Applications Lodged Listing - Combined Development Applic ...

78
Applications Lodged Listing - Combined Development Applic From 1/01/2015 to 31/12/2015 Sorted by Application Number Document Applicant Name/ Address Current Action Development Determination Lodged Date Subject Land Proposal Estimated Cost 9/04/2015 BARGAIN STEEL CENTRE BURTON SA 5110 Lot 10 Heaslip Road Approved DAP 7/2015/1 5/01/2015 129 Dawkins Road LEWISTON LOT: 110 ALT: A HD: 3 PL: D013489 CT: 5698/760 Outbuilding (Shed) $21,000 Planning Assessment 16/04/2015 Category 2 Category: Approval: BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000) $5.05 Planning Fee DAC $66.50 Planning Lodgement Fee (over $5,000) $101.00 Category 2 Fee $95.95 Planning Fee ($10,000-$100,000) $38.90 Staged Consent Fee $19.60 Staged Consent Fee DAC in accordance with plans submitted P1 Builder: Conditions: Payments: 17/02/2015 BARGAIN STEEL CENTRE BURTON SA 5110 Lot 10 Heaslip Road Approved Private Certifier 7/2015/2 5/01/2015 Pederick Road LEWISTON LOT: 206 ALT: A HD: 3 PL: D83809 CT: 6065/503 Verandah $9,000 Decision Issued 25/03/2015 Category 1 Category: Approval: BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000) $1.85 Planning Fee DAC $34.65 Planning Fee (up to $10,000) $66.50 Planning Lodgement Fee (over $5,000) in accordance with plans submitted P1 Stormwater drained and retained onsite P243 external appearance maintained P10 structure not be enclosed with solid P11 external materials to match existing bld P12 provisional building rules consent P101 Dwelling occupation requirements B69 Builder: Conditions: Payments: 2/12/2015 BARGAIN STEEL CENTRE BURTON SA 5110 Lot 10 Heaslip Road Approved Private Certifier 7/2015/3 5/01/2015 Shellgrit Road TWO WELLS LOT: 44 ALT: A HD: 3 PL: D93015 CT: 6134/846 Construction of commercial packing shed $15,000 Decision Issued 2/12/2015 Category 2 Category: Approval: BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000) $438.00 Septic Tank application Fee $1.85 Planning Fee DAC $34.65 Planning Fee (up to $10,000) $66.50 Planning Lodgement Fee (over $5,000) $101.00 Category 2 Fee $38.90 Staged Consent Fee $19.60 Staged Consent Fee DAC in accordance with plans submitted P1 comply to conditions imposed P2 existing trees to be protected P51 Site Conditions P242 Stormwater drained and retained onsite P243 external walls of building subdued P6 external walls maintained in good cond P7 finished floor level not less 700mm P18 planting bushes to and replace when die P44 propagted from locall indigenous species P45 planting approp bushes within first seas P48 provisional building rules consent P101 Dwelling occupation requirements B69 Builder: Conditions: Payments: Page 1 of 78

Transcript of Applications Lodged Listing - Combined Development Applic ...

Page 1: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

9/04/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved DAP

7/2015/1 5/01/2015 129 Dawkins Road LEWISTON

LOT: 110 ALT: A HD: 3 PL: D013489 CT: 5698/760

Outbuilding (Shed) $21,000 Planning Assessment 16/04/2015

Category 2Category:

Approval:

BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$95.95 Planning Fee ($10,000-$100,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

17/02/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/2 5/01/2015 Pederick Road LEWISTON

LOT: 206 ALT: A HD: 3 PL: D83809 CT: 6065/503

Verandah

$9,000 Decision Issued 25/03/2015

Category 1Category:

Approval:

BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$66.50 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

Stormwater drained and retained onsiteP243

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

2/12/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/3 5/01/2015 Shellgrit Road TWO WELLS

LOT: 44 ALT: A HD: 3 PL: D93015 CT: 6134/846

Construction of commercial packing

shed

$15,000 Decision Issued 2/12/2015

Category 2Category:

Approval:

BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

finished floor level not less 700mmP18

planting bushes to and replace when dieP44

propagted from locall indigenous speciesP45

planting approp bushes within first seasP48

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

Page 1 of 78

Page 2: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

30/01/2015C J LEMM

TWO WELLS SA 5501

2 Trim RoadApproved by Delegation

7/2015/4 6/01/2015 2A Trim Road TWO WELLS

LOT: 120 ALT: A HD: 3 PL: D84395 CT: 6063/679

Verandah

$4,900 Final Inspection 27/03/2015

Category 1Category:

Approval:

C J LEMM $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

stormwater dischargeB31

LitterB76

Footings in natural groundB88

Builder: Conditions: Payments:

29/01/2015M PJEVAC

LEWISTON SA 5501

Pte Road Off Tower Road RoadApproved by Delegation

7/2015/5 14/01/2015 32 Robins Road LEWISTON

LOT: 6 ALT: A HD: 3 PL: D007364 CT: 6060/187

Outbuilding (Shed) $3,600 Decision Issued 29/01/2015

Category 1Category:

Approval:

M PJEVAC $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

in accordance with plans submittedP1

stormwater dischargeB31

LitterB76

Footings in natural groundB88

building non standard conditionBNS1

Builder: Conditions: Payments:

1/07/2015M PANELLA

TWO WELLS SA 5501

Lot 11 Old Port Wakefield Roadwithdrawn Application

7/2015/6 14/01/2015 Old Port Wakefield Road TWO WELLS

LOT: 11 ALT: A HD: 3 PL: F219571 CT: 6106/720

Sheep Keeping (20 sheep) $0 Decision Issued 1/07/2015

Category 3Category:

Approval:

M PANELLA $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

Builder: Conditions: Payments:

28/01/2015A H ROUTLEY

TWO WELLS SA 5501

76 Old Port Wakefield RoadApproved by Delegation

7/2015/7 14/01/2015 76 Old Port Wakefield Road TWO WELLS

LOT: 367 ALT: A HD: 3 PL: F174834 CT: 5410/612

Outbuilding (Refrigerated Container) $9,000 Decision Issued 28/01/2015

Category 1Category:

Approval:

A H ROUTLEY $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$59.95 Class 7 & 8

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

planning non standard conditionPNS1

planning non standard conditionPNS2

Fire ExtinguishersB77

Statement of ComplianceB8

Builder: Conditions: Payments:

Page 2 of 78

Page 3: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

1/07/2015C A FLAMANK

LEWISTON SA 5501

19 Aunger RoadApproved by Delegation

7/2015/8 14/01/2015 19 Aunger Road LEWISTON

LOT: 12 ALT: A HD: 3 PL: D013157 CT: 5885/966

Construction of Fence (in flood

hazard zones 1 and 2)

$4,000 Decision Issued 1/07/2015

Category 1Category:

Approval:

C A FLAMANK $58.50 Planning Lodgement Fee (up to $5,000)

$2.55 Planning Fee DAC

$107.10 Planning Fee DAC

$47.95 Planning Fee Non-Complying

$94.00 Planning Fee Non-Complying

$11.90 Planning Fee Non-Complying

$175.00 HYDROLOGICAL REPORT (FLOOD)

planning non standard conditionPNS1Builder: Conditions: Payments:

22/04/2015J BEAUCHAMP

UNKNOWN 0000Approved by Delegation

7/2015/9 15/01/2015 11 Cameron Terrace MALLALA

LOT: 3 ALT: A HD: 1 PL: D021978 CT: 6079/133

Outbuilding (Garage) $7,000 Decision Issued 22/04/2015

Category 1Category:

Approval:

J BEAUCHAMP $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$66.50 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

provisional building rules consentP101

stormwater dischargeB31

building non standard conditionBNS1

Builder: Conditions: Payments:

21/01/2015S CHAN

BROOKLYN PARK SA 5032

PO Box 670Approved by Delegation

7/2015/10 16/01/2015 Bailey Road West TWO WELLS

LOT: 7 ALT: S HD: 3 PL: D93213 CT: 6135/131

Outbuilding (Toilet Facilities) $1,000 Decision Issued 21/01/2015

Category 1Category:

Approval:

S CHAN $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$318.00 Septic Tank application Fee

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

in accordance with plans submittedP1

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

dwelling connected to effluent systemP13

Builder: Conditions: Payments:

17/02/2015G N BUDGEN

THOMPSON BEACH SA 5501

32 Sandpiper DriveApproved by Delegation

7/2015/11 19/01/2015 32 Sandpiper Drive THOMPSON BEACH

LOT: 94 ALT: A HD: 2 PL: D029513 CT: 5295/785

Verandah

$1,500 Decision Issued 17/02/2015

Category 1Category:

Approval:

G N BUDGEN $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

in accordance with plans submittedP1

Stormwater drained and retained onsiteP243

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

stormwater dischargeB31

LitterB76

Footings in natural groundB88

Inspection of building workB5

Builder: Conditions: Payments:

Page 3 of 78

Page 4: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

2/02/2015STATEWIDE POOLS PTY LTD

SALISBURY PLAIN SA 5109

59-63 Saints RoadApproval Bulding Consent

7/2015/12 19/01/2015 2 Karapas Court LEWISTON

LOT: 110 ALT: A HD: 3 PL: D75923 CT: 6002/20

Swimming Pool & Safety Fence

$9,600 Final Inspection 27/02/2015

Category 1Category:

Approval:

STATEWIDE POOLS PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$175.00 Swimming Pool Lodgement Fee

$46.55 Building Rules Consent Only Fee

$2.45 DAC - Building Rules Consent Only Fee

Dwelling occupation requirementsB69Builder: Conditions: Payments:

C SRAYNEANG.

SALISBURY DOWNS SA 5108

56 Natalie Avenue

7/2015/13 22/01/2015 Tower Road LEWISTON

LOT: 150 ALT: A HD: 3 PL: D059456 CT: 5899/231

Construction of 2 plastic covered

greenhouses...... Construction of 2

plastic covered greenhouses, 1

shade house and 1 water storage

dam

$41,552 2nd Additional Information 12/04/2016

Category 2Category:

Approval:

L MARAFIOTI $58.50 Planning Lodgement Fee (up to $5,000)

$214.00 Septic Tank application Fee

$5.05 Planning Fee DAC

$207.76 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$95.95 Planning Fee ($10,000-$100,000)

$2,760.24 Class 7 & 8

in accordance with plans submittedP1Builder: Conditions: Payments:

29/01/2015B J BIRKS

TWO WELLS SA 5501

5 Gameau RoadApproved by Delegation

7/2015/14 22/01/2015 5 Gameau Road TWO WELLS

LOT: 50 ALT: A HD: 3 PL: D064975 CT: 5919/364

Outbuilding (Shed) $6,500 Decision Issued 29/01/2015

Category 1Category:

Approval:

B J BIRKS $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

stormwater dischargeB31

LitterB76

Footings in natural groundB88

building non standard conditionBNS1

Builder: Conditions: Payments:

17/02/2015J & S PERGOLA INSTALLATIONS

SALISBURY NORTH SA 5108

19A Playford CrescentApproved Private Certifier

7/2015/15 23/01/2015 55 Aunger Road LEWISTON

LOT: 23 ALT: A HD: 3 PL: D014929 CT: 5885/919

Demolition of sunroom, erect

verandah

$4,990 Decision Issued 17/02/2015

Category 1Category:

Approval:

J & S PERGOLA INSTALLATIONS $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

provisional building rules consentP101

Builder: Conditions: Payments:

Page 4 of 78

Page 5: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

21/04/2015 A BRISCOE.

PASADENA SA 5042

9 Kalka Cresent

C/- BDCApproval Bulding Consent

7/2015/16 23/01/2015 16 Canala Court TWO WELLS

LOT: 22 ALT: A HD: 3 PL: D033249 CT: 5060/219

Extension and Alteration to Dwelling $45,000 Decision Issued 21/04/2015

Category 1Category:

Approval:

MCARDLE PROJECTS $58.50 Planning Lodgement Fee (up to $5,000)

$66.50 Planning Lodgement Fee (over $5,000)

$46.55 Building Rules Consent Only Fee

$2.45 DAC - Building Rules Consent Only Fee

Dwelling occupation requirementsB69Builder: Conditions: Payments:

3/02/2015BGI Building Group

Nuriootpa 5355

21-23 Tanunda RoadApproved by Delegation

7/2015/17 23/01/2015 27 Bailey Road TWO WELLS

LOT: 10 ALT: A HD: 3 PL: D90686 CT: 6106/352

Attached Flat Outback Verandah $11,500 Decision Issued 3/02/2015

Category 1Category:

Approval:

BGI Building Group $58.50 Planning Lodgement Fee (up to $5,000)

$88.28 Class 10

$5.05 Planning Fee DAC

$6.64 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

Stormwater drained and retained onsiteP243

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

stormwater dischargeB31

LitterB76

Footings in natural groundB88

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

Distinctive Homes

MARLESTON SA 5033

PO Box 208

7/2015/18 23/01/2015 26 Butler Street MALLALA

LOT: 21 ALT: A HD: 1 PL: D93594 CT: 6137/313

Variation to 312/192/2014 to amend

final truss calculations

$212,647 Building Assessment 29/01/2015

Category 1Category:

Approval:

Distinctive Homes $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

Builder: Conditions: Payments:

Page 5 of 78

Page 6: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

10/02/2015K MALTHOUSE

THOMPSON BEACH SA 5501

22 Heron CrescentApproved by Delegation

7/2015/19 27/01/2015 22 Heron Crescent THOMPSON BEACH

LOT: 227 ALT: A HD: 2 PL: D029513 CT: 5370/727

Outbuilding (Shed) and Verandah $10,400 Decision Issued 10/02/2015

Category 1Category:

Approval:

M J MALTHOUSE $58.50 Planning Lodgement Fee (up to $5,000)

$69.34 Class 10

$5.05 Planning Fee DAC

$5.22 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$28.00 Certificate of Title Request

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Site ConditionsP242

Stormwater drained and retained onsiteP243

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

external walls maintained in good condP7

approved for domestic purposes onlyP9

planting bushes to and replace when dieP44

planning non standard conditionPNS1

DisclaimerPNS6

stormwater dischargeB31

LitterB76

Footings in natural groundB88

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

V H LY.

VIRGINIA SA 5120

PO Box 1071

7/2015/20 27/01/2015 Shellgrit Road TWO WELLS

LOT: 43 ALT: A HD: 3 PL: D93015 CT: 6134/845

4 plastic covered greenhouses and 1

water storage dam... 4 plastic

covered greenhouses and 1 water

storage dam, in 2 stages

$85,000 Additional Information Buildin 17/04/2015

Category 2Category:

Approval:

V H LY. $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$249.90 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$95.95 Planning Fee ($10,000-$100,000)

$3,320.10 Class 7 & 8

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Site ConditionsP242

Stormwater drained and retained onsiteP243

planting bushes to and replace when dieP44

propagted from locall indigenous speciesP45

planting approp bushes within first seasP48

planning non standard conditionPNS1

no other egress shall be createdP40

epa - practical measuresP140

Builder: Conditions: Payments:

10/02/2015B J FRIDD

TWO WELLS SA 5501

48a Dawkins RoadApproved by Delegation

7/2015/21 27/01/2015 48A Dawkins Road TWO WELLS

LOT: 32 ALT: A HD: 3 PL: D065294 CT: 5921/940

Storage Shed for Domestic Use $3,000 Decision Issued 10/02/2015

Category 1Category:

Approval:

B J FRIDD $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

in accordance with plans submittedP1

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

stormwater dischargeB31

LitterB76

Footings in natural groundB88

Inspection of building workB5

Builder: Conditions: Payments:

Page 6 of 78

Page 7: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

24/08/2015S J CASKEY

LEWISTON SA 5501

7 Humzy CourtRefused by Delegation

7/2015/22 29/01/2015 7 Humzy Court LEWISTON

LOT: 71 ALT: A HD: 3 PL: 24982 CT: 5377/730

Parking of 2 Trucks $0 Decision Issued 24/08/2015

Category 1Category:

Approval:

S J CASKEYBuilder: Conditions: Payments:

7/04/2015CONSTRUCTION SERVICES

AUSTRALIA PTY LTD

HACKNEY SA 5069

25 NORTH TERRACEApproved Private Certifier

7/2015/23 3/02/2015 44 Walter Avenue TWO WELLS

LOT: 18 ALT: A HD: 3 PL: D92086 CT: 6117/277

Dwelling

$216,975 Decision Issued 9/04/2015

Category 1Category:

Approval:

CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$13.56 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$257.66 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

dwelling connected to effluent systemP13

water storage tank 22400 litresP174

provisional building rules consentP101

no other egress shall be createdP40

epa - practical measuresP140

Waste containmentB19

On site toilet facilityB20

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

10/02/2015STATEWIDE POOLS PTY LTD

SALISBURY PLAIN SA 5109

59-63 Saints RoadApproval Bulding Consent

7/2015/24 3/02/2015 11 Kathleen Road TWO WELLS

LOT: 61 ALT: A HD: 3 PL: D045869 CT: 5365/351

Swimming Pool and Safety Fence $9,600 Decision Issued 10/02/2015

Building Rules Consent OnlyCategory:

Approval:

STATEWIDE POOLS PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$175.00 Swimming Pool Lodgement Fee

$46.55 Building Rules Consent Only Fee

$2.45 DAC - Building Rules Consent Only Fee

Dwelling occupation requirementsB69Builder: Conditions: Payments:

23/02/2015K L SINFIELD

WILD HORSE PLAINS SA 5501

Sec 360 Second StreetApproved by Delegation

7/2015/25 3/02/2015 Second Street WILD HORSE PLAINS

ALT: S HD: 2 SEC: 360 PL: H140400 CT: 6102/304

Verandah

$0 Decision Issued 23/02/2015

Category 1Category:

Approval:

K L SINFIELD $58.50 Planning Lodgement Fee (up to $5,000)

$62.50 Class 10

$3.99 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.70 Building - DAC

$0.21 Building - DAC

$28.00 Certificate of Title Request

in accordance with plans submittedP1

external appearance maintainedP10

structure not be enclosed with solidP11

provisional building rules consentP101

stormwater be directed away from roofP125

stormwater dischargeB31

LitterB76

Footings in natural groundB88

Inspection of building workB5

Builder: Conditions: Payments:

Page 7 of 78

Page 8: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

24/08/2015SIMONDS HOMES

ADELAIDE 5000

280 Pultney StreetRefused by Delegation

7/2015/26 4/02/2015 Bailey Road West TWO WELLS

LOT: 24 ALT: A HD: 3 PL: D89146 CT: 6094/793

Single storey dwelling (incorporating

porch and garage)

$249,767 Decision Issued 24/08/2015

Category 1Category:

Approval:

SIMONDS HOMES $58.50 Planning Lodgement Fee (up to $5,000)

$15.62 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$296.88 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

Builder: Conditions: Payments:

29/05/2015 RIVERGUM HOMES PTY LTD.

TORRENSVILLE SA 5031

PO Box 191Approved Private Certifier

7/2015/27 5/02/2015 4 Milbourne Court LEWISTON

LOT: 302 ALT: A HD: 3 PL: D94528 CT: 6146/874

Dwelling

$262,079 Decision Issued 29/05/2015

Category 1Category:

Approval:

RIVERGUM HOMES PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$16.38 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$311.21 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

Stormwater drained and retained onsiteP243

dwelling connected to effluent systemP13

Site ConditionsP242

planning non standard conditionPNS1

provisional building rules consentP101

Waste containmentB19

On site toilet facilityB20

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

5/03/2015 ALPHA INDUSTRIES.

CAVAN SA 5094

12 STOCK ROADApproved by Delegation

7/2015/28 5/02/2015 50 Bethesda Road LEWISTON

LOT: 704 ALT: A HD: 3 PL: D81532 CT: 6041/215

Shed

$6,650 Decision Issued 5/03/2015

Category 1Category:

Approval:

L K SCOTT. $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

stormwater dischargeB31

LitterB76

Footings in natural groundB88

building non standard conditionBNS1

Engineer's SpecificationsB90

Builder: Conditions: Payments:

16/04/2015BOUNDRINA LTD

REEVES PLAINS SA 5502

Boundary RoadApproved by Delegation

7/2015/29 6/02/2015 1,194-75 Boundary Road LEWISTON

LOT: 513 ALT: A HD: 3 PL: F174980 CT: 5732/312

Variation to 312/208/2014 to

increase floor area by 252sqm

Variation to 312/208/2014 to

increase floor area by 252sqm

$100,000 Decision Issued 16/04/2015

Category 1Category:

Approval:

MAGNUS AUSTRALIA $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$44.41 Building - DAC

$95.95 Planning Fee ($10,000-$100,000)

$585.59 Class 7 & 8

in accordance with plans submittedP1

stormwater dischargeB31

LitterB76

Footings in natural groundB88

Engineer's SpecificationsB90

building non standard conditionBNS1

Builder: Conditions: Payments:

Page 8 of 78

Page 9: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

24/08/2015A E PLACUCCI

WINDSOR SA 5501

8 Windsor StreetApproved by Delegation

7/2015/30 6/02/2015 8 Windsor Street WINDSOR

LOT: 13 ALT: A HD: 2 PL: D000493 CT: 5593/221

Change of land use to residential,

construction of a single... storey

dwelling and temporary

accommodation of a caravan

$130,000 Underfloor - Septic 1/09/2015

Category 1Category:

Approval:

A E PLACUCCI

L E PLACUCCI$58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$8.13 Planning Fee DAC

$40.37 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$154.38 Planning Fee (more than $100,001)

$536.38 Class 1, 2 & 4

building non standard conditionBNS1

building non standard conditionBNS2

stormwater dischargeB31

LitterB76

Footings in natural groundB88

building non standard conditionBNS3

building non standard conditionBNS4

Statement of ComplianceB8

in accordance with plans submittedP1

dwelling connected to effluent systemP13

external surfaces painted durable paintP17

water storage tank 22400 litresP174

Fire fighting water tankP238

safe vehicle access to roadP163

Stormwater drained and retained onsiteP243

Site ConditionsP242

planning non standard conditionPNS1

epa - practical measuresP140

Builder: Conditions: Payments:

23/02/2015 K A SMITH.

TWO WELLS SA 5501

15 Artesian RoadApproved by Delegation

7/2015/31 10/02/2015 15 Artesian Road TWO WELLS

LOT: 50 ALT: A HD: 3 PL: D025644 CT: 5334/715

Shed

$3,500 Decision Issued 23/02/2015

Category 1Category:

Approval:

K A SMITH. $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

stormwater dischargeB31

LitterB76

Footings in natural groundB88

building non standard conditionBNS1

Builder: Conditions: Payments:

12/03/2015 N L BELLCHAMBERS

TWO WELLS SA 5501

Lot 11 Coats RoadApproved by Delegation

7/2015/32 10/02/2015 18A Coats Road TWO WELLS

LOT: 11 ALT: A HD: 3 PL: D93865 CT: 6139/773

Horse Keeping, 2 Horses, Fencing,

Day Yards and Stables

$2,500 Decision Issued 12/03/2015

Category 1Category:

Approval:

N L BELLCHAMBERS.

C W BELLCHAMBERS.$58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

11/11/2015 H E CURNOW.

WINDSOR SA 5501

Port Wakefield RoadApproved by Development Assess

Commision

7/2015/33 11/02/2015 Avon Road DUBLIN

LOT: 1001 ALT: A HD: 2 PL: D047003 CT: 5452/42

Port Wakefield Road DUBLIN

LOT: 1000 ALT: A HD: 2 PL: D047003 CT: 5452/41

Land Division (boundary realignment) $0 Decision Issued 11/11/2015

Category 1Category:

Approval:

H E CURNOW. in accordance with plans submittedP1Builder: Conditions: Payments:

Page 9 of 78

Page 10: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

23/04/2015J D BEAUCHAMP

MALLALA SA 5502

11 Cameron TerracePlanning Consent Only

7/2015/34 12/02/2015 11 Cameron Terrace MALLALA

LOT: 3 ALT: A HD: 1 PL: D021978 CT: 6079/133

Variation to 312/009/2015 to

increase the floor area... Variation to

312/009/2015 to increase the floor

area of the outbuilding to 54 square

metres

$10,000 Decision Issued 23/04/2015

Category 1Category:

Approval:

J D BEAUCHAMP $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$28.00 Certificate of Title Request

in accordance with plans submittedP1

stormwater dischargeB31

building non standard conditionBNS1

Builder: Conditions: Payments:

5/08/2015DISTRICT COUNCIL OF MALLALA

MALLALA SA 5502

2A Wasleys RoadApproved by Delegation

7/2015/35 12/02/2015 210 Hayman Road LEWISTON

LOT: 3 ALT: A HD: 3 PL: D050726 CT: 5627/789

Variation to development

authorisation 312/199/2010...

