APPROVEQ % DEC 1 3 2017 BOARD OF RECREATION AND PARK COMMISSIONERS no. 17-258 BOARD REPORT DATE December 13, 2017 CD. 11 BOARD OF RECREATION AND PARK COMMISSIONERS DOCKWEILER STATE BEACH - APPROVAL FOR THE USE OF SUBMERGED TIDELANDS FOR A PROPOSED SUBSEA FIBER-OPTIC CABLE SYSTEMS CONNECTING THE UNITED STATES AND THE ASIA PACIFIC REGION; CONSIDERATION OF THE ENVIRONMENTAL IMPACT REPORT (EIR), FINDINGS, STATEMENT OF OVERRIDING CONSIDERATIONS AND ACCOMPANYING MITIGATION MEASURES, AND OF THE MITIGATION MONITORING AND REPORTING PLAN FOR THE LOS ANGELES TRANS-PACIFIC TELECOMMUNICATIONS CABLE HUB EIR (SCH NO. 2016101050) SUBJECT: AP Diaz *R. Barajas H. Fujita V. Israel S. Pifla-Cortez N. Williams <r *al Manager X Disapproved Approved Withdrawn With Corrections RECOMMENDATIONS 1. Grant approval for the use of the Submerged Tidelands under the jurisdiction of the City of Los Angeles, Department of Recreation and Parks (RAP) at Dockweiler State Beach for a proposed Subsea Fiber-Optic Cable System connecting the United States and the Asia Pacific Region, also referred to as the Los Angeles Trans-Pacific Telecommunications Cable Hub; Authorize the General Manager and/or his designee to negotiate and develop an Easement Agreement with Tyco Electronics Subsea Communications LLC (TE SubCom) for the use of the submerged tidelands under the jurisdiction of RAP at Dockweiler State Beach under terms and conditions indicated in the Summary of this Report; 2.

Transcript of APPROVEQ BOARD OF RECREATION AND PARK COMMISSIONERS

Page 1: APPROVEQ BOARD OF RECREATION AND PARK COMMISSIONERS

APPROVEQ

% DEC 1 3 2017

BOARD OF RECREATION AND PARK COMMISSIONERS no. 17-258BOARD REPORT

DATE December 13, 2017 CD. 11

BOARD OF RECREATION AND PARK COMMISSIONERS

DOCKWEILER STATE BEACH - APPROVAL FOR THE USE OF SUBMERGED TIDELANDS FORA PROPOSED SUBSEA FIBER-OPTIC CABLE SYSTEMS CONNECTING THE UNITED STATES AND THE ASIA PACIFIC REGION; CONSIDERATION OF THE ENVIRONMENTAL IMPACT REPORT (EIR), FINDINGS, STATEMENT OF OVERRIDING CONSIDERATIONS AND ACCOMPANYING MITIGATION MEASURES, AND OF THE MITIGATION MONITORING AND REPORTING PLAN FOR THE LOS ANGELES TRANS-PACIFIC TELECOMMUNICATIONS CABLE HUB EIR (SCH NO. 2016101050)

SUBJECT:

AP Diaz

*R. Barajas

H. Fujita

V. Israel

S. Pifla-Cortez

N. Williams

<r

*al Manager

X DisapprovedApproved WithdrawnWith Corrections

RECOMMENDATIONS

1. Grant approval for the use of the Submerged Tidelandsunder the jurisdiction of the City of Los Angeles, Department of

Recreation and Parks (RAP) at Dockweiler State Beach for a proposed Subsea Fiber-Optic Cable System connecting the United States and the Asia Pacific Region, also referred to as the Los Angeles Trans-Pacific Telecommunications Cable Hub;

Authorize the General Manager and/or his designee to negotiate and develop an Easement Agreement with Tyco Electronics Subsea Communications LLC (TE SubCom) for the use of the submerged tidelandsunder the jurisdiction of RAP at Dockweiler State Beach under terms and conditions indicated in the Summary of this Report;

2.

Page 2: APPROVEQ BOARD OF RECREATION AND PARK COMMISSIONERS

BOARD REPORT

NO, 17-258PG. 2

Authorize the General Manager and/or his designee and the City Attorney to make any necessary changes to the Easement Agreement consistent with the terms, improvements, and uses set forth in this Report;

3.

Authorize the Board President and Secretary to execute the final Easement Agreement subject to the approval of the City Attorney as to form, and the approval of the City Council by ordinance;

4.

Authorize RAP’s Accounting Employee to establish the appropriate account for the receipt of $400,000.00 from TE SubCom as consideration for the execution of the Easement Agreement; and,

5.

Find, pursuant to the State of California Environmental Quality Act (CEQA) Guidelines, in consideration of the whole administrative record, that the project was adequately assessed in the certified Environmental Impact Report (EIR), Findings, Statement of Overriding Considerations and accompanying mitigation measures, and of the Mitigation Monitoring and Reporting Plan for the Los Angeles Trans-Pacific Telecommunications Cable Hub EIR (SCH No. 2016101050).

