P OTENTIAL T OPICS FOR B REAK -O UT D ISCUSSION  Integration of stand-alone models  Cyberinfrastructure  Economics  Communications and Outreach

Transcript of Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

Page 1: Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

Apr 12, 2011Pullman, Washington

KICK-OFF MEETING, DAY 2

Page 2: Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

BREAK-OUT DISCUSSIONS

Page 3: Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

POTENTIAL TOPICS FOR BREAK-OUT DISCUSSION

Integration of stand-alone models

Cyberinfrastructure

Economics

Communications and Outreach

Page 4: Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

INTEGRATION OF STAND-ALONE MODELS

Degree of integration/coupling

1-way (loose coupling)

Iterative coupling

Tight coupling

States/fluxes to pass between various models

Model rebuilding, simplification, or code translation?

Page 5: Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

MODEL SPACE/TIME DOMAINS

Page 6: Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

Set Purpose Time period

Model Configuration Compute Facility Who Whenmodel input

1

Establish baseline results of models

as they are; model evaluation & calibration

2000to

2009

WRF-Noah reanalysis bluefire WSU first yearoffline CMAQ & MEGAN modeled meteorology WSU WSU first 15

months

offline CropSyst observed meteorology WSU WSU   modeled meteorology

offline RHESSys

observed meteorology (and deposition?)  

modeled meteorology, deposition, and ozone  

modeled meteorology; no deposition, no ozone

 

offline VIC observed meteorology WSU WSU   modeled meteorology

2

Impacted of integrated WRF-

VIC (without biogeochemistry

modeling)

2000to

2009

WRF- VIC w/o RHESSys/CropSyst reanalysis bluefire PNNL first year

offline CMAQ & MEGAN modeled meteorology WSU WSU first 18

monthsoffline CropSyst

modeled meteorology, deposition, & ozone

WSU WSU  offline RHESSys  offline VIC-RHESSys-CropSyst WSU WSU  

3 Integrate all model components

2000to

2009

WRF-VIC with RHESSys/CropSyst coupled to CMAQ & MEGAN

NCEP reanalysis NCAR Wyoming WSU 3rd or 4th

year?

4 Future scenario2010

to2050

WRF-VIC with RHESSys/CropSyst coupled to CMAQ and MEGAN + CREM

CCSM4 climate NCAR Wyoming WSU 4th and

5th year

Page 7: Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

CYBERINFRASTRUCTURE NEEDS

1. Code Versioning Software

subversion, cvs, git

2. Data Storage

DateOne, HDF

3. Cluster Software Support

Virtualization, MapReduce, Hadoop

4. Document Sharing

DropBox, SharePoint, Google Group, code.google.com

5. Videoconferencing

Evo, MeetingPlace, LiveMeeting (MS), BigBlueButton, SharePoint, Elluminate, Adobe Connect, Skype

Refer to details in memo by Joe Vaughan

Page 8: Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

GROUP DISCUSSION ON PROJECT INTEGRATION

Page 9: Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

TIMELINE

Major milestones for entire 5-year project duration (see hand-out of project milestones)

Specific milestones for first year: need to determine

Design milestones to match specific objectives

1-way land/atmosphere impacts

2-way land/atmosphere impacts/feedback

Feedbacks with human decision making (economics)

Communications and outreach

Page 10: Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

WORKING GROUPS

Need to discuss what working groups will look like

Working groups will change throughout project duration

Initial working groups will be formed to accomplish first year milestones

Page 11: Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

MEETING FREQUENCY

Steering committee meetings

Bi-monthly in early stages, eventually monthly?

All faculty participants invited

Working group meetings: weekly to bi-monthly

All-faculty meetings: quarterly?

All-participant meetings (faculty&students): bi-annually?

E.g., Kick-off meeting, poster presentations, etc..

Peer review meetings: annually?

Outreach Meetings: bi-annually to annually?

Page 12: Apr 12, 2011 Pullman, Washington K ICK -O FF M EETING, D AY 2.

CONCLUDING REMARKS