Variation to development

authorisation 312/199/2010 involving

removal of Development Plan

condition 3 to allow relocation of

playground vehicular access/egress

point from Hayman Road to Pederick

Road, and relocation of car park

$0 Decision Issued 5/08/2015

Category 3Category:

Approval:

DISTRICT COUNCIL OF MALLALA in accordance with plans submittedP1Builder: Conditions: Payments:

4/06/2015CONSTRUCTION SERVICES

AUSTRALIA PTY LTD

HACKNEY SA 5069

25 NORTH TERRACEApproved Private Certifier

7/2015/36 12/02/2015 5 Morias Court LEWISTON

LOT: 124 ALT: A HD: 3 PL: D88783 CT: 6091/52

Dwelling

$240,166 Decision Issued 4/06/2015

Category 1Category:

Approval:

CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$15.01 Planning Fee DAC

$169.00 Consultative Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$39.00 Consultative Fee - Other

$285.20 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

Waste containmentB19

On site toilet facilityB20

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

16/04/2015B R BEER

PARHAM SA 5501

24 The EsplanadeApproved by Delegation

7/2015/37 13/02/2015 24 The Esplanade PARHAM

LOT: 93 ALT: A HD: 2 PL: T140402 CT: 5714/337

Installation of Solar Photovoltaic

Panels

$3,921 Decision Issued 16/04/2015

Category 1Category:

Approval:

EUROSOLAR. $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

25/03/2015K L EARL

WINDSOR SA 5501

Sec 122 Windsor StreetApproved by Delegation

7/2015/38 13/02/2015 20 Balaklava Road MALLALA

LOT: 42 ALT: A HD: 1 PL: D019203 CT: 5453/478

Carport

$4,800 Decision Issued 25/03/2015

Category 1Category:

Approval:

OLYMPIC INDUSTRIES $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$4.05 Building - DAC

stormwater dischargeB31

LitterB76

Footings in natural groundB88

Builder: Conditions: Payments:

Page 10 of 78

Page 11: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

29/05/2015CONSTRUCTION SERVICES

AUSTRALIA PTY LTD

HACKNEY SA 5069

25 NORTH TERRACEApproved Private Certifier

7/2015/39 17/02/2015 129 Dawkins Road LEWISTON

LOT: 110 ALT: A HD: 3 PL: D013489 CT: 5698/760

Single Storey Detached Dwelling and

Demolition of Existing Dwelling

Construction of a single storey

detached dwelling and demolition of

existing dwelling and ancillary carport

and outbuilding

$239,876 Decision Issued 29/05/2015

Category 1Category:

Approval:

CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$100.00 Septic Tank application Fee

$14.99 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$284.86 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

dwelling connected to effluent systemP13

Stormwater drained and retained onsiteP243

water storage tank 22400 litresP174

Fire fighting water tankP238

planning non standard conditionPNS1

provisional building rules consentP101

Builder: Conditions: Payments:

13/08/2015 T J PALMER

DUBLIN SA 5501

3 Third StreetApproved by Delegation

7/2015/40 17/02/2015 3 Third Street DUBLIN

LOT: 39 ALT: A HD: 2 PL: T140401 CT: 5514/90

Construction of a single storey

dwelling Construction of a single

storey dwelling - dependent

accommodation in association with

existing main dwelling and demolition

of domestic outbuilding

$20,000 Decision Issued 13/08/2015

Category 1Category:

Approval:

WOODLAND CONSTRUCTIONS. $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$209.00 Septic Tank application Fee

$5.05 Planning Fee DAC

$4.05 Building - DAC

$6.21 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$82.61 Class 1, 2 & 4

in accordance with plans submittedP1

dwelling connected to effluent systemP13

planning non standard conditionPNS1

LitterB76

Rainwater tankB81

Statement of ComplianceB8

Builder: Conditions: Payments:

14/10/2015A R LODGE

LEWISTON SA 5501

229 Hayman RoadApproved by Delegation

7/2015/41 17/02/2015 229 Hayman Road LEWISTON

LOT: 49 ALT: A HD: 3 PL: D014929 CT: 5691/849

Extension to carport forward of

dwelling

$21,646 Decision Issued 14/10/2015

Category 2Category:

Approval:

OLYMPIC INDUSTRIES $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$64.50 Category 2 Fee

$36.50 Category 2 Fee

$375.00 HYDROLOGICAL REPORT (FLOOD)

in accordance with plans submittedP1

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

23/02/2015 S R WILLIAMS.

TWO WELLS SA 5501

28 Chapman StreetApproval Bulding Consent

7/2015/42 20/02/2015 Chapman Street TWO WELLS

LOT: 21 ALT: A HD: 3 PL: D80696 CT: 6048/12

Swimming Pool and Safety Fence

$33,000 Decision Issued 23/02/2015

Building Rules Consent OnlyCategory:

Approval:

FREEDOM POOLS $58.50 Planning Lodgement Fee (up to $5,000)

$175.00 Swimming Pool Lodgement Fee

$46.55 Building Rules Consent Only Fee

$2.45 DAC - Building Rules Consent Only Fee

Dwelling occupation requirementsB69Builder: Conditions: Payments:

Page 11 of 78

Page 12: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

16/03/2015CROWN CASTLE AUSTRALIA PTY

LTD

CHATSWOOD NSW 2067

PO Box 202Approval Land Division

7/2015/43 23/02/2015 6,167 Port Wakefield Road WILD HORSE PLAINS

LOT: 213 ALT: Q HD: 2 PL: D028530 CT: 5506/611

Slant Road WILD HORSE PLAINS

LOT: 212 ALT: Q HD: 2 PL: D028530 CT: 5506/611

Land Division (Lease) $0 Planning Assessment 17/04/2015

Category 1Category:

Approval:

CROWN CASTLE AUSTRALIA PTY LTD in accordance with plans submittedP1Builder: Conditions: Payments:

5/03/2015D B NUSKE

MIDDLE BEACH SA 5501

Sec 748 Middle Beach RoadApproved by Delegation

7/2015/44 24/02/2015 The Esplanade MIDDLE BEACH

ALT: S HD: 3 SEC: 748 PL: H140800 CT: 5484/544

Carport $1,200 Decision Issued 5/03/2015

Category 1Category:

Approval:

D B NUSKE $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$5.05 Planning Fee DAC

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$28.00 Certificate of Title Request

in accordance with plans submittedP1

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

stormwater dischargeB31

LitterB76

Footings in natural groundB88

Builder: Conditions: Payments:

12/06/2015R J PAGET

TWO WELLS SA 5501

Lot 1 Germantown RoadApproved by Delegation

7/2015/45 25/02/2015 576 Germantown Road TWO WELLS

LOT: 1 ALT: A HD: 3 PL: F107857 CT: 5187/748

Parking of 2 x Trucks and 6 x Trailers

associated with... ... off-site grain

transport and 3 Storage Containers

$6,600 Decision Issued 12/06/2015

Category 1Category:

Approval:

R J PAGET $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$335.00 Advertising Fee

$15.75 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$209.25 Class 7 & 8

in accordance with plans submittedP1

Stormwater drained and retained onsiteP243

Site ConditionsP242

1 prime mover or truck, up to 10 tonnesP189

minor repairs & maintenance to vehicleP190

restriction times of truck movementsP197

planning non standard conditionPNS1

planning non standard conditionPNS2

external materials to match existing bldP12

external appearance maintainedP10

planning non standard conditionPNS3

approved for domestic purposes onlyP9

building non standard conditionBNS1

Builder: Conditions: Payments:

16/04/2015 K HAYWOOD.

MUNNO PARA WEST SA 5115

69 Peerless Roadwithdrawn Application

7/2015/46 25/02/2015 3 Tatura Avenue TWO WELLS

LOT: 61 ALT: A HD: 3 PL: D031300 CT: 5784/285

Parking of 1 Truck and Trailer $0 Decision Issued 16/04/2015

Category 1Category:

Approval:

K HAYWOOD. $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

Builder: Conditions: Payments:

Page 12 of 78

Page 13: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

8/04/2015 R & M TIMBER.

WILLASTON SA 5118

PO Box 71Approved by Delegation

7/2015/47 25/02/2015 4 Goss Road LEWISTON

LOT: 113 ALT: A HD: 3 PL: D018653 CT: 5136/691

Verandah

$4,069 Decision Issued 8/04/2015

Category 1Category:

Approval:

A J GAMEAU $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

in accordance with plans submittedP1

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

stormwater dischargeB31

LitterB76

Footings in natural groundB88

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

C L MOSTYN.

LEWISTON SA 5501

186 Dawkins Road

7/2015/48 25/02/2015 186 Dawkins Road LEWISTON

LOT: 2 ALT: A HD: 3 PL: D89655 CT: 6096/640

Dog keeping (9 dogs) $0 Additional Information Plannin 18/03/2015

Category 1Category:

Approval:

C L MOSTYN. $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

Builder: Conditions: Payments:

8/04/2015M S EUSTACE

LEWISTON SA 5501

3 James RoadApproved by Delegation

7/2015/49 26/02/2015 3 James Road LEWISTON

LOT: 126 ALT: A HD: 3 PL: D033551 CT: 5071/336

Outbuilding - Domestic Storage Shed $7,000 Decision Issued 8/04/2015

Category 1Category:

Approval:

M S EUSTACE $58.50 Planning Lodgement Fee (up to $5,000)

$74.60 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$5.62 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

stormwater dischargeB31

LitterB76

Footings in natural groundB88

building non standard conditionBNS1

Engineer's SpecificationsB90

Builder: Conditions: Payments:

18/05/2015N D TILLER

MALLALA SA 5502

Franks RoadApproval Land Division

7/2015/50 26/02/2015 701 Traeger Road GRACE PLAINS

LOT: 2 ALT: S HD: 1 PL: D110762 CT: 6164/509

Broster Road GRACE PLAINS

LOT: 666 ALT: A HD: 1 PL: F175133 CT: 6006/473

Traeger Road GRACE PLAINS

LOT: 1 ALT: S HD: 1 PL: D110762 CT: 6164/508

Land Division - boundary realignment $0 Decision Issued 18/05/2015

Category 1Category:

Approval:

N D TILLER in accordance with plans submittedP1Builder: Conditions: Payments:

Page 13 of 78

Page 14: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

Premium Home Improvements

KENT TOWN SA 5067

78 North Terrace

7/2015/51 25/02/2015 27 Walter Avenue TWO WELLS

LOT: 6 ALT: A HD: 3 PL: D84941 CT: 6064/403

Verandah

$11,750 Health Assessment 28/04/2015

Category 1Category:

Approval:

Premium Home Improvements $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$5.05 Planning Fee DAC

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

stormwater dischargeB31Builder: Conditions: Payments:

7/05/2015CONSTRUCTION SERVICES

AUSTRALIA PTY LTD

HACKNEY SA 5069

25 NORTH TERRACEApproved Private Certifier

7/2015/52 25/02/2015 576 Germantown Road TWO WELLS

LOT: 1 ALT: A HD: 3 PL: F107857 CT: 5187/748

Construction of New Dwelling $337,920 Decision Issued 7/05/2015

Category 1Category:

Approval:

CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$21.12 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$401.28 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

Stormwater drained and retained onsiteP243

Site ConditionsP242

dwelling connected to effluent systemP13

provisional building rules consentP101

Builder: Conditions: Payments:

22/05/2015 M E ROACH.

LEWISTON SA 5501

Lot 58 Hayman RoadApproved by Delegation

7/2015/53 26/02/2015 Hayman Road LEWISTON

LOT: 58 HD: 3 PL: D89849 CT: 6098/306

Construction of Outbuildings

(Storage Shed/Carport and Stables)

$10,300 Decision Issued 22/05/2015

Category 1Category:

Approval:

ALPHA INDUSTRIES. $58.50 Planning Lodgement Fee (up to $5,000)

$103.12 Class 10

$1.85 Planning Fee DAC

$7.76 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

external appearance maintainedP10

Stormwater drained and retained onsiteP243

finished floor level not less 700mmP18

planning non standard conditionPNS1

building non standard conditionBNS1

stormwater dischargeB31

Builder: Conditions: Payments:

4/03/2015 BEYOND INK.

HAHNDORF SA 5245

PO Box 531Planning Consent Only

7/2015/54 27/02/2015 495 Frost Road DUBLIN

LOT: 100 ALT: A HD: 2 PL: F017282 CT: 6162/359

Hay Shed $80,000 Decision Pending 30/03/2015

Category 1Category:

Approval:

GREENWHEAT FREEKEH. $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$95.95 Planning Fee ($10,000-$100,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

Page 14 of 78

Page 15: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

26/06/2015DECHELLIS HOMES PTY LTD

Evandale SA 5069

170 Payneham RoadApproved Private Certifier

7/2015/55 2/03/2015 8 Milbourne Court LEWISTON

LOT: 304 ALT: A HD: 3 PL: D94528 CT: 6146/876

Single storey dwelling with garage

under main roof

$277,303 Waste Control Approval 28/01/2016

Category 1Category:

Approval:

DECHELLIS HOMES PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$24.26 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$322.36 Planning Fee (more than $100,001)

in accordance with plans submittedP1

Stormwater drained and retained onsiteP243

dwelling connected to effluent systemP13

planning non standard conditionPNS1

provisional building rules consentP101

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

1/09/2015CONSTRUCTION SERVICES

AUSTRALIA PTY LTD

HACKNEY SA 5069

25 NORTH TERRACEwithdrawn Application

7/2015/56 2/03/2015 4 Mallee Court TWO WELLS

LOT: 17 ALT: A HD: 3 PL: D95828 CT: 6153/552

Coats Road TWO WELLS

LOT: 14 ALT: A HD: 3 PL: D93865 CT: 6139/776

Single storey detached dwelling with

garage under main roof

$294,205 Decision Issued 1/09/2015

Category 1Category:

Approval:

CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$427.00 Septic Tank application Fee

$18.39 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$349.37 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

12/03/2015D F BRAY

TWO WELLS SA 5501

16 Elizabeth StreetApproved by Delegation

7/2015/57 3/03/2015 12-14 Elizabeth Street TWO WELLS

LOT: 17 ALT: A HD: 3 PL: D000244 CT: 6037/792

Solid Fence in Flood Zone $860 Decision Issued 12/03/2015

Category 1Category:

Approval:

D F BRAY $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

planning non standard conditionPNS1

planning non standard conditionPNS2

Builder: Conditions: Payments:

25/03/2015PBS AUSTRALIA

SOUTH PLYMPTON SA 5038

607 Marion RoadPlanning Consent Only

7/2015/58 3/03/2015 255 Hart Road LOWER LIGHT

LOT: 100 ALT: A HD: 3 PL: D070158 CT: 6156/227

Swimming Pool and Safety Fence

$40,000 Planning Assessment 25/03/2015

Category 1Category:

Approval:

PBS AUSTRALIA $58.50 Planning Lodgement Fee (up to $5,000)

$2.45 Planning Fee DAC

$2.60 Planning Fee DAC

$175.00 Swimming Pool Lodgement Fee

$46.55 Planning Fee ($10,000-$100,000)

$49.40 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1Builder: Conditions: Payments:

Page 15 of 78

Page 16: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

21/07/2015BAYLIES ROAD PROPERTY

INVESTMENTS PTY LTD.

TWO WELLS SA 5501

Section 194 Bailey Road WestApproved by Delegation

7/2015/59 4/03/2015 Shellgrit Road MIDDLE BEACH

ALT: S HD: 3 SEC: 218 PL: H140800 CT: 6155/358

Change of Land Use from Primary

Production to Horticulture

$2,000 Decision Issued 21/07/2015

Category 1Category:

Approval:

BAYLIES ROAD PROPERTY INVESTMENTS PTY LTD. in accordance with plans submittedP1Builder: Conditions: Payments:

2/09/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadPlanning Consent Only

7/2015/60 5/03/2015 143 Brownes Road PORT GAWLER

ALT: S HD: 3 SEC: 23 PL: H140800 CT: 5463/582

Construction of 44 plastic covered

greenhouses, 6 water.....

Construction of 44 plastic covered

greenhouses, 6 water storage dams,

5 machinery sheds and 1 water tank

(32,000 litres)

$80,000 Approved by Private Certifier 14/01/2016

Category 2Category:

Approval:

BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)

$4.95 Planning Fee DAC

$5.05 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$94.05 Planning Fee (more than $100,001)

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Site ConditionsP242

Stormwater drained and retained onsiteP243

planning non standard conditionPNS1

no other egress shall be createdP40

epa - practical measuresP140

provisional building rules consentP101

Builder: Conditions: Payments:

23/11/2015S LEONELLO

MALLALA SA 5502

Lot 64 Redbanks RoadApproved Private Certifier

7/2015/61 5/03/2015 2,401 Redbanks Road REDBANKS

LOT: 64 ALT: A HD: 1 PL: D045143 CT: 6057/278

Construction of Store (incorporating

cold storage area)

$100,000 Decision Issued 23/11/2015

Category 1Category:

Approval:

S LEONELLO $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$169.00 Consultative Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$39.00 Consultative Fee - Other

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

planning non standard conditionPNS1

provisional building rules consentP101

Builder: Conditions: Payments:

12/03/2015STATEWIDE POOLS PTY LTD

SALISBURY PLAIN SA 5109

59-63 Saints RoadApproved Private Certifier

7/2015/62 5/03/2015 21B Williams Road TWO WELLS

LOT: 702 ALT: A HD: 3 PL: D078947 CT: 6021/868

Swimming Pool and Safety Fence

$9,600 Decision Issued 25/03/2015

Category 1Category:

Approval:

STATEWIDE POOLS PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$175.00 Swimming Pool Lodgement Fee

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

Page 16 of 78

Page 17: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

14/09/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/63 5/03/2015 170 Dawkins Road LEWISTON

LOT: 5 ALT: A HD: 3 PL: D011388 CT: 5440/611

Construction of fence (in Hazard

Zone 2) and construction...

Construction of fence (in Hazard

Zone 2) and construction of

outbuilding (shed)

$4,000 Decision Issued 14/09/2015

Category 1Category:

Approval:

BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

planning non standard conditionPNS1

approved for domestic purposes onlyP9

provisional building rules consentP101

Private Certifer Consent ConditionsB11

Builder: Conditions: Payments:

M D LLOYD

TWO WELLS SA 5501

48 Dawkins Road

7/2015/64 6/03/2015 48 Dawkins Road TWO WELLS

LOT: 31 ALT: A HD: 3 PL: D065294 CT: 5921/939

Swimming Pool and Safety Fence

$15,000 Swim Pool Fence Inspection 19/03/2015

Category 1Category:

Approval:

M D LLOYD $175.00 Swimming Pool Lodgement Fee

$46.55 Building Rules Consent Only Fee

$2.45 DAC - Building Rules Consent Only Fee

$28.00 Certificate of Title Request

Inspection of building workB5

Swimming Pool Backwash DisposalB74

Swimming Pool WarningsB70

building non standard conditionBNS1

Builder: Conditions: Payments:

9/07/2015S F FATTORI

TWO WELLS SA 5501

44 Bailey Road WestApproval Land Division

7/2015/65 5/03/2015 44 Bailey Road West TWO WELLS

LOT: 30 ALT: A HD: 3 PL: D006229 CT: 5456/201

46 Bailey Road West TWO WELLS

LOT: 12 ALT: A HD: 3 PL: D110951 CT: 6165/394

48 Bailey Road West TWO WELLS

LOT: 13 ALT: A HD: 3 PL: D110951 CT: 6165/395

50 Bailey Road West TWO WELLS

LOT: 14 ALT: A HD: 3 PL: D110951 CT: 6165/396

Land Division - One Allotment into

Four

$0 Decision Issued 26/06/2015

Category 1Category:

Approval:

S F FATTORI planning non standard conditionPNS1Builder: Conditions: Payments:

VIRGINIA PACKING SHEDS SA.

PO Box 1000 KENT TOWN SA 5071

C/- Alexander Symonds Pty Ltd

7/2015/66 6/03/2015 176 McEvoy Road LOWER LIGHT

LOT: 8 ALT: A HD: 3 PL: F000086 CT: 5530/177

Light Beach Road LOWER LIGHT

LOT: 1 ALT: A HD: 3 PL: F000086 CT: 5530/170

Paterson Road LOWER LIGHT

LOT: 9 ALT: A HD: 3 PL: F000086 CT: 5530/178

Division of Land - 9 allotments into

30 allotments - Non-complying

$0 Planning Assessment 6/03/2015

Category 3Category:

Approval:

VIRGINIA PACKING SHEDS SA. planning non standard conditionPNS1Builder: Conditions: Payments:

10/04/2015C R BILLING

WEBB BEACH SA 5501

10 Jury StreetApproved by Delegation

7/2015/67 10/03/2015 10 Jury Street WEBB BEACH

ALT: S HD: 2 SEC: 581 PL: H140400 CT: 5500/771

Construction of Front Verandah $2,506 Decision Issued 10/04/2015

Category 1Category:

Approval:

C R BILLING $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

in accordance with plans submittedP1

Stormwater drained and retained onsiteP243

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

stormwater dischargeB31

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

Page 17 of 78

Page 18: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

5/08/2015S G MERTINEIT

LEWISTON SA 5501

225 Hayman Roadwithdrawn Application

7/2015/68 11/03/2015 225 Hayman Road LEWISTON

LOT: 51 ALT: A HD: 3 PL: D014929 CT: 5691/848

Dog Keeping (25 dogs), construction

of dog kennels and... Dog Keeping

(25 dogs), construction of dog

kennels and associated exercise

yards, use of land for dog obedience

training, construction of ablution

block and construction of chicken

shed

$9,500 Decision Issued 5/08/2015

Category 2Category:

Approval:

S G MERTINEIT $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$175.00 HYDROLOGICAL REPORT (FLOOD)

Builder: Conditions: Payments:

12/06/2015S G MERTINEIT

LEWISTON SA 5501

225 Hayman Roadwithdrawn Application

7/2015/69 11/03/2015 225 Hayman Road LEWISTON

LOT: 51 ALT: A HD: 3 PL: D014929 CT: 5691/848

Construction of two habitable rooms

and two storage containers

$3,000 Decision Issued 12/06/2015

Category 1Category:

Approval:

S G MERTINEIT $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$125.00 HYDROLOGICAL REPORT (FLOOD)

Builder: Conditions: Payments:

4/06/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/70 11/03/2015 33 Dawkins Road TWO WELLS

LOT: 1 ALT: A HD: 3 PL: F001030 CT: 5298/386

Demolition of existing outbuildings

and construction of.... Demolition of

existing outbuildings and

construction of new outbuilding

(shed)

$28,000 Decision Issued 4/06/2015

Category 2Category:

Approval:

S R LOCKWOOD $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$95.95 Planning Fee ($10,000-$100,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

planning non standard conditionPNS1

approved for domestic purposes onlyP9

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

D J THOMAS

LEWISTON SA 5501

129 Dawkins Road

7/2015/71 12/03/2015 129 Dawkins Road LEWISTON

LOT: 110 ALT: A HD: 3 PL: D013489 CT: 5698/760

Demolition of dwelling and shed and

carport

$20,000 Decision Issued 2/04/2015

Building Rules Consent OnlyCategory:

Approval:

D J THOMAS $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

Demolition of structureB83

Asbestos demolition, transport and dispoB84

Builder: Conditions: Payments:

Page 18 of 78

Page 19: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

7/05/2015H J HAYDON

LEWISTON SA 5501

84 Bethesda RoadApproved by Delegation

7/2015/72 13/03/2015 84 Bethesda Road LEWISTON

LOT: 32 ALT: A HD: 3 PL: D019441 CT: 5390/395

Outbuilding (Garage) $6,860 Decision Issued 7/05/2015

Category 1Category:

Approval:

OLYMPIC INDUSTRIES $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$175.00 HYDROLOGICAL REPORT (FLOOD)

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

planning non standard conditionPNS1

no other egress shall be createdP40

stormwater dischargeB31

building non standard conditionBNS1

Builder: Conditions: Payments:

24/04/2015CONSTRUCTION SERVICES

AUSTRALIA PTY LTD

HACKNEY SA 5069

25 NORTH TERRACEApproved Private Certifier

7/2015/73 13/03/2015 19 Milbourne Court LEWISTON

LOT: 316 ALT: A HD: 3 PL: D94528 CT: 6146/888

Construction of New Dwelling $203,525 Decision Issued 24/04/2015

Category 1Category:

Approval:

CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$12.73 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$241.68 Planning Fee (more than $100,001)

in accordance with plans submittedP1

Stormwater drained and retained onsiteP243

dwelling connected to effluent systemP13

planning non standard conditionPNS1

provisional building rules consentP101

Waste containmentB19

On site toilet facilityB20

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

26/08/2015S M SMITH

TWO WELLS SA 5501

28 Walter AvenueApproved by Delegation

7/2015/74 19/03/2015 28 Walter Avenue TWO WELLS

LOT: 37 ALT: A HD: 3 PL: D84941 CT: 6064/416

Construction of Shed for Domestic

Storage and Attached Carport

$13,500 Decision Issued 26/08/2015

Category 1Category:

Approval:

S M SMITH $58.50 Planning Lodgement Fee (up to $5,000)

$92.18 Class 10

$5.05 Planning Fee DAC

$6.94 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$95.95 Planning Fee ($10,000-$100,000)

planning non standard conditionPNS1

Building work contractor insuranceB6

Stormwater disposalB33

Engineers ReportB64

Builder: Conditions: Payments:

Page 19 of 78

Page 20: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

9/10/2015HOMESTEAD AWARD WINNING

HOMES PTY LTD

MODBURY SA 5092

928 North East RoadApproved Private Certifier

7/2015/75 20/03/2015 3 Leilete Road TWO WELLS

LOT: 2 ALT: A HD: 3 PL: D93938 CT: 6140/804

Construction of New Dwelling $176,331 Decision Issued 9/10/2015

Category 1Category:

Approval:

HOMESTEAD AWARD WINNING HOMES PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$15.42 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$204.99 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

existing trees to be protectedP51

Stormwater drained and retained onsiteP243

Vehicle AccessP236

external surfaces painted durable paintP17

provisional building rules consentP101

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

28/08/2015 COMO GLASSHOUSE PTY LTD.

