2016 Design and Construction Issues at Hazardous Waste Sites Application of Multiple Remedial Techniques and Approaches (In-Situ/Ex- Situ) at the Ewan Property Superfund Site

Transcript of Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in...

Page 1: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Application of Multiple Remedial Techniques and Approaches (In-Situ/Ex-

Situ) at the Ewan Property Superfund Site

Page 2: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Ewan Property Superfund Site

Burlington County, New Jersey Pinelands Area of New Jersey

• Designated Environmentally Sensitive Area

Former Disposal Area – Drums, Liquid Wastes and Sludge Cohansey-Kirkwood Formation –

Drinking Water Supply Listed Superfund Site

Page 3: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

Shamong Township Recreational Center

Ewan CEA Boundary

Meeting H

ouse Ct.

Groundwater Flow Direction

0 500 1000 feet

NORTH

Meeting H

ouse Ct.

Mill Road

Page 4: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Response Activities Operable Unit 1 Buried drums and contaminated soil

removed in 1995-1996 3,820 drums and 14,000 cubic yards of

contaminated soils removed and disposed offsite

Excavation addressed bulk waste and unsaturated contaminated soils

Source removal program implemented to address the contaminant source to groundwater

Wetlands mitigation completed due to OU1 activities

Page 5: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Response Activities Operable Unit 2 Extraction, treatment and reinfiltration of

contaminated groundwater (195 gpm) Seven Extraction Wells and Conveyance

Lines VOCs/SVOCs/Elevated Iron/Low pH Residual contaminated soils treated via

flushing/in-situ bioremediation Prevent migration of dissolved

constituents of concern Remedial Objectives/Classification

Exception Area (CEA) Compliance Criteria

Page 6: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and
Page 7: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Groundwater Remedy: Recovery and Treatment System

Equalization Aeration (Oxidation) Chemical Precipitation Sand Filters Air Stripping Activated Carbon Cat OX and HCl Scrubber Sludge Thickening Filter Press

Page 8: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Remedy Performance Issue: Decrease in Mass Removal

Cumulative Total VOCs Removed by Water Treatment System vs. Time of Operation

0

50

100

150

200

250

300

350

Mar-99 Sep-99 Mar-00 Sep-00 Mar-01 Sep-01 Mar-02 Sep-02 Mar-03 Sep-03 Mar-04 Sep-04 Mar-05 Sep-05Date

Tota

l Pou

nds

of V

OCs

Rem

oved

Page 9: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Remedy Performance Issue: Iron Fouling

Page 10: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Groundwater Remedy Evaluation: Short-term Recommendations

Terminated Air Permit Due to Low VOC Mass Recovery (Cat Ox and Scrubber)

Bypassed Air Stripper Treatment Due to Low VOC Mass Recovery

Page 11: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Groundwater Remedy Evaluation: Long-term Recommendations

Develop Well & Conveyance Line Rehabilitation Program to Increase Extraction Efficiency using HCl Online Performance

Improvements Supplemental Source

Removal Conduct Pilot Study of

Supplemental Technologies

Page 12: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Supplemental Source Removal Program

Page 13: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Supplemental Source Removal Program

TC-30 Soil Removal Program Wet excavation into smear

zone to address LNAPL at TC-30

1,000 tons of contaminated soil removed and disposed offsite

LNAPL/groundwater removal and treatment

Page 14: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Supplemental Source Removal Program

TC-32 Soil Removal Program Wet excavation to address

residual contamination at TC-32

600 tons of contaminated soil removed and disposed offsite

15,000 gallons of groundwater removed and treated at plant

Page 15: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Supplemental Source Removal Program

Remedial Objective = 15 µg/L

0

50

100

150

200

250

300

350

400

450

500

Mar-04 Mar-05 Mar-06 Mar-07 Mar-08 Mar-09 Mar-10 Mar-11 Mar-12 Mar-13 Mar-14 Mar-15

2-Methylnaphthalene Concentrations in TC-302004 - 2015

TC-30 TC-30 CEA Compliance Criterion Reporting Limit

Page 16: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Supplemental Source Removal Program

Remedial Objective = 1000 µg/L

0

1,000

2,000

3,000

4,000

5,000

6,000

May-10 Nov-10 May-11 Nov-11 May-12 Nov-12 May-13 Nov-13 May-14 Nov-14 May-15 Nov-15

Conc

entr

atio

n (µ

g/L)

Date

Toluene Concentrations over TimeTC-32/TC-32R and VE-2

TC-32 VE-2 Remedial Objective

TC-32/VE-2 Remedial Action

Page 17: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

In-Situ Pilot Study – Alternatives Considered

Soil Vapor Extraction Bioslurping Dual Phase Extraction Air Sparging/Soil Vapor

Extraction Biosparging

Page 18: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

In-Situ Pilot Study - High Vacuum Dual Phase Extraction (DPE)

Groundwater flow = 10 gpm Capture Zone = 55 feet Radius of Influence = 26 feet Significant VOCs recovered Effectively enhance migration

control Mass Recovery Rate = 0.7

lbs/day

Page 19: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Groundwater Completion Strategy

Terminated Groundwater Recovery, Treatment and Reinfiltration System (2006) Continuous Operation of DPE

System (2006-2010) Phased-Shutdown of DPE

System (2010-2011) Monitored Natural Attenuation

(2011- Present) Site Decommissioning and

Restoration (2015-2016)

Page 20: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Site Restoration Deed of Conservation

Easement – Green Acres• Utilities Removal• Removal of all infrastructure

4,000 linear feet of underground piping

2,000 linear feet of aboveground piping

Septic System & Leach Field• Preserved as Greenfields

Page 21: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Site Restoration

Pinelands Restoration Requirements Reinfiltration Basin

Restoration (5 Acres) Top Soil Native Species Vegetation 600 Indigenous Trees Monitoring Program

Page 22: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Project Status Completion of Site Restoration Plan (Spring 2016) Completion of Off-site Residential Monitoring Program

(Spring 2016)Groundwater Monitoring Program (Tri-Annual Sampling) Achieve Groundwater Remedial Action Objectives and

Associated Cleanup Levels Delete Site from the NPL Monitored Natural Attenuation with CEA until PL-1 GWQS

achieved (NJDEP)

Page 23: Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in 1995- 1996 3,820 drums and 14,000 cubic yards of contaminated soils removed and

2016 Design and Construction Issues at Hazardous Waste Sites

Keys to Success

Never Assume Status QuoValue of Constant Remedy EvaluationSupplemental Targeted Remedial Alternatives within