Republic of the Philippines Davao City NBC FORM 8- 01 Province of Davao Del Sur OFFICE OF THE BUILDING OFFICIAL APPLICATION FOR BUILDING PERMIT NEW RENEWAL AMENDATORY APPLICATION NO. AREA NO. DATE OF APPLICATION DATE ISSUED BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE APPLICANT) OWNER’S LASTNAME FIRSTNAME M.I DO NOT FILL-UP (NSO USE ONLY) TAX ACCOUNT NO. FOR CONSTRUCTION OWNED BY ENTERPRISE FORM OF OWNERSHIP ADDRESS : NO. STREET BARANGAY CITY/MUNICIPALITY ZIP CODE TELEPHONE NO. LOCATION OF CONSTRUCTION : TCT NO. SCOPE OF WORK: NEW CONSTRUCTION ERECTION ADDITION ALTERATION RENOVATION CONVERSION REPAIR MOVING RAISING ACCESSORY BUILDING STRUCTURE OTHERS (SPECIFY) USE OR OCCUPANCY OF BUILDING / STRUCTURE : RESIDENTIAL INDUSTRIAL AGRICULTURAL COMMERCIAL INSTITUTIONAL OTHERS (SPECIFY) USE OR CHARACTER OF OCCUPANCY : GROUP A – RESIDENTIAL DWELLING GROUP B – RESIDENTIAL HOTEL APARTMENT GROUP C – EDUCATIONAL RECREATIONAL GROUP D – INSTITUTIONAL GROUP E – BUSINESS AND MERCANTILE GROUP F – INDUSTRIAL GROUP G – INDUSTRIAL STORAGE AND HAZARDOUS GROUP H – RECREATIONAL ASSEMBLY OCCUPANT LOAD LESS THAN 1000 GROUP I – RECREATIONAL ASSEMBLY OCCUPANT LOAD 1000 OR MORE GROUP J – AGRICULTURAL ACCESSORY OTHERS (SPECIFY) OCCUPANCY CLASSIFIED : NUMBER OF UNITS : TOTAL FLOOR AREA : TOTAL ESTIMATED COST : PROPOSED DATE OF CONSTRUCION : PROPOSED DATE OF COMPLETION : BOX 2 (FULL-TIME INSPECTOR AND SUPERVISOR OF CONSTRUCTION WORKS (REPRESENTING THE OWNER)) ARCHITECT OR CIVIL ENGINEER (SIGNED AND SEALED OVER PRINTED NAME) DATE ADDRESS : PRC NO. : PTR NO. : PLACE ISSUED : VALIDITY : DATE ISSUED: TIN : BOX 3 BOX 4 DATE : (SIGNATURE OVER PRINTED NAME) NAME OF APPLICANT : ADDRESS : CTO NO.: DATE ISSUED: WITH CONSENT : LOT OWNER DATE : (SIGNATURE OVER PRINTED NAME) ADDRESS : CTO NO.: DATE ISSUED: PLACE ISSUED: PLACE ISSUED: BOX 5 REPUBLIC OF THE PHILIPPINES ) CITY/MUNICIPALITY OF ) BEFORE ME, at the City/Municipality of on personally appeared APPLICANT NAME C.T.C NO. DATE ISSUED PLACE ISSUED LICENSED ARCHITECT / CIVIL ENGINEER C.T.C NO. DATE ISSUED PLACE ISSUED (FULL TIME INSPECTOR AND SUPERVISOR OF CONSTUCTION) whose signature appear herein above known to me to be the same persons who executed this standard prescribed form and acknowledged to me that the same is their free and voluntary act and deed WITNESS MY HAND AND SEAL on the date and place above written Doc. No. Page No. Book No. Series No. NOTARY PUBLIC (until December ______ )

Transcript of APPLICATION NO. AREA NO. - Davao City

Page 1: APPLICATION NO. AREA NO. - Davao City

Republic of the PhilippinesDavao City

NBC FORM 8-01

Province of Davao Del SurOFFICE OF THE BUILDING OFFICIAL

APPLICATION FOR BUILDING PERMITNEW RENEWAL AMENDATORY

APPLICATION NO. AREA NO.

DATE OF APPLICATION DATE ISSUEDBOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE APPLICANT)

OWNER’S LASTNAME FIRSTNAME M.I

DO NOT FILL-UP (NSO USE ONLY)

TAX ACCOUNT NO.

FOR CONSTRUCTION OWNED BY ENTERPRISE FORM OF OWNERSHIP

ADDRESS : NO. STREET BARANGAY CITY/MUNICIPALITY ZIP CODE TELEPHONE NO.