SOUTH YARRA VIC 3141

644 Chapel Street

Level 18, Como Office TowerApproved Private Certifier

7/2015/76 20/03/2015 687 Germantown Road KORUNYE

LOT: 10 ALT: S HD: 3 PL: D93356 CT: 6133/537

Kenner Road KORUNYE

ALT: S HD: 3 SEC: 505 PL: H140800 CT: 5869/886

Construction of Wood Fired Boiler

including.... Construction of Wood

Fired Boiler including conversion of

existing store (storage shed)

$750,000 Decision Issued 28/08/2015

Category 3Category:

Approval:

COMO GLASSHOUSE PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)

$46.87 Planning Fee DAC

$310.00 Consultative Fee DAC

$335.00 Advertising Fee

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$39.00 Consultative Fee - Other

$890.63 Planning Fee (more than $100,001)

in accordance with plans submittedP1

Site ConditionsP242

Stormwater drained and retained onsiteP243

provisional building rules consentP101

planning non standard conditionPNS1

Private Certifer Consent ConditionsB11

Builder: Conditions: Payments:

8/04/2015STATEWIDE POOLS PTY LTD

SALISBURY PLAIN SA 5109

59-63 Saints RoadApproval Bulding Consent

7/2015/77 20/03/2015 Old Port Wakefield Road TWO WELLS

LOT: 502 ALT: A HD: 3 PL: D072248 CT: 6120/654

Swimming Pool and Safety Fence

$9,600 Decision Issued 8/04/2015

Building Rules Consent OnlyCategory:

Approval:

STATEWIDE POOLS PTY LTD $175.00 Swimming Pool Lodgement Fee

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

$46.55 Building Rules Consent Only Fee

$2.45 DAC - Building Rules Consent Only Fee

Dwelling occupation requirementsB69Builder: Conditions: Payments:

M R TULL

LEWISTON SA 5501

108 Dawkins Road

7/2015/78 23/03/2015 108 Dawkins Road LEWISTON

LOT: 13 ALT: A HD: 3 PL: D032588 CT: 5077/333

Extension to Carport $6,000 Additional Information Buildin 9/06/2015

Category 2Category:

Approval:

M R TULL $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$28.00 Certificate of Title Request

in accordance with plans submittedP1

external appearance maintainedP10

external materials to match existing bldP12

Stormwater drained and retained onsiteP243

stormwater dischargeB31

Builder: Conditions: Payments:

Page 20 of 78

Page 21: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

9/04/2015N KYRIACOU

TWO WELLS SA 5501

27 Bailey RoadApproval Bulding Consent

7/2015/79 25/03/2015 27 Bailey Road TWO WELLS

LOT: 9 ALT: A HD: 3 PL: D90686 CT: 6106/351

Demolition of Dwelling and Ancillary

Outbuilding and Storage Shed

$7,000 Decision Issued 9/04/2015

Building Rules Consent OnlyCategory:

Approval:

N KYRIACOU $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$4.05 Building - DAC

$46.55 Building Rules Consent Only Fee

$2.45 DAC - Building Rules Consent Only Fee

in accordance with plans submittedP1

Demolition of structureB83

Builder: Conditions: Payments:

1/05/2015E ANDREW

MALLALA SA 5502

8 Cameron TerraceApproved by Delegation

7/2015/80 26/03/2015 8 Cameron Terrace MALLALA

LOT: 754 ALT: A HD: 1 PL: F175221 CT: 5779/970

Demolition

$10,000 Decision Issued 30/04/2015

Category 1Category:

Approval:

E ANDREW $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$4.05 Building - DAC

$46.55 Building Rules Consent Only Fee

$2.45 DAC - Building Rules Consent Only Fee

in accordance with plans submittedP1

Demolition of structureB83

Asbestos demolition, transport and dispoB84

Builder: Conditions: Payments:

13/07/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/81 30/03/2015 9 Buckland Park Road TWO WELLS

LOT: 5 ALT: A HD: 3 PL: D043578 CT: 5298/928

Construction of Outbuilding (Garage) $11,000 Decision Issued 13/07/2015

Category 1Category:

Approval:

ADELAIDE FENCING & STEEL SUPPLIES $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

planning non standard conditionPNS1

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

23/04/2015 BEYOND INK.

HAHNDORF SA 5245

PO Box 531Approved Private Certifier

7/2015/82 31/03/2015 495 Frost Road DUBLIN

LOT: 100 ALT: A HD: 2 PL: F017282 CT: 6162/359

Hay Shed $80,000 Decision Issued 23/04/2015

Category 1Category:

Approval:

BEYOND INK. $58.50 Planning Lodgement Fee (up to $5,000)

$66.50 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

9/09/2015METRICON HOMES PTY LTD

NORWOOD SA 5067

88 Fullarton Roadwithdrawn Application

7/2015/83 31/03/2015 21 Walter Avenue TWO WELLS

LOT: 3 ALT: A HD: 3 PL: D84941 CT: 6064/400

Dwelling (Single Storey) $277,464 Decision Issued 9/09/2015

Category 1Category:

Approval:

METRICON HOMES PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$17.34 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$329.48 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

Builder: Conditions: Payments:

Page 21 of 78

Page 22: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

11/06/2015L J SUTHERLAND

LEWISTON SA 5501

255 Hayman RoadApproved by Delegation

7/2015/84 7/04/2015 255 Hayman Road LEWISTON

LOT: 36 ALT: A HD: 3 PL: D014929 CT: 5273/306

Demolition of verandah and

construction.... Demolition of

verandah and construction of

dwelling addition (incorporating

family room and deck)

$35,000 Decision Issued 11/06/2015

Category 1Category:

Approval:

L J SUTHERLAND $58.50 Planning Lodgement Fee (up to $5,000)

$83.97 Planning Lodgement Fee (up to $5,000)

$26.51 Class 10

$5.05 Planning Fee DAC

$1.99 Building - DAC

$6.31 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$175.00 HYDROLOGICAL REPORT (FLOOD)

in accordance with plans submittedP1

Site ConditionsP242

Stormwater drained and retained onsiteP243

external surfaces painted durable paintP17

planning non standard conditionPNS1

planning non standard conditionPNS2

certificate building indemnity insuranceB7

Termite managementB60

roko - written statement of completionB53

building non standard conditionBNS1

Builder: Conditions: Payments:

12/06/2015G P CURNOW

LOWER LIGHT SA 5501

Ryan RoadApproved Private Certifier

7/2015/85 2/04/2015 Ryan Road LOWER LIGHT

LOT: 1 ALT: A HD: 1 PL: D012092 CT: 5331/970

Construction of Farm Building (hay

shed) and...... Construction of Farm

Building (hay shed) and relocation of

existing water tank

$85,000 Decision Issued 12/06/2015

Category 1Category:

Approval:

G P CURNOW $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$28.00 Certificate of Title Request

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

planning non standard conditionPNS1

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

12/06/2015 R VERBIS.

THOMPSON BEACH SA 5501

53 Sandpiper DriveApproved by Delegation

7/2015/86 8/04/2015 53 Sandpiper Drive THOMPSON BEACH

LOT: 70 ALT: A HD: 2 PL: D029513 CT: 5369/639

Construction of domestic outbuilding

- storage shed

$9,900 Decision Issued 12/06/2015

Category 1Category:

Approval:

R VERBIS. $58.50 Planning Lodgement Fee (up to $5,000)

$63.28 Class 10

$1.85 Planning Fee DAC

$169.00 Consultative Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.76 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$39.00 Consultative Fee - Other

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

planning non standard conditionPNS1

planning non standard conditionPNS2

stormwater dischargeB31

building non standard conditionBNS1

Builder: Conditions: Payments:

Page 22 of 78

Page 23: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

14/09/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/87 8/04/2015 27 Bailey Road TWO WELLS

LOT: 9 ALT: A HD: 3 PL: D90686 CT: 6106/351

Construction of Storage and Utility

Shed associated with... ...the existing

approved use of the land

$18,000 Decision Issued 14/09/2015

Category 1Category:

Approval:

N KYRIACOU $58.50 Planning Lodgement Fee (up to $5,000)

$209.00 Septic Tank application Fee

$5.05 Planning Fee DAC

$335.00 Advertising Fee

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$95.95 Planning Fee ($10,000-$100,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

planning non standard conditionPNS1

provisional building rules consentP101

Waste containmentB19

On site toilet facilityB20

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

10/04/2015 VERGOLA (SA) PTY LTD.

THEBARTON SA 5031

101 Port RoadApproval Bulding Consent

7/2015/88 8/04/2015 14 Redbanks Road MALLALA

LOT: 1 ALT: A HD: 1 PL: D018916 CT: 5342/263

Vergola Louvred Sun Control System $18,599 Decision Issued 10/04/2015

Category 1Category:

Approval:

VERGOLA (SA) PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)

$66.50 Planning Lodgement Fee (over $5,000)

$46.55 Building Rules Consent Only Fee

$2.45 DAC - Building Rules Consent Only Fee

Dwelling occupation requirementsB69Builder: Conditions: Payments:

12/08/2015G M INGERSON

TWO WELLS SA 5501

Lot 1 Halstead RoadApproved by Delegation

7/2015/89 10/04/2015 Halstead Road West Road TWO WELLS

LOT: 1 ALT: A HD: 3 PL: D064908 CT: 5930/773

Relocate Transportable Outbuilding

and Install Rainwater Tank

$14,000 Decision Issued 12/08/2015

Category 1Category:

Approval:

G M INGERSON $58.50 Planning Lodgement Fee (up to $5,000)

$96.53 Class 10

$5.05 Planning Fee DAC

$7.26 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

Stormwater drained and retained onsiteP243

finished floor level not less 700mmP18

floor level no less than 2.1 metresP173

external walls maintained in good condP7

approved for domestic purposes onlyP9

stormwater dischargeB31

Footings in natural groundB88

Builder: Conditions: Payments:

12/08/2015T J GAMEAU

TWO WELLS SA 5501

43 Gawler RoadApproved by Delegation

7/2015/90 14/04/2015 942 Boundary Road REEVES PLAINS

LOT: 1 ALT: A HD: 3 PL: D032983 CT: 5059/267

Dwelling addition Construction of

single storey detached dwelling

addition

$72,462 Decision Issued 12/08/2015

Category 1Category:

Approval:

GAMEAU BUILDERS $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$12.99 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$172.62 Class 1, 2 & 4

in accordance with plans submittedP1

external materials to match existing bldP12

faulty or unsuitable materials not usedB3

Stormwater disposalB33

roko - footing sizes - footing failuresB56

Builder: Conditions: Payments:

Page 23 of 78

Page 24: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

18/06/2015 GLENCORE GRAIN PTY LTD.

ADELAIDE SA 5001

124-130 South TerraceApproved Private Certifier

7/2015/91 14/04/2015 17 Port Wakefield Road TWO WELLS

LOT: 500 ALT: A HD: 3 PL: D057142 CT: 5851/382

Port Wakefield Road TWO WELLS

LOT: 500 ALT: A HD: 3 PL: D057142 CT: 5851/382

Erection of an advertising hoarding

and advertising display (sign)

$5,000 Decision Issued 22/07/2015

Category 3Category:

Approval:

GLENCORE GRAIN PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$5.05 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$335.00 Advertising Fee

$95.95 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

planning non standard conditionPNS1

planning non standard conditionPNS2

Builder: Conditions: Payments:

14/09/2015FAIRMONT HOMES GROUP PTY LTD

ADELAIDE SA 5000

21 - 24 North TerraceApproved Private Certifier

7/2015/92 14/04/2015 2 Mallee Court TWO WELLS

LOT: 15 ALT: A HD: 3 PL: D95828 CT: 6153/550

Single Storey Detached Dwelling $232,360 Decision Issued 14/09/2015

Category 1Category:

Approval:

FAIRMONT HOMES GROUP PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$14.52 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$275.93 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

$175.00 HYDROLOGICAL REPORT (FLOOD)

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

Vehicle AccessP236

dwelling connected to effluent systemP13

external surfaces painted durable paintP17

provisional building rules consentP101

Builder: Conditions: Payments:

26/08/2015FAIRMONT HOMES GROUP PTY LTD

ADELAIDE SA 5000

21 - 24 North TerraceApproved Private Certifier

7/2015/93 14/04/2015 1 Mallee Court TWO WELLS

LOT: 14 ALT: A HD: 3 PL: D95828 CT: 6153/549

Single Storey Detached Dwelling $240,259 Decision Issued 26/08/2015

Category 1Category:

Approval:

FAIRMONT HOMES GROUP PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$15.01 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$285.31 Planning Fee (more than $100,001)

$175.00 HYDROLOGICAL REPORT (FLOOD)

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

Vehicle AccessP236

dwelling connected to effluent systemP13

external surfaces painted durable paintP17

provisional building rules consentP101

Private Certifer Consent ConditionsB11

Builder: Conditions: Payments:

8/09/2015S M MCARDLE

MALLALA SA 5502

5 Aerodrome Roadwithdrawn Application

7/2015/94 15/04/2015 44 The Esplanade PARHAM

LOT: 103 ALT: A HD: 2 PL: T140402 CT: 5992/591

Demolition of part of existing dwelling

and construction of two... Demolition

of part of existing dwelling and

construction of two storey dwelling

addition

$120,000 Health Assessment 11/09/2015

Category 1Category:

Approval:

MCARDLE PROJECTS $58.50 Planning Lodgement Fee (up to $5,000)

$7.50 Planning Fee DAC

$169.00 Consultative Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$39.00 Consultative Fee - Other

$142.50 Planning Fee (more than $100,001)

Builder: Conditions: Payments:

Page 24 of 78

Page 25: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

24/06/2015 T LUTFI.

ADELAIDE SA 5000

165 Grenfell Street

Level 1Approved Private Certifier

7/2015/95 15/04/2015 495 Frost Road DUBLIN

LOT: 100 ALT: A HD: 2 PL: F017282 CT: 6162/359

Change in use of land to Light

Industry - Produce Processing

Works... Change in use of land to

light industry including conversion of

existing hay shed to a grain produce

roasting and drying processing

works, ancillary buildings including

office/control room, amenities

building, storage shed, 7 grain

storage tanks, 2 chaff tunnels, 3 fuel

storage tanks and 2 water tanks and

associated car parking, earthworks

and landscaping

$1,600,000 Approved by Private Certifier 12/08/2015

Category 3Category:

Approval:

GE HUGHES CONSTRUCTION CO. $58.50 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$100.00 Planning Fee DAC

$310.00 Consultative Fee DAC

$335.00 Advertising Fee

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$39.00 Consultative Fee - Other

$1,900.00 Planning Fee (more than $100,001)

planning non standard conditionPNS1

Private Certifer Consent ConditionsB11

Builder: Conditions: Payments:

21/05/2015S P BAIS

MIDDLE BEACH SA 5501

The EsplanadeApproved by Delegation

7/2015/96 16/04/2015 The Esplanade MIDDLE BEACH

ALT: S HD: 3 SEC: 752 PL: 140800 CT: 5483/512

Demolition of Existing Shed and

construction of Outbuilding (Shed)

$10,000 Decision Issued 21/05/2015

Category 1Category:

Approval:

S P BAIS $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls maintained in good condP7

planning non standard conditionPNS1

planning non standard conditionPNS3

approved for domestic purposes onlyP9

DisclaimerPNS6

stormwater dischargeB31

building non standard conditionBNS1

Builder: Conditions: Payments:

7/03/2016 OUTBACK TRUCKSTOPS PTY LTD.

ALBION QLD 4010

PO BOX 301

C/- TFA Project GroupApproved Private Certifier

7/2015/97 16/04/2015 Road Train Drive TWO WELLS

LOT: 27 ALT: F HD: 3 PL: C023105 CT: 6094/827

Construction of petrol filling station

(unmanned truck refuelling...

Construction of petrol filling station

(unmanned truck refuelling facility)

and associated advertising signage

$190,000 Decision Issued 7/03/2016

Category 1Category:

Approval:

OUTBACK TRUCKSTOPS PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)

$11.88 Planning Fee DAC

$169.00 Consultative Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$39.00 Consultative Fee - Other

$225.62 Planning Fee (more than $100,001)

in accordance with plans submittedP1

comply to conditions imposedP2

dwelling connected to effluent systemP13

planning non standard conditionPNS1

planning non standard conditionPNS2

planning non standard conditionPNS3

planning non standard conditionPNS5

Site ConditionsP242

Stormwater drained and retained onsiteP243

planning non standard conditionPNS4

provisional building rules consentP101

Builder: Conditions: Payments:

Page 25 of 78

Page 26: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

23/06/2015 N SCOTT.

MALLALA SA 5502

Lot 9 Dublin RoadApproved by Delegation

7/2015/98 16/04/2015 16/13 Dublin Road MALLALA

LOT: 9 ALT: A HD: 1 PL: C27154 CT: 6091/682

Construction of Verandah $8,000 Decision Issued 23/06/2015

Category 1Category:

Approval:

N SCOTT. $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$66.50 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

stormwater dischargeB31

building non standard conditionBNS1

Builder: Conditions: Payments:

2/03/2016 MALLALA MENS SHED WORKING

GROUP.

MALLALA SA 5502

4 Dublin RoadApproved by Delegation

7/2015/99 20/04/2015 1-3 Dublin Road MALLALA

LOT: 740 ALT: A HD: 1 PL: F175207 CT: 5790/80

Construction of community centre

(Mens Shed)..... Construction of

community centre (Mens Shed) and

two 50,000 litre rainwater tanks

$40,000 Decision Issued 2/03/2016

Category 3Category:

Approval:

MALLALA MENS SHED WORKING GROUP. $5.05 Planning Fee DAC

$335.00 Advertising Fee

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

existing trees to be protectedP51

planning non standard conditionPNS1

Inspection of building workB5

Waste containmentB19

On site toilet facilityB20

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

5/08/2015K KING

LEWISTON SA 5501

Lot 311 Milbourne CourtApproved by Delegation

7/2015/100 20/04/2015 9 Milbourne Court LEWISTON

LOT: 311 ALT: A HD: 3 PL: D94528 CT: 6146/883

Construction of outbuilding - storage

shed

$14,795 Decision Issued 5/08/2015

Category 1Category:

Approval:

ALPHA INDUSTRIES. $58.50 Planning Lodgement Fee (up to $5,000)

$60.94 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.58 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

stormwater dischargeB31

building non standard conditionBNS1

Manufacturers RecommendationB63

epa - practical measuresP140

Builder: Conditions: Payments:

Page 26 of 78

Page 27: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

5/08/2015K KING

LEWISTON SA 5501

Lot 311 Milbourne CourtApproved by Delegation

7/2015/101 20/04/2015 9 Milbourne Court LEWISTON

LOT: 311 ALT: A HD: 3 PL: D94528 CT: 6146/883

Verandah

$8,066 Decision Issued 5/08/2015

Category 1Category:

Approval:

K KING $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$5.05 Planning Fee DAC

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

stormwater dischargeB31

Manufacturers RecommendationB63

Builder: Conditions: Payments:

29/06/2015P R BAKER

MALLALA SA 5502

Old Dublin RoadApproval Bulding Consent

7/2015/102 20/04/2015 Turner Road MALLALA

LOT: 2 ALT: A HD: 1 PL: F014843 CT: 5320/652

Construction of Farm Building

(Machinery Shed) and 3 Rainwater

Tanks

$125,000 Decision Issued 29/06/2015

Category 1Category:

Approval:

P R BAKER $58.50 Planning Lodgement Fee (up to $5,000)

$7.81 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$148.44 Planning Fee (more than $100,001)

in accordance with plans submittedP1

existing trees to be protectedP51

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

building non standard conditionBNS1

Builder: Conditions: Payments:

1/07/2015 S B HOLLEY.

LEWISTON SA 5501

31 Bethesda Roadwithdrawn Application

7/2015/104 21/04/2015 31 Bethesda Road LEWISTON

LOT: 16 ALT: A HD: 3 PL: D77219 CT: 6012/582

2 Shipping Containers (Domestic

Storage)

$2,500 Decision Issued 1/07/2015

Category 1Category:

Approval:

S B HOLLEY. $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

Builder: Conditions: Payments:

2/07/2015 ALPHA INDUSTRIES.

