    STANDARD OPERATING PROCEDURE OF

    APRDS

    [JITPL / SOP / APRDS]

    2X600MW DERANG, ANGUL

    SOP OF APRDS

    Issue Date:

    JINDAL INDIA THERMAL POWER LIMITED

    DERANG, ANGUL, ODISHA

    2 X 600 MW Power Plant

  • 8/11/2019 APRDS SOP

    2/14

    No. Index Page

    1.0 Equipment description 1

    1.1 Power supply detail 2

    2.0 Starting Procedure 3

    2.1 Pre start 3

    2.2 Post start 3

    3.0 Stopping Procedure 4

    4.0 Isolating procedure /safety aspect(PTW) 5

    5.0 Emergency operation 66.0 Schematic diagram 7

    7.0 References 8

    Jindal India Thermal power Limited, Derang, Angul, Odisha (2x600 MW TPP)

    STANDARD OPERATING PROCEDURE

    Index of APRDS

  • 8/11/2019 APRDS SOP

    3/14

    EQUIPMENT DESCRIPTION of APRDS:

    `

    1.0 Scope:

    1

    Jindal India Thermal power Limited, Derang, Angul, Odisha (2x600 MW TPP)

    STANDARD OPERATING PROCEDURE

    1.0 Equipment Details

    APRDS: This Procedure is intended to provide guidance and instructions for carrying out the Charging &

    Depressurising of Auxiliary Steam Header.

    a) This Procedure is applicable for Charging & Depressurising of Auxiliary Steam Header.

  • 8/11/2019 APRDS SOP

    4/14

    Jindal India Thermal power Limited, D

    1.1

    No. Power Source

    1 Motor-operated valve in NoASV-29

    2 Motor-operated valve in No ASV-35

    3 Motor-operated valve in No FDV-30

    4 Motor-operated valve in No CDV-90

    5 Motor-operated valve in No CDV-93

    STANDARD OPERATING PROCEDURE

    Power Supply of APRDS system

    415 V 1KB ( 12.5 m) tu

  • 8/11/2019 APRDS SOP

    5/14

    rang, Angul, Odisha (2x600 MW TPP)

    Feeder No.

    1KB 15 Y

    1 KB 08 E

    1 KB 12 P

    1 KB 07 S

    1 KB 07 U

    2

    rbine valve mcc

  • 8/11/2019 APRDS SOP

    6/14

    2.0

    2.1

    S. No.

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    2.2

    1

    2

    S.No1

    2

    3

    4

    5

    STANDAR

    2.3 Syste

  • 8/11/2019 APRDS SOP

    7/14

  • 8/11/2019 APRDS SOP

    8/14

    Jindal India Thermal power Limited, Derang, Angul, Odisha (2x600 MW TPP)

    Starting Procedure of APRDS

    PRE START CHECK of APRDS:

    Description

    Ensure all PTWs related to ASH of all maintenance department stands cancelled and system is ready for cha

    Ensure instrument air compressor in service and header pressure normal.

    Ensure Main MOVs panel supply incomers available.

    Ensure CRH to ASH MIV and its BYPASS MIV is in CLOSED condition.

    Ensure CRH to ASH MOV power supply ON and CLOSED condition.

    Ensure CRH to ASH control valve is operating and CLOSED condition

    Ensure MS to ASH MIV in CLOSED condition.

    Ensure MS to ASH PCV air line charge condition

    Ensure MS to ASH control valve is operating and CLOSED condition.

    Ensure MS to ASH Spray control valve operating and CLOSED condition (I/L MIV in open condition)

    Ensure adjacent units ASH interconnection MOVs CLOSED condition.

    Ensure ASH interconnecting MOVs to other units CLOSE condition and its drain to atmosphere OPEN

    condition.

    Ensure other unit ASH pressure normal and its CRH control valve in auto with set point 8.0 Kg/cm2

    Ensure ASH to Mill line main MIV CLOSED condition.

    Ensure ASH to Dearator Main MIV close and MOV power supply ON and CLOSE condition.

    Ensure ASH to DEA control valve CLOSE condition

    Ensure ASH drains to Flash tank OPEN Condition.

    Ensure ASH header pressure gauge is lined up.And also Ensure ASH drains to flash tank is open condition

    POST START

    Confirm from local operator that APRDS header normal condition: a) No abnormal sound. b) No steam and

    water Leakage.

    Maintain header pressure & Temperature

    Description Slowly open the adjacent unit ASH interconnecting MOV towards charging unit from that end.

