N - R List of Contaminated or Potentially Contaminated Sites
Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in...
Transcript of Application of Multiple Remedial Techniques and …...Buried drums and contaminated soil removed in...
2016 Design and Construction Issues at Hazardous Waste Sites
Application of Multiple Remedial Techniques and Approaches (In-Situ/Ex-
Situ) at the Ewan Property Superfund Site
2016 Design and Construction Issues at Hazardous Waste Sites
Ewan Property Superfund Site
Burlington County, New Jersey Pinelands Area of New Jersey
• Designated Environmentally Sensitive Area
Former Disposal Area – Drums, Liquid Wastes and Sludge Cohansey-Kirkwood Formation –
Drinking Water Supply Listed Superfund Site
Shamong Township Recreational Center
Ewan CEA Boundary
Meeting H
ouse Ct.
Groundwater Flow Direction
0 500 1000 feet
NORTH
Meeting H
ouse Ct.
Mill Road
2016 Design and Construction Issues at Hazardous Waste Sites
Response Activities Operable Unit 1 Buried drums and contaminated soil
removed in 1995-1996 3,820 drums and 14,000 cubic yards of
contaminated soils removed and disposed offsite
Excavation addressed bulk waste and unsaturated contaminated soils
Source removal program implemented to address the contaminant source to groundwater
Wetlands mitigation completed due to OU1 activities
2016 Design and Construction Issues at Hazardous Waste Sites
Response Activities Operable Unit 2 Extraction, treatment and reinfiltration of
contaminated groundwater (195 gpm) Seven Extraction Wells and Conveyance
Lines VOCs/SVOCs/Elevated Iron/Low pH Residual contaminated soils treated via
flushing/in-situ bioremediation Prevent migration of dissolved
constituents of concern Remedial Objectives/Classification
Exception Area (CEA) Compliance Criteria
2016 Design and Construction Issues at Hazardous Waste Sites
Groundwater Remedy: Recovery and Treatment System
Equalization Aeration (Oxidation) Chemical Precipitation Sand Filters Air Stripping Activated Carbon Cat OX and HCl Scrubber Sludge Thickening Filter Press
2016 Design and Construction Issues at Hazardous Waste Sites
Remedy Performance Issue: Decrease in Mass Removal
Cumulative Total VOCs Removed by Water Treatment System vs. Time of Operation
0
50
100
150
200
250
300
350
Mar-99 Sep-99 Mar-00 Sep-00 Mar-01 Sep-01 Mar-02 Sep-02 Mar-03 Sep-03 Mar-04 Sep-04 Mar-05 Sep-05Date
Tota
l Pou
nds
of V
OCs
Rem
oved
2016 Design and Construction Issues at Hazardous Waste Sites
Remedy Performance Issue: Iron Fouling
2016 Design and Construction Issues at Hazardous Waste Sites
Groundwater Remedy Evaluation: Short-term Recommendations
Terminated Air Permit Due to Low VOC Mass Recovery (Cat Ox and Scrubber)
Bypassed Air Stripper Treatment Due to Low VOC Mass Recovery
2016 Design and Construction Issues at Hazardous Waste Sites
Groundwater Remedy Evaluation: Long-term Recommendations
Develop Well & Conveyance Line Rehabilitation Program to Increase Extraction Efficiency using HCl Online Performance
Improvements Supplemental Source
Removal Conduct Pilot Study of
Supplemental Technologies
2016 Design and Construction Issues at Hazardous Waste Sites
Supplemental Source Removal Program
2016 Design and Construction Issues at Hazardous Waste Sites
Supplemental Source Removal Program
TC-30 Soil Removal Program Wet excavation into smear
zone to address LNAPL at TC-30
1,000 tons of contaminated soil removed and disposed offsite
LNAPL/groundwater removal and treatment
2016 Design and Construction Issues at Hazardous Waste Sites
Supplemental Source Removal Program
TC-32 Soil Removal Program Wet excavation to address
residual contamination at TC-32
600 tons of contaminated soil removed and disposed offsite
15,000 gallons of groundwater removed and treated at plant
2016 Design and Construction Issues at Hazardous Waste Sites
Supplemental Source Removal Program
Remedial Objective = 15 µg/L
0
50
100
150
200
250
300
350
400
450
500
Mar-04 Mar-05 Mar-06 Mar-07 Mar-08 Mar-09 Mar-10 Mar-11 Mar-12 Mar-13 Mar-14 Mar-15
2-Methylnaphthalene Concentrations in TC-302004 - 2015
TC-30 TC-30 CEA Compliance Criterion Reporting Limit
2016 Design and Construction Issues at Hazardous Waste Sites
Supplemental Source Removal Program
Remedial Objective = 1000 µg/L
0
1,000
2,000
3,000
4,000
5,000
6,000
May-10 Nov-10 May-11 Nov-11 May-12 Nov-12 May-13 Nov-13 May-14 Nov-14 May-15 Nov-15
Conc
entr
atio
n (µ
g/L)
Date
Toluene Concentrations over TimeTC-32/TC-32R and VE-2
TC-32 VE-2 Remedial Objective
TC-32/VE-2 Remedial Action
2016 Design and Construction Issues at Hazardous Waste Sites
In-Situ Pilot Study – Alternatives Considered
Soil Vapor Extraction Bioslurping Dual Phase Extraction Air Sparging/Soil Vapor
Extraction Biosparging
2016 Design and Construction Issues at Hazardous Waste Sites
In-Situ Pilot Study - High Vacuum Dual Phase Extraction (DPE)
Groundwater flow = 10 gpm Capture Zone = 55 feet Radius of Influence = 26 feet Significant VOCs recovered Effectively enhance migration
control Mass Recovery Rate = 0.7
lbs/day
2016 Design and Construction Issues at Hazardous Waste Sites
Groundwater Completion Strategy
Terminated Groundwater Recovery, Treatment and Reinfiltration System (2006) Continuous Operation of DPE
System (2006-2010) Phased-Shutdown of DPE
System (2010-2011) Monitored Natural Attenuation
(2011- Present) Site Decommissioning and
Restoration (2015-2016)
2016 Design and Construction Issues at Hazardous Waste Sites
Site Restoration Deed of Conservation
Easement – Green Acres• Utilities Removal• Removal of all infrastructure
4,000 linear feet of underground piping
2,000 linear feet of aboveground piping
Septic System & Leach Field• Preserved as Greenfields
2016 Design and Construction Issues at Hazardous Waste Sites
Site Restoration
Pinelands Restoration Requirements Reinfiltration Basin
Restoration (5 Acres) Top Soil Native Species Vegetation 600 Indigenous Trees Monitoring Program
2016 Design and Construction Issues at Hazardous Waste Sites
Project Status Completion of Site Restoration Plan (Spring 2016) Completion of Off-site Residential Monitoring Program
(Spring 2016)Groundwater Monitoring Program (Tri-Annual Sampling) Achieve Groundwater Remedial Action Objectives and
Associated Cleanup Levels Delete Site from the NPL Monitored Natural Attenuation with CEA until PL-1 GWQS
achieved (NJDEP)
2016 Design and Construction Issues at Hazardous Waste Sites
Keys to Success
Never Assume Status QuoValue of Constant Remedy EvaluationSupplemental Targeted Remedial Alternatives within
Definition of RODPartnering with Regulatory Agency