CAVAN SA 5094

12 STOCK ROADApproved by Delegation

7/2015/105 22/04/2015 18 Gawler River Road LEWISTON

LOT: 184 ALT: A HD: 3 PL: F163152 CT: 5802/68

Construction of a Commercial Shed

(storage & packing)

$8,375 Decision Issued 3/07/2015

Category 2Category:

Approval:

ALPHA INDUSTRIES. $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$18.82 Building - DAC

$9.52 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$250.10 Class 7 & 8

$126.56 Class 7 & 8

stormwater dischargeB31

in accordance with plans submittedP1

external walls maintained in good condP7

external walls of building subduedP6

approved for domestic purposes onlyP9

Builder: Conditions: Payments:

Page 27 of 78

Page 28: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

19/05/2015A K EDWARDS

WINDSOR SA 5501

Lot 5 Port Parham RoadApproved by Delegation

7/2015/106 22/04/2015 438 Port Parham Road WINDSOR

LOT: 5 ALT: A HD: 2 PL: F100548 CT: 5103/157

Domestic Outbuilding (Garage) $7,300 Decision Issued 19/05/2015

Category 1Category:

Approval:

A K EDWARDS $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

stormwater dischargeB31

building non standard conditionBNS1

Builder: Conditions: Payments:

18/06/2015CONSTRUCTION SERVICES

AUSTRALIA PTY LTD

HACKNEY SA 5069

25 NORTH TERRACEApproved Private Certifier

7/2015/107 22/04/2015 17 Bailey Road TWO WELLS

LOT: 49 ALT: A HD: 3 PL: 21519 CT: 5445/441

Dwelling

$233,780 Decision Issued 18/06/2015

Category 1Category:

Approval:

CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$14.62 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$274.61 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

26/05/2015A F LEAR

MALLALA SA 5502

38 Dublin RoadApproved by Delegation

7/2015/108 22/04/2015 38 Dublin Road MALLALA

LOT: 11 ALT: A HD: 1 PL: D020382 CT: 5084/459

Shed

$8,845 Decision Issued 26/05/2015

Category 1Category:

Approval:

OLYMPIC INDUSTRIES $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

stormwater dischargeB31

building non standard conditionBNS1

Builder: Conditions: Payments:

10/07/2015K J ECKERMANN

LEWISTON SA 5501

72 Bethesda RoadApproved by Delegation

7/2015/109 23/04/2015 72 Bethesda Road LEWISTON

LOT: 38 ALT: A HD: 3 PL: D019441 CT: 5275/878

Construction of Fence (in Flood

Hazard Zone 1)

$4,800 Decision Issued 10/07/2015

Category 1Category:

Approval:

K J ECKERMANN $58.50 Planning Lodgement Fee (up to $5,000)

$2.55 Planning Fee DAC

$5.95 Planning Fee DAC

$47.95 Planning Fee Non-Complying

$113.05 Planning Fee Non-Complying

$175.00 HYDROLOGICAL REPORT (FLOOD)

in accordance with plans submittedP1Builder: Conditions: Payments:

Page 28 of 78

Page 29: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

R K FATCHEN

TWO WELLS SA 5501

1 Leilete Road

7/2015/110 24/04/2015 604 Williams Road KORUNYE

ALT: S HD: 3 SEC: 485 PL: H140800 CT: 5330/154

Parking of 5 trucks (prime movers)

and 10 trailers.... Parking of 5 trucks

(prime movers) and 10 trailers for

commercial purposes and

construction of 3 shipping containers

for domestic storage

$0 Additional Information Buildin 17/09/2015

Category 3Category:

Approval:

R K FATCHEN $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$335.00 Advertising Fee

$101.00 Category 2 Fee

$28.00 Certificate of Title Request

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Site ConditionsP242

Stormwater drained and retained onsiteP243

1 prime mover or truck, up to 10 tonnesP189

minor repairs & maintenance to vehicleP190

restriction times of truck movementsP197

planning non standard conditionPNS1

planning non standard conditionPNS2

planning non standard conditionPNS3

planning non standard conditionPNS4

planting approp bushes within first seasP48

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

no other egress shall be createdP40

advertising displays not in consentP102

epa - practical measuresP140

Builder: Conditions: Payments:

17/06/2015SELECTA HOMES & BUILDING

COMPANY

BURTON SA 5110

1-8 Deuter RoadPlanning Consent Only

7/2015/111 24/04/2015 18 Lionel Road LEWISTON

LOT: 68 ALT: A HD: 3 PL: D027864 CT: 5163/294

Dependent accomodation $76,270 Decision Issued 26/06/2015

Category 1Category:

Approval:

SELECTA HOMES & BUILDING COMPANY $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$5.05 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

Builder: Conditions: Payments:

N S FARRUGIA-GAY

TWO WELLS SA 5501

Lot 101 Williams Road

7/2015/112 27/04/2015 Williams Road TWO WELLS

LOT: 101 ALT: A HD: 3 PL: D83023 CT: 6055/679

Construction of shed - Store for

animal feed

$3,500 Additional Information Plannin 21/05/2015

Category 1Category:

Approval:

N S FARRUGIA-GAY $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

Builder: Conditions: Payments:

Page 29 of 78

Page 30: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

6/08/2015 COMO GLASSHOUSE PTY LTD.

SOUTH YARRA VIC 3141

644 Chapel Street

Level 18, Como Office TowerApproved Private Certifier

7/2015/113 29/04/2015 687 Germantown Road KORUNYE

LOT: 10 ALT: S HD: 3 PL: D93356 CT: 6133/537

Construction of Store (Storage Shed) $20,000 Decision Issued 6/08/2015

Category 1Category:

Approval:

COMO GLASSHOUSE PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls maintained in good condP7

provisional building rules consentP101

Builder: Conditions: Payments:

14/09/2015FAIRMONT HOMES GROUP PTY LTD

ADELAIDE SA 5000

21 - 24 North TerraceApproved Private Certifier

7/2015/114 29/04/2015 Temby Road TWO WELLS

LOT: 3 ALT: A HD: 3 PL: F002634 CT: 5214/359

Dwelling

$278,941 Information Further Clarificat 29/10/2015

Category 1Category:

Approval:

FAIRMONT HOMES GROUP PTY LTD $427.00 Septic Tank application Fee

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

$375.00 HYDROLOGICAL REPORT (FLOOD)

in accordance with plans submittedP1

Waste containmentB19

On site toilet facilityB20

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

1/07/2015D K QUIN

THOMPSON BEACH SA 5501

7 Sandpiper DriveApproved by Delegation

7/2015/115 30/04/2015 7 Sandpiper Drive THOMPSON BEACH

LOT: 11 ALT: A HD: 2 PL: D029513 CT: 5370/273

Construction of Verandah with

stormwater system

$2,000 Decision Issued 1/07/2015

Category 1Category:

Approval:

D K QUIN $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

in accordance with plans submittedP1

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

stormwater dischargeB31

building non standard conditionBNS1

Builder: Conditions: Payments:

9/06/2015F INTINI

LEWISTON SA 5501

Lot 14 Bethesda RoadApproval Bulding Consent

7/2015/116 12/05/2015 39A Bethesda Road LEWISTON

LOT: 14 ALT: S HD: 3 PL: D77219 CT: 6012/580

Swimming Pool and Safety Fence

$40,000 Swim Pool Fence Inspection 21/12/2015

Category 1Category:

Approval:

FREEDOM POOLS $58.50 Planning Lodgement Fee (up to $5,000)

$175.00 Swimming Pool Lodgement Fee

$46.55 Building Rules Consent Only Fee

$2.45 DAC - Building Rules Consent Only Fee

Dwelling occupation requirementsB69Builder: Conditions: Payments:

26/06/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/117 13/05/2015 21B Williams Road TWO WELLS

LOT: 702 ALT: A HD: 3 PL: D078947 CT: 6021/868

Verandah

$16,000 Decision Issued 26/06/2015

Category 1Category:

Approval:

BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

Page 30 of 78

Page 31: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

15/05/2015S G MERTINEIT

LEWISTON SA 5501

225 Hayman RoadApproved by Delegation

7/2015/118 5/05/2015 225 Hayman Road LEWISTON

LOT: 51 ALT: A HD: 3 PL: D014929 CT: 5691/848

Dog Keeping (5 breeding dogs) and

whelping area within existing... Dog

Keeping (5 breeding dogs) and

whelping area within existing dwelling

$0 Decision Issued 15/05/2015

Category 1Category:

Approval:

S G MERTINEIT $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

in accordance with plans submittedP1Builder: Conditions: Payments:

23/09/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/119 13/05/2015 9 East Terrace WINDSOR

LOT: 26 ALT: A HD: 2 PL: D000493 CT: 5820/507

Construction of Outbuilding - Shed

14.4m x 9.1m x 3.4 m wall.......

height, existing Shed 9m x 6.5m x

3m wall height & two Verandahs

$15,000 Decision Issued 23/09/2015

Category 2Category:

Approval:

BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$95.95 Planning Fee ($10,000-$100,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

provisional building rules consentP101

Builder: Conditions: Payments:

17/06/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/120 13/05/2015 17 Gilks Road LEWISTON

LOT: 12 ALT: A HD: 3 PL: D040106 CT: 5201/318

Construction of two carports $7,000 Decision Issued 17/06/2015

Category 1Category:

Approval:

BARGAIN STEEL CENTRE $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$66.50 Planning Lodgement Fee (over $5,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

Site ConditionsP242

Stormwater drained and retained onsiteP243

external appearance maintainedP10

external materials to match existing bldP12

structure not be enclosed with solidP11

provisional building rules consentP101

Builder: Conditions: Payments:

12/06/2015 E FRITTMANN.

LEWISTON SA 5501

87 Pederick RoadApproved by Delegation

7/2015/121 18/05/2015 87 Pederick Road LEWISTON

LOT: 3 ALT: A HD: 3 PL: D021970 CT: 5384/188

Construction of domestic outbuilding

- garage

$6,500 Decision Issued 12/06/2015

Category 1Category:

Approval:

E FRITTMANN. $58.50 Planning Lodgement Fee (up to $5,000)

$71.80 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$5.40 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

stormwater dischargeB31

Builder: Conditions: Payments:

Page 31 of 78

Page 32: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

12/06/2015 ALL CARE BUILDING & HOME

IMPROVEMENTS.

EVANSTON GARDENS SA 5116

8 Houston CourtApproved by Delegation

7/2015/122 14/05/2015 1 Fifth Street DUBLIN

LOT: 62 PL: D76536 CT: 6006/616

Construction of verandah $7,500 Decision Issued 12/06/2015

Category 1Category:

Approval:

ALL CARE BUILDING & HOME IMPROVEMENTS. $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

$49.00 Planning Lodgement Fee (over $5,000)

$17.50 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

external appearance maintainedP10

external materials to match existing bldP12

structure not be enclosed with solidP11

stormwater dischargeB31

building non standard conditionBNS1

Builder: Conditions: Payments:

19/08/2015AHRENS ENGINEERING PTY LTD

SHEAOAK LOG 5371

PO Box 2withdrawn Application

7/2015/123 18/05/2015 Carslake Road DUBLIN

LOT: 11 ALT: A HD: 2 PL: D019148 CT: 5452/708

Bulk grain handling and storage

facility comprising conveyor.... silos,

weighbridge, site office and

associated site works

$4,000,000 Decision Issued 19/08/2015

Category 2Category:

Approval:

AHRENS ENGINEERING PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$250.00 Planning Fee DAC

$39.00 Consultative Fee - EPA

$310.00 Consultative Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$4,750.00 Planning Fee (more than $100,001)

Builder: Conditions: Payments:

RIVERGUM HOMES PTY LTD.

TORRENSVILLE SA 5031

PO Box 191

7/2015/124 14/05/2015 7 Kestrel Crescent THOMPSON BEACH

LOT: 347 ALT: A HD: 2 PL: D031537 CT: 5142/847

Construction of single storey dwelling $181,413 Waste Control Approval 18/11/2015

Category 1Category:

Approval:

RIVERGUM HOMES PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$11.33 Planning Fee DAC

$169.00 Consultative Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$39.00 Consultative Fee - Other

$215.42 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

Builder: Conditions: Payments:

Page 32 of 78

Page 33: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

14/09/2015 A ROZHKOV.

NORTHGATE SA 5085

47 Cityside DriveApproved Private Certifier

7/2015/125 22/05/2015 12 Coats Road TWO WELLS

LOT: 47 ALT: A HD: 3 PL: D006683 CT: 5651/669

2 Wheller Road TWO WELLS

LOT: 101 ALT: A HD: 3 PL: D112335 CT: 6173/579

Construction of Single Storey

Dwelling

$150,000 Decision Issued 14/09/2015

Category 1Category:

Approval:

A ROZHKOV. $58.50 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$9.36 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$178.14 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

finished floor level not less 700mmP18

external surfaces painted durable paintP17

water storage tank 22400 litresP174

planning non standard conditionPNS1

dwelling connected to effluent systemP13

Vehicle AccessP236

no other egress shall be createdP40

provisional building rules consentP101

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

30/03/2016M A BEJAN

LEWISTON SA 5501

38 Bethesda Roadwithdrawn Application

7/2015/126 25/05/2015 5 Greens Road LEWISTON

LOT: 806 ALT: A HD: 3 PL: D94057 CT: 6145/209

Construction of Dwelling $150,000 Decision Issued 30/03/2016

Category 1Category:

Approval:

M A BEJAN $58.50 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$9.38 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$178.12 Planning Fee (more than $100,001)

$30.00 Certificate of Title Request

Builder: Conditions: Payments:

12/08/2015S ALMOND

LEWISTON SA 5501

37 Bethesda RoadApproved by Delegation

7/2015/127 25/05/2015 37 Bethesda Road LEWISTON

LOT: 19 ALT: A HD: 3 PL: D038019 CT: 5150/602

Keeping of 9 dogs - conversion of

existing rumpus room.... Keeping of

9 dogs - conversion of existing

rumpus room to dog kennels - and

associated dog runs

$5,700 Decision Issued 12/08/2015

Category 1Category:

Approval:

S ALMOND $58.50 Planning Lodgement Fee (up to $5,000)

$209.00 Septic Tank application Fee

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$6.11 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$81.19 Class 7 & 8

in accordance with plans submittedP1

no more than dogs kept on an allotmentP128

animals be restrained from making noiseP109

solid waste waterproof containerP137

kennels be cleaned regularlyP129

floor, waste system be maintainedP133

kenenls painted in subdued coloursP134

Site ConditionsP242

Stormwater drained and retained onsiteP243

epa - practical measuresP140

dogs to be registered in dog/cat actP141

Builder: Conditions: Payments:

19/06/2015HICKINBOTHAM GROUP OF

COMPANIES

HACKNEY SA 5069

25 North TerraceApproval Land Division

7/2015/128 26/05/2015 Gawler Road TWO WELLS

LOT: 58 ALT: Q HD: 3 PL: D064975 CT: 5966/721

Land Division - one allotment into

two

$0 Decision Issued 19/06/2015

Category 1Category:

Approval:

HICKINBOTHAM GROUP OF COMPANIES planning non standard conditionPNS1Builder: Conditions: Payments:

Page 33 of 78

Page 34: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

23/06/2015I M MCMILLAN

MALLALA SA 5502

30B Adelaide RoadApproved by Delegation

7/2015/129 26/05/2015 30 Adelaide Road MALLALA

LOT: 3 ALT: A HD: 1 PL: F002723 CT: 5381/778

Construction of garage $4,900 Decision Issued 23/06/2015

Category 1Category:

Approval:

I M MCMILLAN $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

$28.00 Certificate of Title Request

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

stormwater dischargeB31

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

28/04/2016R ROSE

LEWISTON SA 5501

140 Dawkins RoadApproval Land Division

7/2015/130 26/05/2015 140 Dawkins Road LEWISTON

LOT: 2 ALT: A HD: 3 PL: D015412 CT: 5747/223

Land Division - one allotment into

two

$0 Decision Issued 28/04/2016

Category 3Category:

Approval:

R ROSE $109.80 Planning Fee DAC

$350.00 Advertising Fee

$103.00 Category 2 Fee

$12.20 Planning Fee Non-Complying

in accordance with plans submittedP1Builder: Conditions: Payments:

1/10/2015R M FIORETTI

TWO WELLS SA 5501

27 Dawkins RoadApproval Land Division

7/2015/131 26/05/2015 4 Coats Road TWO WELLS

LOT: 50 ALT: A HD: 3 PL: D006683 CT: 6159/596

4A Coats Road TWO WELLS

LOT: 2 ALT: A HD: 3 PL: D111793 CT: 6172/728

Land Division - one allotment into

two

$0 Decision Issued 1/10/2015

Category 1Category:

Approval:

R M FIORETTI in accordance with plans submittedP1

contact council after conditions compileP164

Builder: Conditions: Payments:

1/10/2015 WEEKS AND MACKLIN HOMES.

HINDMARSH SA 5007

193-195 Port RoadApproved by Delegation

7/2015/132 2/06/2015 16/4 Dublin Road MALLALA

LOT: 1 ALT: A HD: 1 PL: C27154 CT: 6091/674

Construction of dwelling $240,419 Decision Pending 1/10/2015

Category 1Category:

Approval:

WEEKS AND MACKLIN HOMES. $58.50 Planning Lodgement Fee (up to $5,000)

$15.03 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$285.49 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

21/07/2015T PHEASE

DUBLIN SA 5501

227 Port Parham RoadApproved by Delegation

7/2015/133 1/06/2015 227 Port Parham Road DUBLIN

LOT: 10 ALT: A HD: 2 PL: D016418 CT: 5277/732

Installation of two elevated ground

Solar Panels

$2,500 Decision Issued 21/07/2015

Category 1Category:

Approval:

T PHEASE $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$4.05 Building - DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

Page 34 of 78

Page 35: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

31/07/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/134 1/06/2015 300 Hayman Road LEWISTON

LOT: 122 ALT: A HD: 3 PL: D017603 CT: 5691/480

Construction of Shed $6,500 Decision Issued 31/07/2015

Category 1Category:

Approval:

ADELAIDE FENCING & STEEL SUPPLIES $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$66.50 Planning Lodgement Fee (over $5,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

5/08/2015K R RICHARDSON

DUBLIN SA 5501

30 Harris RoadApproval Land Division

7/2015/135 2/06/2015 30 Harris Road DUBLIN

ALT: S HD: 2 SEC: 279 PL: H140400 CT: 5662/394

Harris Road DUBLIN

LOT: 10 ALT: S HD: 2 PL: D111819 CT: 6169/296

Land Division - one allotment into

two

$0 Decision Issued 5/08/2015

Category 1Category:

Approval:

K R RICHARDSON in accordance with plans submittedP1Builder: Conditions: Payments:

31/07/2015F C MAIOLO

TWO WELLS SA 5501

50 Dawkins RoadApproved by Delegation

7/2015/136 2/06/2015 50 Dawkins Road TWO WELLS

LOT: 16 ALT: A HD: 3 PL: D006682 CT: 5730/840

Land Division - one allotment into

two

$0 Decision Issued 31/07/2015

Category 1Category:

Approval:

F C MAIOLO in accordance with plans submittedP1Builder: Conditions: Payments:

8/07/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproval Bulding Consent

7/2015/137 3/06/2015 34 Walter Avenue TWO WELLS

LOT: 31 ALT: A HD: 3 PL: D84941 CT: 6064/410

Construction of Verandah $3,000 Decision Issued 8/07/2015

Category 1Category:

Approval:

ADELAIDE STEEL AND FENCE SUPPLIES $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$46.55 Building Rules Consent Only Fee

$2.45 DAC - Building Rules Consent Only Fee

Dwelling occupation requirementsB69Builder: Conditions: Payments:

9/07/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/138 3/06/2015 18 Sanders Avenue DUBLIN

ALT: S HD: 2 SEC: 239 PL: H140400 CT: 5438/536

Construction of shed and shed

extension

$9,500 Decision Issued 9/07/2015

Category 1Category:

Approval:

A K CARLEY $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$66.50 Planning Lodgement Fee (over $5,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

Page 35 of 78

Page 36: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

21/08/2015 A DOLMAN.

LEWISTON SA 5501

14 Milbourne CourtApproved by Delegation

7/2015/139 5/06/2015 14 Milbourne Court LEWISTON

LOT: 307 ALT: A HD: 3 PL: D94528 CT: 6146/879

Construction of Shed $20,000 Decision Issued 21/08/2015

Category 2Category:

Approval:

A DOLMAN. $58.50 Planning Lodgement Fee (up to $5,000)

$171.08 Class 10

$5.05 Planning Fee DAC

$12.88 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

$95.95 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Building good & workmanlike mannerB2

Stormwater disposalB33

Engineers ReportB64

Builder: Conditions: Payments:

N ROZHKOV.

TWO WELLS SA 5501

12 Coats Road

7/2015/140 9/06/2015 12 Coats Road TWO WELLS

LOT: 47 ALT: A HD: 3 PL: D006683 CT: 5651/669

2 Wheller Road TWO WELLS

LOT: 101 ALT: A HD: 3 PL: D112335 CT: 6173/579

Land Division - one allotment into

two allotments

$0 Planning Assessment 9/06/2015

Category 1Category:

Approval:

N ROZHKOV. in accordance with plans submittedP1Builder: Conditions: Payments:

26/06/2015SA QUALITY HOME IMPROVEMENTS

CLARENCE GARDENS SA 5039

SOUTH RDApproved Private Certifier

7/2015/141 9/06/2015 203 Dawkins Road LEWISTON

LOT: 474 ALT: A HD: 3 PL: F174941 CT: 5606/898

Construction of Verandah $11,610 Decision Issued 26/06/2015

Category 1Category:

Approval:

SA QUALITY HOME IMPROVEMENTS $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

12/11/2015Murray Machining

MURRAY BRIDGE SA 5253

110 Maurice RoadApproved by Delegation

7/2015/142 11/06/2015 90 The Esplanade PARHAM

LOT: 61 ALT: A HD: 2 PL: D90750 CT: 6105/768

Construction of Shed (12m x 12m x

4.1m wall height)

$30,657 Decision Issued 12/11/2015

Category 2Category:

Approval:

Murray Machining $58.50 Planning Lodgement Fee (up to $5,000)

$150.77 Class 10

$5.05 Planning Fee DAC

$173.00 Consultative Fee DAC

$11.35 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

$95.95 Planning Fee ($10,000-$100,000)

$40.00 Consultative Fee - Other

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

planning non standard conditionPNS1

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

Page 36 of 78

Page 37: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

7/04/2016DECHELLIS HOMES PTY LTD

Evandale SA 5069

170 Payneham RoadApproved Private Certifier

7/2015/143 11/06/2015 50 Dawkins Road TWO WELLS

LOT: 16 ALT: A HD: 3 PL: D006682 CT: 5730/840

Construction of Dwelling $152,245 Decision Issued 7/04/2016

Category 1Category:

Approval:

DECHELLIS HOMES PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$415.50 Septic Tank application Fee

$22.50 Septic Tank application Fee

$9.52 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$180.79 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

29/06/2015BGI Building Group

Nuriootpa 5355

21-23 Tanunda RoadApproval Bulding Consent

7/2015/144 11/06/2015 10 Noble Crescent TWO WELLS

LOT: 3 ALT: A HD: 3 PL: D058967 CT: 5869/703

Construction of Verandah $10,500 Decision Issued 29/06/2015

Building Rules Consent OnlyCategory:

Approval:

BGI Building Group $58.50 Planning Lodgement Fee (up to $5,000)

$59.95 Class 10

$5.05 Planning Fee DAC

$4.05 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

stormwater dischargeB31

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

23/06/2015 AUSTRALIAN OUTDOOR LIVING.

WEST LAKES SA 5021

PO Box 7361Approved Private Certifier

7/2015/145 18/06/2015 129 Old Port Wakefield Road WINDSOR

LOT: 813 ALT: A HD: 2 PL: F175280 CT: 6099/424

Construction of Swimming Pool and

Safety Fence

$37,700 Swim Pool Completion 21/12/2015

Building Rules Consent OnlyCategory:

Approval:

AUSTRALIAN OUTDOOR LIVING. $58.50 Planning Lodgement Fee (up to $5,000)

$175.00 Swimming Pool Lodgement Fee

$46.55 Building Rules Consent Only Fee

$2.45 DAC - Building Rules Consent Only Fee

Dwelling occupation requirementsB69Builder: Conditions: Payments:

19/06/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/146 19/06/2015 23 Harniman Road LEWISTON

LOT: 75 ALT: A HD: 3 PL: D020952 CT: 5284/788

Construction of Shed $8,000 Decision Issued 8/07/2015

Category 1Category:

Approval:

V CAVALLARO $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$66.50 Planning Lodgement Fee (over $5,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

provisional building rules consentP101

Builder: Conditions: Payments:

Page 37 of 78

Page 38: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

12/11/2015 A C RADFORD.

TWO WELLS SA 5501

92 Hayman RoadApproved by Delegation

7/2015/147 19/06/2015 92 Hayman Road TWO WELLS

LOT: 111 ALT: A HD: 3 PL: D059936 CT: 6047/694

Construction of three verandahs, bull

nose verandah and front........

decking and placement of two

transportable outbuildings

$15,000 Decision Issued 12/11/2015

Category 1Category:

Approval:

A C RADFORD. $58.50 Planning Lodgement Fee (up to $5,000)

$196.08 Class 10

$5.05 Planning Fee DAC

$14.76 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

building non standard conditionBNS1

building non standard conditionBNS2

building non standard conditionBNS3

building non standard conditionBNS4

Builder: Conditions: Payments:

26/08/2015H THOEUN

BURTON SA 5110

325 Burton RoadApproved by Delegation

7/2015/148 24/06/2015 170 Port Parham Road WINDSOR

LOT: 20 ALT: A HD: 2 PL: F101978 CT: 5117/393

Construction of 12 Plastic Covered

Greenhouses

$304,000 Decision Issued 26/08/2015

Category 1Category:

Approval:

H THOEUN $58.50 Planning Lodgement Fee (up to $5,000)

$19.00 Planning Fee DAC

$686.00 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$361.00 Planning Fee (more than $100,001)

$9,114.00 Class 7 & 8

in accordance with plans submittedP1

faulty or unsuitable materials not usedB3

Engineers report acceptanceB27

Engineers ReportB64

schedule of essential safety provisionsB9

Builder: Conditions: Payments:

17/09/2015 COMO GLASSHOUSE PTY LTD.