LOCATION OF CONSTRUCTION : TCT NO.

SCOPE OF WORK: NEW CONSTRUCTION

ERECTIONADDITIONALTERATION

RENOVATION

CONVERSIONREPAIR

MOVING

RAISING

ACCESSORY BUILDING STRUCTURE

OTHERS (SPECIFY)

USE OR OCCUPANCY OF BUILDING / STRUCTURE :RESIDENTIAL

INDUSTRIAL

AGRICULTURAL

COMMERCIAL

INSTITUTIONAL

OTHERS (SPECIFY)

USE OR CHARACTER OF OCCUPANCY :

GROUP A – RESIDENTIAL DWELLING

GROUP B – RESIDENTIAL HOTEL APARTMENT

GROUP C – EDUCATIONAL RECREATIONAL

GROUP D – INSTITUTIONAL

GROUP E – BUSINESS AND MERCANTILE

GROUP F – INDUSTRIAL

GROUP G – INDUSTRIAL STORAGE AND HAZARDOUS

GROUP H – RECREATIONAL ASSEMBLY OCCUPANT LOAD LESS THAN 1000

GROUP I – RECREATIONAL ASSEMBLY OCCUPANT LOAD 1000 OR MORE

GROUP J – AGRICULTURAL ACCESSORY

OTHERS (SPECIFY)

OCCUPANCY CLASSIFIED :

NUMBER OF UNITS :

TOTAL FLOOR AREA :

TOTAL ESTIMATED COST :

PROPOSED DATE OF CONSTRUCION :

PROPOSED DATE OF COMPLETION :

BOX 2 (FULL-TIME INSPECTOR AND SUPERVISOR OF CONSTRUCTION WORKS (REPRESENTING THE OWNER))

ARCHITECT OR CIVIL ENGINEER(SIGNED AND SEALED OVER PRINTED NAME)

DATE

ADDRESS :

PRC NO. :

PTR NO. :

PLACE ISSUED :

VALIDITY :

DATE ISSUED:

TIN :

BOX 3 BOX 4

DATE :(SIGNATURE OVER PRINTED NAME)

NAME OF APPLICANT :

ADDRESS :

CTO NO.: DATE ISSUED:

WITH CONSENT : LOT OWNERDATE :

(SIGNATURE OVER PRINTED NAME)

ADDRESS :

CTO NO.: DATE ISSUED:PLACE ISSUED: PLACE ISSUED:

BOX 5REPUBLIC OF THE PHILIPPINES )

CITY/MUNICIPALITY OF )

BEFORE ME, at the City/Municipality of on personally appeared

APPLICANT NAME C.T.C NO. DATE ISSUED PLACE ISSUED

LICENSED ARCHITECT / CIVIL ENGINEER C.T.C NO. DATE ISSUED PLACE ISSUED(FULL TIME INSPECTOR AND SUPERVISOR OF CONSTUCTION)

whose signature appear herein above known to me to be the same persons who executed this standard prescribed form and acknowledged to methat the same is their free and voluntary act and deed

WITNESS MY HAND AND SEAL on the date and place above written

Doc. No.

Page No.

Book No.

Series No. NOTARY PUBLIC (until December ______ )

Page 2: APPLICATION NO. AREA NO. - Davao City

BOX 6 (TO BE ACCOMPLISHED BY THE BUILDING OFFICIAL)ASSESSED FEE ASSESSED BY AMOUNT DUE DATE PAID O.R. NUMBER NSO

LOCATIONAL/ZONING OF LAND USE

LINE AND GRADE (Geodetic)

FILING FEE

BUILDING FEE

ELECTRICAL FEE

MECHANICAL FEE

SANITARY/PLUMBING FEE

ELECTRONICS FEE

(1/2) OF FIRE SERVICE FUND (FSF)

OTHERS (SPECIFY)

TOTAL :

BOX 7(TO BE ACCOMPLISHED BY THE DIVISION / SECTION CONCERNED)PROGRESS FLOW

IN

TIME DATE

OUT

TIME DATEACTION / REMARKS PROCESSED BY

RECEIVING and RECORDING

LAND USE and ZONING

GEODETIC (Line and Grade)

ARCHITECTURAL

STRUCTURAL

SANITARY / PLUMBING

ELECTRICAL

MECHANICAL

NOTED

CHIEF,PROCESSING, DIVISION/SECTION

BOX 8 (TO BE ACCOMPLISHED BY THE BUILDING OFFICIAL)

WE HEREBY AFFIX OUR HANDS SIGNIFYING OUR CONFORMITY TO THE INFORMATION HEREIN ABOVE SETFORTH

BUILDING PERMIT NO. : BUILDING PERMITDATE ISSUED :

M M D D Y Y

OFFICIAL RECIEPT NO.

