte Capixaba

Maritime: Peroá, Cangoá, Golfinho, Canapu e Camarupim.

In the future, with the construction of the Capixaba Southern/Northern gas pipeline, it will also be able to receive gas from the Parque das Baleias [Park of the Whales], in the State Southern Coast.

Oil and Gas – Cacimbas Incentive Zone

61,000 cu.m. of

concrete

11,000 t of tubing

1,900,000 m of

cables

402 units of

equipment being

managed

ECOVIX

Presentation

and

RIO GRANDE