6.

SUMMARY:

For the past several months, City staff from RAP, information Technology and the City Attorney have been meeting with representatives from Tyco Electronics Subsea Communications LLC (TE SubCom) concerning a proposal to install and operate infrastructure for subsea fiber-optic telecommunications cable systems connecting the United States (US) and the Asia Region, also referred to as the Los Angeles Trans-Pacific Telecommunications Cable Hub. The proposed Project locations are in Los Angeles, California.

The proposed landing site for the proposed hub in the US is the northeast corner of the parking lot at Dockweiler State Beach, immediately west of South Marine Avenue and west of Vista del Mar Boulevard abutting the western boundary of the Los Angeles Airport (Exhibit A-1).

A subsurface terrestrial conduit system would be constructed from the project installed underground manholes at the parking lot to an existing data center, through the public street right-of way within the limits of the City of Los Angeles and El Segundo (Exhibit A-2)

Page 3: APPROVEQ BOARD OF RECREATION AND PARK COMMISSIONERS

BOARD REPORT

NO. 17-258PG. 3

four (4)The project includes the installation of XXXXXtidelands and a terrestrial conduit system at the parking lot at Dockweiler State Beach. With the exception of a small portion at the corner of Vista Del Mar and Imperial, RAP does not own Dockweiler State Beach (Exhibit A-3). However, the ownership of the submerged tidelands along the coastline within the City of Los Angeles limits were granted to the City by the California State Land Commission in 1929. The City Council subsequently conferred jurisdiction over the submerged tidelands to RAP by ordinance (Los Angeles Municipal Code Section 63.01).

At this time, the negotiating parties have come to an understanding on the terms and conditions for a possible easement agreement that would allow TE SubCom to install and operate the proposed project. These terms and conditions are reflected on the attached Term Sheet (Exhibit B).

With the Board’s approval of the proposed project and the terms indicated in the term sheet, RAP staff with the assistance of staff from the Information Technology Agency and the Office of City Attorney shall finalize the Easement Agreement which will be forwarded to the City Council for approval.

ENVIRONMENTAL IMPACT REPORT (CALIFORNIA ENVIRONMENTAL QUALITYACT (CEQA))

RAP staff has determined that the actions before the Board are part of a larger project, adequately assessed in a previously certified EIR, along with Findings and Statement of Overriding Considerations, and a Mitigation Monitoring and Reporting Plan, for the Los Angeles Trans-Pacific Telecommunications Cable Hub EIR (SCH No. 2016101050).

On November 3, 2017, the Los Angeles City Council certified the EIR for the proposed Trans-Pacific Telecommunications Cable Hub and approved the Findings and Statement of Overriding Considerations ant the Monitoring and Reporting Program. A Notice of Determination (NOD) was filed with the Los Angeles County Clerk on November 3, 2017. Staff recommends that the Board concur with the City Council’s determination. No further CEQA documentation is required for the subject actions before the Board.

FISCAL IMPACT STATEMENT

There is no negative impact to RAP’s General Fund related to the approval of the proposed Los Angeles Trans-Pacific Telecommunications Cable Hub project and the related Easement Agreement. There will be a net gain of $400,000.00.

Page 4: APPROVEQ BOARD OF RECREATION AND PARK COMMISSIONERS

BOARD REPORT

PG. 4 NO. 17-258

This Report has been prepared by Cid Macaraeg, Sr. Management Analyst II, Planning Maintenance and Construction Branch.

List of Attachments

Exhibit A-1 Exhibit A-2 Exhibit A-3 Exhibit B

Page 5: APPROVEQ BOARD OF RECREATION AND PARK COMMISSIONERS

Exhibit A-1V

W'*■’

J\Atv .r N » (l*

o

1%i w\0- / V-,!L. . /Site LocationKi \r*• n ■ i*. I ». .ia □ h 1

\Iv% v‘ .:;V i

3.c3 iVV

•'.VQtn' ,nt

i11- .> \0

o o do 120 4 \v).VMilesm Tijuana \: tV~fi

ai Los Angeles ,

*s fio L J •>'

. 'Malibu]i

Monica!if

a"D

it\ !lfU)l*W<JOfi r: >

jU *7-7;

//.//■, twUo'cKwoiiorg i

'tSSftataaEidh:!

vfflaaesaBgeeG)

a.i?a ;: v

Tori an ce !ifi I v

6 r;M,1.. & - Vv

'llft \\

EssgBoEafes

a

630Nautical Miles

Kilometers140

LegendFigure 2-1

Location MapLos Angeles Trans-Pacific

Telecommunications Cable Hub

PLCN Cable Route

Trans-Pacific Cable Segment

# Cable Landing SiteEnvironmental Resources Management www.erm.com

ERM

Page 6: APPROVEQ BOARD OF RECREATION AND PARK COMMISSIONERS

W 'MPERIAI MWVW >M w «*5- ■WActciaAv# -gk rJ>>.■

W WelmrtAv*

6 Mjplt Avctft

A. ■ «’.CL

E.Palm Awe

Created By: GF Pate: 4/12/2017 Project 0332^96>It-

SMQRIO VW y-.4 <WC«w4kR

O A'*' ■3O 1*.«N’T

E MAp«pr»5A AVf

lf Pin* Av«

*E Kt II. A..

?Ci c*

•*«0 4/<5 Center Street

Elementary SchoolTMARIPOSA AVE <2

5JJ~*W:^»<=R(aFhw"S. -

* 4i JtlJ

; Wdnut Av*^

zv« CcntityBVdO

s

r%t

%\

'•\ s\

\

At\A

i-

&

Eft

VkV

i/l

•»

Celtic cearHyperionTreatment

Plant.i.y.a •

T0.50.250 ■

MilesV

mx

>i

LegendTerrestrial Conduit Route Figure 2-2

Terrestrial Conduit RouteLos Angeles Trans-Pacific

Telecommunications Cable Hub

• Cable Landing SiteConstruction Method (Proposed) J Equinix Data Center------Trenching““ Horizontal Directional Drill

Environmental Resources Managementt'ww.enn.foir

LffiHyCRM

*ci£t

’ ' Lom

a.Vi

siaS

f

Bayo

on+'

StI I* Ioft% 5'Hilt

cres

lSl 1 L

ctn i

b!•

I,

i<

3

P'Pf

*4 ?»

iSUodip-)

<■

<fi

NSf

PtJ«

.VFf

l£i*v

n

Stc>■1

l*

s

*•

c

n

iu>ri aut

fc.

laud

8i

>i 3

iI 4 P-i* : H

£

C fi

S SEP

UtV

EOA B

Lvrm

fi

-* J

■Fi

Page 7: APPROVEQ BOARD OF RECREATION AND PARK COMMISSIONERS

Wwdwalvs02\Data\Projects\Q332596 TE Subcom\MXD\20170814 Entitlement Jurisdictions.mxd, REVISED: 08/14/2017. SCALE: 1:24,000 when printed at 8.5x11 DRAWN BY: PWP

N\\4129001901

VV,'r ii .•!

* -‘it

j»0‘L‘ - iPnlisade:, del Rev

1,000]Feet

z. r. .v

, ;• >

State Waters <3 Nautical Miles) \

\\

'‘.n

AV A 11.’I - ,v,

□4

- t

Exhibit A-3 - I

2,0000Feet

5\VLegendS'City of LA Information

Technology Agency (ITA) Franchise Agreement

LA County Licensing Agreement

Submerged Lands Easement-City of LA Recreation and Parks

Terrestrial Conduit Route• Cable Landing Site

□ Existing Data Center — PLCN Cable Route

Entitlement Jurisdictions Los Angeles Trans-Pacific

Telecommunications Cable Hubs-s

is_ | Parcel Boundary t------ Marine Bore Pipe fEnvironmental Resources Management

wv/w.ernuconi ERM

El Segundo Easement Agreement

Source: Esri World Topographic Map - Esri. HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, ©OpenStreetMap contributors, and the GIS User Community

Page 8: APPROVEQ BOARD OF RECREATION AND PARK COMMISSIONERS

Exhibit BTE SubCom: Los Angeles Trans-Pacific Telecommunications Cable Hub

Term Sheet for Submerged and Tidelands

• Easement Description: Use of submerged and tidelands owned by the City of Los Angeles and controlled by its Department of Recreation and Parks for four fiber optic cable systems that include the following:

o Four bore pipes with a cumulative length of 15,829.2 linear feet, as more particularly identified in Exhibit A. Each bore pipe is 5 inches in diameter with a 6% inch collar at each connection point (every 20 feet).

o Four separate fiber optic cables, including casings, entering the boundary of the City's submerged lands and pulled through each of the four bore pipes. The first cable, known known as the Pacific Light Cable Network, extends 15,528.63 feet from the bore pipe exit to the boundary of the City's submerged lands, and is more particularly identified in Exhibit B. The fiber optic cable is 49 millimeters in diameter. Descriptions of each of the three additional cables will be provided to the Department of Recreation and Parks as they are developed and will become part of the easement area.

• Consideration: A one-time, lump sum payment of $400,000 to be paid within 60 days of the easement agreement's effective date. This payment is inclusive of any extensions of the easement term.

• Term: 21-year term, plus an additional 10-year option subject to the Board of Recreation and Park Commissioners and City Council approval.

• Other Terms: Construction may not begin until the Coastal Commission approves the project's coastal development permit.