DATE PAID :

M M D D Y Y

1) THAT UNDER ARTICLE 1723 OF THE CIVIL CODE OF THE PHILIPPINES, THE ENGINEER OR ARCHITECT WHO DREW UP THE PLANS AND SPECIFICATIONS FOR A BUILDING/STRUCTURE IS LIABLE FOR DAMAGES IF WITHIN FIFTEEN (15) YEARS FROM THE COMPLETION OF THE BUILDING/STRUCTURE, THE SAME SHOULD COLLAPSE DUE TO DEFECT IN THE PLANS OR SPECIFICATIONS OF DEFECTS IN THE GROUND. THE ENGINEER OR ARCHITECT WHO SUPERVISES THE CONSTRUCTION SHALL BE SOLIDARILY LIABLE WITH THE CONTRACTOR SHOULD THE EDIFICE COLLAPSE DUE TO DEFECT IN THE CONSTRUCTION OR THE USE OF INFERIOR MATERIALS.

2) THIS PERMIT ACCOMPANIED BY THE VARIOU S APPLICABLE ANCILLARY AND ACCESSORY PERMITS,PLANS AND SPECIFICATIONS SIGNED AND SEALED BY THE CORRESPONDING DESIGN PROFESSIONALS WHO SHALL BE RESPONSIBLE FOR THE COMPREHENSIVE AND CORRECTNESS OF THE PLANS IN COMPLIANCE TO THE CODE AND ITS IRR AND TO ALL APPLICABLE REFERAL CODES AND PROFESSIONAL REGULATORY LAWS.

3) THAT THE PROPOSED CONSTRUCTION/ERECTION/ADDITION/ALTERATION/RENOVATION/CONVERSION/REPAIR/MOVING/DEMOLITION, ETC. SHALL BE IN CONFORMITY WITH THE PROVISIONS OF THE NATIONAL BUILDING CODE AND ITS IRR.

A. THAT PRIOR TO COMMENCEMENT OF THE PROPOSED PROJECTS AND CONSTRUCTIONS AN ACTUAL RELOCATION SURVEY SHALL BE CONDUCTED BY A DULY LICENSED GEODETIC ENGINEER.B. THAT BEFORE COMMENCING THE EXCAVATION THE PERSON MAKING OR CAUSING THE EXCAVATION TO BE MADE SHALL NOTIFY IN WRITING TO THE OWNER OF ADJOINING PROPERTY . NOT LESS THAN TEN (10) DAYS BEFORE SUCH EXCAVATION IS TO BE MADE AND SHOW THE ADJOINING PROPERTY SHOULD BE PROTECTED.C. THAT NO PERSON SHALL USE OR OCCUPY A STREET ALLEY OR PUBLIC SIDEWALK FOR THE PERFORMANCE OF WORK COVERED BY A BUILDING PERMIT.D. THAT NO PERSON SHALL PERFORM ANY WORK ON ANY BUILDING OR STRUCTURE ADJACENT TO A PUBLIC WAY IN GENERAL USE FOR PEDESTRIAN TRAVEL, UNLESS THE PEDESTRIANS ARE PROTECTED.E. THAT THE SUPERVISING ARCHITECT/CIVIL ENGINEER SHALL KEEP THE JOBSITE AT ALL TIMES A LOGBOOK OF DAILY CONSTRUCTION ACTIVITIES WHEREIN THE ACTUAL DAILY PROGRESS OF CONSTRUCTION INCLUDING TEST CONDUCTED, WEATHER CONDITION AND OTHER PERTINENT DATE ARE TO INSPECTION PURSUANT TO SECTION 207 OF THE NATIONAL BUILDING CODE.F. THAT UPON COMPLETION OF THE CONSTRUCTION, THE SAID LICENSED SUPERVISING ARCHITECT/CIVIL ENGINEER SHALL SUBMIT TO THE BUILDING OFFICIAL DULY SIGNED AND SEALED LOGBOOK, AS-BUILT PLANS AND OTHER DOCUMENTS AND SHALL ALSO PREPARE AND SUBMIT A CERTIFICATE OF COMPLETION OF THE PROJECT STATING THAT THE CONSTRUCTION OF THE BUILDING/STRUCTURE CONFORM TO THE PROVISION OF THE CODE, ITS IRR AS WELL AS THE PLANS AND SPECIFICATIONS.G. ALL SUCH CHANGES,MODIFICATIONS AND ALTERATIONS SHALL LIKEWIS E BE SUBMITTED TO THE BUILDING OFFICIAL AND THE SUBSEQUENT AMENDATORY PERMIT THEREFORE ISSUED BEFORE ANY WORK ON SAID CHANGES,MODIFICATIONS AND ALTERATIONS SHALL BE STARTED. THE AS-BUILT PLANS AND SPECIFICATIONS MAYBE JUST AN ORDERLY AND COMPREHENSIVE COMPILATION OF ALL DOCUMENTS WHICH INCLUDE THE ORIGINALLY SUBMITTED PLANS AND SPECIFICATIONS OF ALL AMMENDMENTS THERETO AS ACTUALLY BUILT OR THEY MAY BE AN ENTIRELY NEW SET OF PLANS AND SPECIFICATIONS ACCURATELY DESCRIBING AND/OR REFLECTING THEREIN THE BUILDING AS ACTUALLY BUILT.