SOUTH YARRA VIC 3141

644 Chapel Street

Level 18, Como Office TowerApproved Private Certifier

7/2015/149 24/06/2015 687 Germantown Road KORUNYE

LOT: 10 ALT: S HD: 3 PL: D93356 CT: 6133/537

Kenner Road KORUNYE

ALT: S HD: 3 SEC: 506 PL: H140800 CT: 5657/53

Construction of three gas micro

turbines, removal of... Construction

of three gas micro turbines, removal

of one existing diesel generator and

alterations to three existing diesel

generators

$5,000,000 Decision Issued 17/09/2015

Category 1Category:

Approval:

COMO GLASSHOUSE PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)

$312.50 Planning Fee DAC

$310.00 Consultative Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$39.00 Consultative Fee - Other

$5,937.50 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

planning non standard conditionPNS1

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

27/10/2015 RIVERGUM HOMES PTY LTD.

TORRENSVILLE SA 5031

PO Box 191Approved Private Certifier

7/2015/150 24/06/2015 Ruskin Road DUBLIN

LOT: 521 ALT: S HD: 2 PL: D93501 CT: 6137/295

Construction of Dwelling $173,079 Decision Issued 27/10/2015

Category 1Category:

Approval:

RIVERGUM HOMES PTY LTD. $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$10.82 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$205.53 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

Page 38 of 78

Page 39: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

28/08/2015FAIRMONT HOMES GROUP PTY LTD

ADELAIDE SA 5000

21 - 24 North TerraceApproved Private Certifier

7/2015/151 25/06/2015 17 Milbourne Court LEWISTON

LOT: 315 ALT: A HD: 3 PL: D94528 CT: 6146/887

Construction of Dwelling $293,400 Decision Issued 28/08/2015

Category 1Category:

Approval:

FAIRMONT HOMES GROUP PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$18.34 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$348.41 Planning Fee (more than $100,001)

in accordance with plans submittedP1

Private Certifer Consent ConditionsB11

Builder: Conditions: Payments:

CONSTRUCTION SERVICES

AUSTRALIA PTY LTD

HACKNEY SA 5069

25 NORTH TERRACE

7/2015/152 25/06/2015 Old Port Wakefield Road TWO WELLS

LOT: 115 ALT: A HD: 3 PL: D95613 CT: 6156/807

Construction of Dwelling $251,305 Additional Information Plannin 9/07/2015

Category 1Category:

Approval:

CONSTRUCTION SERVICES AUSTRALIA PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$15.71 Planning Fee DAC

$5.95 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$113.05 Planning Fee Non-Complying

$298.42 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

Builder: Conditions: Payments:

1/03/2016 CONCORDE MODEL FLYING CLUB.

TWO WELLS SA 5501

6 Port Wakefield RoadApproved DAP

7/2015/153 25/06/2015 3,341B Port Wakefield Road LOWER LIGHT

LOT: 6 ALT: A HD: 3 PL: D026285 CT: 5940/164

Radio Controlled Flying Club, Shade

Cloth Pergolas, Verandah,.........

Shipping Container Storage Unit and

Advertising Sign

$9,000 Planning Assessment 3/03/2016

Category 3Category:

Approval:

CONCORDE MODEL FLYING CLUB. $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$335.00 Advertising Fee

$66.50 Planning Lodgement Fee (over $5,000)

$101.00 Category 2 Fee

in accordance with plans submittedP1Builder: Conditions: Payments:

10/07/2015 A G HOSKIN.

DUBLIN SA 5501

Lot 523 Ruskin RoadApproved by Delegation

7/2015/154 1/07/2015 Ruskin Road DUBLIN

LOT: 523 ALT: S HD: 2 PL: D93501 CT: 6137/297

Keeping of animals - 4 Sheep 2

Alpacas and 1 Goat

$200 Decision Issued 10/07/2015

Category 1Category:

Approval:

A G HOSKIN. $58.50 Planning Lodgement Fee (up to $5,000)

$1.85 Planning Fee DAC

$34.65 Planning Fee (up to $10,000)

$28.00 Certificate of Title Request

in accordance with plans submittedP1

structures & yards be maintained in goodP110

epa - practical measuresP140

Builder: Conditions: Payments:

P T IRISH

MALLALA SA 5502

Old Dublin Road

7/2015/155 1/07/2015 175 Hill Road MALLALA

ALT: S HD: 1 SEC: 576 PL: 140500 CT: 5139/117

Dublin Road MALLALA

LOT: 15 ALT: S HD: 1 PL: D96313 CT: 6160/541

Feltwell Road MALLALA

ALT: S HD: 1 SEC: 571 PL: H140500 CT: 5733/934

Land division - boundary realignment $0 Planning Assessment 1/10/2015

Category 1Category:

Approval:

P T IRISHBuilder: Conditions: Payments:

Page 39 of 78

Page 40: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

31/07/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/156 1/07/2015 1,061 Germantown Road KORUNYE

LOT: 454 ALT: A HD: 3 PL: F174921 CT: 5771/126

Construction of Shed $14,000 Decision Issued 3/11/2015

Category 1Category:

Approval:

ADELAIDE FENCING & STEEL SUPPLIES $58.50 Planning Lodgement Fee (up to $5,000)

$5.05 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

floor level no less than 2.3 metresP181

approved for domestic purposes onlyP9

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

23/07/2015I M EATTS

DUBLIN SA 5501

Lot 521 Ruskin RoadApproved by Delegation

7/2015/157 1/07/2015 Ruskin Road DUBLIN

LOT: 521 ALT: S HD: 2 PL: D93501 CT: 6137/295

Construction of Shed and placing of

a 115,0000 litre......... rain water tank

$20,000 Decision Issued 23/07/2015

Category 1Category:

Approval:

I M EATTS $58.50 Planning Lodgement Fee (up to $5,000)

$99.99 Class 10

$5.05 Planning Fee DAC

$7.53 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

stormwater dischargeB31

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

5/11/2015 ALPHA INDUSTRIES.

CAVAN SA 5094

12 STOCK ROADApproved by Delegation

7/2015/158 1/07/2015 170 Port Parham Road WINDSOR

LOT: 20 ALT: A HD: 2 PL: F101978 CT: 5117/393

Construction of packing shed for

horticulture purposes

$12,890 Health Assessment 6/11/2015

Category 2Category:

Approval:

H THOEUN $58.50 Planning Lodgement Fee (up to $5,000)

$150.00 Class 10

$5.05 Planning Fee DAC

$11.30 Building - DAC

$22.33 Building - DAC

$66.50 Planning Lodgement Fee (over $5,000)

$95.95 Planning Fee ($10,000-$100,000)

$296.67 Class 7 & 8

building non standard conditionBNS1

building non standard conditionBNS2

building non standard conditionBNS3

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Builder: Conditions: Payments:

21/07/2015H G DOWLING

TWO WELLS SA 5501

10 Noble CrescentApproved by Delegation

7/2015/159 8/07/2015 10 Noble Crescent TWO WELLS

LOT: 3 ALT: A HD: 3 PL: D058967 CT: 5869/703

Construction of Carport $11,950 Decision Issued 21/07/2015

Category 1Category:

Approval:

C WUTTKE $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$5.15 Planning Fee DAC

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

building non standard conditionBNS1

in accordance with plans submittedP1

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

Builder: Conditions: Payments:

Page 40 of 78

Page 41: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

4/11/2015METRICON HOMES PTY LTD

NORWOOD SA 5067

88 Fullarton RoadApproved Private Certifier

7/2015/160 6/07/2015 15 Milbourne Court LEWISTON

LOT: 314 ALT: A HD: 3 PL: D94528 CT: 6146/886

Construction of Dwelling $276,625 Decision Issued 4/11/2015

Category 1Category:

Approval:

METRICON HOMES PTY LTD $58.50 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$17.29 Planning Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$328.49 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

10/08/2015T I ESPOSITO

TWO WELLS SA 5501

8 McCord RoadApproved by Delegation

7/2015/161 2/07/2015 8 McCord Road TWO WELLS

LOT: 54 ALT: A HD: 3 PL: D006687 CT: 5448/950

Construction of Shed (21.1m x 9.1m

x 3.9m wall height)

$9,200 Decision Issued 10/08/2015

Category 1Category:

Approval:

ALPHA INDUSTRIES. $60.00 Planning Lodgement Fee (up to $5,000)

$152.92 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$11.51 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

planting bushes to and replace when dieP44

propagted from locall indigenous speciesP45

Building not for human habitationB1

Manufacturers RecommendationB63

Builder: Conditions: Payments:

3/11/2015 V H NGUYEN.

TWO WELLS SA 5501

14 Old Port Wakefield RoadApproved by Delegation

7/2015/162 9/07/2015 14 Old Port Wakefield Road TWO WELLS

LOT: 169 ALT: A HD: 3 PL: 163137 CT: 5401/177

Horticulture comprising 3 plastic

covered greenhouses............. &

water storage dam

$90,000 Decision Issued 29/10/2015

Category 2Category:

Approval:

V H NGUYEN. $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$300.06 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

$97.85 Planning Fee ($10,000-$100,000)

$3,986.46 Class 3, 5 & 6

in accordance with plans submittedP1

schedule of essential safety provisionsB9

Builder: Conditions: Payments:

5/11/2015 S A STACEY.

TWO WELLS SA 5501

10 Clydesdale DriveApproved by Delegation

7/2015/163 14/07/2015 10 Clydesdale Drive TWO WELLS

LOT: 55 ALT: A HD: 3 PL: D045869 CT: 5365/345

Construction of outbuilding (shed)

and conversion of existing......

Construction of outbuilding (shed)

and conversion of existing carport to

partially enclosed entertaining area

$6,500 Decision Issued 5/11/2015

Category 1Category:

Approval:

OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)

$106.02 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$7.98 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$30.00 Certificate of Title Request

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

external walls of building subduedP6

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

Page 41 of 78

Page 42: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

26/11/2015BAYLIES ROAD PROPERTY

INVESTMENTS PTY LTD.

TWO WELLS SA 5501

Section 194 Bailey Road WestApproved by Delegation

7/2015/164 14/07/2015 Shellgrit Road MIDDLE BEACH

ALT: S HD: 3 SEC: 218 PL: H140800 CT: 6155/358

Change of land use from primary

production to open field... Change of

land use from primary production to

open field horticulture and

construction of two canopies

$2,000 Decision Issued 26/11/2015

Category 2Category:

Approval:

BAYLIES ROAD PROPERTY INVESTMENTS PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$101.00 Category 2 Fee

$30.00 Certificate of Title Request

$30.00 Certificate of Title Request

in accordance with plans submittedP1

provisional building rules consentP101

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

17/09/2015A J LEANEY

REEVES PLAINS SA 5502

Sec 134 Day RoadApproved by Delegation

7/2015/165 15/07/2015 522 Day Road REEVES PLAINS

ALT: S HD: 3 SEC: 624 PL: H140800 CT: 5692/760

Shed

$7,000 Decision Issued 17/09/2015

Category 1Category:

Approval:

A J LEANEY $60.00 Planning Lodgement Fee (up to $5,000)

$91.80 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$6.90 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

M KAFANTARIS

DUBLIN SA 5501

Bubner Road

7/2015/166 14/07/2015 Bubner Road DUBLIN

ALT: S HD: 2 SEC: 269 PL: H140400 CT: 5662/418

Land Division 1 into 3 $0 Health Assessment 12/11/2015

Category 1Category:

Approval:

M KAFANTARIS in accordance with plans submittedP1Builder: Conditions: Payments:

16/12/2015E VOUGAMALIS

LEWISTON SA 5501

Lot 15 Hayman RoadApproved by Delegation

7/2015/167 15/07/2015 94 Hayman Road LEWISTON

LOT: 15 HD: 3 PL: D83018 CT: 6053/183

Filling of land in flood plain $0 Decision Issued 16/12/2015

Category 1Category:

Approval:

E VOUGAMALIS $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

in accordance with plans submittedP1Builder: Conditions: Payments:

3/11/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/168 15/07/2015 9 Cavallaro Place LEWISTON

LOT: 15 HD: 3 PL: D81621 CT: 6041/31

Construction of Domestic

Outbuilding - Storage Shed and

Verandah

$25,000 Decision Issued 3/11/2015

Category 1Category:

Approval:

R A LEPLEY $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

external walls maintained in good condP7

comply to conditions imposedP2

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

Page 42 of 78

Page 43: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

28/10/2015 RIVERGUM HOMES PTY LTD.

TORRENSVILLE SA 5031

PO Box 191Approved Private Certifier

7/2015/169 15/07/2015 10A Tatura Avenue TWO WELLS

LOT: 22 ALT: A HD: 3 PL: D93205 CT: 6139/615

Construction of dwelling $131,566 Decision Issued 28/10/2015

Category 1Category:

Approval:

RIVERGUM HOMES PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$8.22 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$156.23 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

30/07/2015 GREENWHEAT FREEKEH.

ADELAIDE SA 5000

165 Grenfell Street

Level 1Approval Bulding Consent

7/2015/170 16/07/2015 149 Sharpe Road TWO WELLS

ALT: S HD: 3 SEC: 462 PL: H140800 CT: 5200/512

Demolition

$10,000 Decision Issued 31/07/2015

Building Rules Consent OnlyCategory:

Approval:

GREENWHEAT FREEKEH. $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$4.15 Building - DAC

Demolition of structureB83Builder: Conditions: Payments:

A H ROUTLEY

TWO WELLS SA 5501

76 Old Port Wakefield Road

7/2015/171 16/07/2015 76 Old Port Wakefield Road TWO WELLS

LOT: 367 ALT: A HD: 3 PL: F174834 CT: 5410/612

Construction of new verandah and

replacement of exisitng verandah.....

to provide sheltered area for alfresco

dining

$20,000 Building Assessment 29/04/2016

Category 1Category:

Approval:

A H ROUTLEY $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

external appearance maintainedP10

external materials to match existing bldP12

planning non standard conditionPNS1

planning non standard conditionPNS2

planning non standard conditionPNS3

Builder: Conditions: Payments:

2/10/2015BAYLIES ROAD PROPERTY

INVESTMENTS PTY LTD.

TWO WELLS SA 5501

Section 194 Bailey Road WestApproved by Delegation

7/2015/172 17/07/2015 Bailey Road West TWO WELLS

LOT: 10 ALT: S HD: 3 PL: D93213 CT: 6155/360

Construction of packing shed $13,000 Decision Issued 2/10/2015

Category 2Category:

Approval:

BAYLIES ROAD PROPERTY INVESTMENTS PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$38.71 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

$97.85 Planning Fee ($10,000-$100,000)

$514.25 Class 7 & 8

in accordance with plans submittedP1

external walls maintained in good condP7

Site ConditionsP242

floodlighting restricted for securityP69

Site in neat tidy conditionP244

Stormwater drained and retained onsiteP243

Stormwater disposalB33

building non standard conditionBNS1

building non standard conditionBNS2

Stormwater drained & retained on siteP245

Builder: Conditions: Payments:

Page 43 of 78

Page 44: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

GERMANTOWN ROAD PTY LTD.

KORUNYE SA 5502

1061 Germantown Road

7/2015/173 17/07/2015 1,061 Germantown Road KORUNYE

LOT: 454 ALT: A HD: 3 PL: F174921 CT: 5771/126

Construction of Transportable Site

Office

$5,000 Additional Information Plannin 29/07/2015

Category 1Category:

Approval:

GERMANTOWN ROAD PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$61.35 Class 7 & 8

Builder: Conditions: Payments:

1/02/2016 D M TRAN.

LEWISTON SA 5501

273 Bakers RoadApproved Private Certifier

7/2015/174 17/07/2015 273 Bakers Road LEWISTON

LOT: 186 ALT: A HD: 3 PL: F163154 CT: 5690/664

Construction of five plastic covered

greenhouses, stormwater.....

retention and water storage dam and

ancillary site works

$110,200 Decision Issued 25/02/2016

Category 2Category:

Approval:

SOUTHERN STEEL SUPPLIES. $60.00 Planning Lodgement Fee (up to $5,000)

$6.89 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

$130.86 Planning Fee (more than $100,001)

in accordance with plans submittedP1Builder: Conditions: Payments:

11/11/2015 DOMESTIC DRAFTING SERVICE.

GAWLER SA 5118

32 King StreetApproved by Delegation

7/2015/175 20/07/2015 12 Wasleys Road MALLALA

LOT: 13 ALT: A HD: 1 PL: D017968 CT: 5837/243

Single storey addition to existing

dwelling

$11,500 Decision Issued 11/11/2015

Category 1Category:

Approval:

P JUVAN $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$318.00 Septic Tank application Fee

$5.15 Planning Fee DAC

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

Stormwater disposalB33Builder: Conditions: Payments:

17/09/2015T E SWITALA

TWO WELLS SA 5501

17 Wilson RoadApproved by Delegation

7/2015/176 22/07/2015 17 Wilson Road TWO WELLS

LOT: 2 ALT: A HD: 3 PL: D022449 CT: 5580/566

Construction of a free standing

carport within Flood Hazard Zone 3

of the Gawler River Floodplain

$5,350 Decision Issued 17/09/2015

Category 1Category:

Approval:

OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$109.80 Planning Fee DAC

$2.60 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$39.90 Planning Fee Non-Complying

$12.20 Planning Fee Non-Complying

Stormwater disposalB33

building non standard conditionBNS1

in accordance with plans submittedP1

Builder: Conditions: Payments:

Page 44 of 78

Page 45: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

14/09/2015 SA MUSHROOMS.

VIRGINIA SA 5120

PO Box 1076Approved Private Certifier

7/2015/177 24/07/2015 327 Crabb Road LOWER LIGHT

ALT: S HD: 3 SEC: 203 PL: D91883 CT: 6141/486

Construction of Implement Shed $16,638 Decision Issued 14/09/2015

Category 1Category:

Approval:

OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

14/10/2015 RIVERINA POOLS & SPAS.

GILLES PLAINS SA 5086

641 North East RoadApproved Private Certifier

7/2015/178 23/07/2015 156 Dawkins Road LEWISTON

LOT: 100 ALT: A HD: 3 PL: D027763 CT: 5348/766

Swimming Pool $41,000 Decision Issued 14/10/2015

Category 1Category:

Approval:

RIVERINA POOLS & SPAS. $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$179.00 Swimming Pool Lodgement Fee

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

floor level no less than 2.3 metresP181

provisional building rules consentP101

Builder: Conditions: Payments:

26/08/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/179 24/07/2015 4 Milbourne Court LEWISTON

LOT: 302 ALT: A HD: 3 PL: D94528 CT: 6146/874

Construction of an outbuilding -

storage shed

$9,000 Decision Issued 26/08/2015

Category 1Category:

Approval:

P J TOMNEY. $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$68.00 Planning Lodgement Fee (over $5,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

provisional building rules consentP101

Private Certifer Consent ConditionsB11

Builder: Conditions: Payments:

12/08/2015 N Parker.

GRACE PLAINS SA 5502

426 Hallion RoadApproved by Delegation

7/2015/180 28/07/2015 426 Hallion Road GRACE PLAINS

ALT: S HD: 1 SEC: 629 PL: H140500 CT: 5394/517

Construction of free standing

outbuilding - garage and verandah

$9,000 Decision Issued 12/08/2015

Category 1Category:

Approval:

N Parker. $60.00 Planning Lodgement Fee (up to $5,000)

$97.09 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$7.31 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$30.00 Certificate of Title Request

faulty or unsuitable materials not usedB3

Stormwater disposalB33

Engineers ReportB64

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

Builder: Conditions: Payments:

Page 45 of 78

Page 46: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

12/08/2015 R J SEELANDER.

THOMPSON BEACH SA 5501

111 The EsplanadeApproved by Delegation

7/2015/181 29/07/2015 111 The Esplanade THOMPSON BEACH

LOT: 167 ALT: A HD: 2 PL: D029513 CT: 5370/588

Construction of an outbuilding -

garage

$7,500 Decision Issued 12/08/2015

Category 1Category:

Approval:

STRATCO $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

floor level no less than 2.3 metresP181

stormwater dischargeB31

Manufacturers RecommendationB63

Builder: Conditions: Payments:

28/09/2015 J N NORRIS.

TWO WELLS SA 5501

16 Glover RoadPlanning Consent Only

7/2015/182 31/07/2015 16 Glover Road TWO WELLS

LOT: 3 ALT: A HD: 3 PL: D90576 CT: 6104/710

Construction of group dwelling -

dependent accommodation and deck

$80,000 Decision Pending 4/01/2016

Category 1Category:

Approval:

J N NORRIS. $60.00 Planning Lodgement Fee (up to $5,000)

$20.07 Class 10

$5.15 Planning Fee DAC

$18.68 Building - DAC

$1.51 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$248.12 Class 1, 2 & 4

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

9/11/2015J M JENKINSON

THOMPSON BEACH SA 5501

4 Heron CrescentApproved by Delegation

7/2015/183 31/07/2015 4 Heron Crescent THOMPSON BEACH

LOT: 238 ALT: A HD: 2 PL: D029513 CT: 5062/961

Construction of a free standing

verandah

$3,000 Decision Issued 9/11/2015

Category 1Category:

Approval:

J M JENKINSON $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

planning non standard conditionPNS1

planning non standard conditionPNS2

building non standard conditionBNS1

Stormwater disposalB33

building non standard conditionBNS2

building non standard conditionBNS3

Builder: Conditions: Payments:

Page 46 of 78

Page 47: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

21/10/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/184 31/07/2015 29 Chapman Street TWO WELLS

LOT: 1 ALT: A HD: 3 PL: D065709 CT: 5930/846

Construction of an outbuilding -

garage

$5,000 Decision Issued 21/10/2015

Category 1Category:

Approval:

BARGAIN STEEL CENTRE $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

floor level no less than 2.3 metresP181

provisional building rules consentP101

approved for domestic purposes onlyP9

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

NADANT CONSULTING.

KENT TOWN SA 5071

PO Box 477

7/2015/186 3/08/2015 175 The Esplanade THOMPSON BEACH

LOT: 237 ALT: A HD: 2 PL: D029513 CT: 5370/722

Removal of internal and external

walls of existing dwelling..... Removal

of internal and external walls of

existing dwelling, alteration to

existing dwelling, construction of

dwelling extension, construction of

two verandahs and enclosure of

existing verandah

$99,500 Additional Information Plannin 7/08/2015

Category 1Category:

Approval:

NADANT CONSULTING. $60.00 Planning Lodgement Fee (up to $5,000)

$214.00 Septic Tank application Fee

$5.15 Planning Fee DAC

$173.00 Consultative Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$40.00 Consultative Fee - Other

Builder: Conditions: Payments:

J A ZAMMIT

LEWISTON SA 5501

100 Gawler Road

7/2015/187 4/08/2015 100 Gawler Road LEWISTON

LOT: 100 ALT: A HD: 3 PL: D012781 CT: 5368/914

Variation to development approval

312/324/2011 - remove condition 6

an d remove internal enclosure

gates,exercise yards and kennel

fencing and reduce tree planting

$0 Planning Assessment 5/08/2015

Category 1Category:

Approval:

J A ZAMMIT $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$103.00 Category 2 Fee

Builder: Conditions: Payments:

J A ZAMMIT

LEWISTON SA 5501

100 Gawler Road

7/2015/188 4/08/2015 100 Gawler Road LEWISTON

LOT: 100 ALT: A HD: 3 PL: D012781 CT: 5368/914

Increase dog numbers to 70 $0 Planning Assessment 5/08/2015

Category 1Category:

Approval:

J A ZAMMIT $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$103.00 Category 2 Fee

Builder: Conditions: Payments:

Page 47 of 78

Page 48: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

3/02/2016 S BROOK

MEADOWS SA 5201

35 Battunga RoadApproved DAP

7/2015/189 6/08/2015 6 Lawrie Road LEWISTON

LOT: 31 ALT: A HD: 3 PL: D036223 CT: 5111/789

Keeping of 16 greyhounds and 2

horses -..... conversion of shed into

dog kennelling, stables and yards

$0 Decision Issued 10/02/2016

Category 2Category:

Approval:

J RICE. $60.00 Planning Lodgement Fee (up to $5,000)

$214.00 Septic Tank application Fee

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$68.00 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

in accordance with plans submittedP1Builder: Conditions: Payments:

9/10/2015 R & M TIMBER.

WILLASTON SA 5118

PO Box 71Approved by Delegation

7/2015/190 6/08/2015 Hart Road LOWER LIGHT

ALT: S HD: 3 SEC: 344 PL: H140800 CT: 6009/418

Construction of a verandah $6,519 Decision Issued 9/10/2015

Category 1Category:

Approval:

R & M TIMBER. $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

comply to conditions imposedP2

external appearance maintainedP10

building non standard conditionBNS1

Stormwater disposalB33

building non standard conditionBNS2

Builder: Conditions: Payments:

S G MERTINEIT

LEWISTON SA 5501

225 Hayman Road

7/2015/191 6/08/2015 225 Hayman Road LEWISTON

LOT: 51 ALT: A HD: 3 PL: D014929 CT: 5691/848

Use of land for dog obedience

training, dog conformation... Use of

land for dog obedience training, dog

conformation training and dog

socialisation

$0 Planning Assessment 7/12/2015

Category 3Category:

Approval:

S G MERTINEIT $335.00 Advertising FeeSite in neat tidy conditionP244Builder: Conditions: Payments:

7/12/2015John Scheepens Design and

Construction

LEWISTON SA 5501

288 Hayman RoadApproved Private Certifier

7/2015/192 11/08/2015 255 Hart Road LOWER LIGHT

LOT: 100 ALT: A HD: 3 PL: D070158 CT: 6156/227

Construction of swimming pool

enclosure and covered alfresco area

$50,000 Decision Issued 7/12/2015

Category 1Category:

Approval:

John Scheepens Design and Construction $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Site ConditionsP242

Stormwater drained and retained onsiteP243

external surfaces painted durable paintP17

provisional building rules consentP101

Dwelling occupation requirementsB69

Waste containmentB19

Builder: Conditions: Payments:

16/12/2015G K LOCKYER

DUBLIN SA 5501

Harris RoadApproved by Delegation

7/2015/193 12/08/2015 Harris Road DUBLIN

ALT: S HD: 2 SEC: 283 PL: H140400 CT: 5662/398

Conversion of existing outbuilding to

dwelling

$4,500 Decision Issued 16/12/2015

Category 1Category:

Approval:

G K LOCKYER $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$12.93 Building - DAC

$171.66 Class 1, 2 & 4

$30.00 Certificate of Title Request

in accordance with plans submittedP1

building non standard conditionBNS1

building non standard conditionBNS2

building non standard conditionBNS3

Builder: Conditions: Payments:

Page 48 of 78

Page 49: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

27/10/2015G CARBONE

TWO WELLS SA 5501

Lot 42 Walter AvenueApproved by Delegation

7/2015/194 12/08/2015 18 Walter Avenue TWO WELLS

LOT: 42 ALT: A HD: 3 PL: D84941 CT: 6064/421

Construction of Domestic Shed $11,900 Decision Issued 27/10/2015

Category 1Category:

Approval:

G CARBONE $60.00 Planning Lodgement Fee (up to $5,000)

$68.16 Class 10

$5.15 Planning Fee DAC

$6.43 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

1/10/2015S M MCARDLE

MALLALA SA 5502

5 Aerodrome RoadApproved Private Certifier

7/2015/195 12/08/2015 13 Butler Street MALLALA

LOT: 8 ALT: A HD: 1 PL: D018916 CT: 5391/889

Extension to Dwelling

$45,000 Health Assessment 8/10/2015

Category 1Category:

Approval:

MCARDLE PROJECTS $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

provisional building rules consentP101

external materials to match existing bldP12

dwelling connected to effluent systemP13

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

9/10/2015K M SPARKS

LEWISTON SA 5501

2 Elouise CourtApproved by Delegation

7/2015/196 13/08/2015 2 Elouise Court LEWISTON

LOT: 8 HD: 3 PL: D77160 CT: 6010/482

Construction of Storage Shed $5,000 Decision Issued 9/10/2015

Category 1Category:

Approval:

K M SPARKS $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$30.00 Certificate of Title Request

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

finished floor level not less 700mmP18

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

9/10/2015 ALPHA INDUSTRIES.

CAVAN SA 5094

12 STOCK ROADApproved by Delegation

7/2015/197 17/08/2015 82 Bethesda Road LEWISTON

LOT: 33 ALT: A HD: 3 PL: D019441 CT: 5393/166

Construction of Shed $0 Decision Issued 9/10/2015

Category 1Category:

Approval:

ALPHA INDUSTRIES. $60.00 Planning Lodgement Fee (up to $5,000)

$111.30 Class 10

$5.15 Planning Fee DAC

$8.38 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Stormwater drained and retained onsiteP243

finished floor level not less 700mmP18

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

certificate building indemnity insuranceB7

Builder: Conditions: Payments:

Page 49 of 78

Page 50: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

3/05/2016P W COCKS

KORUNYE SA 5502

Sec 497 Temby RoadApproved by Delegation

7/2015/198 18/08/2015 11 Forby Road KORUNYE

LOT: 13 ALT: S HD: 3 PL: D79837 CT: 6031/17

Transportable outbuilding - domestic

storage purposes

$0 Decision Issued 3/05/2016

Category 1Category:

Approval:

P W COCKS $60.00 Planning Lodgement Fee (up to $5,000)

$66.15 Class 10

$5.15 Planning Fee DAC

$4.98 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

floor level no less than 2.3 metresP181

base perimeter infilled suitable materiaP23

approved for domestic purposes onlyP9

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

24/02/2016 I DUNCAN.

WILLASTON SA 5118

PO Box 501Approved Private Certifier

7/2015/199 18/08/2015

LOT: 122 ALT: A HD: 3 PL: D88783 CT: 6091/50

Construction of Dwelling and

Domestic Outbuilding - Storage Shed

with Attached Carport

$470,000 Decision Issued 24/02/2016

Category 1Category:

Approval:

I DUNCAN. $60.00 Planning Lodgement Fee (up to $5,000)

$91.80 Class 10

$438.00 Septic Tank application Fee

$29.37 Planning Fee DAC

$6.91 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$558.13 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

$30.00 Certificate of Title Request

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

Vehicle AccessP236

dwelling connected to effluent systemP13

external walls of building subduedP6

planning non standard conditionPNS1

provisional building rules consentP101

approved for domestic purposes onlyP9

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

building non standard conditionBNS1

Builder: Conditions: Payments:

2/12/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/200 19/08/2015 16 Milbourne Court LEWISTON

LOT: 308 ALT: A HD: 3 PL: D94528 CT: 6146/880

Construction of swimming pool and

safety fence, deck and...

Construction of swimming pool and

safety fence, deck and partially

enclosed verandah

$0 Decision Issued 2/12/2015

Category 1Category:

Approval:

D A PUDDY. $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$179.00 Swimming Pool Lodgement Fee

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

Page 50 of 78

Page 51: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

25/09/2015H R HARRISON

TWO WELLS SA 5501

2 Kay AvenueApproved by Delegation

7/2015/201 24/08/2015 2 Kay Avenue TWO WELLS

LOT: 35 ALT: A HD: 3 PL: D064975 CT: 5919/349

Construction of Domestic

Outbuilding / Storage Shed

$5,900 Decision Issued 25/09/2015

Category 1Category:

Approval:

H R HARRISON $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$30.00 Certificate of Title Request

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external materials to match existing bldP12

external walls maintained in good condP7

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

10/12/2015FIRST CHOICE VERANDAHS AND

CARPORTS

MILE END 5031

2 Railway TerraceApproved by Delegation

7/2015/202 24/08/2015 39-43 Elizabeth Street TWO WELLS

LOT: 4 ALT: A HD: 3 PL: D024657 CT: 5164/456

Construction of Carport $10,270 Decision Issued 10/12/2015

Category 1Category:

Approval:

FIRST CHOICE VERANDAHS AND CARPORTS $60.00 Planning Lodgement Fee (up to $5,000)

$6.10 Planning Fee DAC

$9.30 Planning Fee DAC

$100.50 Planning Fee DAC

$12.20 Planning Fee Non-Complying

$96.50 Planning Fee Non-Complying

$115.90 Planning Fee Non-Complying

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

2/12/2015A OWEN

TWO WELLS SA 5501

11 Jean AvenueApproved by Delegation

7/2015/203 26/08/2015 21 Jean Avenue TWO WELLS

LOT: 29 ALT: A HD: 3 PL: D92086 CT: 6117/288

Construction of Shed for Domestic

Use

$17,000 Decision Issued 2/12/2015

Category 1Category:

Approval:

A OWEN $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$30.00 Certificate of Title Request

in accordance with plans submittedP1

comply to conditions imposedP2

external walls maintained in good condP7

planning non standard conditionPNS1

external walls of building subduedP6

Stormwater disposalB33

Builder: Conditions: Payments:

21/10/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/204 31/08/2015 16 Dawkins Road TWO WELLS

LOT: 50 ALT: A HD: 3 PL: D058467 CT: 5864/439

Construction of Domestic Outbuilding

- Storage Shed

$11,000 Decision Issued 21/10/2015

Category 1Category:

Approval:

M G HEENAN $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

external walls of building subduedP6

approved for domestic purposes onlyP9

provisional building rules consentP101

planning non standard conditionPNS1

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

Page 51 of 78

Page 52: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

23/09/2015K A WARREN

TWO WELLS SA 5501

17 Old Mallala RoadApproved by Delegation

7/2015/205 31/08/2015 17 Old Mallala Road TWO WELLS

LOT: 387 ALT: A HD: 3 PL: F174854 CT: 5377/486

Construction of verandah $6,134 Decision Issued 23/09/2015

Building Rules Consent OnlyCategory:

Approval:

PETER ELLIS FENCING. $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$47.50 Building Rules Consent Only Fee

$2.50 DAC - Building Rules Consent Only Fee

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

27/10/2015E CARTER

*********************************** 550

***** error while formatting ******

***********************************Approved by Delegation

7/2015/206 31/08/2015 Port Wakefield Road LOWER LIGHT

LOT: 92 ALT: A HD: 2 PL: F175374 CT: 6118/182

Construction of domestic outbuilding

- storage shed

$7,000 Decision Issued 27/10/2015

Category 1Category:

Approval:

OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

floor level no less than 2.3 metresP181

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

27/10/2015CONSTRUCTION SERVICES

AUSTRALIA PTY LTD

HACKNEY SA 5069

25 NORTH TERRACEApproved Private Certifier

7/2015/207 1/09/2015 72 Hayman Road TWO WELLS

LOT: 702 ALT: A HD: 3 PL: D93694 CT: 6138/672

Construction of a single storey

dwelling

$214,424 Information Further Clarificat 7/04/2016

Category 1Category:

Approval:

CONSTRUCTION SERVICES AUSTRALIA PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$13.40 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$254.63 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

dwelling connected to effluent systemP13

external surfaces painted durable paintP17

existing trees to be protectedP51

water storage tank 22400 litresP174

Fire fighting water tankP238

Vehicle AccessP236

Site ConditionsP242

Stormwater drained and retained onsiteP243

provisional building rules consentP101

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

22/02/2016FAIRMONT HOMES GROUP PTY LTD

ADELAIDE SA 5000

21 - 24 North TerraceApproved Private Certifier

7/2015/208 3/09/2015 Lawrie Road CALOMBA

LOT: 93 ALT: S HD: 2 PL: F216245 CT: 5798/168

Construction of a single storey

dwelling

$379,100 Decision Issued 22/02/2016

Category 1Category:

Approval:

FAIRMONT HOMES GROUP PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$23.70 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$450.18 Planning Fee (more than $100,001)

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

Page 52 of 78

Page 53: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

27/10/2015M H BOON

LOWER LIGHT SA 5501

Sec 736 Gordon RoadApproved by Delegation

7/2015/209 8/09/2015 15 Hayman Road TWO WELLS

LOT: 333 ALT: A HD: 3 PL: F174800 CT: 5772/693

Construction of 2x verandahs &

internal renovations

$90,000 Decision Issued 27/10/2015

Category 1Category:

Approval:

M H BOON $60.00 Planning Lodgement Fee (up to $5,000)

$80.06 Class 10

$214.00 Septic Tank application Fee

$5.15 Planning Fee DAC

$5.99 Building - DAC

$6.03 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$79.56 Class 1, 2 & 4

in accordance with plans submittedP1

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

certificate building indemnity insuranceB7

Stormwater disposalB33

building non standard conditionBNS1

building non standard conditionBNS2

building non standard conditionBNS3

building non standard conditionBNS4

building non standard conditionBNS5

Builder: Conditions: Payments:

23/09/2015R J BONE

DUBLIN SA 5501

Lot 112 Bubner RoadApproved Private Certifier

7/2015/210 9/09/2015 146 Bubner Road DUBLIN

LOT: 112 HD: 2 PL: D79500 CT: 6025/684

Construction of Garage $9,202 Decision Issued 23/09/2015

Category 1Category:

Approval:

STRATCO (SA) PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$68.00 Planning Lodgement Fee (over $5,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

provisional building rules consentP101

Builder: Conditions: Payments:

K DOE.

TWO WELLS SA 5501

211 Brownes Road

7/2015/211 11/09/2015 211 Jefferies Road PORT GAWLER

LOT: 47 ALT: A HD: 3 PL: F100407 CT: 5097/873

Construction of shed and storage

container

$3,200 Additional Information Plannin 17/09/2015

Category 1Category:

Approval:

K DOE. $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$30.00 Certificate of Title Request

Builder: Conditions: Payments:

6/10/2015S R RODELL

TWO WELLS SA 5501

Lot 26 Jean AvenueApproved by Delegation

7/2015/212 10/09/2015 15 Jean Avenue TWO WELLS

LOT: 26 ALT: A HD: 3 PL: D92086 CT: 6117/285

Construction of garage and carport $16,659 Decision Issued 6/10/2015

Category 1Category:

Approval:

OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)

$76.63 Class 10

$5.15 Planning Fee DAC

$5.77 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

planning non standard conditionPNS1

planning non standard conditionPNS2

structure not be enclosed with solidP11

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

Page 53 of 78

Page 54: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

12/10/2015C R BILLING

WEBB BEACH SA 5501

10 Jury StreetApproved by Delegation

7/2015/213 15/09/2015 10 Jury Street WEBB BEACH

ALT: S HD: 2 SEC: 581 PL: H140400 CT: 5500/771

Construction of Freestanding Carport $4,587 Decision Issued 12/10/2015

Category 1Category:

Approval:

C R BILLING $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

in accordance with plans submittedP1

existing trees to be protectedP51

Stormwater drained and retained onsiteP243

Site ConditionsP242

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

Stormwater disposalB33

Builder: Conditions: Payments:

25/09/2015M F PIETSCH

KORUNYE SA 5502

Wasley RoadApproval Bulding Consent

7/2015/214 15/09/2015 Wasley Road KORUNYE

ALT: S HD: 3 SEC: 529 PL: H140800 CT: 5509/973

Construction of a domestic

outbuilding - storage shed

$3,000 Decision Issued 25/09/2015

Building Rules Consent OnlyCategory:

Approval:

OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$4.15 Building - DAC

$47.50 Building Rules Consent Only Fee

$2.50 DAC - Building Rules Consent Only Fee

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

12/10/2015M H LAWRENCE

TWO WELLS SA 5501

Lot 12 Bailey RoadApproved by Delegation

7/2015/215 15/09/2015 4A Bailey Road TWO WELLS

LOT: 12 ALT: A HD: 3 PL: D049355 CT: 5508/780

Construction of verandah and

freestanding carport

$3,000 Decision Issued 12/10/2015

Category 1Category:

Approval:

M H LAWRENCE $60.00 Planning Lodgement Fee (up to $5,000)

$139.65 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$10.51 Building - DAC

Stormwater disposalB33

in accordance with plans submittedP1

external materials to match existing bldP12

Stormwater drained and retained onsiteP243

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

21/10/2015 RIVERGUM HOMES PTY LTD.

TORRENSVILLE SA 5031

PO Box 191Planning Consent Only

7/2015/216 16/09/2015 255 Hart Road LOWER LIGHT

LOT: 100 ALT: A HD: 3 PL: D070158 CT: 6156/227

Construction of single storey dwelling

with carport under main roof

$90,272 Planning Assessment 21/10/2015

Category 1Category:

Approval:

RIVERGUM HOMES PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$5.64 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$107.20 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

Page 54 of 78

Page 55: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

28/01/2016LONGRIDGE GROUP

MILE END SA 5031

158 Railway TerraceApproved Private Certifier

7/2015/217 16/09/2015 Old Port Wakefield Road TWO WELLS

LOT: 32 ALT: A HD: 3 PL: D94768 CT: 6147/583

Construction of a single storey

dwelling

$67,484 Wall Framing Inspection 23/05/2016

Category 1Category:

Approval:

LONGRIDGE GROUP $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

dwelling connected to effluent systemP13

external surfaces painted durable paintP17

existing trees to be protectedP51

water storage tank 22400 litresP174

Fire fighting water tankP238

Vehicle AccessP236

Stormwater drained and retained onsiteP243

Site ConditionsP242

provisional building rules consentP101

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

H I O'LOAN.

MALLALA SA 5502

14 Redbanks Road

7/2015/218 17/09/2015 18 Butler Street MALLALA

LOT: 9 ALT: A HD: 1 PL: D004133 CT: 5712/479

Land Division - one allotment into

three

$0 Health Assessment 2/02/2016

Category 1Category:

Approval:

H I O'LOAN. in accordance with plans submittedP1

planning non standard conditionPNS1

planning non standard conditionPNS2

planning non standard conditionPNS3

Builder: Conditions: Payments:

H I O'LOAN.

MALLALA SA 5502

14 Redbanks Road

7/2015/219 17/09/2015 18 Butler Street MALLALA

LOT: 9 ALT: A HD: 1 PL: D004133 CT: 5712/479

Community Title Land Division - one

allotment into three allotments

Community Title Land Division - One

allotment into three and common

property

$0 Planning Assessment 17/09/2015

Category 1Category:

Approval:

H I O'LOAN.Builder: Conditions: Payments:

8/03/2016 P J BLACKET.

REDBANKS SA 5502

Lot 65 Redbanks RoadApproved by Delegation

7/2015/220 18/09/2015 2,376 Redbanks Road REDBANKS

LOT: 138 ALT: Q HD: 1 PL: F216465 CT: 5664/652

Construction of a farm shed and

160,000 litre rain water tank

$48,000 Decision Issued 8/03/2016

Category 1Category:

Approval:

S J LIGHTFOOT $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$116.13 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$30.00 Certificate of Title Request

$1,542.75 Class 7 & 8

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

Page 55 of 78

Page 56: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

6/10/2015 G J GILBERT.

WINDSOR SA 5501

128 Gilberts RoadApproved by Delegation

7/2015/221 18/09/2015 Gilberts Road WINDSOR

ALT: S HD: 2 SEC: 346 PL: H140400 CT: 5273/488

Construction of a domestic

outbuilding - garage

$8,000 Decision Issued 6/10/2015

Category 1Category:

Approval:

G J GILBERT. $60.00 Planning Lodgement Fee (up to $5,000)

$87.38 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$6.58 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

Stormwater drained and retained onsiteP243

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

9/12/2015M A GREGORY

REEVES PLAINS SA 5502

Sec 94 Richter RoadApproved Private Certifier

7/2015/222 21/09/2015 303 Richter Road REEVES PLAINS

ALT: S HD: 3 SEC: 94 PL: H140800 CT: 5303/12

Construction of outbuilding - storage

shed

$20,900 Decision Issued 9/12/2015

Category 1Category:

Approval:

M A GREGORY $60.00 Planning Lodgement Fee (up to $5,000)

$203.89 Class 10

$5.15 Planning Fee DAC

$15.35 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$30.00 Certificate of Title Request

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

M CROSS.

BALAKLAVA SA 5461

PO Box 312

7/2015/223 24/09/2015 62 Mallala Road MALLALA

LOT: 90 ALT: A HD: 1 PL: D80481 CT: 6054/203

Construction of two bunkers for grain

storage

$900,000 Planning Assessment 24/09/2015

Category 1Category:

Approval:

M CROSS. $60.00 Planning Lodgement Fee (up to $5,000)

$68.00 Planning Lodgement Fee (over $5,000)

Builder: Conditions: Payments:

26/11/2015SELECTA HOMES & BUILDING

COMPANY

BURTON SA 5110

1-8 Deuter RoadPlanning Consent Only

7/2015/224 24/09/2015 7 Kestrel Crescent THOMPSON BEACH

LOT: 347 ALT: A HD: 2 PL: D031537 CT: 5142/847

Construction of a single storey

dwelling

$111,120 Decision Pending 11/01/2016

Category 1Category:

Approval:

SELECTA HOMES & BUILDING COMPANY $58.50 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$6.95 Planning Fee DAC

$169.00 Consultative Fee DAC

$66.50 Planning Lodgement Fee (over $5,000)

$39.00 Consultative Fee - Other

$131.95 Planning Fee (more than $100,001)

$38.90 Staged Consent Fee

$19.60 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

Page 56 of 78

Page 57: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

5/11/2015 R VERBIS.

THOMPSON BEACH SA 5501

53 Sandpiper DriveApproved by Delegation

7/2015/225 30/09/2015 53 Sandpiper Drive THOMPSON BEACH

LOT: 70 ALT: A HD: 2 PL: D029513 CT: 5369/639

Shipping Container with Verandah for

Domestic Storage

$0 Decision Issued 5/11/2015

Category 1Category:

Approval:

R VERBIS. $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Stormwater drained and retained onsiteP243

Site ConditionsP242

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

22/02/2016 J HARDER.

SALISBURY SA 5108

22 Harvey AveApproved Private Certifier

7/2015/226 30/09/2015 Shellgrit Road PORT GAWLER

LOT: 743 ALT: A HD: 3 PL: D89602 CT: 6099/269

Construction of 3 plastic covered

greenhouses and dam

$80,000 Decision Issued 22/02/2016

Category 1Category:

Approval:

J HARDER. $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

building non standard conditionBNS1

Builder: Conditions: Payments:

22/02/2016 V CHHIM.

DUBLIN SA 5501

22 Ruskin RoadApproved Private Certifier

7/2015/227 30/09/2015 Ruskin Road DUBLIN

LOT: 22 ALT: S HD: 2 PL: D88499 CT: 6090/419

Construction of 8 plastic covered

greenhouses,..... dam and packing

shed

$150,000 Decision Issued 22/02/2016

Category 1Category:

Approval:

V CHHIM. $60.00 Planning Lodgement Fee (up to $5,000)

$214.00 Septic Tank application Fee

$9.38 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$178.12 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

22/02/2016 V CHHIM.

DUBLIN SA 5501

22 Ruskin RoadApproved Private Certifier

7/2015/227 30/09/2015 Ruskin Road DUBLIN

LOT: 22 ALT: S HD: 2 PL: D88499 CT: 6090/419

Construction of 8 plastic covered

greenhouses,..... dam and packing

shed

$150,000 Decision Issued 22/02/2016

Category 1Category:

Approval:

V CHHIM. $60.00 Planning Lodgement Fee (up to $5,000)

$214.00 Septic Tank application Fee

$9.38 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$178.12 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

Page 57 of 78

Page 58: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

22/02/2016 V CHHIM.

DUBLIN SA 5501

22 Ruskin RoadApproved Private Certifier

7/2015/227 30/09/2015 Ruskin Road DUBLIN

LOT: 22 ALT: S HD: 2 PL: D88499 CT: 6090/419

Construction of 8 plastic covered

greenhouses,..... dam and packing

shed

$150,000 Decision Issued 22/02/2016

Category 1Category:

Approval:

V CHHIM. $60.00 Planning Lodgement Fee (up to $5,000)

$214.00 Septic Tank application Fee

$9.38 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$178.12 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

27/10/2015 S A CHANDLER.

TWO WELLS SA 5501

Lot 32 Old Port Wakefield RoadApproved by Delegation

7/2015/228 1/10/2015 Old Port Wakefield Road TWO WELLS

LOT: 32 ALT: A HD: 3 PL: D94768 CT: 6147/583

Construction of domestic outbuilding

- storage shed

$3,500 Decision Issued 27/10/2015

Category 1Category:

Approval:

S A CHANDLER. $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

in accordance with plans submittedP1

comply to conditions imposedP2

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

external surfaces painted durable paintP17

Stormwater drained and retained onsiteP243

Site ConditionsP242

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

7/12/2015 P J TOMNEY.

DUBLIN SA 5501

Harris RoadApproval Land Division

7/2015/229 2/10/2015 76 Harris Road DUBLIN

LOT: 151 ALT: S HD: 2 PL: D83415 CT: 6056/553

Land Division - one allotment into

two

$0 Decision Issued 7/12/2015

Category 1Category:

Approval:

P J TOMNEY. planning non standard conditionPNS1

planning non standard conditionPNS2

planning non standard conditionPNS3

in accordance with plans submittedP1

planning non standard conditionPNS4

Builder: Conditions: Payments:

9/11/2015ASPIRE HOMES

GAWLER SA 5118

55 Murray StreetPlanning Consent Only

7/2015/230 2/10/2015 Kay Avenue TWO WELLS

LOT: 35 ALT: A HD: 3 PL: D84941 CT: 6064/414

Construction of single storey dwelling

with garage under main roof

$245,000 Decision Pending 6/01/2016

Category 1Category:

Approval:

ASPIRE HOMES $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$15.22 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$289.03 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Stormwater drained and retained onsiteP243

Site ConditionsP242

dwelling connected to effluent systemP13

Vehicle AccessP236

provisional building rules consentP101

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

Page 58 of 78

Page 59: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

29/03/2016P N LEAV

PORT GAWLER SA 5501

Lot 13 Port Gawler RoadApproved Private Certifier

7/2015/231 2/10/2015 Shellgrit Road PORT GAWLER

LOT: 741 ALT: A HD: 3 PL: D89602 CT: 6099/267

Construction of 15 plastic covered

greenhouses, 3 dams and... a

packing shed

$25,000 Decision Issued 29/03/2016

Category 2Category:

Approval:

P N LEAV $60.00 Planning Lodgement Fee (up to $5,000)

$214.00 Septic Tank application Fee

$15.63 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

$296.87 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

29/03/2016P N LEAV

PORT GAWLER SA 5501

Lot 13 Port Gawler RoadApproved Private Certifier

7/2015/231 2/10/2015 Shellgrit Road PORT GAWLER

LOT: 741 ALT: A HD: 3 PL: D89602 CT: 6099/267

Construction of 15 plastic covered

greenhouses, 3 dams and... a

packing shed

$25,000 Decision Issued 29/03/2016

Category 2Category:

Approval:

P N LEAV $60.00 Planning Lodgement Fee (up to $5,000)

$214.00 Septic Tank application Fee

$15.63 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

$296.87 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

29/03/2016P N LEAV

PORT GAWLER SA 5501

Lot 13 Port Gawler RoadApproved Private Certifier

7/2015/231 2/10/2015 Shellgrit Road PORT GAWLER

LOT: 741 ALT: A HD: 3 PL: D89602 CT: 6099/267

Construction of 15 plastic covered

greenhouses, 3 dams and... a

packing shed

$25,000 Decision Issued 29/03/2016

Category 2Category:

Approval:

P N LEAV $60.00 Planning Lodgement Fee (up to $5,000)

$214.00 Septic Tank application Fee

$15.63 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

$296.87 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

28/01/2016 RIVERGUM HOMES PTY LTD.

TORRENSVILLE SA 5031

PO Box 191Approved Private Certifier

7/2015/232 6/10/2015 7 Thompson's Beach Road THOMPSON BEACH

LOT: 224 ALT: A HD: 2 PL: D029513 CT: 5119/929

Construction of two storey dwelling

with garage under main roof

$240,627 Decision Issued 28/01/2016

Category 1Category:

Approval:

RIVERGUM HOMES PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$15.04 Planning Fee DAC

$173.00 Consultative Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$40.00 Consultative Fee - Other

$285.74 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

Page 59 of 78

Page 60: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

16/12/2015A W RICKARDS

LEWISTON SA 5501

40 Pederick RoadApproved by Delegation

7/2015/233 7/10/2015 40 Pederick Road LEWISTON

LOT: 62 ALT: A HD: 3 PL: D021995 CT: 5235/857

Construction of a shed $9,500 Decision Issued 16/12/2015

Category 1Category:

Approval:

A W RICKARDS $60.00 Planning Lodgement Fee (up to $5,000)

$74.02 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$5.58 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

floor level no less than 2.3 metresP181

planning non standard conditionPNS1

approved for domestic purposes onlyP9

Stormwater disposalB33

Builder: Conditions: Payments:

9/11/2015 R & M TIMBER.

WILLASTON SA 5118

PO Box 71Approved by Delegation

7/2015/234 8/10/2015 5 Cockatoo Road LEWISTON

LOT: 91 ALT: A HD: 3 PL: D020952 CT: 5138/807

Construction of a verandah $3,983 Decision Issued 9/11/2015

Category 1Category:

Approval:

R & M TIMBER. $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$4.15 Building - DAC

$10.00 Building Rules Consent Only Fee

$37.50 Building Rules Consent Only Fee

$2.50 DAC - Building Rules Consent Only Fee

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

11/02/2016 RIVERGUM HOMES PTY LTD.

TORRENSVILLE SA 5031

PO Box 191Approved Private Certifier

7/2015/235 12/10/2015 12 Artesian Road TWO WELLS

LOT: 202 ALT: A HD: 3 PL: D029726 CT: 5408/674

Construction of a single storey

dwelling

$186,258 Decision Issued 11/02/2016

Category 1Category:

Approval:

RIVERGUM HOMES PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$11.65 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$221.17 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Stormwater drained and retained onsiteP243

Site ConditionsP242

dwelling connected to effluent systemP13

external surfaces painted durable paintP17

provisional building rules consentP101

Vehicle AccessP236

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

Page 60 of 78

Page 61: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

10/11/2015 ALPHA INDUSTRIES.

CAVAN SA 5094

12 STOCK ROADApproved by Delegation

7/2015/236 9/10/2015 7 Wasleys Road MALLALA

LOT: 620 ALT: A HD: 1 PL: F175087 CT: 6021/528

Construction of Shed $8,270 Decision Issued 10/11/2015

Category 1Category:

Approval:

ALPHA INDUSTRIES. $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

comply to conditions imposedP2

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

external surfaces painted durable paintP17

Site ConditionsP242

Stormwater drained and retained onsiteP243

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

23/12/2015 A POLE.

THOMPSON BEACH SA 5501

1 The EsplanadeApproved by Delegation

7/2015/237 15/10/2015 1 The Esplanade THOMPSON BEACH

LOT: 301 ALT: A HD: 2 PL: D031537 CT: 5346/926

Construction of elevated single

storey dwelling

$40,000 Decision Issued 23/12/2015

Category 1Category:

Approval:

A POLE. $60.00 Planning Lodgement Fee (up to $5,000)

$52.59 Class 10

$438.00 Septic Tank application Fee

$5.15 Planning Fee DAC

$173.00 Consultative Fee DAC

$11.17 Building - DAC

$3.96 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$40.00 Consultative Fee - Other

$148.33 Class 1, 2 & 4

certificate building indemnity insuranceB7

in accordance with plans submittedP1

comply to conditions imposedP2

dwelling connected to effluent systemP13

finished floor level not less 700mmP18

external surfaces painted durable paintP17

no other egress shall be createdP40

water storage tank 22400 litresP174

Vehicle AccessP236

Site ConditionsP242

Stormwater drained and retained onsiteP243

planning non standard conditionPNS1

planning non standard conditionPNS2

approval remove native vegetationP100

provisional building rules consentP101

Waste containmentB19

On site toilet facilityB20

building non standard conditionBNS1

building non standard conditionBNS2

building non standard conditionBNS3

building non standard conditionBNS4

building non standard conditionBNS5

Builder: Conditions: Payments:

Page 61 of 78

Page 62: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

22/02/2016T TRAN

TWO WELLS SA 5501

Lot 8 Bailey Road WestApproved Private Certifier

7/2015/238 19/10/2015 Bailey Road West TWO WELLS

LOT: 8 ALT: S HD: 3 PL: D93213 CT: 6135/132

Construction of 2 greenhouses,

packing shed and water storage dam

$80,000 Decision Issued 22/02/2016

Category 2Category:

Approval:

T TRAN $60.00 Planning Lodgement Fee (up to $5,000)

$214.00 Septic Tank application Fee

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

$30.00 Certificate of Title Request

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

21/12/2015J L VERNER

REDBANKS SA 5502

Hall RoadApproved Private Certifier

7/2015/239 20/10/2015 1,520 Germantown Road REDBANKS

ALT: S HD: 1 SEC: 45 PL: H140500 CT: 5469/566

Construction of Grain Storage shed $95,000 Decision Issued 22/12/2015

Category 1Category:

Approval:

J L VERNER $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Stormwater drained and retained onsiteP243

Site ConditionsP242

external walls of building subduedP6

external walls maintained in good condP7

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

21/04/2016OASIS TRANSPORTABLE

BUILDINGS & HOMES PTY LTD.

SMITHFIELD 5114

PO BOX 169Approved Private Certifier

7/2015/240 19/10/2015 211 Dawkins Road LEWISTON

LOT: 472 ALT: A HD: 3 PL: F174939 CT: 5356/966

Construction of transportable

dwelling (dependent

accommodation)

$0 Decision Issued 21/04/2016

Category 1Category:

Approval:

OASIS TRANSPORTABLE BUILDINGS & HOMES PTY LTD. $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

15/12/2015CONSTRUCTION SERVICES

AUSTRALIA PTY LTD

HACKNEY SA 5069

25 NORTH TERRACEApproved Private Certifier

7/2015/241 22/10/2015 22 Jean Avenue TWO WELLS

LOT: 20 ALT: A HD: 3 PL: D92086 CT: 6117/279

Construction of single storey dwelling

with garage under main roof

$210,534 Decision Issued 15/12/2015

Category 1Category:

Approval:

CONSTRUCTION SERVICES AUSTRALIA PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)

$427.00 Septic Tank application Fee

$13.16 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$250.01 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

Page 62 of 78

Page 63: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

10/11/2015C J LEMM

TWO WELLS SA 5501

2 Trim RoadApproved by Delegation

7/2015/242 21/10/2015 2A Trim Road TWO WELLS

LOT: 120 ALT: A HD: 3 PL: D84395 CT: 6063/679

Construction of outbuilding - storage

shed

$6,200 Decision Issued 10/11/2015

Category 1Category:

Approval:

C J LEMM $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

16/03/2016DECHELLIS HOMES PTY LTD

Evandale SA 5069

170 Payneham RoadApproved Private Certifier

7/2015/243 22/10/2015 13 Milbourne Court LEWISTON

LOT: 313 ALT: A HD: 3 PL: D94528 CT: 6146/885

Construction of single storey dwelling

with garage under main roof

$224,895 Decision Issued 16/03/2016

Category 1Category:

Approval:

DECHELLIS HOMES PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$14.06 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$267.06 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

18/02/2016PLANNING CHAMBERS PTY LTD

Adelaide SA 5000

Halifax Street

PO Box 6196Approved by Delegation

7/2015/244 27/10/2015 294 Hayman Road LEWISTON

LOT: 119 ALT: A HD: 3 PL: D017603 CT: 5390/203

Construction of outbuilding - storage

shed and relocation of...... existing

outbuilding - shipping container in

Development Authorisation

312/3/2013

$5,000 Decision Issued 18/02/2016

Category 1Category:

Approval:

PLANNING CHAMBERS PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$2.60 Planning Fee DAC

$4.15 Building - DAC

$48.90 Planning Fee Non-Complying

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Stormwater disposalB33

Builder: Conditions: Payments:

10/11/2015K E BURFORD

TWO WELLS SA 5501

Lot 1 Windmill RoadApproved by Delegation

7/2015/245 27/10/2015 34 Windmill Road TWO WELLS

LOT: 1 ALT: A HD: 3 PL: F006893 CT: 5117/775

Removal of transportable dwelling $10,000 Decision Issued 10/11/2015

Category 1Category:

Approval:

K E BURFORD $60.00 Planning Lodgement Fee (up to $5,000)

$4.15 Building - DAC

$61.35 Class 1, 2 & 4

building non standard conditionBNS1Builder: Conditions: Payments:

7/03/2016MCARDLE PROJECTS

MALLALA SA 5502

PO BOX 151Approved Private Certifier

7/2015/246 29/10/2015 44 The Esplanade PARHAM

LOT: 103 ALT: A HD: 2 PL: T140402 CT: 5992/591

Second storey addition to single

storey dwelling

$120,000 Information Further Clarificat 7/04/2016

Category 1Category:

Approval:

MCARDLE PROJECTS $60.00 Planning Lodgement Fee (up to $5,000)

$7.50 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$142.50 Planning Fee (more than $100,001)

in accordance with plans submittedP1

external materials to match existing bldP12

Dwelling occupation requirementsB69

Waste containmentB19

Builder: Conditions: Payments:

Page 63 of 78

Page 64: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

23/11/2015M S LEVER

LEWISTON SA 5501

Lot 21 Germantown RoadApproved by Delegation

7/2015/247 29/10/2015 54 Germantown Road LEWISTON

LOT: 21 HD: 3 PL: D85982 CT: 6074/452

Construction of Verandah $8,500 Decision Issued 23/11/2015

Category 1Category:

Approval:

M S LEVER $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

15/01/2016LONGRIDGE GROUP

MILE END SA 5031

158 Railway TerraceApproved Private Certifier

7/2015/248 29/10/2015 31 The Esplanade THOMPSON BEACH

LOT: 316 ALT: A HD: 2 PL: D031537 CT: 5173/199

Construction of two storey dwelling $163,362 Wall Framing Inspection 18/05/2016

Category 1Category:

Approval:

LONGRIDGE GROUP $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$10.38 Planning Fee DAC

$173.00 Consultative Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$40.00 Consultative Fee - Other

$197.19 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

18/12/2015FAIRMONT HOMES GROUP PTY LTD

ADELAIDE SA 5000

21 - 24 North TerraceApproved Private Certifier

7/2015/249 29/10/2015 14 Kathleen Road TWO WELLS

LOT: 150 ALT: A HD: 3 PL: D72778 CT: 6002/863

Construction of single storey dwelling

with garage under main roof

$255,000 Wall Framing Inspection 20/05/2016

Category 1Category:

Approval:

FAIRMONT HOMES GROUP PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$15.94 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$302.81 Planning Fee (more than $100,001)

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Stormwater drained and retained onsiteP243

Site ConditionsP242

Vehicle AccessP236

dwelling connected to effluent systemP13

external surfaces painted durable paintP17

provisional building rules consentP101

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

21/12/2015D J HEARNE

DUBLIN SA 5501

Sec 330 Old Dublin RoadApproval Land Division

7/2015/250 3/11/2015 136 Long Plains Road DUBLIN

ALT: S HD: 2 SEC: 330 PL: H140400 CT: 5663/17

Land Division - one allotment into

two

$0 Decision Issued 21/12/2015

Category 1Category:

Approval:

HENNIG & CO PTY LTD in accordance with plans submittedP1Builder: Conditions: Payments:

Page 64 of 78

Page 65: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

TELSTRA CORPORATION.

CRAFERS SA 5152

PO Box 138

C/- SK Planning Pty Ltd

7/2015/251 30/10/2015 Horseshoe Crescent TWO WELLS

LOT: 138 ALT: A HD: 3 PL: F162487 CT: 5520/894

Construction of telecommunications

facility

$125,000 Additional Information Plannin 30/11/2015

Category 3Category:

Approval:

TELSTRA CORPORATION. $60.00 Planning Lodgement Fee (up to $5,000)

$7.82 Planning Fee DAC

$350.00 Advertising Fee

$68.00 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

$103.00 Category 2 Fee

$148.43 Planning Fee (more than $100,001)

Builder: Conditions: Payments:

18/12/2015Metal As Anything

KADINA SA 5554

3-5 Price StreetApproved by Delegation

7/2015/252 30/10/2015 53 Wasleys Road MALLALA

LOT: 512 ALT: A HD: 1 PL: D050336 CT: 5731/983

Construction of farm shed $141,200 Decision Issued 18/12/2015

Category 1Category:

Approval:

Metal As Anything $60.00 Planning Lodgement Fee (up to $5,000)

$7.50 Planning Fee DAC

$169.35 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$142.50 Planning Fee (more than $100,001)

$2,249.85 Class 7 & 8

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

Builder: Conditions: Payments:

AUSTRALIAN OUTDOOR LIVING.

WEST LAKES SA 5021

PO Box 7361

7/2015/253 2/11/2015 31 Pederick Road LEWISTON

LOT: 102 ALT: A HD: 3 PL: D027763 CT: 5073/325

Construction of swimming pool and

safety fence

$39,460 Swim Pool Fence Inspection 21/12/2015

Category 1Category:

Approval:

AUSTRALIAN OUTDOOR LIVING. $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$179.00 Swimming Pool Lodgement Fee

$97.85 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

planning non standard conditionPNS2

Builder: Conditions: Payments:

16/11/2015 T B PALMER.

TWO WELLS SA 5501

19 Germantown RoadApproved by Delegation

7/2015/254 2/11/2015 19 Germantown Road TWO WELLS

LOT: 50 ALT: A HD: 3 PL: D054093 CT: 5781/91

Construction of outbuilding - storage

shed

$10,670 Decision Issued 16/11/2015

Category 1Category:

Approval:

T B PALMER. $60.00 Planning Lodgement Fee (up to $5,000)

$137.64 Class 10

$5.15 Planning Fee DAC

$7.24 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external walls maintained in good condP7

external walls of building subduedP6

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

29/02/2016MALAVON NOMINEES PTY LTD

MALLALA SA 5502

Farrelly Roadwithdrawn Application

7/2015/255 3/11/2015 121 Farrelly Road MALLALA

LOT: 641 ALT: A HD: 1 PL: F175108 CT: 5406/462

549 Davies Road MALLALA

LOT: 1 ALT: A HD: 1 PL: D028870 CT: 5176/148

Land Division - boundary realignment

- Non-complying - WITHDRAWN

$0 Planning Assessment 3/11/2015

Category 1Category:

Approval:

MALAVON NOMINEES PTY LTDBuilder: Conditions: Payments:

Page 65 of 78

Page 66: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

D J HUNTER

TWO WELLS SA 5501

Lot 13 Coats Road

7/2015/256 2/11/2015 18C Coats Road TWO WELLS

LOT: 13 ALT: A HD: 3 PL: D93865 CT: 6139/775

Construction of outbuilding - garage $9,000 Additional Information Buildin 14/01/2016

Category 1Category:

Approval:

D J HUNTER $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

comply to conditions imposedP2

metal cladding on roof to be colourbondP3

external surfaces of building paintedP4

iron clad buildings to be colourbondP5

external walls maintained in good condP7

external appearance maintainedP10

approved for domestic purposes onlyP9

Site ConditionsP242

Builder: Conditions: Payments:

7/12/2015 TREVOR JOHN AND ASSOCIATES.

GLEN OSMOND SA 5064

367 Glen Osmond RoadApproved by Delegation

7/2015/257 5/11/2015 Port Wakefield Road LOWER LIGHT

LOT: 92 ALT: A HD: 2 PL: F175374 CT: 6118/182

Construction of outbuilding - storage

shed

$8,000 Decision Issued 7/12/2015

Category 1Category:

Approval:

OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

floor level no less than 2.3 metresP181

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

3/02/2016BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadPlanning Consent Only

7/2015/258 5/11/2015 16 Cavallaro Place LEWISTON

LOT: 8 HD: 3 PL: D80783 CT: 6037/842

Construction of gable barn shed -

mixed use domestic storage &.....

horse stable, and keeping of 3

horses

$15,000 Planning Assessment 8/03/2016

Category 2Category:

Approval:

C W TORNEY $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Stormwater disposalB33

Builder: Conditions: Payments:

10/11/2015 M E ROACH.

LEWISTON SA 5501

Lot 58 Hayman RoadApproved by Delegation

7/2015/259 5/11/2015 Hayman Road LEWISTON

LOT: 58 HD: 3 PL: D89849 CT: 6098/306

Horse Keeping (2 horses) and

associated day yards

$0 Decision Issued 10/11/2015

Category 1Category:

Approval:

M E ROACH. $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

in accordance with plans submittedP1

certificate from licensed surveyorP183

Builder: Conditions: Payments:

Page 66 of 78

Page 67: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

18/12/2015A E WEBB

TWO WELLS SA 5501

21 Hayman RoadApproved by Delegation

7/2015/260 5/11/2015 21 Hayman Road TWO WELLS

LOT: 2 ALT: A HD: 3 PL: F001980 CT: 5338/638

Construction of outbuilding - storage

shed

$12,600 Decision Issued 18/12/2015

Category 1Category:

Approval:

A E WEBB $60.00 Planning Lodgement Fee (up to $5,000)

$131.07 Class 10

$5.15 Planning Fee DAC

$9.87 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

floor level no less than 2.3 metresP181

planning non standard conditionPNS1

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

J P JONES

LEWISTON SA 5501

98 Dawkins Road

7/2015/261 9/11/2015 98 Dawkins Road LEWISTON

LOT: 7 ALT: A HD: 3 PL: D031412 CT: 5138/554

Construction of Carport $5,000 Decision Issued 18/12/2015

Category 1Category:

Approval:

J P JONES $60.00 Planning Lodgement Fee (up to $5,000)

$96.29 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$7.24 Building - DAC

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

1/03/2016 S SALVEMINI.

MALLALA SA 5502

PO Box 95Approved by Delegation

7/2015/262 9/11/2015 30 Harris Road DUBLIN

ALT: S HD: 2 SEC: 279 PL: H140400 CT: 5662/394

Harris Road DUBLIN

LOT: 10 ALT: S HD: 2 PL: D111819 CT: 6169/296

Construction of three stables and

horse keeping - 2 horses

$5,000 Decision Issued 1/03/2016

Category 1Category:

Approval:

S SALVEMINI. $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

planning non standard conditionPNS1

Stormwater disposalB33

Builder: Conditions: Payments:

16/03/2016M B COOMBE

TWO WELLS SA 5501

5 Fertile AvenueApproval Land Division

7/2015/263 9/11/2015 5 Fertile Avenue TWO WELLS

LOT: 7 ALT: A HD: 3 PL: D006229 CT: 5321/310

Land Division - one allotment into

two

$0 Decision Issued 16/03/2016

Category 1Category:

Approval:

HENNIG & CO PTY LTD in accordance with plans submittedP1Builder: Conditions: Payments:

Page 67 of 78

Page 68: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

27/04/2016J WASHINGTON

REDBANKS SA 5502

1806 Redbanks RoadApproved Private Certifier

7/2015/264 11/11/2015 Gawler Road REDBANKS

LOT: 17 ALT: Q HD: 1 PL: D80667 CT: 6043/877

Construction of Dwelling - Inground

Cellar - Separate Garage and

Alfresco Area - Outbuilding and

Rainwater Tanks

$365,000 Decision Issued 27/04/2016

Category 1Category:

Approval:

J WASHINGTON $60.00 Planning Lodgement Fee (up to $5,000)

$23.27 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$441.98 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Vehicle AccessP236

dwelling connected to effluent systemP13

external walls of building subduedP6

approved for domestic purposes onlyP9

provisional building rules consentP101

Builder: Conditions: Payments:

10/05/2016 JBG ARCHITECTS.

TANUNDA SA 5352

38 Murray StreetApproved by Delegation

7/2015/265 11/11/2015 121 The Esplanade THOMPSON BEACH

LOT: 162 ALT: A HD: 2 PL: D029513 CT: 5370/481

Construction of single story dwelling

on poles and outbuilding- garage

$200,000 Decision Issued 10/05/2016

Category 1Category:

Approval:

UNDERWOOD BUILDING. $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$12.50 Planning Fee DAC

$173.00 Consultative Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$40.00 Consultative Fee - Other

$237.50 Planning Fee (more than $100,001)

in accordance with plans submittedP1

provisional building rules consentP101

dwelling connected to effluent systemP13

external surfaces painted durable paintP17

water storage tank 22400 litresP174

finished floor level not less 700mmP18

comply to conditions imposedP2

Vehicle AccessP236

Site ConditionsP242

Stormwater drained and retained onsiteP243

no other egress shall be createdP40

planning non standard conditionPNS1

planning non standard conditionPNS2

Inspection of building workB5

certificate building indemnity insuranceB7

Building good & workmanlike mannerB2

Boundary locationB18

footing construction & designB4

Termite managementB60

Manufacturers RecommendationB63

Dwelling occupation requirementsB69

Asbestos demolition, transport and dispoB84

Exit doors protected with bollardsB98

building non standard conditionBNS1

building non standard conditionBNS2

building non standard conditionBNS3

Builder: Conditions: Payments:

Page 68 of 78

Page 69: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

8/12/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/266 11/11/2015 10 Gameau Road TWO WELLS

LOT: 6 ALT: A HD: 3 PL: D064975 CT: 5919/336

Construction of verandah $10,000 Approved by Private Certifier 12/01/2016

Category 1Category:

Approval:

S D O'CALLAHAN. $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$68.00 Planning Lodgement Fee (over $5,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Stormwater drained and retained onsiteP243

Site ConditionsP242

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

23/11/2015A W LAIRD

MALLALA SA 5502

Lot 22 Butler StreetApproved by Delegation

7/2015/267 16/11/2015 30 Butler Street MALLALA

LOT: 22 ALT: A HD: 1 PL: D93594 CT: 6137/314

Construction of Verandah $3,713 Decision Issued 23/11/2015

Category 1Category:

Approval:

A W LAIRD $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$30.00 Certificate of Title Request

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

Stormwater disposalB33

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

5/05/2016FAIRMONT HOMES GROUP PTY LTD

ADELAIDE SA 5000

21 - 24 North TerraceApproved Private Certifier

7/2015/268 16/11/2015 98 Frost North Road LEWISTON

LOT: 2 ALT: A HD: 3 PL: F156341 CT: 5284/250

Construction of Dwelling $226,136 Decision Issued 5/05/2016

Category 1Category:

Approval:

FAIRMONT HOMES GROUP PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$14.14 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$268.53 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

Page 69 of 78

Page 70: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

16/12/2015 B BRAVINGTON.

LEWISTON SA 5501

33 Bethesda RoadApproved by Delegation

7/2015/269 16/11/2015

LOT: 15 ALT: S HD: 3 PL: D77219 CT: 6012/581

Construction of Shed for Domestic

Storage

$9,000 Decision Issued 16/12/2015

Category 1Category:

Approval:

ALPHA INDUSTRIES. $60.00 Planning Lodgement Fee (up to $5,000)

$92.85 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$6.99 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Stormwater drained and retained onsiteP243

Site ConditionsP242

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

29/03/2016V KHATH

PARALOWIE SA 5108

22 Belmar StreetApproved Private Certifier

7/2015/270 16/11/2015 Shellgrit Road PORT GAWLER

LOT: 742 ALT: A HD: 3 PL: D89602 CT: 6099/268

Six plastic covered

greenhouses,....... & one water

storage dam

$100,000 Decision Issued 29/03/2016

Category 1Category:

Approval:

V KHATH $60.00 Planning Lodgement Fee (up to $5,000)

$214.00 Septic Tank application Fee

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

17/03/2016D W WOULLEMAN

TWO WELLS SA 5501

Lot 21 Jean AvenueApproved by Delegation

7/2015/271 16/11/2015 20 Jean Avenue TWO WELLS

LOT: 21 ALT: A HD: 3 PL: D92086 CT: 6117/280

Construction of outbuilding - storage

shed

$8,000 Decision Issued 17/03/2016

Category 1Category:

Approval:

D W WOULLEMAN $60.00 Planning Lodgement Fee (up to $5,000)

$72.81 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$5.49 Building - DAC

in accordance with plans submittedP1

comply to conditions imposedP2

Site ConditionsP242

Stormwater drained and retained onsiteP243

external walls of building subduedP6

planning non standard conditionPNS1

Stormwater disposalB33

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

16/12/2015 J N NORRIS.

TWO WELLS SA 5501

16 Glover RoadApproved by Delegation

7/2015/272 16/11/2015 16 Glover Road TWO WELLS

LOT: 3 ALT: A HD: 3 PL: D90576 CT: 6104/710

Construction of Swimming Pool and

Safety Fence

$2,000 Decision Issued 16/12/2015

Category 1Category:

Approval:

J N NORRIS. $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$4.15 Building - DAC

$179.00 Swimming Pool Lodgement Fee

Swimming pool safety barriersB35

Inspection of building workB5

building non standard conditionBNS1

Swimming Pool Backwash DisposalB74

Builder: Conditions: Payments:

Page 70 of 78

Page 71: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

16/03/2016 J R MARSH.

TWO WELLS SA 5501

Lot 17 Mallee CourtApproved by Delegation

7/2015/273 19/11/2015 4 Mallee Court TWO WELLS

LOT: 17 ALT: A HD: 3 PL: D95828 CT: 6153/552

Construction of outbuilding - garage $17,620 Decision Issued 16/03/2016

Category 1Category:

Approval:

OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)

$109.10 Class 10

$5.15 Planning Fee DAC

$5.74 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

15/02/2016SELECTA HOMES & BUILDING

COMPANY

BURTON SA 5110

1-8 Deuter RoadApproved Private Certifier

7/2015/274 19/11/2015 Bubner Road DUBLIN

LOT: 716 HD: 2 PL: D81477 CT: 6042/430

Construction of Dwelling $149,100 Decision Issued 15/02/2016

Category 1Category:

Approval:

SELECTA HOMES & BUILDING COMPANY $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$9.32 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$177.06 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

provisional building rules consentP101

dwelling connected to effluent systemP13

comply to conditions imposedP2

Vehicle AccessP236

Site ConditionsP242

existing trees to be protectedP51

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

18/12/2015 N P BAKER.

MALLALA SA 5502

26 Butler StreetApproved by Delegation

7/2015/275 19/11/2015 26 Butler Street MALLALA

LOT: 21 ALT: A HD: 1 PL: D93594 CT: 6137/313

Construction of Verandah $4,717 Decision Issued 18/12/2015

Category 1Category:

Approval:

STRATCO $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$30.00 Certificate of Title Request

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

building non standard conditionBNS1

Stormwater disposalB33

Builder: Conditions: Payments:

Page 71 of 78

Page 72: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

18/05/2016KOTZUR PTY LTD

WALLA WALLA NSW 2659

Commercial StreetApproved Private Certifier

7/2015/276 1/12/2015 Carslake Road DUBLIN

LOT: 11 ALT: A HD: 2 PL: D019148 CT: 5452/708

Bulk grain storage and export facility

comprising... silos and associated

plant, storage containers,

weighbridge, office and control room,

car park, advertising sign,

landscaping and ancillary site works

$4,100,000 Decision Issued 18/05/2016

Category 2Category:

Approval:

KOTZUR PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$256.25 Planning Fee DAC

$317.00 Consultative Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

$40.00 Consultative Fee - Other

$4,868.75 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

A M JONES.

LEWISTON SA 5501

Lot 203 Pederick Road

7/2015/277 25/11/2015 Pederick Road LEWISTON

LOT: 203 ALT: A HD: 3 PL: D83809 CT: 6065/500

Construction of Domestic Storage

Shed

$20,000 Decision Issued 21/01/2016

Category 1Category:

Approval:

A M JONES. $60.00 Planning Lodgement Fee (up to $5,000)

$218.45 Class 10

$5.15 Planning Fee DAC

$16.45 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Stormwater disposalB33

Builder: Conditions: Payments:

24/11/2015C GEORGOPOULOS

TWO WELLS SA 5501

21 Garden AvenueApproved by Delegation

7/2015/278 23/11/2015 21 Garden Avenue TWO WELLS

LOT: 3 ALT: A HD: 3 PL: D023208 CT: 5148/119

Demolition of dwelling $0 Decision Issued 24/11/2015

Building Rules Consent OnlyCategory:

Approval:

C GEORGOPOULOS $60.00 Planning Lodgement Fee (up to $5,000)

$4.15 Building - DAC

$61.35 Class 1, 2 & 4

Asbestos demolition, transport and dispoB84

in accordance with plans submittedP1

Builder: Conditions: Payments:

4/02/2016D O'DONNELL

ANDREWS FARM SA 5114

30 Crawford GroveApproved by Delegation

7/2015/279 25/11/2015 58 Dublin Road MALLALA

LOT: 61 ALT: A HD: 1 PL: D78729 CT: 6031/28

Construction of Verandah $11,500 Referral Katnich Dodd 4/04/2016

Category 1Category:

Approval:

D O'DONNELL $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$5.15 Planning Fee DAC

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$30.00 Certificate of Title Request

in accordance with plans submittedP1

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

Page 72 of 78

Page 73: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

18/12/2015 L P ABALOS.

SALISBURY SA 5108

22 Harvey AvenuePlanning Consent Only

7/2015/280 25/11/2015 Shellgrit Road PORT GAWLER

LOT: 743 ALT: A HD: 3 PL: D89602 CT: 6099/269

Construction of 3 plastic covered

greenhouses and 1 water storage

dam

$80,000 Decision Pending 11/02/2016

Category 1Category:

Approval:

L P ABALOS. $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

18/12/2015BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadPlanning Consent Only

7/2015/281 3/12/2015 6 Williams Road TWO WELLS

LOT: 53 ALT: A HD: 3 PL: D006683 CT: 5621/434

Construction of a verandah $11,000 Decision Pending 12/01/2016

Category 1Category:

Approval:

M A FRANK. $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

Site ConditionsP242

Stormwater drained and retained onsiteP243

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

16/05/2016STERLING HOMES PTY LTD

ALLENBY GARDENS SA 5009

110-114 GRANGE ROADPlanning Consent Only

7/2015/282 2/12/2015 17 Dawkins Road TWO WELLS

LOT: 701 ALT: A HD: 3 PL: D078947 CT: 6021/867

Construction of single storey dwelling

with garage and alfresco under. main

roof

$209,295 Planning Assessment 16/05/2016

Category 1Category:

Approval:

STERLING HOMES PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$13.09 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$248.53 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

21/12/2015 E S AYERS.

TWO WELLS SA 5501

5 Buckland Park RoadApproved by Delegation

7/2015/283 3/12/2015 5 Buckland Park Road TWO WELLS

LOT: 3 ALT: A HD: 3 PL: D041466 CT: 5253/913

Construction of an outbuilding -

garage

$7,840 Decision Issued 21/12/2015

Category 1Category:

Approval:

OLYMPIC INDUSTRIES $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

external walls of building subduedP6

external walls maintained in good condP7

floor level no less than 2.3 metresP181

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

Page 73 of 78

Page 74: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

ALLSTEEL TRANSPORTABLES

ELIZABETH WEST SA 5113

40 Barfield Crescent

7/2015/284 3/12/2015 130 Dawkins Road LEWISTON

LOT: 50 ALT: A HD: 3 PL: 15070 CT: 5696/933

Demolition of existing dwelling and

construction of detached dwelling

$191,987 Health Assessment 9/02/2016

Category 1Category:

Approval:

ALLSTEEL TRANSPORTABLES $60.00 Planning Lodgement Fee (up to $5,000)

$11.37 Class 10

$12.00 Planning Fee DAC

$34.77 Building - DAC

$0.86 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

$227.98 Planning Fee (more than $100,001)

$461.93 Class 1, 2 & 4

in accordance with plans submittedP1

provisional building rules consentP101

dwelling connected to effluent systemP13

external surfaces painted durable paintP17

water storage tank 22400 litresP174

comply to conditions imposedP2

Vehicle AccessP236

Fire fighting water tankP238

Site ConditionsP242

Stormwater drained and retained onsiteP243

existing trees to be protectedP51

Builder: Conditions: Payments:

28/01/2016BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/285 7/12/2015 170 Hayman Road LEWISTON

LOT: 100 ALT: A HD: 3 PL: D053847 CT: 5755/507

Construction of a verandah $6,000 Decision Issued 28/01/2016

Category 1Category:

Approval:

ADELAIDE FENCING & STEEL SUPPLIES $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$68.00 Planning Lodgement Fee (over $5,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

provisional building rules consentP101

Builder: Conditions: Payments:

V M HA

PARALOWRIE SA 5108

26 Brazil Drive

7/2015/286 7/12/2015 587C Ellis Road TWO WELLS

LOT: 4 ALT: A HD: 3 PL: D013832 CT: 6099/237

Construction of 4 plastic covered

greenhouses, a water storage dam....

and a storage shed

$80,000 Planning Assessment 7/12/2015

Category 1Category:

Approval:

V M HA $60.00 Planning Lodgement Fee (up to $5,000)

$214.00 Septic Tank application Fee

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

21/12/2015K J ECKERMANN

LEWISTON SA 5501

72 Bethesda RoadApproved by Delegation

7/2015/287 7/12/2015 72 Bethesda Road LEWISTON

LOT: 38 ALT: A HD: 3 PL: D019441 CT: 5275/878

Construction of Carport $1,500 Decision Issued 21/12/2015

Category 1Category:

Approval:

K J ECKERMANN $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

in accordance with plans submittedP1

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

Page 74 of 78

Page 75: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

7/03/2016BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/288 7/12/2015 Pederick Road LEWISTON

LOT: 206 ALT: A HD: 3 PL: D83809 CT: 6065/503

Construction of outbuilding - storage

shed

$17,500 Decision Issued 15/03/2016

Category 1Category:

Approval:

M L HARRIS. $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$68.00 Planning Lodgement Fee (over $5,000)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external walls of building subduedP6

external walls maintained in good condP7

approved for domestic purposes onlyP9

Builder: Conditions: Payments:

N CIRILLO

TWO WELLS SA 5501

17 Gawler River Road

7/2015/289 7/12/2015 17 Gawler River Road TWO WELLS

LOT: 6 ALT: A HD: 3 PL: D006094 CT: 5726/737

Construction of ten plastic covered

greenhouses, water storage dam and

hardstand area (Non-complying)

$100,000 Planning Assessment 7/12/2015

Category 1Category:

Approval:

N CIRILLO $60.00 Planning Lodgement Fee (up to $5,000)

$109.80 Planning Fee DAC

$5.15 Planning Fee DAC

$6.10 Planning Fee DAC

$350.00 Advertising Fee

$68.00 Planning Lodgement Fee (over $5,000)

$103.00 Category 2 Fee

$115.90 Planning Fee Non-Complying

$96.50 Planning Fee Non-Complying

$12.20 Planning Fee Non-Complying

$97.85 Planning Fee ($10,000-$100,000)

$28.50 Staged Consent Fee

$11.40 Staged Consent Fee

$20.10 Staged Consent Fee DAC

Builder: Conditions: Payments:

8/12/2015B JOHNSON

GAWLER BELT SA 5118

22 Kentish RoadApproval Bulding Consent

7/2015/290 7/12/2015 182 Nairn Road GRACE PLAINS

ALT: S HD: 1 SEC: 486 PL: H140500 CT: 5496/450

Nairn Road GRACE PLAINS

LOT: 14 ALT: S HD: 1 PL: D95580 CT: 6167/931

Demolition of Dwelling and Shed $11,000 Decision Issued 8/12/2015

Building Rules Consent OnlyCategory:

Approval:

B JOHNSON $60.00 Planning Lodgement Fee (up to $5,000)

$4.15 Building - DAC

$47.50 Building Rules Consent Only Fee

$2.50 DAC - Building Rules Consent Only Fee

$61.35 Class 1, 2 & 4

Asbestos demolition, transport and dispoB84Builder: Conditions: Payments:

5/05/2016DISTRICT COUNCIL OF MALLALA

MALLALA SA 5502

2A Wasleys RoadApproved by Delegation

7/2015/291 14/12/2015 North Terrace PARHAM

LOT: 1 ALT: A HD: 2 PL: D029502 CT: 5753/646

Upgrade to existing coastal levee $52,200 Decision Issued 5/05/2016

Category 1Category:

Approval:

DISTRICT COUNCIL OF MALLALABuilder: Conditions: Payments:

16/12/2015C M KLUSKE

REDBANKS SA 5502

Sec 99 Wasleys RoadApproved by Delegation

7/2015/292 15/12/2015 347 Woolsheds Road REDBANKS

ALT: S HD: 1 SEC: 227 PL: H140500 CT: 5886/227

Demolition of fire damaged buildings

- 2 dwellings and 5 outbuildings

$4,000 Decision Issued 16/12/2015

Category 1Category:

Approval:

C M KLUSKE $60.00 Planning Lodgement Fee (up to $5,000)Demolition of structureB83

Asbestos demolition, transport and dispoB84

Builder: Conditions: Payments:

Page 75 of 78

Page 76: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

21/04/2016LONGRIDGE GROUP

MILE END SA 5031

158 Railway TerraceApproved Private Certifier

7/2015/293 16/12/2015 Germantown Road LEWISTON

LOT: 24 HD: 3 PL: D89231 CT: 6094/947

Construction of detached dwelling,

pergola and outbuilding - garage

$234,415 Decision Issued 21/04/2016

Category 1Category:

Approval:

LONGRIDGE GROUP $60.00 Planning Lodgement Fee (up to $5,000)

$14.65 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$278.36 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1

Dwelling occupation requirementsB69

Waste containmentB19

On site toilet facilityB20

Builder: Conditions: Payments:

28/01/2016J L COLLINS

TWO WELLS SA 5501

Lot 202 Bailey RoadApproved by Delegation

7/2015/294 16/12/2015 2A Bailey Road TWO WELLS

LOT: 202 ALT: A HD: 3 PL: D89020 CT: 6094/870

Construction of Verandah $8,130 Decision Issued 28/01/2016

Category 1Category:

Approval:

J L COLLINS $60.00 Planning Lodgement Fee (up to $5,000)

$88.19 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$6.64 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

Stormwater disposalB33

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

7/03/2016RENDITION HOMES PTY LTD

CAMPBELLTOWN SA 5074

503 Lower North East RoadPlanning Consent Only

7/2015/295 16/12/2015 11 East Terrace WINDSOR

LOT: 27 ALT: A HD: 2 PL: D000493 CT: 6169/706

Construction of Dwelling $64,044 Planning Assessment 7/03/2016

Category 1Category:

Approval:

RENDITION HOMES PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

dwelling connected to effluent systemP13

Vehicle AccessP236

provisional building rules consentP101

Builder: Conditions: Payments:

16/02/2016CREATIVE OUTDOORS

ST AGNES SA

PO Box 350Approved Private Certifier

7/2015/296 17/12/2015 21 Kain Road BARABBA

ALT: S HD: 1 SEC: 192 PL: H140500 CT: 5195/38

Construction of verandah $69,000 Decision Issued 16/02/2016

Category 1Category:

Approval:

CREATIVE OUTDOORS $60.00 Planning Lodgement Fee (up to $5,000)

$5.15 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$97.85 Planning Fee ($10,000-$100,000)

in accordance with plans submittedP1

comply to conditions imposedP2

Stormwater drained and retained onsiteP243

Site ConditionsP242

external appearance maintainedP10

structure not be enclosed with solidP11

external materials to match existing bldP12

provisional building rules consentP101

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

Page 76 of 78

Page 77: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

12/01/2016S J LIGHTFOOT

REDBANKS SA 5502

Lot 1 Paddy's Bridge RoadApproved by Delegation

7/2015/297 16/12/2015 166 Davies Road MALLALA

ALT: S HD: 1 SEC: 63 PL: H140500 CT: 5425/440

Construction of a farm building $0 Decision Issued 12/01/2016

Category 1Category:

Approval:

S J LIGHTFOOT $60.00 Planning Lodgement Fee (up to $5,000)

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$16.93 Building - DAC

$224.99 Class 7 & 8

in accordance with plans submittedP1

comply to conditions imposedP2

existing trees to be protectedP51

Stormwater drained and retained onsiteP243

Site ConditionsP242

external walls maintained in good condP7

external walls of building subduedP6

Stormwater disposalB33

building non standard conditionBNS1

building non standard conditionBNS2

Builder: Conditions: Payments:

18/12/2015KEY BUILDING SERVICES

BEULAH PARK SA 5067

295 The ParadeApproved by Delegation

7/2015/298 18/12/2015 458 Owen Road GRACE PLAINS

LOT: 501 ALT: A HD: 1 PL: D014362 CT: 5659/328

Demolition of fire damaged dwelling $0 Health Assessment 18/12/2015

Building Rules Consent OnlyCategory:

Approval:

KEY BUILDING SERVICES $60.00 Planning Lodgement Fee (up to $5,000)Demolition of structureB83

Asbestos demolition, transport and dispoB84

Builder: Conditions: Payments:

12/05/2016STERLING HOMES PTY LTD

ALLENBY GARDENS SA 5009

110-114 GRANGE ROADPlanning Consent Only

7/2015/299 18/12/2015 Clonan Road DUBLIN

LOT: 862 ALT: A HD: 2 PL: D81240 CT: 6039/524

Construction of detached dwelling

with garage

$289,099 Planning Assessment 12/05/2016

Category 1Category:

Approval:

STERLING HOMES PTY LTD $60.00 Planning Lodgement Fee (up to $5,000)

$438.00 Septic Tank application Fee

$438.00 Septic Tank application Fee

$18.06 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$343.31 Planning Fee (more than $100,001)

$39.90 Staged Consent Fee

$20.10 Staged Consent Fee DAC

in accordance with plans submittedP1Builder: Conditions: Payments:

29/03/2016M GREEN

TWO WELLS SA 5501

10A Tatura Avenuewithdrawn Application

7/2015/300 21/12/2015 10A Tatura Avenue TWO WELLS

LOT: 22 ALT: A HD: 3 PL: D93205 CT: 6139/615

Construction of outbuilding - garage $6,500 Decision Issued 29/03/2016

Category 1Category:

Approval:

M GREEN $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

Stormwater disposalB33

Builder: Conditions: Payments:

Page 77 of 78

Page 78: Applications Lodged Listing - Combined Development Applic ...

Applications Lodged Listing - Combined Development Applic

From 1/01/2015 to 31/12/2015Sorted by Application Number

Document Applicant Name/

Address

Current ActionDevelopment

DeterminationLodged

Date

Subject LandProposalEstimated

Cost

3/02/2016BETTER BUILT INDUSTRIES

ATHOL PARK 5012

40 ATHOL STREETApproved by Delegation

7/2015/301 21/12/2015 12 Canala Court TWO WELLS

LOT: 24 ALT: A HD: 3 PL: D033249 CT: 5060/203

Construction of verandah $5,400 Decision Issued 3/02/2016

Building Rules Consent OnlyCategory:

Approval:

G FALCO $60.00 Planning Lodgement Fee (up to $5,000)

$61.35 Class 9B

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$4.15 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

Stormwater disposalB33Builder: Conditions: Payments:

22/02/2016W P MOLLOY

TWO WELLS SA 5501

19 Leilete RoadApproved by Delegation

7/2015/302 23/12/2015 5 Leilete Road TWO WELLS

LOT: 1 ALT: A HD: 3 PL: D93938 CT: 6140/803

Shed

$8,720 Decision Issued 22/02/2016

Category 1Category:

Approval:

W P MOLLOY $60.00 Planning Lodgement Fee (up to $5,000)

$111.18 Class 10

$1.90 Planning Fee DAC

$35.60 Planning Fee (up to $10,000)

$8.37 Building - DAC

$68.00 Planning Lodgement Fee (over $5,000)

in accordance with plans submittedP1

comply to conditions imposedP2

external appearance maintainedP10

external materials to match existing bldP12

Site ConditionsP242

Stormwater drained and retained onsiteP243

approved for domestic purposes onlyP9

Stormwater disposalB33

building non standard conditionBNS1

Builder: Conditions: Payments:

7/04/2016BARGAIN STEEL CENTRE

BURTON SA 5110

Lot 10 Heaslip RoadApproved Private Certifier

7/2015/303 23/12/2015 3 Cavallaro Place LEWISTON

LOT: 18 HD: 3 PL: D81621 CT: 6041/32

Shed and Verandah $45,000 Decision Issued 7/04/2016

Category 1Category:

Approval:

ADELAIDE FENCING & STEEL SUPPLIES $60.00 Planning Lodgement Fee (up to $5,000)

$6.10 Planning Fee DAC

$68.00 Planning Lodgement Fee (over $5,000)

$43.00 Certificate of Occupancy

$115.90 Planning Fee Non-Complying

in accordance with plans submittedP1

provisional building rules consentP101

comply to conditions imposedP2

Site ConditionsP242

external walls of building subduedP6

approved for domestic purposes onlyP9

planning non standard conditionPNS1

planning non standard conditionPNS2

Dwelling occupation requirementsB69

Builder: Conditions: Payments:

Number of Document Type 7 ( Combined Development Applic ): 301

Total number of Applications Reported: 301

Page 78 of 78