    Slowly open the ASH interconnecting valve in this side after condensate is drained.

    Observe the ASH pressure in local gauge.

    Further slowly open the adjacent unit ASH interconnecting MOV towards charging unit from that end.

    (Monitor the CRH to ASH control valve opening and header pressure)

    Further open the ASH interconnecting valve in this side and charge up to the rated pressure.

    OPERATING PROCEDURE

    charging from adjacent unit Auxiliary Steam Header:

  • 8/11/2019 APRDS SOP

    9/14

    Throttle the ASH drains so as to achieve the rated temperature of ASH.

    Interconnecting line drain line steam trap to be LINED UP and open to atmosphere line drain to be

    Required parameters are: Pressure: 10.5 Kg/cm2 Temperature: 3200C

    The same procedure to be followed for charging from the other unit.

    When the CRH pressure reaches 15 Kg/cm2, CRH steam can supply ASH

    a)OPEN after PCV drain to atmosphere.

    b)OPEN CRH to ASH MOV and drain the condensate.

    c)OPEN CRH to ASH MIV.

    d)Take the CRH to ASH pressure control valve into auto with set point 10.0 Kg.

    Description

    Ensure boiler in lighted up condition and main steam parameter meet the requirement of Auxiliary steam

    Ensure at least one CEP in running condition.

    Ensure MS to ASH line before PCV drain open condition.

    Ensure MS to ASH line after control valve drain to atmosphere open condition.

    After draining the condensate OPEN the main MIV.

    Gradually OPEN the after MIV control valve and drain the condensate

    Open the LT APRDS main MOV and its header drain

    Control the ASH pressure & temperature with help of control valve and spray control valve.

    Both before MOV and after control valve drain line steam trap to be LINED UP and CLOSE the direct drain.

    When the CRH pressure reaches 1.6 Mpa, CRH steam can supply ASH

    a)OPEN after PCV drain to atmosphere.

    b)OPEN CRH to ASH MOV and drain the condensate.

    c)OPEN CRH to ASH MOV.

    d)Take the CRH to ASH pressure control valve into auto with set point 10.5 Kg

    3

    System charging with only one unit running:

  • 8/11/2019 APRDS SOP

    10/14

  • 8/11/2019 APRDS SOP

    11/14

    Jindal India Thermal power Limited, Derang, Angul, Odisha (2x600 MW TPP)

    3.0 APRDS Stop Procedure

    No. Activity

    1 Close ASH to DEA line control valve and its MOVs and OPEN all drains.

    2 Close ASH to Mill line MIV, MOV and OPEN all drains

    3 Close CRH to ASH MIV, MOV and its control valve and OPEN all drains.

    4 Close MS to ASH MIV and PCV OPEN all drains.

    5Close interconnecting MOVs of others units and OPEN the I/C drains to

    atmosphere.

    6 Full Open drains of ASH header.7 Observe the header depressurization and hand tight the MOVs in this end.

    4

    STANDARD OPERATING PROCEDURE

  • 8/11/2019 APRDS SOP

    12/14

    4.04.1

    No.

    1

    2

    4

    5

    6

    Note: 5

    Follow recommended procedure to issue PTW,isolation & nomalisation

    STANDARD OPERATING PROCEDUREJINDAL INDIA THERMAL POWER LTD.(2*600 MW)DERANG ANGUL

    Isolation pocedure /safety aspects(PTW)Isolation procedure ofAPRDS

    Description

    Isolate the MS Line to PRDS

    Isolate the CRH Line to PRDS

    Isolate spray line from CEP Discharge for LT PRDS

    Isolate the spray line from BFP Discharge to HTPRDS

    Open Drains of all steam line

  • 8/11/2019 APRDS SOP

    13/14

    5.0

    No.

    1

    2

    1

    1

    1

    2

    1

    1

    6

    STANDARD OPERATING PROCEDUREJINDAL INDIA THERMAL POWER LTD.(2*600 MW)DERANG ANGUL

    Emergency operation of APRDS

    Description

    Case 1.:PRDS pressure high/low

    Causes:

    Effect:

    Action:

    Case 2.:PRDS temp high/low

    Causes:

    Effect:

    Action:

  • 8/11/2019 APRDS SOP

    14/14

    Jindal India Thermal power Limited, Derang, Angul, Odisha (2x600 MW TPP)

    STANDARD OPERATING PROCEDURE

    7.0 Reference

    No. Description Feeder

    1 BOILER O & M manual

    8