4) THAT NO BUILDING/STRUCTURE SHALL BE USED UNTIL THE BUILDING OFFICIAL HAS ISSUED A CERTIFICATE OF OCCUPANCY THEREFORE AS PROVIDED IN THE CODE. HOWEVER, A PARTIAL CERTIFICATE OF OCCUPANCY MAY BE ISSUED FOR USE/OCCUPANCY OF A PORTION(S) OF A BUILDING/STRUCTURE PRIOR TO THECOMPLETION OF THE ENTIRE BUILDING/STRUCTURE.

5) THAT THIS PERMIT SHALL NOT SERVE AS AN EXEMPTION FROM SECURING WRITTEN CLEARANCES FROM VARIOUS GOVERNMENT AUTHORITIES EXERCISING REGULATORY FUNCTION AFFECTING BUILDING/STRUCTURES.

6) WHEN THE CONSTRUCTION IS UNDERTAKEN BY CONTRACT, THE WORK SHALL BE DONE BY DULY LICENSED AND REGISTERED CONTRACTOR PURSUANT TO THE PROVISIONS OF THE CONTRACTORS LICENSE LAW (RA 4566).

7) THE OWNER/PERMITTEE SHALL SUBMIT A DULY ACCOMPLISHED PRESCRIBED 'NOTICE OF CONSTRUCTION' TO THE OFFICE OF THE BUILDING OFFICIAL PRIOR TO ANY CONSTRUCTION ACTIVITY.

8) THE OWNER/PERMITTEE SHALL PUT A BUILDING PERMIT SIGN WICH COMPLIES WITH THE PRESCRIBED DIMENSIONS AND INFORMATION, WHICH SHALL REMAIN POSTED ON THE CONSTRUCTION SITE FOR THE DURATION OF THE CONSTRUCTION.

Permit is issued to for the proposed(Type of Project)

under

, of Group

subject of the following :

(Owner/Applicant)

PERMIT ISSUED BY:

ENGR. CIRINIA GRACE L. CATUBIGOfficer-In-Charge

Date:

NOTE: THIS PERMIT MAY BE CANCELLED OR REVOKED PURSUANT TO SECTIONS 305 AND 306 OF THE NATIONAL BUILDING CODE.

, located at

Page 3: APPLICATION NO. AREA NO. - Davao City

Republic of the Philippines

OFFICE OF THE CITY BUILDING OFFICIALCity of Davao

DOCUMENTARY REQUIREMENTS FOR BUILDING PERMIT APPLICATION

Five (5) copies of properly filled up and notarized Unified Application Form for Building Permit, locational clearance and Fire Safety Evaluation Clearance.

Additional Requirements for Locational Clearance:Submitted Certificate of Height Clearance from Air transportation Office for Tall Structure

Submit Permit from National Water Resource Board if project has groundwater extractionSubmit Drainage Impact Statement if project is Major Devt.

Submit Socio-Economic Impact Statement if project has Large Employnment requirement

Submit initial Environmental Examination (IEE) signed by licensed Environmental planner and according to DENR specified format for light Industrial projects/usesSubmit Water Management plan if project is a heavy water-using facility

Submit Historic Site/Facility Development Statement if project is a Historic Site or with Historic Facility. Submit Traffic Impact Assessment if Project is a potential Traffic Generating Devt.Submit Notarized Certificate of No Objection from affected neighbors if project has Firewall/abulment on any side of the property.

One (1) copy of certified true copy and Three (3) photocopies of Original Certificate of Title (OCT)/Transfer Certificate of Title (TCT); if applicant is a lessee, submit Contract of Lease; if OCT/TCT is not in the name of the applicant , Submit:

Special prower of Attorney (SPA) Board Resolution or Secretary's Certificate if the applicant is a Corporation (4 copies: One (1) original and three (3) photocopies).

Five (5) sets of Building/Survey plans, Design plans and other documents, signed and sealed by the concerned Design Professionals, as follows; (20"x30")

One (1) clear photocopy of valid professional licenses (PRC I.D.) and current professional Tax receipts (PTR) of all involved professionals .

Four (4) copies of notrarized Project Technical Specifications and estimated total construction cost/Value of the building or structure to be constructed as declared by the owner.

One (1) copy of the project's Construction Safety and Health Program stamped received by DOLE regional or District office; Thre e (3) photocopies of the stamped CSHP cover page. If commercial, Should be approved by Dole

Environmental Compliance Certificate (ECC / DENR)

Note: INCOMPLETE DOCUMENTS WILL NOT BE ACCEPTED

(dili dawaton kung kulang ang mga dokumento) all forms must be filled-up properly, use black ink only and write legibly in print Received/pre-evaluated as to checklist by:

Name/Position:

Date/Time:

Signature:

Civil/Structural Documents (including Soil Test and Structural Design Analysis, if applicable)

Architectural Documents (including Materials and Technical Specifications and Gen. Conditions)

Electrical Documents

Mechanical Documents

Sanitary Documents

Plumbing Documents

Electronics Documents

Geodetic Documents (Including lot plan with technical descriptionand vicinity map covering 2km radius)

Certified true copy of Tax Declaration of Property of Land.

Notarized Contract of sale

Notarized Authority to Construct from the lot owner

Advance Technical Description (Certified DENR)

One (1) photocopy of Owners Valid I.D with 3 specimen Signature

DPWH CLEARANCE (IF ALONG NATIONAL HIGHWAY)

PICTURE ON SITE WITH LANDMARK,

Notarized Deed of Absolute Sale

ONE STOP SHOP FOR CONSTRUCTION PERMIT

(CHECKLIST)

Page 4: APPLICATION NO. AREA NO. - Davao City

Republic of the PhilippinesOFFICE OF THE CITY BUILDING OFFICIAL

City of Davao

DOCUMENTARY REQUIREMENTS FOR CERTIFICATE OF OCCUPANCY APPLICATION

FOR CERTIFICATE OF OCCUPANCY

ONE (1) COPIES OF PROPERLY FILLED-UP APPLICATION FORM FOR CERTIFICATE OF OCCUPANCY AND FIRE SAFETY INSPECTION CERTIFICATE.

ONE (1) COPIES OF PROPERLY FILLED-UP AND DULY NOTARIZED CERTIFICATE OF COMPLETION,SIGNED BY THE OWNER/APPLICANT AND SIGNED AND SEALED BY THE DULY LICENSED ARCHITECT OR CIVIL ENGINEER IN-CHARGE OF CONSTRUCTION, TOGETHER WITH ONE (1) SET OF ISSUED BUILDING PERMIT PLANS AND. IF THE CONSTRUCTION WAS UNDERTAKEN THROUGH A CONTRACT, THE CERTIFICATE OF COMPLETION SHALL ALSO BE SIGNED BY THE CONTRACTOR/AUTHORIZED MANGAGING OFFICER

ONE(1) SETS PHOTOCOPY OF THE ISSUED BUILDING PERMIT ANDT HE ISSUED ANCILLARY PERMITS.

ONE (1) SETS PHOTOCOPY OF OWNER'S COPY OF ISSUED FIRE SAFETY CHECKLIST AND IT'S CORRESPONDING FIRE SAFETY EVALUATION CLEARANCE.

ONE (1) SETS OF COMPLIANT AS-BUILT PLANS REFLECTING ALL CORRECTED COMMENTS MADE IN THE ISSUED BUILDING PERMIT PLANS SIGNED AND SEALED BY OWNER AND ALL INVOLVED PROFESSIONALS.

CLEAR 3R SIZE PHOTOGRAPS OF THE COMPLETED STRUCTURE SHOWING SUBSTANTIAL COMPLETION OF FRONT , SIDES AND REAR AREAS (1 SET) AND PICTURE TARPAULIN (3X2 ft.)

ONE STOP SHOP FOR CONSTRUCTION PERMIT

RAIN WATER CATCHMENT SYSTEM (RCS) PICTURE.

Note: INCOMPLETE DOCUMENTS WILL NOT BE ACCEPTED

(dili dawaton kung kulang ang mga dokumento) all forms must be filled-up properly, use black ink only and write legibly in print Received/pre-evaluated as to checklist by:

Name/Position:

Date/Time:

Signature: