APPLICATION FOR ENVIRONMENTAL CLEARANCE
FORM 1, PREFEASIBILITY REPORT & ANNEXURE
FOR
Proposed Facility Augmentation Project –Construction of New Tanks & Reallocation of Tanks
at Kochi Marketing Terminal, Irumpanam
at
VILLAGE: Thiruvankulam
TEHSIL: Kanayannur
DISTRICT: Ernakulam
STATE: Kerala
By
M/s. INDIAN OIL CORPORATION LIMITED
(IMPORT, STORAGE & MARKETING TERMINAL – KOCHI)
Prepared by:
(NABET Accredited vide Certificate No. NABET/EIA/1619/RA0083 &MoEF Recognized Lab vide F. No. Q-15018/13/2016-CPW)HUBERT ENVIRO CARE SYSTEMS (P) LTD, CHENNAI
APRIL, 2018
2
Hubert Enviro Care Systems (P)Ltd.Client: M/s. INDIAN OIL CORPORATION LIMITED (IMPORT, STORAGE & MARKETING
TERMINAL – KOCHI), Irumpanam, Thiruvankulam Village, Thrippunithura Municipality,Kochi, Kerala
Project:Proposed Facility Augmentation Project –Construction of New Tanks & Reallocati on ofTanks at Kochi Marketing Terminal, Irumpanam
Project No.:KESO/OPS/EC/KOCHI/WODated 14.11.17
Title:EC Application-Form 1 & PFR
Document No.:
RP002Rev.:
R3This document is the property of Hubert Enviro Care Systems (P) Ltd.and mustnot be passed on to any person or body not authorised by us to receive it nor becopied or otherwise made use of either in full or in part by such person or bodywithout our prior permission in writing.
File path:
Notes:
1. Documents – Form 1 , PFR & ANNUXERE
a) 27/1/18 EC application submitted in MoEF&CC under category ’B’, 6(b), isolated storage & handlingof hazardous chemicals with specific condition apply
b) MoEF&CC EDS on 2 8/02/18 directed to be appraised by SEAC/SEIAA.
Revision Details:
Rev. Date DetailsPrepared Checked Approved
Init. Sign. Init. Sign. Init. Sign.
R3 19/04/2018 R3 – 3rd ReviewDhanya
Tamil SelvanDr.Moses
R2 06/04/2018 R2 – 3rd ReviewDhanya
Tamil SelvanDr.Moses
R2 02/04/2018 R2 – 2nd ReviewDhanya
Tamil SelvanDr.Moses
R2 14/03/2018 R2 - 1st ReviewDhanya/Varadharajan/Tamilselvan
Mr.Vamsee
R1 27/01/2018 1st submissionVaradharajan/Dhanya
Mr.Vamsee
Dr.Moses
R0 11/01/2018 2nd review
Thomas/Varadharajan/Tamilselvan/Ramaa
Mr.Vamsee
R0 01/01/2018 1st reviewThomas/Varadharajan/Tamilselvan
3
FORM 1
(I) Basic Information:
S.No. Item Details
1 Name of the project/s: Proposed Facility Augmentation Project – Constructionof New Tanks & Reallocation of Tanks at KochiMarketing Terminal, Irumpanam by Indian OilCorporation Limited, Thiruvankulam Village,Kanayannur Taluk, Ernakulam District- 682 036,Kerala.
2 S. No. in the schedule 6 (b)Isolated storage & handling of hazardous chemicals (Asper threshold planning quantity indicated in column 3of schedule 2 & 3 of MSIHC Rules 1989 amended2000)
3. Proposedcapacity/area/length/tonnage to behandled/ command area/leasearea/number of Wells to be drilled.
A) Proposed Re-allocation:
Existing Tanks Reallocated to
Tank No. Name of
Product
Capacity (KL) Product
T1 HSD 6300 ATF
T2 HSD 6300 ATF
T3 HSD 6300 ATF
T6 HSD 2900 ATF
T9 Motor Spirit 3000 Ethanol
T10 Motor Spirit 3000 Ethanol
T11 LAN 7389 Motor Spirit
Total 35189
B) Proposed New Tankages:
Tank No. Name of Product Class* Licensed
Capacity (KL)
T18 Motor Spirit A 11415
T19 Motor Spirit A 11415
T20 Motor Spirit A 11415
T21 Motor Spirit A 11415
T22 HSD B 15000
T23 HSD B 15000
T24 HSD B 15000
T25 HSD B 15000
T26 Biodiesel B 2040
T27 Biodiesel B 2040
T28 PCK B 2900
Total 112640
4
S.No. Item Details
C) Details of Products, Tanks & Quantity:
S.NoTank
No.
Name of
ProductsClass*
Existing Re-allocation ProposedAfter
Expansion
Licensed
Capacity
(KL)
Proposed
Re-
allocation to
Capacity
(KL)
Proposed
Capacity (KL)Capacity (KL)
1 T1 HSD B 6300 ATF 6300 - 6300
2 T2 HSD B 6300 ATF 6300 - 6300
3 T3 HSD B 6300 ATF 6300 - 6300
4 T4 HSD B 6300 No change - - 6300
5 T5 HSD B 6300 No change - - 6300
6 T6 HSD B 2900 ATF 2900 - 2900
7 T7 SKO B 2900 No change - - 2900
8 T8 SKO B 2900 No change - - 2900
9 T9 Motor Spirit A 3000 Ethanol 3000 - 3000
10 T10 Motor Spirit A 3000 Ethanol 3000 - 3000
11 T11 Naphtha(LAN)
A 7389 - - 7389
12 T12 Motor Spirit A 7389 - - 7389
13 T13 Motor Spirit A 7389 - - 7389
14 T14 Motor Spirit A 7389 - - 7389
15 T15 Ethanol A 70 - - 70
16 T16 Ethanol A 200 - - 200
17 T17 Ethanol A 200 - - 200
18 T18 Motor Spirit A - - 11415 11415
19 T19 Motor Spirit A - - 11415 11415
20 T20 Motor Spirit A - - 11415 11415
21 T21 Motor Spirit A - - 11415 11415
22 T22 HSD B - - 15000 15000
23 T23 HSD B - - 15000 15000
24 T24 HSD B - - 15000 15000
25 T25 HSD B - - 15000 15000
26 T26 Biodiesel B - - 2040 2040
27 T27 Biodiesel B - - 2040 2040
28 T28 PCK B - - 2900 2900
Total 76226 35189 112640 188866
D) Summary of the Products, Tanks & Quantity:
S.No Existing Re-allocation Proposed After Expansion
1No of
Products5
1 no newly proposed
2 nos retained from
existing
3 8
5
S.No. Item Details
2No of
Tanks17
7 nos Tanks are re-
allocation11 28
3
Product
Capacity
(KL)
76226 35189 112640
((76226 – 35189) +
35189 + 112640) =
188866
Note:*Petroleum Products Classification References:
1. Petroleum and Explosives Safety Organisation (PESO), Govt. of India( http://www.peso.gov.in/Work_Mannual/wmchap10wo.pdf )
2. The Petroleum and Natural Gas Regulatory Board Regulations (2006), Petroleum Rules (1976), Govt. ofIndia.
Proposed Project Tankages Area: 13.70 Acres (within total area of 78.65 Acres). Refer Site
Layout in Annexure 1.
4. New/Expansion/Modernization Expansion & Re-Allocation of Tank Products
5. Existing Capacity, Area etc. Existing Tankages:Tank No. Name of
ProductClass Licensed
ExistingCapacity(KL)
Proposed Re-Allocation to
T1 HSD B 6300 ATFT2 HSD B 6300 ATFT3 HSD B 6300 ATFT4 HSD B 6300 No changeT5 HSD B 6300 No changeT6 HSD B 2900 ATFT7 SKO B 2900 No changeT8 SKO B 2900 No changeT9 Motor Spirit A 3000 EthanolT10 Motor Spirit A 3000 EthanolT11 Naphtha A 7389 Motor SpiritT12 Motor Spirit A 7389 No changeT13 Motor Spirit A 7389 No changeT14 Motor Spirit A 7389 No changeT15 Ethanol A 70 No changeT16 Ethanol A 200 No changeT17 Ethanol A 200 No change
Total 76226
Existing Total Project Area: 78.65 AcresExisting Tankages Area: 23.7 AcresProposed Tankages Area: 13.70 Acres (within total areaof 78.65 Acres)Refer Site Layout in Annexure 1.
6. Category of Project i.e.' A' or 'B' Category B
1. As per EIA Notification, 2006 and itssubsequent amendments the proposed project iscoming under General Condition since the site
6
S.No. Item Details
is in Greater Cochin, a critically polluted areadeclared by CPCB, CEPI of Greater Cochin atCPCB website is 57.94 (2013).
2. We have submitted our application inMoEF&CC vide file no. IA-J-11011/42/2018-IA-II(I) & dated 27/01/2018 under category A,6(b).
3. MoEF&CC EDS dated 28/02/2018 directedus to appraise in SEAC/SEIAA.
4. As on date, The Kerala SEAC/SEIAA isunavailable since the term has completed on19.03.2018 as per MoEF Notification S.O 804(E) dated 19.03.2015
7. Does it attract the general condition?If yes,Please specify.
Yes.The project site is in Greater Cochin, a criticallypolluted area declared by CPCB. CEPI of GreaterCochin at CPCB website is 57.94 (2013).
8. Does it attract the specificcondition? If yes, Please specify.
No
9. Location Indian Oil Corporation Limited, Irumpanam,Thiruvankulam Village, Thrippunithura Municipality,Kochi, Kerala
Plot/Survey/Khasra No. Block No: 10, S. Nos. 30/11 12; 31/3, 4, 6, 8, 10, 11, 12, 13,14, 15, 16, 17, 18, 20, 22, 25, 26, 27, 31, 33, 34, 35, 36, 37,38, 39, 40, 41, 42, 43, 44, 45, 46, 48, 49, 50, 51, 52, 53, 54,55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 71, 72;39/3; 48/3, 4, 5, 6, 7; 49/1, 2, 4; 50/1, 2, 3, 4, 5, 6, 7, 8, 9;51/1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 15, 16, 17, 18, 19,20, 21, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33; 52/1, 2, 3,4, 5, 6, 7, 8, 9, 11, 12, 13, 14; 69/2, 3
Village ThiruvankulamTehsil KanayannurDistrict ErnakulamState Kerala
10. Nearest railway station/airport alongwith Distance in kms.
Thrippunithura Railway Station – 3.0 km in SSWErnakulam Junction (South Railway Station) – 6.9 kmin WSWCochin International Airport – 18.3 km in NNE
11. Nearest Town, city, DistrictHeadquartersalong with distance in kms.
Thrippunithura - 3.9 km towards SSW
7
S.No. Item Details
12. Village Panchayats, Zilla Parishad,Municipal Corporation, Local body(complete postal Address withtelephone nos. to be given)
Village: ThiruvankulamTaluk: KanayannurMunicipality: ThrippunithuraIndian Oil Corporation Limited,Kochi Terminal, Sea Port Air Port RoadIrumpanam, Kochi - 682309Ernakulam DistrictKeralaTel: 0484 278 2309
13. Name of the applicant INDIAN OIL CORPORATION LIMITED
14. Registered Address G-9, Ali Yavar Jung Marg, Bandra (East), Mumbai –400 051, India
15. Address for correspondence: INDIAN OIL CORPORATION LIMITED
Panampilly Avenue,
Panampilly Nagar P.O.
Kochi – 682 036,
Ernakulam District, Kerala
Tel: 0484 2319545Name Mr O K Sethumadhavan
Designation (Owner/Partner/CEO) Deputy General Manager (Terminal)
Address INDIAN OIL CORPORATION LIMITED
Irumpanam Terminal,
Irumpanam
Kochi – 682 309
Ernakulam District, Kerala
Pin Code 682 309
E-mail [email protected]
Telephone No. 04842774918
Fax No. 04842775307
16. Details of Alternative Sitesexamined, if any. Location of thesesites should be shown on a toposheet.
Nil.(The proposed project will be located within theexisting premises. Topo Map of the study area isenclosed as Annexure 4).
17. Interlinked Projects Not Applicable
18. Whether separate application ofinterlinkedProject has been submitted?
No
19. If yes, date of submission NA
20. If no, reason NA
8
S.No. Item Details
21. Whether the proposal involvesapproval / clearance under: if yes,Details of the same and their statusto be given.(a) The Forest (Conservation) Act,
1980?(b) The Wildlife (Protection) Act,
1972(c) The C.R.Z. Notification, 1991?
a. No
b. No
c. No
22. Whether there is any GovernmentOrder/ Policy relevant/ relating tothe site?
The Irumpanam Terminal has been declared as“Prohibited Area”under vide Gazette Notification No.G.O. (MS) No.79/99/Home dated 21.5.1999, Govt. ofKerala (Refer Annexure 5)
23. Forest land involved (hectares) No Forest Land involved
24. Whether there is any litigationpending against the project and /orland in which the project is proposedto be set up?(a) Name of the Court(b) Case No.(c) Orders/directions of the Court,
if any and its relevance withthe proposed project.
No Litigation pending against the project
Capacity corresponding to sectoral activity (such as production capacity formanufacturing, mining lease area and production capacity for mineral production,area for mineral exploration, length for linear transport infrastructure, generationcapacity for power generation etc.,)
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which will causephysical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No.Information/Checklistconfirmation Yes/No
Details thereof (with approximate quantities /rates,wherever possible) with source of information data
1.1 Permanent ortemporary change inland use, land cover ortopography includingincrease in intensityof land use (withrespect to local landuse plan)
Yes Expansion & Re-Allocation of IOCL Kochi MarketingTerminal Storage Facility is planned in the open area of theexisting project premises at Irumpanam.
9
1.2 Clearance of existingland, vegetation andbuildings?
Yes Clearance of shrubs and trees in the proposed area will bedone and the present greenbelt of about 24 trees will beremoved. This will be compensated within the premises.
1.3 Creation of new landuses?
No Existing land is already well developed for petroleumimport/storage/export facilities.
1.4 Pre-constructioninvestigations e.g. borehouses, soil testing?
No Geo-technical studies will be carried out before starting ofthe construction works.
1.5 Construction works? Yes Construction of New Tanks (built up area: 13.7 acres)1.6 Demolition works? No Nil1.7 Temporary sites used
for construction worksor housing ofconstruction workers?
No No temporary sites used for housing of construction workersinside the project facility.
1.8 Above groundbuildings, structures orearthworks includinglinear structures, cutand fill or excavations
Yes Proposed construction of 11 numbers of above groundstorage tanks with their dyke areas.
1.9 Underground worksincluding mining ortunneling?
No Not Applicable
1.10 Reclamation works? No Nil1.11 Dredging? No Not Applicable1.12 Offshore structures? No Not Applicable1.13 Production and
manufacturingprocesses?
No No Manufacturing activities (Only Receipt, Storage, TruckFilling-Distribution /Marketing facilities are proposed)
1.14 Facilities for storage ofgoods or materials?
Yes Temporary sheds for storage of construction materials.
1.15 Facilities for treatmentor disposal of solidwaste or liquideffluents?
Yes Solid WasteConstruction Phase:
Type Quantity(kg/day)
CollectionMethod Disposal method
Organic 7.5Manual throughBins
Biogas plant at site
Inorganic 17.5Manual throughBins
Authorized SPCBrecyclers
Total 25.0
Note:1. Manpower- 50 Nos2.Organic waste quantity includes canteen wastes3.Biogas plant capacity: 6 m3 of methane per day4.As per CPHEEO Norms: MSW per capita/day =0.5
Operations Phase:
10
TypeExistingQuantity(kg/day)
ProposedQuantity(kg/day)
TotalQuantity(kg/day)
CollectionMethod
Disposalmethod
Organic 77.1 39.15 116.258ManualthroughBins
Biogasplant at site
Inorganic 179.9 91.35 271.25ManualthroughBins
AuthorizedSPCBrecyclers
Total 257.0 130.5 387.5
Note:1. Manpower- 125 Nos + 650 truck crew2. Organic waste quantity includes canteen wastes3. Biogas plant capacity: 6 m3 of methane per day4. As per CPHEEO Norms: MSW per capita/day =0.5
Hazardous wasteWaste
CategoryHazardous
wasteGenerated
Quantity Method ofhandling
Existing Proposed Total
5.1
UsedOil/Spentoil
0.5 KLA 0.8KLA 1.3KLACollection,storage &disposal toauthorizedrecyclers3.3
Tankbottomsludge
804 kg/A 827 kg/A1635kg/A
Effluents:
Total water Requirement 351 KLD Existing sewage generated 31 KLD and disposed into
septic tank/soak pit. New STP will be installed at siteduring expansion @ 50 KLD.
Effluent generated from cleaning of total 28 tanksonce in 5 years - 56 KL. Effluent is transferred to oilwater separator (OWS) for oil separation, andretrieved oil is pumped back to tank. The recycledwater is used for greenbelt maintenance.
Now new ETP @ 5 KL/hr is proposed and treatedwater will be used for fire fighting purpose.
1.16 Facilities for long termhousing of operationalworkers?
No Not Applicable
1.17 New road, rail or seatraffic duringconstruction oroperation?
No Not ApplicableThe project site is well connected to Seaport – Airport Roadbordering the site in the west & NH 47 Kanyakumari toSalem at a distance of 4 km towards the west and site is ofeasy access to railway stations.
1.18 New road, rail, airwaterborne or othertransport infrastructureincluding new oraltered routes andstations, ports, airports
No Not ApplicableThe project site is well connected to Seaport – Airport Road& NH 47. Site is also connected to cities Thripunithura,Ernakulam, Aluva and Kakkanad through Irumpanam –Eroor Road and is of easy access to railway stations.
11
etc?1.19 Closure or diversion of
existing transportroutes or infrastructureleading to changes intraffic movements?
No Not applicable
1.20 New or divertedtransmission lines orpipelines?
No Not applicable
1.21 Impoundment,damming, culverting,realignment or otherchanges to thehydrology ofwatercourses oraquifers?
No Not applicable
1.22 Stream crossings? No Nil1.23 Abstraction or transfers
of water from groundor surface waters?
No Water is purchased through approved road tankers.
1.24 Changes in waterbodies or the landsurface affectingdrainage or run-off?
No Not applicable
1.25 Transport of personnelor materials forconstruction, operationor decommissioning?
Yes Public Transport and hired vehicles will be used formovement of personnel/material.
1.26 Long-term dismantlingor decommissioning orrestoration works?
No Nil
1.27 Ongoing activityduringdecommissioningwhich could have animpact on theenvironment?
No Nil
1.28 Influx of people to anarea in eithertemporarily orpermanently?
Yes During the construction phase skilled manpower will besourced from surrounding area.Construction manpower is 50 people.
Permanent Contractual TotalExisting 50 64 114Proposed 5 6 11
Total 55 70 125
Note:650 including (existing 550 and proposed 100) truck crew
12
will use toilet facilities.1.29 Introduction of alien
species?No Not envisaged
1.30 Loss of native speciesor genetic diversity?
No Not envisaged
1.31 Any other actions? No Nil
2. Use of Natural resources for construction or operation of the Project (such as land, water,materials or energy, especially any resources which are non-renewable or in short supply):
S.No. Information/checklistconfirmation
Yes/NoDetails thereof (with approximate quantities /rates,wherever possible) with source of information data
2.1 Land especiallyundeveloped oragricultural land (ha)
No Not Applicable, as the vacant land available inside theexisting premises will be used for the proposed Expansion &Re-Allocation Project.
2.2 Water (expected source& competing users)unit: KLD
Yes Water requirement is 351 KLD which is needed for operationof the storage terminal (domestic and greenbelt maintenancepurpose). Source: Water is purchased through approved roadtankers.
2.3 Minerals (MT) No Nil
2.4 Construction material –stone, aggregates, sand/ soil (expected source– MT)
Yes Locally available materials like stones, sand and aggregatewill be used for tank dykes and pavements construction.
2.5 Forests and timber(source – MT)
No Nil
2.6 Energy includingelectricity and fuels(source, competingusers) Unit: fuel (MT),energy (MW)
YesDetails Capacity (KVA) Source
Existing Proposed TotalPowerRequirement
300 0 300 KSEB
Power Back Up
1 x 3801 x 500
2 x 700
2 x 7001 x 380(S.B.)
1 x 500(S.B.)
DG Sets
DieselRequirements
Approx.1500
lit/Month
Approx.1500
lit/Month
3000lit/month
IOCLRetailOutletnearby
2.7 Any other naturalresources (useappropriate standardunits)
No Not Applicable
13
3. Use, storage, transport, handling or production of substances or materials, which could beharmful to human health or the environment or raise concerns about actual or perceivedrisks to human health.
4. Production of solid wastes during construction or operation or Decommissioning(MT/month)
S. No. Information/Checklistconfirmation
Yes/No Details thereof (with approximate quantities /rates,wherever possible) with source of information data
4.1 Spoil, overburden ormine wastes
No Not applicable
4.2 Municipal waste(domestic and orcommercial wastes)
Yes Solid WasteConstruction:
TypeQuantity(kg/day)
Collection MethodDisposal method
Organic 7.5Manual throughBins
Biogas plant at site
Inorganic 17.5Manual throughBins
Authorized SPCBrecyclers
Total 25.0
S.No. Information/Checklist confirmationYes/No
Details thereof (with approximatequantities /rates, wherever possible)with source of information data
3.1 Use of substances or materials, which arehazardous (as per MSIHC rules) tohuman health or the environment (flora,fauna, and water supplies)
Yes Receipt, storage and truck-filling of MotorSpirit, High-Speed Diesel and Kerosenewill be done in a closed circuit withoutcausing any adverse effect to humans andenvironment
3.2 Changes in occurrence of disease oraffect disease vectors (e.g. insect orwater borne diseases)
No Not applicable
3.3 Affect the welfare of people e.g. bychanging living conditions?
No The storage terminal is already in place atIrumpanam.Local people will get employment withthe proposed project activities.
3.4 Vulnerable groups of people who couldbe affected by the project e.g. hospitalpatients, children, the elderly etc.,
No The storage terminal is already in placewhere the proposed expansion will alsotake place. The closest hospitals areLakshmi Hospital 3.13 km in the SSW,Welcare Hospital 4.4 km in WSW andGovernment Hospital Thripunithura 4.0km in SSW.
3.5 Any other causes No Nil
14
Note:1. Manpower- 50 No2. Organic waste quantity includes canteen wastes3. Biogas plant capacity: 6 m3 of methane per day4. As per CPHEEO Norms: MSW per capita/day =0.5
Operations:
TypeExistingQuantity(kg/day)
ProposedQuantity(kg/day)
TotalQuantity(kg/day)
CollectionMethod
Disposalmethod
Organic 77.1 39.15 116.258ManualthroughBins
Biogasplant at site
Inorganic 179.9 91.35 271.25ManualthroughBins
AuthorizedSPCBrecyclers
Total 257.0 130.5 387.5
Note:1. Manpower- 125 Nos + 650 truck crew2. Organic waste quantity includes canteen wastes3. Biogas plant capacity: 6 m3 of methane per day4. As per CPHEEO Norms: MSW per capita/day =0.5
4.3 Hazardous wastes (asper Hazardous WasteManagement Rules)
Yes Hazardous wasteWaste
CategoryHazardous
wasteGenerated
Quantity Method ofhandling
Existing Proposed Total
5.1
UsedOil/Spentoil
0.5 KLA 0.8 KLA 1.3 KLA
Collection,storage &disposal toauthorizedrecyclers
3.3Tankbottomsludge
804 kg/A 827 kg/A 1635 kg/A
Collection,storage &disposal toauthorizedrecyclers
Effluent generated from cleaning of total 28 tanksonce in 5 years - 56 KL. Effluent is transferred to oilwater separator (OWS) for oil separation, andretrieved oil is pumped back to tank. Recycled wateris used for greenbelt maintenance.
4.4 Other industrialprocess wastes
NoNot applicable
4.5 Surplus product No Not applicable
4.6 Sewage sludge or othersludge from effluenttreatment
Yes Domestic wastewater disposed into septic tank/soakpit and existing sewage generated 31 KLD anddisposed into septic tank/soak pit. New STP will beinstalled at site during expansion @ 50 KLD.
Sewage sludge generated – 1.66 kg per day
Sewage sludge transported to Brahmapuram solidwaste treatment plant through housekeeping
15
contractor. Now new ETP @ 5 KL/hr is proposed and treated
water will be used for firefighting purpose.4.7 Construction or
demolition wastesNo
Not applicable
4.8 Redundant machineryor equipment
NoNot applicable
4.9 Contaminated soils orother materials
NoNot applicable
4.10 Agricultural wastes No Not applicable
4.11 Other solid wastes No Not applicable
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S. No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities /rates, wherever possible) withsource of information data
5.1 Emissions from combustion of fossilfuels from stationary or mobilesources
Yes Existing BIS approved stand by DG set willbe used with acoustic enclosure as per SPCBnorms
5.2 Emissions from production processes NoNo production, only receipt, storage &transfer of product.
Details Capacity (KVA) APCExistingProposed Total
DG Sets(PowerBackUp)
1 x 3801 x 500
2 x 700
2 x 7001 x 380(S.B.)
1 x 500(S.B.)
SPCBnorms Stackheight 30 m
AGL
5.3 Emissions from materials handlingincluding storage or transport
No Receipt, storage and truck-filling of MotorSpirit, High-Speed Diesel and Kerosene willbe done in a closed system involvingnegligible emissions of noxious substances.
5.4 Emissions from constructionactivities including plant andequipment
Yes There may be small amounts of suspendeddust particles in air during constructionphase which will be controlled by dustsuppression measures like sprinkling ofwater. Gases generated from welding ofsteel structures and construction equipmentwill be negligible and the same will pose norisk to environment.
5.5 Dust or odours from handling ofmaterials including constructionmaterials, sewage and waste
No There may be small amounts of suspendeddust particles in air during constructionphase which will be controlled by dustsuppression measures like sprinkling ofwater.
16
S. No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities /rates, wherever possible) withsource of information data
5.6 Emissions from incineration of waste No Not applicable5.7 Emissions from burning of waste in
open air (e.g. slash materials,construction debris)
NoNot applicable
5.8 Emissions from any other sources Yes Sufficient stack height will be provided asper norms directed by SPCB for DG set forbetter dispersion of pollutants.
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities /rates, wherever possible) withsource of information data with source ofinformation data
6.1 From operation of equipment e.g.engines, ventilation plant, crushers
No Operation involves receipt, storage &transfer of product producing negligiblenoise or vibration. DG sets will beenclosed by acoustic enclosures.
6.2 From industrial or similar processes No No Industrial process is involved.6.3 From construction or demolition Yes During mechanized construction phase,
some noise may be generated. During arcwelding process for construction of tanks,some light may be emitted and the sameshall be properly shielded duringconstruction.
6.4 From blasting or piling No Not applicable
6.5 From construction or operationaltraffic
Yes Increase in noise due to movement oftrucks only during construction period
6.6 From lighting or cooling systems No There is no industrial cooling processinvolved
6.7 From any other sources No Nil
7. Risks of contamination of land or water from releases of pollutants into the ground or intosewers, surface waters, groundwater, coastal waters or the sea:
S.No. Information/Checklist confirmation Yes/No Details thereof (with approximatequantities /rates, wherever possible) withsource of information data
7.1 From handling, storage, use orspillage of hazardous materials
Yes
Receipt, storage and truck-filling of MotorSpirit, High-Speed Diesel and Keroseneare being done in a closed system. Tankand pipelines leakage monitoring system is
17
available for identifying accidentalleakage. However in case of accidentalleakage,(a) containment for spillage(b) oil water separators are provided to
minimize hazards.7.2 From discharge of sewage or other
effluents to water or the land(expected mode and place ofdischarge)
Yes
Sewage generated 31 KLD anddisposed into septic tank/soak pit. STPwill be installed at site duringexpansion.
Effluent generated from cleaning oftotal 28 tanks once in 5 years - 56 KL.Effluent is transferred to oil waterseparator (OWS) for oil separation andretrieved oil is pumped back to tank.The recycled water is used for greenbeltmaintenance.
7.3 By deposition of pollutants emitted toair into the land or into water
No Nil
7.4 From any other sources No Nil
7.5 Is there a risk of long term build up ofpollutants in the environment fromthese sources?
No Nil
8. Risk of accidents during construction or operation of the Project, which could affect humanhealth or the environment
S.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities /rates, wherever possible) withsource of information data
8.1 From explosions, spillages, fires etcfrom storage, handling, use orproduction of hazardous substances No
Facilities will conform to the standards laidby Oil Industry SafetyDirectorate/API/PESO Rules regardingsafety of petroleum products storage facilityagainst fire, spillage etc.
8.2 From any other causes No Nil8.3 Could the project be affected by
natural disasters causingenvironmental damage (e.g. floods,earthquakes, landslides, cloudburstetc)?
NoThe project site falls under seismic zone-III(Moderate) according to the Indian StandardSeismic Zoning Map. Further it is a mildflood prone area. Hence, no risk due tonatural hazards is envisaged. Suitableseismic coefficients in horizontal andvertical directions are adopted whileconstruction of the facility.
18
9. Factors which should be considered (such as consequential development) which could lead toenvironmental effects or the potential for cumulative impacts with other existing or plannedactivities in the locality
S. No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities /rates, wherever possible) withsource of information data
9.1 Lead to development of supporting.Utilities, ancillary development ordevelopment stimulated by theproject which could have impact onthe environment e.g.:• Supporting infrastructure (roads,
power supply, waste orwastewater treatment, etc.)
• housing development• extractive industries• supply industries• other
No Industrial activity and transport shallpromote local entrepreneurs to engage intransport and other service industry likegarage, cafeteria, etc.
The unit shall promote education,healthcare, self employment program, etc.through its local community developmentactivities through CSR.
9.2 Lead to after-use of the site, whichcould have an impact on theenvironment
No Nil
9.3 Set a precedent for laterdevelopments No
Not applicable
9.4 Have cumulative effects due toproximity to other existing orplanned projects with similareffects
NoNil
(III) Environmental Sensitivity
S.No. Areas Name/Identity
Aerial distance (within 15 km.) Proposedproject location boundary
1 Areas protected underinternational conventions,national or local legislation fortheir ecological, landscape,cultural or other related value
Yes
Mangalavanam Bird Sanctuary, is a notifiedprotected and ecologically sensitive area (ESA)≃8.77 km in W
19
S.No. Areas Name/Identity
Aerial distance (within 15 km.) Proposedproject location boundary
2 Areas which are important orsensitive for ecological reasons- Wetlands, watercourses orother water bodies, coastalzone, biospheres, mountains,forests
Yes
S. No Name ≃ Distance(km)
Direction
1 Chithrapuzha River 0.50 NNE
2 Kadambrayar River 0.95 SW
3 Vembanad Lake 36.0 S
4 Peri ar River 14.5 N
5 Mangalavanam BirdSanctuary ESA
8.77 W
6 Cochin BackwaterMouth
12.0 W
7 Wellington Island 8.40 WSW
8 Kumarakom BirdSanctuary
38.88 SSE
9 Muvattupuzha River 25.40 E
10 Kodanad ResearchRange Forest
28.55 NE
3 Areas used by protected,important or sensitive speciesof flora or fauna for breeding,nesting, foraging, resting, overwintering, migration
Yes
Mangalavanam Bird Sanctuary, a notifiedprotected and ecologically sensitive area (ESA),which is used by migratory birds ≃8.77 km inW
4 Inland, coastal, marine orunderground waters Yes
Creek of Chithrapuzha River ≃0.10 km in ECochin Backwater Mouth ≃12.0 in WPeriyar River ≃14.5 km in N
5 State, National boundaries No Nil6 Routes or facilities used by the
public for access to recreationor other tourist, pilgrim areas
No Nil
7 Defense installationsYes
Cochin Naval Base and Airport in WellingtonIsland is ≃9.75 km in WSW
8 Densely populated or built-uparea Yes
Ernakulam Town ≃5.8 km towards WFort Kochi ≃12.25 km in WSWAluva ≃13.75 km in N
20
S.No. Areas Name/Identity
Aerial distance (within 15 km.) Proposedproject location boundary
9 Areas occupied by sensitiveman-made land uses (hospitals,schools, places of worship,community facilities)
Yes
Schools & Colleges
Name≃Dist(km)
Direction
The Choice School 2.15 SSWRajagiri School of ngineering &Technology
0.82 NE
Cochin Refineries School 4.8 EDawn International School 4.7 ENalanda Public School 4.2 W
Religious PlacesThamarakulangara Sree Dharmasastha
emple3.7 SW
St. George Church Edappally 2.2 WSWSt. Michaels Church 4.5 NWShree Kuladevatha Mandir 3.7 EHayathul Islam Mosque 3.8 NWIlfathul Islam Juma Masjid 3.6 NE
HospitalsErnakulam Medical Centre 4.5 NWWelcare Hospital 4.4 WSWGovernment Hospital Thripunithura 4.0 SSWPunarnava Bamboo Lagoon AyurvedaVillage
3.2 SW
Amrita Ayurveda Medical Centre 3.5 SSW
10 Areas containing important,high quality or scarceresources (groundwaterresources, surface resources,forestry, agriculture, fisheries,tourism, minerals)
No Nil
11 Areas already subjected topollution or environmentaldamage. (those where existinglegal environmental standardsare exceeded) Yes
Periyar River downstream is mostly polluted byindustrial effluents as per CPCB Reports andsurveys conducted by institutions.Greater Cochin has been declared as CriticallyPolluted Area by CPCB. CEPI of GreaterCochin at CPCB website is 57.94 (2013). CEPIof Greater Cochin is 75.08 (ComprehensiveEnvironmental Assessment of IndustrialClusters, Dec 2009).
12 Areas susceptible to naturalhazard which could cause theproject to present environmentalproblems (earthquakes,subsidence, landslides, erosion,flooding or extreme or adverseclimatic conditions)
NoNil as there are no such incidences from last 50years
21
(IV) Proposed Terms of Reference for EIA studies
1 A recent satellite imagery of the project area and its surroundings
S. No Proposed Terms of Reference
2 Topo-plan and layout drawing of the project site.
project3 Location of National Park/Wild life Sanctuary/ Reserve Forest within 10 km radius of the
radius.4 Present land use and cropping pattern based on satellite imagery for the study area of 10 km
6 Process Description along with Process & Flow Diagram5 Rain Water Harvesting details
and effluent disposal with water balance7 Details of water consumption and source of water supply, wastewater generation, treatment
9 Power requirement & power back up8 Water Conservation measures proposed
reuse, treatment and disposal10 Detailed solid & hazardous waste generation, collection, segregation, its recycling and
11 Fire fighting facilities
environmental pollution control measures12 Total cost of the project along with total capital cost and recurring cost/annum for
speed and direction and rainfall for one season at one location13 Site-specific micro-meteorological data for temperature, relative humidity, hourly wind
sensitive receptorsMonsoon) taking into account the predominant wind direction, population zone andBenzene (C6H6), and Polycyclic Aromatic Compounds (PAHs) for one season (NonPM2.5, SO2, NOX, CO, Ammonia (NH3), Respirable Lead, Hydrogen Sulphide (H2S),
14 Ambient air quality monitoring at 8 locations within 10 Km radius of study area for PM10,
proposed project.15 Assessment of ground level concentration of pollutants. Air quality modelling for the
16 Determination of atmospheric inversion level
radius of study area for one season (Non Monsoon)17 Water quality monitoring including surface & groundwater at 8 locations within 10 km
18 Soil sample analysis at 8 locations within the study area for one season (Non Monsoon).
19 Noise Monitoring within 8 locations in the study area for one season (Non Monsoon)
21 Ecological features (terrestrial & aquatic) of the study area for one season (Non Monsoon)
20 Demography & socio-economics of the study area
22 Assessment of impact on air, water, soil, solid /hazardous waste and noise levels
within permissible limits.23 Air pollution control measures proposed for the effective control of gaseous emissions
22
S. No Proposed Terms of Reference
24 Risk Assessment including Hazard Identification, Consequence Analysis, Risk Assessmentand preparation of Disaster Management Plan
25 Details of proposed Occupational Health Surveillance program for the employees and otherlaborers
26 Detailed Environment Management Plan (EMP) with specific reference to EnergyConservation and natural resource conservation, details of pollution control system, water& wastewater management, monitoring frequency, responsibility and time boundimplementation plan for mitigation measures will be provided.
23
V. Declaration
I hereby give undertaking that the data and information given in the application and enclosure are trueto the best of my knowledge and belief and I am aware that if any part of the data and informationsubmitted is found to be false or misleading at any stage, the project will be rejected and clearancegiven, if any to the project will be revoked at our risk and cost.
Date: 19.04.2018Place: Kochi
Signature of the ApplicantM/s. Indian Oil Corporation Limited
(Kochi Terminal)Mr O K Sethumadhavan
(Deputy General Manager (T), Kochi Terminal)Sea Port Air Port Road
Irumpanam,Kochi – 682309
Ernakulam District,Kerala State
NOTE:1. The projects involving clearance under coastal Regulation zone Notification, 1991 shall submit
with the application a C.R.Z. map duly demarcated by one of the authorized agencies, showingthe project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendations of the Statecoastal zone Management Authority (at the stage of EC). Simultaneous action shall also be takento obtain the requisite clearance under the provisions of the C.R.Z. Notification, 1991 for theactivities to be located in the CRZ.
2. The projects to be located within 10 km of the National parks, sanctuaries, Biosphere Reserves,Migratory corridors of wild Animals, the project proponent shall submit the map dulyauthenticated showing by chief wildlife warden showing these features vis-a-vis the projectlocation and the Recommendation or comments of the Chief Wildlife Warden 'thereon (at thestage of EC)."
3. All correspondence with the Ministry of Environment & Forests including submission ofapplication for TOR/Environment Clearances, subsequent Clarifications, as may be required fromtime to time, participation in the EAC Meeting on behalf of the project proponent shall be madeby the authorized signatory only. The authorized signatory should also submit a document insupport of his claim of being an authorized signatory for the specific project.
1
APPLICATION FOR ENVIRONMENTAL CLEARANCE
PRE-FEASIBILITY REPORT
FOR
Proposed Facility Augmentation Project –Construction of New Tanks & Reallocation of
Tanks at Kochi Marketing Terminal,Irumpanam
at
VILLAGE: Thiruvankulam
TEHSIL: Kanayannur
DISTRICT: Ernakulam
STATE: Kerala
By
M/s. INDIAN OIL CORPORATION LIMITED
(IMPORT, STORAGE & MARKETING TERMINAL – KOCHI)
Prepared by:
(NABET Accredited vide Certificate No. NABET/EIA/1619/RA0083 &MoEF Recognized Lab vide F. No. Q-15018/13/2016-CPW)HUBERT ENVIRO CARE SYSTEMS (P) LTD, CHENNAI
APRIL, 2018
2
TABLE OF CONTENTS1. EXECUTIVE SUMMARY................................................................................................................... 6
2. INTRODUCTION OF THE PROJECT..............................................................................................15
2.1 Identification of the Project and Project Proponent ..................................................................... 15
2.2 Brief Description and Nature of the Project................................................................................. 15
2.3 Need for the Project and its importance....................................................................................... 16
2.4 Demand - Supply Gap.................................................................................................................. 16
2.5 Imports Vs. Indigenous Production ............................................................................................. 16
2.6 Employment Generation due to the project ................................................................................. 17
2.7 Project Benefits............................................................................................................................ 17
3. PROJECT DESCRIPTION.................................................................................................................18
3.1 Type of the Project....................................................................................................................... 18
3.2 Project Location ........................................................................................................................... 18
3.3 Details of Alternate sites considered............................................................................................ 24
3.4 Magnitude of Operation............................................................................................................... 25
3.5 Process Description...................................................................................................................... 26
3.6 Raw Materials Requirement......................................................................................................... 27
3.7 Resource optimization ................................................................................................................. 28
3.7.1 Water Requirement ....................................................................................................................28
3.7.2 Power Requirement....................................................................................................................28
3.7.3 Air Pollution Control System and Management ........................................................................29
3.8 Waste Management and Disposal Method................................................................................... 29
3.8.1 Liquid Waste Management ........................................................................................................29
3.8.2 Hazardous and Solid Waste Management..................................................................................29
4. SITE ANALYSIS ...............................................................................................................................32
4.1 Connectivity ................................................................................................................................. 32
4.2 Land form, Land use and Land ownership................................................................................... 36
4.3 Land Topography......................................................................................................................... 37
4.4 Land use pattern ........................................................................................................................... 38
4.5 Soil classification ......................................................................................................................... 39
4.6 Climate data from secondary sources........................................................................................... 40
4.7 Social Infrastructure available...................................................................................................... 41
4.8 Existing infrastructure.................................................................................................................. 42
5. PLANNING BRIEF ............................................................................................................................46
3
5.1 Planning concept .......................................................................................................................... 46
5.2 Population Projection ................................................................................................................... 46
5.3 Land use planning ........................................................................................................................ 46
5.4 Assessment of Infrastructure Demand ......................................................................................... 47
5.5 Amenities/Facilities...................................................................................................................... 47
6. PROPOSED INFRASTRUCTURE ....................................................................................................48
6.1 Industrial Area.............................................................................................................................. 48
6.2 Residential Area ........................................................................................................................... 48
6.3 Green belt ..................................................................................................................................... 48
6.4 Social Infrastructure ..................................................................................................................... 48
6.5 Connectivity ................................................................................................................................. 48
6.6 Drinking Water Management....................................................................................................... 49
6.7 Sewerage System ......................................................................................................................... 49
6.8 Industrial Waste Management...................................................................................................... 49
7. REHABILITATION AND RESETTLEMENT (R &R) PLAN .........................................................51
7.1 Policy to be adopted (Central/ State)............................................................................................ 51
8. PROJECT SCHEDULE AND COST ESTIMATE ............................................................................52
8.1 Likely date of start of construction and likely date of completion............................................... 52
8.2 Estimated project cost .................................................................................................................. 52
9. ANALYSIS OF PROPOSAL .............................................................................................................53
9.1 Financial and social benefits ........................................................................................................ 53
10. CONCLUSION...................................................................................................................................55
4
LIST OF TABLES
Table 1-1 Project Summary ...................................................................................................................... 7Table 2-1 Manpower of the project........................................................................................................17Table 3-1 Environmental setting of the existing project site ..............................................................24Table 3-2 Existing Safety and Fire fighting Equipment Quantities and Capacities........................25Table 3-3 Water requirement .................................................................................................................28Table 3-4 Power and Fuel Requirements.............................................................................................28Table 3-5: Air Pollution Sources ............................................................................................................29Table 3-6 Solid Waste Generation and Management ........................................................................30Table 3-7 Hazardous waste generation and management................................................................31Table 4-1 Salient Features of the Project Site .....................................................................................32Table 4-2 Geographical Locations of the Project Site ........................................................................33Table 4-3 Water Bodies of the Study Area 15 km Radius .................................................................33Table 4-4 Sensitive areas of the Study Area 10 km Radius..............................................................34Table 4-5 Project Land Area Break up Details ....................................................................................37Table 4-6 Land use pattern of the Study Area.....................................................................................39Table 4-7 Meteorological Observations ................................................................................................40Table 4-8 Project surrounding features ................................................................................................41Table 4-9 List of Existing Fire Fighting Facilities .................................................................................43Table 5-1 Manpower of the project........................................................................................................46Table 6-1 Industrial waste management details..................................................................................49Table 9-1 CSR Details.............................................................................................................................54
LIST OF FIGURES
Figure 3-1 Index Map...............................................................................................................................19Figure 3-2 Satellite Imagery of the Project Site ...................................................................................20Figure 3-3 Existing and proposed expansion project site layout ......................................................21Figure 3-4 Project Site Photographs .....................................................................................................23Figure 3-5 Facility Process Flow Chart .................................................................................................27Figure 4-1 Topo Map of the Study Area – IOCL Kochi.......................................................................35Figure 4-2 Satellite Imagery of the Study Area (15, 10, 5 & 1 km)...................................................36Figure 4-3 Land use pattern of the Study Area ...................................................................................39Figure 4-4 Wind Rose plot of Kochi.......................................................................................................40
5
LIST OF ANNEXURES
Annexure No Description1 Site Layout - Existing & Expansion2 Land documents3 Licenses held by IOCL4 Topo Map5 Copy of Govt. Gazette Notification6 Screenshot of EDS generated
LIST OF ABBREVIATIONS
CTE Consent to Establish
CTO Consent to Operate
DG Diesel Generator
EMP Environmental Management Plan
IOCL Indian Oil Corporation Limited
ISO International Organization for Standardization
HSD High Speed Diesel
KLD Kilo litres per day
KSEB Kerala State Electricity Board
KSPCB Kerala State Pollution Control Board
kVA Kilo volt ampere
kWh Kilowatt per hour
MoEF&CC Ministry of Environment, Forest and Climate Change
MSW Municipal Solid Waste
OISD Oil Industry Safety Directorate
OWS Oil Water Separator
PESO Petroleum Explosives Safety Organization
SKO Superior Kerosene Oil
WHO World Health Organization
6
1. EXECUTIVE SUMMARY
M/s Indian Oil Corporation Limited (IOCL) is a Government of India, premier Public Sector
Organisation / Company and is engaged in the business of refining, transporting and
marketing of petroleum products including Motor Spirit, HSD and SKO in the country. It is
the leading Indian corporate in the Fortune 'Global 500' listing, which ranked at the 98th
position in the year 2013. IOCL is having several import, storage and distribution/marketing
terminals in the country with Kochi and Calicut as predominant terminals in Kerala for
distribution covering more than 10 districts.
The received tankaged products are supplied to major market consumers. The growth in
demand of various petroleum products for commercial use and transportation is increasing at
a rapid pace everywhere in the country including southern states of India. To cope up with
the increasing demand, Public Sector Oil Companies are setting up new storage and
distribution facilities as well as augmenting their existing capacities. Accordingly, IOCL has
also initiated the process of augmenting their existing storage and distribution/marketing
facilities.
IOCL, Kochi Terminal facility was established in 1998 at Irumpanam with the existing
tankage capacity of 76226 KL, and 2 nos of 600 mm dock lines for HSD/SKO and
Naphtha/MS commissioned on in 2005 and 2006 respectively. Receipt of products is from
BPCL - Kochi Refinery /Tankers through pipelines. Dispatch of products by Tank Trucks to
Retail Outlets/Consumers.
With the increasing demand IOCL proposes an augmentation of the terminal storage facilities
comprising construction of new tanks and re-allocation of existing tanks within the existing
facility at Irumpanam, Thiruvankulam Village, Thripunithura Municipality, Ernakulam
District, Kochi Terminal.
The proposed project is being carried out by M/s Indian Oil Corporation Limited (IOCL)
(land details enclosed), situated at 13 km from Ernakulam, 45 km from Kottayam and 62 km
from Thrissur. This is an existing petroleum products importation, storage and
distribution/marketing facility. To meet the market demands Expansion and Reallocation of
7
Tanks of petroleum products storage facility has been proposed. Land documents are
enclosed as Annexure 2.
The terminal project site has been declared as ‘Prohibited Place’by Vide Gazette Notification
No. G.O. (MS) No.79/99/Home dated 21.5.1999, Govt. of Kerala and as ‘Prohibited Place’
for Restriction of entry and control of photography.
There has not been any expansion of storage capacities since establishment of IOCL Kochi
facility.
An Environmental Clearance (J-16011/50/2001-IA-III) under EIA notification, 2006 exists
for products transfer through Dock line from Tanker Berth at Cochin Port to Irumpanam
Marketing Terminal of IOCL, issued by the then Ministry of Environment and Forests
(MoEF) in 2003. Facility has also been awarded an Integrated Consent to Operate (CTO) by
KSPCB (R16ERRCTOA1019586) in 2016. There is also a revised Consent Order for
Petroleum Sludge Disposal from KSPCB (R16ERRCTOA10195860, issued in 2016. IOCL
has also been granted with a PESO License (P/HQ/KL/15/305 (14508)) valid till 31.12.2020.
Permission is also granted by PESO to operate the terminal during night hours on
18/02/2013. Integrated CTO for the facility is valid till 30.06.2018. All licenses are enclosed
in Annexure 3.
As per EIA Notification, 2006 and subsequent amendments the proposed project falls under
schedule 6(b) Isolated Storage & Handling of Hazardous Chemicals, Category B.
1. As per EIA Notification, 2006 and its subsequent amendments the proposed projectis coming under General Condition since the site is in Greater Cochin, a criticallypolluted area declared by CPCB, CEPI of Greater Cochin at CPCB website is 57.94(2013).
2. We have submitted our application in MoEF & CC File no. IA-J-11011/42/2018-IA-II(I) dated 27/01/2018 under category A, 6(b).
3. MoEF&CC EDS dated 28/02/2018 directed us to seek appraisal in SEAC/SEIAA.4. As on date, The Kerala SEAC/SEIAA is unavailable since the term has completed
on 19.03.2018 as per MoEF Notification S.O 804 (E) dated 19.03.2015
The Project Summary given in Table 1-1.
Table 1-1 Project Summary
S. No. Particulars Details
1. Name of Company M/s. Indian Oil Corporation Limited,Kochi Terminal
8
S. No. Particulars Details
2. Project Location Block No: 10, S. Nos. 30/11 12; 31/3, 4, 6, 8, 10, 11, 12, 13, 14, 15, 16, 17, 18,20, 22, 25, 26, 27, 31, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 48, 49,50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 71, 72;39/3; 48/3, 4, 5, 6, 7; 49/1, 2, 4; 50/1, 2, 3, 4, 5, 6, 7, 8, 9; 51/1, 2, 3, 4, 5, 6, 7, 8,9, 10, 11, 12, 13, 15, 16, 17, 18, 19, 20, 21, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32,33; 52/1, 2, 3, 4, 5, 6, 7, 8, 9, 11, 12, 13, 14; 69/2, 3Indian Oil Corporation Limited,IrumpanamThiruvankulam Village,Thrippunithura Municipality,Ernakulam District,Kochi – 682 036Kerala
3. Site Coordinates Latitude 90 58.876’NLongitude 76021.233’E
4. Project Activity
Schedule,
Category as per
EIA Notification
2006 &
amendments
The proposed project falls under Schedule 6(b) Isolated Storage & Handling of
Hazardous Chemicals, Category B.
1. As per EIA Notification, 2006 and its subsequent amendments theproposed project is coming under General Condition since the site is inGreater Cochin, a critically polluted area declared by CPCB, CEPI ofGreater Cochin at CPCB website is 57.94 (2013).
2. We have been submitted our application in MoEF & CC File no IA-J-11011/42/2018-IA-II(I) & dated 27/01/2018 under category
A, 6(b).3. MoEF&CC EDS dated 28/02/2018 directed us to appraise in
SEAC/SEIAA.
4. As on date, The Kerala SEAC/SEIAA is unavailable since the term
has completed on 19.03.2018 as per MoEF Notification S.O804 (E) dated 19.03.2015
5. Name of the project Proposed Facility Augmentation Project – Construction of New Tanks &
Reallocation of Tanks at Kochi Marketing Terminal, Irumpanam
6. Land Details 1. Total Land Area: 78.65 Acres (318285.3 Sq. M.)
2. Existing Tankages Area: 23.70 Acres (95910.5 Sq.M.)
3. Proposed Tankages Area: 13.70 Acres (55510 Sq.M.)
4. Total Tankages Area after Expansion: 37.40 Acres (151420.5 Sq.M.)
5. Existing Green Belt: 8.99 Acres (36383 Sq.M.)
i.e 11.43 % of Total land Area 78.65 Acres
9
S. No. Particulars Details
7. Existing Capacity Existing Tankages:
Tank No. Name ofProduct
Class* LicensedExistingCapacity (KL)
ProposedRe-Allocation to
T1 HSD B 6300 ATF
T2 HSD B 6300 ATF
T3 HSD B 6300 ATF
T4 HSD B 6300 No change
T5 HSD B 6300 No change
T6 HSD B 2900 ATF
T7 SKO B 2900 No change
T8 SKO B 2900 No change
T9 Motor Spirit A 3000 Ethanol
T10 Motor Spirit A 3000 Ethanol
T11 Naphtha A 7389 Motor Spirit
T12 Motor Spirit A 7389 No change
T13 Motor Spirit A 7389 No change
T14 Motor Spirit A 7389 No change
T15 Ethanol A 70 No change
T16 Ethanol A 200 No change
T17 Ethanol A 200 No change
Total 76226
Note:
*Petroleum Products Classification References:
1. Petroleum and Explosives Safety Organisation (PESO), Govt. of India( http://www.peso.gov.in/Work_Mannual/wmchap10wo.pdf )
2. The Petroleum and Natural Gas Regulatory Board Regulations (2006),Petroleum Rules (1976), Govt. of India.
10
S. No. Particulars Details
8. Proposed Capacity
A) Proposed Re-allocation:
Existing Tanks Reallocated to
Tank No. Name of Product Capacity (KL) Product
T1 HSD 6300 ATF
T2 HSD 6300 ATF
T3 HSD 6300 ATF
T6 HSD 2900 ATF
T9 Motor Spirit 3000 Ethanol
T10 Motor Spirit 3000 Ethanol
T11 LAN 7389 Motor Spirit
Total 35189
B) Proposed New Tankages:
Tank No. Name of Product Class Licensed Capacity (KL)
T18 Motor Spirit A 11415
T19 Motor Spirit A 11415
T20 Motor Spirit A 11415
T21 Motor Spirit A 11415
T22 HSD B 15000
T23 HSD B 15000
T24 HSD B 15000
T25 HSD B 15000
T26 Biodiesel B 2040
T27 Biodiesel B 2040
T28 PCK B 2900
Total 112640
C) Details of Products, Tanks & Quantity:
11
S. No. Particulars Details
S.No TankNo.
Name ofProducts Class*
Existing Re-allocation Proposed AfterExpansion
LicensedCapacity
(KL)
Proposed Re-allocation to
Capacity(KL)
ProposedCapacity
(KL)
Capacity(KL)
1 T1 HSD B 6300 ATF 6300 - 6300
2 T2 HSD B 6300 ATF 6300 - 6300
3 T3 HSD B 6300 ATF 6300 - 6300
4 T4 HSD B 6300 No change - - 6300
5 T5 HSD B 6300 No change - - 6300
6 T6 HSD B 2900 ATF 2900 - 2900
7 T7 SKO B 2900 No change - - 2900
8 T8 SKO B 2900 No change - - 2900
9 T9MotorSpirit
A 3000 Ethanol 3000 - 3000
10 T10MotorSpirit
A 3000 Ethanol 3000 - 3000
11 T11Naphtha(LAN)
A 7389 - - 7389
12 T12MotorSpirit
A 7389 - - 7389
13 T13MotorSpirit
A 7389 - - 7389
14 T14MotorSpirit
A 7389 - - 7389
15 T15 Ethanol A 70 - - 70
16 T16 Ethanol A 200 - - 200
17 T17 Ethanol A 200 - - 200
18 T18MotorSpirit
A - - 11415 11415
19 T19MotorSpirit
A - - 11415 11415
20 T20MotorSpirit
A - - 11415 11415
21 T21MotorSpirit
A - - 11415 11415
22 T22 HSD B - - 15000 15000
23 T23 HSD B - - 15000 15000
24 T24 HSD B - - 15000 15000
25 T25 HSD B - - 15000 15000
26 T26 Biodiesel B - - 2040 2040
27 T27 Biodiesel B - - 2040 2040
28 T28 PCK B - - 2900 2900
Total 76226 35189 112640 188866
12
S. No. Particulars Details
D) Summary of the Products, Tanks & Quantity:
S.No Existing Re-allocation ProposedAfter
Expansion
1No ofProducts
5
1 no newly proposed
2 nos retained fromexisting
3 8
2No ofTanks
177 nos Tanks are re-allocation
11 28
3ProductCapacity(KL)
76226 35189 112640
((76226 –35189) + 35189
+ 112640) =188866
Proposed Project Tankages Area: 13.70 Acres (within total area of 78.65 Acres). Refer Site Layout inAnnexure 1.
9. Water
requirement
Source: Water is purchased through approved road tankers.
SI.No.
Description Water Break up (KLD) Wastewater generated
Existing Proposed Total Existing Proposed Total
1 DomesticUse
29.88 4.995 34.90 26.9 4.5 31.4
2 Green beltMaintenance
109.15
(for36383Sq.M)
205.962(for
68654.14Sq. M)
315.11 - - -
3 Fire water 0.415 0.166 0.581 - - -
Total waterrequirement
139.45 211.12 350.6 - - -
Total water Requirement – 351 KLD
Water required for Green belt area (36383 Sq.M) - 109 KLD
Wastewater generated – 31 KLD
Existing sewage generated 31 KLD and disposed into septic tank/soakpit. New STP will be installed at site during expansion @ 50 KLD.
Effluent generated from cleaning of total 28 tanks once in 5 years - 56KL. Effluent is transferred to oil water separator (OWS) for oilseparation, and retrieved oil is pumped back to tank. The recycled wateris used for greenbelt maintenance.
Now new ETP @ 5 KL/hr is proposed and treated water will be used for
firefighting purpose.
10. Wastewater and
mode of disposal
Existing sewage generated 31 KLD and disposed into septic tank/soakpit. New STP will be installed at site during expansion @ 50 KLD.
Now new ETP @ 5 KL/hr is proposed and treated water will be used forfirefighting purpose.
13
S. No. Particulars Details
11. PowerDetails Capacity (KVA) Source
Existing Proposed TotalPowerRequirement
300 0 300 KSEB
Power Back Up
1 x 3801 x 500
2 x 700
2 x 7001 x 380(S.B.)
1 x 500(S.B.)
DG Sets
DieselRequirements
Approx.1500
lit/Month
Approx.1500
lit/Month
3000lit/month
IOCL RetailOutletnearby
12. Air EmissionDetails Capacity (KVA) APC
Existing Proposed Total
DG Sets(Power Back
Up)1 x 3801 x 500
2 x 700
2 x 7001 x 380(S.B.)
1 x 500(S.B.)
SPCB normsStack height 30 m
AGL
13. Solid Waste Construction:
TypeQuantity(kg/day)
Collection MethodDisposal method
Organic 7.5Manual throughBins
Biogas plant at site
Inorganic 17.5Manual throughBins
Authorized SPCBrecyclers
Total 25.0
Note:1. Manpower- 50 Nos2. Organic waste quantity includes canteen wastes3. Biogas plant capacity: 6 m3 of methane per day4. As per CPHEEO Norms: MSW kg per capita/day =0.5
Operations:
TypeExistingQuantity(kg/day)
Proposed
Quantity(kg/day)
Total
Quantity(kg/day)
CollectionMethod Disposal
method
Organic 77.1 39.15 116.258ManualthroughBins
Biogasplant at site
Inorganic 179.9 91.35 271.25ManualthroughBins
AuthorizedSPCBrecyclers
14
S. No. Particulars Details
Total 257.0 130.5 387.5
Note:1. Manpower - 125 Nos + 650 truck crew2. Organic waste quantity includes canteen wastes3. Biogas plant capacity: 6 m3 of methane per day4. As per CPHEEO Norms: MSW kg per capita/day =0.5
Hazardous waste
WasteCategory
Hazardouswaste
Generated
Quantity Method ofhandling
Existing Proposed Total
5.1
UsedOil/Spent
oil0.5KLA 0.8KLA
1.3KLA
Collection,storage &disposal toauthorizedrecyclers
3.3Tank
bottomsludge
804 kg/A 827 kg/A 1635kg/A
Collection,storage &disposal toauthorizedrecyclers
Effluent generated from cleaning of total 28 tanks once in 5 years - 56KL. Effluent is transferred to oil water separator (OWS) for oilseparation. Retrieved oil is pumped back to tank, and the recycled wateris used for greenbelt maintenance.
Existing sewage generated 31 KLD and disposed into septic tank/soakpit. New STP will be installed at site during expansion @ 50 KLD.
Now new ETP @ 5 KL/hr is proposed and treated water will be used forfirefighting purpose.
5. Manpower Construction manpower is 50 people.
Permanent Contractual Total
Existing 50 64 114
Proposed 5 6 11
Total 55 70 125
Note:
1. 650 including (existing 550 and proposed 100) truck crew will use toiletfacilities.
6. Project cost Rs. 31,289.59 Lakhs
15
2. INTRODUCTION OF THE PROJECT
2.1 Identification of the Project and Project Proponent
M/s Indian Oil Corporation Limited (IOCL) is a Government of India, premier Public Sector
Organisation/ Company and is engaged in the business of refining, retailing, storage and
distribution/marketing of petroleum products in the country. IOCL Head office is at Mumbai,
Maharashtra, and IOCL Kochi Terminal was established in 1998. IOCL is the leading Indian
corporate in the Fortune 'Global 500' listing, which ranked at the 98th position in the year
2013. IOCL is having several import, storage and distribution/marketing terminals in the
country with Kochi and Calicut as predominant terminals in Kerala for distribution covering
more than 10 districts.
The existing terminal is located at Irumpanam, Thiruvankulam Village, Thripunithura
Municipality, Ernakulam District, Kochi Terminal in Kerala.
Contact Person: Mr O K Sethumadhavan (Deputy General Manager (T), Kochi Terminal)
2.2 Brief Description and Nature of the Project
IOCL, Kochi Terminal facility was established in 1998 in Irumpanam with the existing
tankage capacity of 76226 KL, and 2 nos. of 600 mm dock lines for HSD/SKO and
Naphtha/MS commissioned on in 2005 and 2006 respectively. Receipt of products is from
Kochi Refinery Limited/Tankers through pipelines. IOCL proposes an Expansion & Re-
allocation of the terminal storage facilities which comprises construction of new tanks as well
as re-allocation of existing tanks within the existing facility at Irumpanam in Thiruvankulam
Village, Thripunithura Municipality, Ernakulam District, Kochi Terminal.
The proposed project is being carried out by M/s Indian Oil Corporation Limited (IOCL) at
Block No: 10, S. Nos. 30/11 12; 31/3, 4, 6, 8, 10, 11, 12, 13, 14, 15, 16, 17, 18, 20, 22, 25,
26, 27, 31, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 48, 49, 50, 51, 52, 53, 54, 55,
56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 71, 72; 39/3; 48/3, 4, 5, 6, 7; 49/1, 2, 4; 50/1,
2, 3, 4, 5, 6, 7, 8, 9; 51/1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 15, 16, 17, 18, 19, 20, 21, 23, 24,
16
25, 26, 27, 28, 29, 30, 31, 32, 33; 52/1, 2, 3, 4, 5, 6, 7, 8, 9, 11, 12, 13, 14; 69/2, 3. The total
land area is 78.65 Acres (31.83 Ha) situated at 13 km from Ernakulam, 45 km from Kottayam
and 62 km from Thrissur. This is an existing petroleum products importation, storage and
distribution/marketing facility. To meet the market demands Expansion and Reallocation of
Tanks of petroleum products storage facility has been proposed. Land documents are
enclosed as Annexure 2.
The terminal project site has been declared as ‘Prohibited Place’ by Vide Gazette Notification
No. G.O. (MS) No.79/99/Home dated 21.5.1999, Govt. of Kerala and as ‘Prohibited Place’
for Restriction of entry and control of photography. Refer Annexure 5 for copy of Govt.
Gazette Notification.
2.3 Need for the Project and its importance
Dispatch of products by Tank Trucks to Retail Outlets/Consumers. The products distribution
in Kerala covers more than 10 districts. IOCL is one of the major share income generators for
the Government. The growth in demand of various petroleum products for commercial use
and transportation is increasing at a rapid pace everywhere in the country including southern
states of India. To cope up with the increasing demand for petroleum products, IOCL has also
initiated the process of augmenting their existing storage and distribution facilities in line
with the other Public Sector Oil Companies.
2.4 Demand - Supply Gap
Based on the ever increasing growth in demand of Motor Spirit, HSD and SKO for
transportation and commercial purposes everywhere in the country including southern states,
IOCL has initiated the process of augmenting their existing facilities to increase the
capacities to cope-up with the increasing demand and to plug the gap.
2.5 Imports Vs. Indigenous Production
There is no indigenous production, operation or manufacturing of petroleum products. IOCL
Kochi involves in the process of receiving, storing & distribution/marketing of Motor Spirit,
HSD and SKO based on the availability. The current total tankage capacity is 76226 KL. The
import of products to terminal is from Kochi Refinery Limited and via loading from tanker
berths at Cochin Port through pipelines. Dispatch of products by Tank Trucks to Retail
Outlets/Consumers.
17
2.6 Employment Generation due to the project
The existing employment in the project is 114 persons and after expansion, there will be an
increase in manpower of 11 persons. Construction manpower is 50 people. Manpower details
are given in Table 2-1.
Table 2-1 Manpower of the project
Permanent Contractual Total
Existing 50 64 114
Proposed 5 6 11
Total 55 70 125
Note:
1. 650 truck crew including (existing 550 and proposed 100) will use toilet facilities.
2.7 Project Benefits
The main objective of the proposed project is to meet the current market demands for
transportation and commercial purposes and increase in the storage capacities.
The benefits of the proposed expansion of IOCL:
The project site shall require no displacement of habitation as it is located away from
the habitation areas and the expansion is proposed in existing project land area.
Socio-economic benefit to the locals is that it would provide employment in the
operations of the facility.
18
3. PROJECT DESCRIPTION
3.1 Type of the Project
IOCL Kochi Terminal, a Government of India premier Public Sector Undertaking proposes
the Expansion and Reallocation of Tanks of the terminal storage facility within the existing
project area located at Irumpanam in Thiruvankulam Village, Thripunithura Municipality,
Ernakulam District, Kochi. The proposed project is intended to increase the storage tank
capacities.
There has not been any expansion of storage capacities since establishment of IOCL Kochi
facility. The facility currently undertakes the petroleum product imports by an Environmental
Clearance (J-16011/50/2001-IA-III) under EIA notification, 2006, issued by the then Ministry
of Environment and Forest (MoEF) in 2003. Facility has also in place a renewed Integrated
Consent to Operate (R16ERRCTOA1019586), issued by KSPCB in 2016. IOCL has also a
PESO license (P/HQ/KL/15/305 (14508)) valid till 31.12.2020 (Copies of licenses enclosed
in Annexure 3).
As per EIA Notification, 2006 and subsequent amendments the proposed project falls under
schedule 6(b) Isolated Storage & Handling of Hazardous Chemicals, Category B.
1. As per EIA Notification, 2006 and its subsequent amendments the proposed project is
coming under General Condition since the site is in Greater Cochin, a critically
polluted area declared by CPCB, CEPI of Greater Cochin at CPCB website is 57.94
(2013).
2. We have submitted our application in MoEF&CC vide file no. IA-J-11011/42/2018-IA-II(I) & dated 27/01/2018 under category A, 6(b).
3. MoEF&CC EDS dated 28/02/2018 directed us to appraise in SEAC/SEIAA.
4. As on date, The Kerala SEAC/SEIAA is unavailable since the term has completed on
19.03.2018 as per MoEF Notification S.O 804 (E) dated 19.03.2015
3.2 Project Location
The proposed project is planned within the existing facility of IOCL, Kochi located at
Irumpanam Block No: 10, Plot Survey Numbers 30/11 12; 31/3, 4, 6, 8, 10, 11, 12, 13, 14,
15, 16, 17, 18, 20, 22, 25, 26, 27, 31, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 48,
19
49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 71, 72; 39/3; 48/3,
4, 5, 6, 7; 49/1, 2, 4; 50/1, 2, 3, 4, 5, 6, 7, 8, 9; 51/1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 15,
16, 17, 18, 19, 20, 21, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33; 52/1, 2, 3, 4, 5, 6, 7, 8, 9, 11,
12, 13, 14; 69/2, 3 in Irumpanam, Thiruvankulam Village, Thripunithura Municipality,
Ernakulam District, Kerala. The site is located about 13 km from Ernakulam, 45 km from
Kottayam and 62 km from Thrissur.
The Project Index map is given in Figure 3-1, Satellite imagery of project site is given in
Figure 3-2, Site Layout is given in Figure 3-3 Site photographs are given in Figure 3-4.
Figure 3-1 Index Map
20
Figure 3-2 Satellite Imagery of the Project Site
21
Figure 3-3 Existing and proposed expansion project site layout
22
IOCL Terminal Facility – Top View Administrative Block
Product Pipeline Receipt Existing Tank Farm
Existing Tank Dykes Existing Tanker Filling Shed
23
Existing Pump House Fire Water Tanks
Existing Green Belt Existing Green Belt
Tanker Truck Parking Area Proposed Site for Expansion of Storage Facility
Figure 3-4 Project Site Photographs
24
3.3 Details of Alternate sites considered
Since the proposed project is an Expansion and Reallocation of Tanks of petroleum storage
facilities in the existing project area at Irumpanam, alternate sites are not considered. The
environmental setting of the existing project site is given in Table 3-1.
Table 3-1 Environmental setting of the existing project site
S. No. Particulars Details
1 Site Co-ordinates of the project site Latitude 90 58.876’N
Longitude 76021.233’E
2 Elevation 7.62 m AMSL
3 Present land use Barren land to Industry (Prohibited Place)
4 Nearest Highway Seaport – Airport Road borders the site in the west.
NH 47 Kanyakumari to Salem at a distance of 4 km
towards the west
5 Nearest railway Station Thrippunithura RS ≃3.0 km in SSWErnakulam Junction (South RS)≃6.9 km in WSWAluva RS≃13.57 km in N
6 Nearest Airport Cochin International Airport ≃18.3 km in NNE
7 Nearest villages Chottanikkara ≃ 5.8 km in SEThiruvaniyoor ≃7.7 KM in SEThrikkakkara ≃5.5 KM in NNWEdappally ≃6.0 KM in NWUdayamperur ≃9 KM in SSE
8 Nearest major city Kochi ≃10.9 km in SW
Kakkanad ≃3.6 km in NNW
Thripunithura ≃3.6 km in SSW
Muvattupuzha ≃23.9 in E
Aluva ≃13.56 km in N
Angamaly ≃22.26 km in NNE
9 River Chithrapuzha River ≃0.50 km in NNE
Kadambrayar River ≃0.95 km in SW
Periyar River ≃14.5 km in N
Muvattupuzha River ≃25.40 km in E
10 Type of soil Red loamy soil
25
3.4 Magnitude of Operation
In the view of fulfilling market requirements, IOCL proposes Expansion and Reallocation of
Tanks of the storage facilities in the existing premises with the current total storage capacity
of 76226 KL. The storage capacity after the proposed expansion will be 112640 KL. The
proposed expansion will be within its 78.65 Acres (31.83 Ha) of land located at Irumpanam
in Thiruvankulam Village, Thripunithura Municipality, Ernakulam District, Kochi, Kerala.
The existing safety and firefighting equipment quantities and capacities are given in Table
3-2 and facility process flow chart is given Figure 3-5.
Table 3-2 Existing Safety and Fire fighting Equipment Quantities and Capacities
S. No.Safety and Fire FightingEquipments Description
Quantity Capacity
1 ABOVE GROUND STATICWATER TANK
4 Nos. 8290 KL
2 FIRE WATER PUMPS 5 Nos Each of 616 KL/hr flow rate
3 JOCKEY PUMPS 2 Nos Each of 55 KL/hr flow rate
4 Water sump for receiving waterthrough tank trucks
1 nos 80 KL
5 AIR COMPRESSORS 2 Nos
6 Manual Call Points 18 Nos
7 Hand Siren 8 Nos
8 Emergency shutdown switches 6 Nos Provided in all critical operatingareas
9 Oil Water Separator Provided before final water discharge
10 Automated ROVs 32 Nos Provided in all tank receipt,delivery and recirculation lines.
11 Gas Monitoring System (No. Ofsensors)
6 + 2 Nos 6 Nos open path detectors and 2nos. point type detectors
12 Electrically operated fire sirens 2 Nos
13 Fire Trolley 1 no.
14 Portable Explosimeter 2 Nos
15 Fire Hydrant Line Available throughout the terminal in line withOISD std. 244.
16 Monitors and hydrant Points Available throughout the terminal in line withOISD std. 244.
17 Fire hoses & Hydrant Nozzles (Jet,Fog, Mayura & Universal type
Available throughout the terminal in line with
26
S. No.Safety and Fire FightingEquipments Description
Quantity Capacity
nozzles) OISD std. 244.
18 Sprinkler System Available in all six floating roof tanks where ClassA products are stored
19 Foam Pourer system Available in all 14 Nos. vertical above ground rooftanks where Class A products are stored
20 Auto rim seal fire detection andextinguishing system
Available in all six floating roof tanks where ClassA products are stored
21 Fixed type Medium Expansionfoam generators (MEFG)
Available in all six floating roof tanks where ClassA products are stored
22 Portable type Medium Expansionfoam generators (MEFG)
2 Nos.
23 Foam Compound (AFFF) 10,000litres
For use in petroleum fire
24 Foam Compound (ATC) 1000Litres
For use in ethanol fire
25 DCP Fire extinguisher – 9/10, 25& 75 kg
120Nos.
Positioned in line with OISD std.244
26 CO2 Fire extinguisher – 2 & 4.5 kg 25 Nos. Positioned in line with OISD std.244
27 Self contained air breathingapparatus (SCABA)
2 Nos 4 Nos. cylinders are available
28 Fire Proximity suit 2 Nos.
29 First Aid Kit Available in all work places
30 Non sparking tools 1 kit
31 Leak control Kit 1 No.
3.5 Process Description
There is no manufacturing of petroleum products. IOCL Kochi storage terminal facility is
involved in the process of receiving, storing & distribution/marketing of Motor Spirit, High
Speed Diesel and SKO based on the availability. It is a proposed Expansion and Reallocation
of Tanks of the petroleum products storage facility. The current total storage capacity is
76226 KL. The storage capacity after the proposed expansion will be 112640 KL. Receiving
of products is from KRL and through tanker berth unloading and pipeline transport to storage
facility. The distribution of products is facilitated through tanker truck filling and deliveries
and by pipeline exports. Facility Process flow chart is given Figure 3-5.
27
Figure 3-5 Facility Process Flow Chart
3.6 Raw Materials Requirement
There is no manufacturing of petroleum products. IOCL Kochi is involved in the process of
receiving, storing & distribution/marketing of Motor Spirit, High Speed Diesel and SKO
based on the availability of products. No raw materials are required for the proposed project.
An Expansion and Reallocation of Tanks of the storage terminal facility within the existing
project premises is proposed.
28
3.7 Resource optimization
3.7.1 Water Requirement
The total water requirement for the proposed project is 351 KLD. The required water is
purchased through approved road tankers. Details of water requirement are given in Table
3-3.
Table 3-3 Water requirement
SI.No.
Description Water Break up (KLD) Wastewater generated
Existing Proposed Total Existing Proposed Total1 Domestic Use 29.88 4.995 34.90 26.9 4.5 31.42 Green belt
Maintenance109.15
(for 36383Sq.M)
205.962(for 68654.14
Sq. M)315.11 - - -
3 Fire water 0.415 0.166 0.581 - - -
Total water requirement 139.45 211.12 350.6 - - -Source: Water is purchased through approved road tankers
Total water Requirement – 351 KLD
Green belt area (36383 Sq.M) - 109 KLD
Domestic wastewater disposed into septic tank/soak pit and existing sewage generated
31 KLD and disposed into septic tank/soak pit. New STP will be installed at site
during expansion @ 50 KLD.
Now new ETP @ 5 KL/hr is proposed and treated water will be used for firefighting
purpose.
3.7.2 Power Requirement
The power requirement for the project is sourced from KSEB. The details of power
requirement are given in Table 3-4.
Table 3-4 Power and Fuel Requirements
Details Capacity (KVA) SourceExisting Proposed Total
Power Requirement 300 0 300 KSEBPower Back Up
1 x 3801 x 500
2 x 700
2 x 7001 x 380 (S.B.)1 x 500 (S.B.)
DG Sets
29
Diesel Requirements Approx.1500 lit/Month
Approx.1500 lit/Month
3000 lit/month IOCL RetailOutlet nearby
3.7.3 Air Pollution Control System and Management
There is no production, and only receipt, storage, filling and distribution of Motor Spirit,
High Speed Diesel and SKO will be done in a closed circuit without causing any effect to
humans and environment. Transfer of petroleum products will be done in a closed system
involving negligible emissions of noxious substances. DG set emissions will be covered by
maintaining sufficient stack heights to minimum 30m AGL in line with SPCB norms.
Moreover, HSD (High Speed Diesel) with sulphur content of < 0.05 % will be used for DG
sets.
There may be small amounts of suspended dust particles in air during construction phase
which will be controlled by dust suppression measures like sprinkling of water. Gases
generated during welding of steel structures of tanks will be negligible and will pose no risk
to environment. The air pollution sources are given in Table 3-5.
Table 3-5: Air Pollution Sources
Details Capacity (KVA) APCExisting Proposed Total
DG Sets (PowerBack Up)
1 x 3801 x 500
2 x 7002 x 700
1 x 380 (S.B.)1 x 500 (S.B.)
SPCB norms Stackheight 30 m AGL
3.8 Waste Management and Disposal Method
3.8.1 Liquid Waste Management Total water requirement – 351 KLD
Domestic wastewater disposed into septic tank/soak pit and existing sewage generated
31 KLD and disposed into septic tank/soak pit. New STP will be installed at site
during expansion @ 50 KLD.
Effluent generated from cleaning of total 28 tanks once in 5 years - 56 KL. Effluent is
transferred to oil water separator (OWS) for oil separation and retrieved oil is pumped
back to tank. The recycled water is used for greenbelt maintenance.
Now new ETP @ 5 KL/hr is proposed and treated water will be used for firefighting
purpose.
30
3.8.2 Hazardous and Solid Waste Management
Solid Waste
Construction phase
During the construction phase, construction waste will be reused to the maximum possible
extent and excess will be disposed through authorized vendors. Solid waste quantities and
management is shown in Table 3-6.
Operation phase
Table 3-6 Solid Waste Generation and Management
TypeExistingQuantity(kg/day)
ProposedQuantity(kg/day)
TotalQuantity(kg/day)
CollectionMethod Disposal method
Organic 77.1 39.15 116.258Manual throughBins
Biogas plant atsite
Inorganic 179.9 91.35 271.25Manual throughBins
Authorized SPCBrecyclers
Total 257.0 130.5 387.5
Note:1. Manpower- 125 Nos + 650 truck crew2. Organic waste quantity includes canteen wastes3. Biogas plant capacity: 6 m3 of methane per day4. As per CPHEEO Norms: MSW per capita/day =0.55. No process waste generated during the normal processing.
Hazardous Waste
Hazardous waste materials are properly disposed as per the Hazardous and
Other Wastes (Management and Transboundary Movement) Amendment Rules, 2016.
Hazardous waste are being collected, stored properly and disposed to authorized recyclers.
The same will be followed for Expansion & Re-Allocation project also (Table 3-7).
31
Table 3-7 Hazardous waste generation and management
WasteCategory
Hazardouswaste
Generated
Quantity Method ofhandlingExisting Proposed Total
5.1
UsedOil/Spent oil
0.5 KLA 0.8 KLA1.3 KLA
Collection,storage &disposal toauthorizedrecyclers
3.3Tank bottom
sludge804 kg/A 827 kg/A
1635 kg/A
Collection,storage &disposal toauthorizedrecyclers
Effluent generated from cleaning of total 28 tanks once in 5 years - 56 KL. Effluent istransferred to oil water separator (OWS) for oil separation and retrieved oil is pumpedback to tank. The recycled water is used for greenbelt maintenance.
32
4. SITE ANALYSIS
4.1 Connectivity
M/s. IOCL Kochi is located at Irumpanam, Thiruvankulam Village, Thripunithura
Municipality, Ernakulam District, Kerala. The project site is well connected to Seaport –
Airport Road bordering the western side of the site and NH 47 at a distance of 4 km towards
the west, and is at easy access to railway stations. The salient features of the project site given
in Table 4-1, Geographical coordinates of the project site are given in Table 4-2. Water
bodies of the study area are given in Table 4-3. Sensitive areas of the study area is given in
Table 4-4, Topo Map of the study area is given in Figure 4-1 and Annexure 4, and Satellite
imagery of the study area is given in Figure 4-2.
Table 4-1 Salient Features of the Project Site
S. No. Particulars Details1 Name of the Company M/s. Indian Oil Corporation Limited,
Kochi Terminal
2 Project Site Location Block No: 10, Plot Survey Numbers: 30/11 12; 31/3,4, 6, 8, 10, 11, 12, 13, 14, 15, 16, 17, 18, 20, 22, 25,26, 27, 31, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43,44, 45, 46, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58,59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 71, 72; 39/3;48/3, 4, 5, 6, 7; 49/1, 2, 4; 50/1, 2, 3, 4, 5, 6, 7, 8, 9;51/1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 15, 16, 17,18, 19, 20, 21, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32,33; 52/1, 2, 3, 4, 5, 6, 7, 8, 9, 11, 12, 13, 14; 69/ 2,3at Thiruvankulam Village, ThripunithuraMunicipality, Ernakulam District, Kochi Terminal
3 Total Land Area 78.65 Acres (31.83 Ha)
4 Site Co-ordinates of the project site(Center)
Latitude 90 58.837’NLongitude 76021.348’E
5 Elevation 7.62 m AMSL6 Topography Plain7 Present land use Barren land to Industry (Prohibited Place)8 Nearest Highway Seaport – Airport Road borders the site in the west.
NH 47 Kanyakumari to Salem at a distance of 4 km
towards the west
9 Nearest railway Station Thrippunithura RS ≃3.0 km in SSWErnakulam Junction (South RS)≃6.9 km in WSWAluva RS≃13.57 km in N
10 Nearest Airport Cochin International Airport ≃18.3 km in NNE
11 Nearest village Chottanikkara ≃ 5.8 km in SE
33
S. No. Particulars DetailsThiruvaniyoor ≃7.7 KM in SEThrikkakkara ≃5.5 KM in NNWEdappally ≃6.0 KM in NWUdayamperur ≃9 KM in SSE
12 Nearest major city Kochi ≃10.9 km in SW
Kakkanad ≃3.6 km in NNW
Thripunithura ≃3.6 km in SSW
Muvattupuzha ≃23.9 in E
Aluva ≃13.56 km in N
Angamaly ≃22.26 km in NNE
13 Historical/Archaeological Phase Hill Palace Archaeological Museum, Thripunithura≃3 km in the SSE14 River Chithrapuzha River ≃0.50 km in NNE
Kadambrayar River ≃0.95 km in SW
Periyar River ≃14.5 km in N
Muvattupuzha River ≃25.40 km in E
15 Type of soil Red loamy soil
Table 4-2 Geographical Locations of the Project Site
Site Point Latitude & Longitude Directions
Site Centre 90 58.837’N76021.348’E -
A 90 58.923’N76021.240’E North West corner
B 90 59.115’N76021.240’E North
C 90 59.067’N76021.501’E East corner
D 90 58.923’N76021.240’E South East
E 90 58.665’N76021.284’E South
F 90 58.654’N76021.216’E South West corner
The details of water bodies & sensitive areas from the site boundary are given in Table 4-3and Table 4-4.
Table 4-3 Water Bodies of the Study Area 15 km Radius
S. No Name ≃Distance (km) Direction
1 Chithrapuzha River 0.50 NNE
2 Kadambrayar River 0.95 SW
3 Periyar River 14.5 N
4 Cochin Backwater Mouth 12.0 W
34
Table 4-4 Sensitive areas of the Study Area 10 km Radius
S. No Name ≃ Distance (km) Direction
1 Mangalavanam Bird Sanctuary 8.77 W
2 Chithrapuzha River 0.50 NNE
3 Kadambrayar River 0.95 SW
35
Figure 4-1 Topo Map of the Study Area – IOCL Kochi
36
Figure 4-2 Satellite Imagery of the Study Area (15, 10, 5 & 1 km)
4.2 Land form, Land use and Land ownership
The proposed expansion project is located at Irumpanam Block No: 10, Plot Survey
Numbers: 30/11 12; 31/3, 4, 6, 8, 10, 11, 12, 13, 14, 15, 16, 17, 18, 20, 22, 25, 26, 27, 31, 33,
34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59,
60, 61, 62, 63, 64, 65, 66, 67, 68, 71, 72; 39/3; 48/3, 4, 5, 6, 7; 49/1, 2, 4; 50/1, 2, 3, 4, 5, 6, 7,
8, 9; 51/1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 15, 16, 17, 18, 19, 20, 21, 23, 24, 25, 26, 27, 28,
29, 30, 31, 32, 33; 52/1, 2, 3, 4, 5, 6, 7, 8, 9, 11, 12, 13, 14; 69/2, 3 situated at 13 km from
Ernakulam, 45 km from Kottayam and 62 km from Thrissur. This is an existing Importation,
Storage and Distribution/Marketing Facility. To meet the market demand Expansion and
Reallocation of Tanks of the terminal storage facility has been proposed. Land documents
enclosed as Annexure 2.
The project site has been declared as ‘Prohibited Place’ by VideGazette Notification No.
G.O. (MS) No.79/99/Home dated 21.5.1999, Govt. of Kerala and as ‘Prohibited Place’ for
37
Restriction of entry and control of photography. Refer Annexure 5 for copy of Govt. Gazette
Notification.
The land break up details of the project area is given in Table 4-5. The existing & expansion
site layout is enclosed as Annexure 1.
Table 4-5 Project Land Area Break up Details
S. No Description Existing Proposed Total
Area inSq. m
Area inAcres
Area inSq. m
Area inAcres
Area inSq. m
Area inAcres
Area%
1 Green belt 36383 8.99 68654.14 16.96 105037.14 25.95 33.02 Road, Parking
& Pavements39034.53 9.65
3 Built up Area 95910.5 23.7 55510 13.7 151420.5 37.4 47.64 Vacant land 146957.27 36.31 22793.13 5.63
Total Land Area 318285.3 78.65
Total Land Area: 78.65 Acres (31.83 Ha)
Existing Tankages Area: 95910.5 Sq.m
Expansion Tankages Area: 55510 Sqm
Total Tankages Area after Expansion: 151420.5 Sqm
Existing Green Belt: 8.99 Acres i.e 11.43 % of Total land Area 78.65 Acres
4.3 Land Topography
Ernakulam town serves as the District Head Quarters. Location of Kochi forms an important
destination for export and import business and tourism as it is very close to Arabian Sea and
backwaters, and is well connected by a network of inter-district highways connecting
Trivandrum, Salem, Coimbatore, Bangalore, Trichy & Madurai Districts.
Kochi city is located at the sea mouth of seven major rivers which start from the Western
Ghats and travel through Kerala’s midlands, lowlands and coastal areas to drain out into
the Arabian Sea. Kochi lies at the northern end of a narrow neck of land, about 19 km long
and less than 1.6 km wide in many places, and is separated from the mainland by inlets from
the Arabian Sea and by the estuaries of rivers draining from the Western Ghats.
38
The river systems are complicated to some extent due to several hills and valleys and its
season is dependent on monsoonal rainfalls. Periyar River is of importance when Kochi is
described.
4.4 Land use pattern
IOCL Kochi has already established a petroleum products import, storage and
distribution/marketing facility at Irumpanam, Thiruvankulam Village, Thripunithura
Municipality, Ernakulam District, Kerala. The proposed project is an Expansion and
Reallocation of Tanks of the storage facility within the existing premises. Land documents
are enclosed as Annexure 2.
The project is notified as ‘Prohibited Place’ by Vide GazetteNotification No. G.O. (MS)
No.79/99/Home dated 21.5.1999, Govt. of Kerala and as ‘Prohibited Place’ for Restriction of
entry and control of photography.
Hence, concern over the use of agriculture land, non-agriculture land, forest land and water
bodies does not arise. The land use pattern of the study area is given in Figure 4-3 and
Table 4-6.
39
Figure 4-3 Land use pattern of the Study Area
Table 4-6 Land use pattern of the Study Area
Total Project Study Area: 341.05 Sq. Km
Description % Sq. Km Acre Ha
Plantation 41.41915 141.26 34906.05 14126
Urban 34.81308 118.73 29338.78 11873
Reservoirs/Lakes/ Ponds
9.303621 31.73 7840.642 3173
Cropland 5.330597 18.18 4492.369 1818
Rural 5.254362 17.92 4428.122 1792
River/ Stream/Canals
2.248937 7.67 1895.295 767
Scrub land 1.084885 3.7 914.2885 370
Fallow land 0.466207 1.59 392.897 159Swamp/MangroveForest
0.067439 0.23 56.83415 23
CoastalWetland
0.011728 0.04 9.8842 4
Total 100 341.05 84275.16 34105
4.5 Soil classification
The soil classification of the project study area is Red loam. The soils range from acidic to
neutral. The texture of the soil is generally brownish red with gravel.
40
4.6 Climate data from secondary sources
The average annual rainfall of Kochi is 2,978.0 mm. The major sources of irrigation in the
district are rivers, water channels and wells.
Climate: Tropical monsoon type of climate prevails in the plains. However, upper hilly areas
record low temperatures and fairly heavy rainfall.
Temperature: The maximum and minimum atmospheric temperatures are 30° C and 25° C
respectively. Heat becomes intense in April and May and shoots further up unless interfered
by monsoonal rains in June.
The predominant wind direction is from W to E. The yearly average temperatures recorded
varied from 23.97 0C – 30.91 0C. The mean wind speed recorded is 36 km/hr. The yearly
average humidity (%) is 75.90 %. The metrological observation is as shown in Table 4-7.
Table 4-7 Meteorological Observations
S. No Parameter Observation1 Wind Direction SW to NE2 Mean Wind Speed 1.8 m/s4 Temperature Range 25 0C - 30 0C5 Average Humidity 75.90 %
The wind rose diagram for Kochi is included in Figure 4-4.
Figure 4-4 Wind Rose plot of Kochi
41
4.7 Social Infrastructure available
The social infrastructure facilities available within in 10 km radius along with aerial
distances are given in Table 4-8.
Table 4-8 Project surrounding features
S. No Name ≃ Distance (Km) DirectionIndustries
1 BPCL LPG Bottling Plant 2.92 E2 FACT 0.70 ESE3 HP Oil Company 0.03 N4 Hindustan Organic Chemicals Ltd 3.30 ESE5 FACT Fertilizer Godown 9.00 NNW
Schools & Colleges
1 The Choice School 2.15 SSW
2 Rajagiri School of Engineering & Technology 0.82 NE
3 Cochin Refineries School 4.8 E
4 Dawn International School 4.7 E
5 Nalanda Public School 4.2 W
Religious Places
1 Thamarakulangara Sree Dharmasastha Temple 3.70 SW
2 Shree Kuladevatha Mandir 3.70 E
3 Bhagavathi Temple 6.30 SE
4 Sree Bhagavathi Temple 5.10 NE
5 Sri Krishna Temple 7.29 SW
6 SNDP Temple 7.15 SW
7 St. George Church Edappally 2.2 WSW
8 St. Michaels Church 4.5 NW
9 St. Mary’s Cathedral 8.25 WSW10 St. Antony’s Chapel 5.02 SW11 St. Mary’s Chapel 2.93 SW12 St. Thomas Church 8.76 SSE13 St. Johns Church 8.40 SE14 Little Flower Church 7.80 ESE15 St. Peters Church 8.50 NE16 St. Antony’s Church 9.74 NW17 Al Hilal Masjid 8.30 WNW18 Thevara Jumma Masjid 7.98 SW
19 Hayathul Islam Mosque 3.8 NW
42
4.8 Existing infrastructure
a. Land
The terminal facilities are spread over 78.65 Acres of land which is completely fortified and
protected on all four sides by boundary walls.
b. Buildings
Total built up area is divided into various sections like storage tanks, pipelines, truck filling
areas, administration, canteen, toilets & other utilities etc. There is adequate space &
provision for operations.
c. Storage Terminal & Utilities
The Storage Terminal Facilities which comprise tank farm and dykes, pump house, taker
filling bays, administration, canteen, roads & parking, utilities and associated pipelines along
with safety & firefighting systems have been designed and set up with the objective to carry
out almost all processes. Details of existing safety and firefighting equipment quantities and
capacities are given in Table 4-9.
20 Ilfathul Islam Juma Masjid 3.6 NE
Hospitals
1 Ernakulam Medical Centre 4.5 NW
2 Welcare Hospital 4.4 WSW
3 Government Hospital Thripunithura 4.0 SSW
4 Punarnava Bamboo Lagoon Ayurveda Village 3.2 SW
5 Amrita Ayurveda Medical Centre 3.5 SSW
Sensitive areas
1 Mangalavanam Bird Sanctuary 8.77 W
2 Chithrapuzha River 0.50 NNE
3 Kadambrayar River 0.95 SW
4 Wellington Island 8.40 WSW
5 Periyar River 14.5 N
43
Table 4-9 List of Existing Fire Fighting Facilities
Sl. No.Safety and Fire FightingEquipments Description Quantity Capacity
1 ABOVE GROUND STATICWATER TANK
4 Nos. 8290 KL
2 FIRE WATER PUMPS 5 Nos Each of 616 KL/hr flow rate
3 JOCKEY PUMPS 2 Nos Each of 55 KL/hr flow rate
4 Water sump for receiving waterthrough tank trucks
1 nos 80 KL
5 AIR COMPRESSORS 2 Nos
6 Manual Call Points 18 Nos
7 Hand Siren 8 Nos
8 Emergency shutdown switches 6 Nos Provided in all critical operatingareas
9 Oil Water Separator Provided before final water discharge
10 Automated ROVs 32 Nos Provided in all tank receipt,delivery and recirculation lines.
11 Gas Monitoring System (No. Ofsensors)
6 + 2 Nos 6 Nos open path detectors and 2nos. point type detectors
12 Electrically operated fire sirens 2 Nos
13 Fire Trolley 1 no.
14 Portable Explosimeter 2 Nos
15 Fire Hydrant Line Available throughout the terminal in line withOISD std. 244.
16 Monitors and hydrant Points Available throughout the terminal in line withOISD std. 244.
17 Fire hoses & Hydrant Nozzles (Jet,Fog, Mayura & Universal typenozzles)
Available throughout the terminal in line withOISD std. 244.
18 Sprinkler System Available in all six floating roof tanks where ClassA products are stored
19 Foam Pourer system Available in all 14 Nos. vertical above ground rooftanks where Class A products are stored
20 Auto rim seal fire detection andextinguishing system
Available in all six floating roof tanks where ClassA products are stored
44
Sl. No.Safety and Fire FightingEquipments Description
Quantity Capacity
21 Fixed type Medium Expansionfoam generators (MEFG)
Available in all six floating roof tanks where ClassA products are stored
22 Portable type Medium Expansionfoam generators (MEFG)
2 Nos.
23 Foam Compound (AFFF) 10,000litres
For use in petroleum fire
24 Foam Compound (ATC) 1000Litres
For use in ethanol fire
25 DCP Fire extinguisher – 9/10, 25& 75 kg
120Nos.
Positioned in line with OISD std.244
26 CO2 Fire extinguisher – 2 & 4.5 kg 25 Nos. Positioned in line with OISD std.244
27 Self contained air breathingapparatus (SCABA)
2 Nos 4 Nos. cylinders are available
28 Fire Proximity suit 2 Nos.
29 First Aid Kit Available in all work places
30 Non sparking tools 1 kit
31 Leak control Kit 1 No.
d. Filling Products into Road Tankers
Petroleum products in bulk are loaded in road tankers from mounded vessels using
Pumps and Compressors at Filling Booths.
When road tankers are loaded with products the displaced vapour is connected back to
the source sphere for reducing the pressure build up.
Measurements of products filled in tanker trucks for distribution against orders are
properly done.
e. Utilities
The Storage Facility will have the following utilities:
Receipt, storage and distribution of water for general use and fire fighting.
HT electrical power for the storage facility operation and lighting, DG sets are for
power back up.
45
f. Fire Protection
Fire protection facilities designed to fight one major fire. Water spray system provided in
storage tanks, truck filling and pump house filling shed as per OISD regulations. In addition
adequate number of portable fire extinguishers of dry chemical type shall be provided at
strategic points. Fire drills shall be conducted at regular intervals and the observations
recorded.
g. Safety Measures
The storage facility layout has been made to meet PCB requirements. Accordingly a green
belt of required width will be provided all around the facility. Currently a greenbelt width of
8 m is maintained in the northern periphery. IOCL will extend the greenbelt area in future to
comply with MoEF&CC/PCB regulations. Safety distances between facilities are being
provided as per PESO/ OISD norms. Also fire water tanks and pumps will be located
minimum 60 m away from risk areas as stipulated by OISD. Required number of firewater
pumps and jockey pumps are provided to take care of the fire hydrants. Four hours pumping
capacity is provided for the firewater tanks. Personnel intended to operate the storage facility
is well qualified and well trained. Facility operations supervised by a responsible engineer
and the plant overseen round the clock in shifts by supervisors who will report to the plant in-
charge. The storage facility personnel are well informed and well trained in fire hazards and
firefighting systems. Storage facility security system has been so envisaged to ensure strict
compliance of safety requirements and to take up prompt and proper action in case of any
emergency.
46
5. PLANNING BRIEF
5.1 Planning concept
M/s. IOCL Kochi is one of the premier Public Sector Undertakings which proposes an
augmentation of the terminal storage facilities in the existing project premises with
construction of new tanks and re-allocation of existing tanks held within 78.65 Acres of area
at Thiruvankulam Village, Thripunithura Municipality, Ernakulam District, Kerala.
The project site is well connected by highways and is of easy access to railway stations.
5.2 Population Projection
The existing employment of the project is 114 persons and after the expansion there is an
addition of manpower of 11, and so the total project manpower will be 125 persons (Table
5-1). Construction manpower is 50 people.
Table 5-1 Manpower of the project
Permanent Contractual Total
Existing 50 64 114
Proposed 5 6 11
Total 55 70 125
Note:1. 650 including (existing 550 and proposed 100) truck crew will use toilet facilities.
5.3 Land use planning
The total land available for the project is about 78.65 Acres (31.83 Ha), existing tankages
area is 23.7 Acres, and greenbelt utilized is 8.99 Acres (11.43 %). The proposed expansion
tankages area is 55510 Sq. m and therefore future expansion area is 13.7 Acres (within total
area of 78.65 Acres). Available land area is utilized for tanks, pipelines, buildings, facility,
roads and pavements, greenbelt, landscaping and future expansion uses.
47
5.4 Assessment of Infrastructure Demand
The existing storage terminal falls under the Vide Gazette Notification No. G.O. (MS)
No.79/99/Home dated 21.5.1999, Govt. of Kerala as ‘Prohibited Place’ for Restriction of
entry and control of photography within the premises of Indian Oil Corporation Ltd, Kochi,
located at Thiruvankulam Village, Thripunithura Municipality, Ernakulam District, Kerala.
The proposed one is an Expansion & Re-Allocation project for the storage terminal facilitiesin the existing project premises.
5.5 Amenities/Facilities
The existing project site is envisaged with Canteen facilities for employees, Occupational
Health Center (OHC) and Safe Assembly Points on emergency.
48
6. PROPOSED INFRASTRUCTURE
6.1 Industrial Area
The existing storage terminal falls under the Vide Gazette Notification No. G.O. (MS)
No.79/99/Home dated 21.5.1999, Govt. of Kerala as ‘Prohibited Place’ for Restriction of
entry and control of photography within the premises of Indian Oil Corporation Ltd, Kochi,
located at Irumpanam, Thiruvankulam Village, Thripunithura Municipality, Ernakulam
District, Kerala.
The proposed project is an Expansion & Re-Allocation of petroleum product storage facilities
to occur within the existing project area only.
6.2 Residential Area
IOCL Kochi was established in 1998 and it is notified as Prohibited Place by Government as
mentioned in section 6.1. As the proposed project is for Expansion and Reallocation of Tanks
of its terminal storage facilities within the existing project premises only, no housing
development is proposed.
6.3 Green belt
The total site area is 78.65 Acres (31.83 Ha). The existing green belt extent is 8.99 Acres i.e.
11.43 % of the total land area. An additional greenbelt area of 16.96 acres is required to be
developed to attain the prescribed 33% green belt guideline for industries.
6.4 Social Infrastructure
The project will provide employment to local youth and good supply of petroleum products
for commercial and transportation purposes, leading to an increase in their standard of living
which thereby helps strengthen the social infrastructure of the region.
6.5 Connectivity
The project site is well connected to the Seaport – Airport Road bordering the site in the west
and NH 47 at a distance of 4 km towards the west and is of easy access to railway stations.
49
6.6 Drinking Water Management
Water for the proposed project is purchased through approved road tankers.
6.7 Sewerage System
Sewage generated is 31 KLD, and will be sent to septic tank/soak pit. STP will be installed at
site during expansion.
6.8 Industrial Waste Management
The details of industrial waste management are included in Table 6-1.
Table 6-1 Industrial waste management details
S. No Description Sources Mitigation Measures1 Air Environment D.G. sets
There may be smallamounts of suspendeddust particles in airduring constructionphase
Transfer of petroleum products will bedone in a closed system involvingnegligible emissions of noxioussubstances.
DG set emissions will be covered bysufficient stack height 30 m AGL as perSPCB norms.
HSD (High Speed Diesel) with sulphurcontent of < 0.05 % will be used for DGsets.
There may be small amounts ofsuspended dust particles in air duringconstruction phase which will becontrolled by dust suppression measureslike sprinkling of water. Gases generatedduring welding of steel structures willbe negligible and will pose no risk toenvironment
2 NoiseEnvironment
DG Sets Compressors & Pumps
Existing BIS approved stand by DG setsused with acoustic enclosure as SPCBnorms
Operation involves transfer of productsproducing negligible noise or vibration.During mechanized construction phase,some noise may be generated. Due toarc welding process for construction oftanks, some light may be emitted andthe same shall be shielded duringconstruction.
Increase in noise due to movement oftrucks only during construction
3 WaterEnvironment
Domestic wastewater
Tank cleaning effluent
Domestic wastewater sent to septictank/soak pit
Tank cleaning effluent is transferred tooil water separator (OWS) for oilseparation and retrieved oil is pumpedback to tank. The recycled water is used
50
for greenbelt maintenance.4 Solid & Hazardous
waste Used oil/spent oil Tank bottom sludge Organic waste
Hazardous waste materials are properlydisposed as per the Hazardous andOther Wastes (Management andTransboundary Movement)Amendment Rules, 2016.
Hazardous waste collection, storage &disposal to authorized recyclers.
Organic waste to be treated in biogasplant at site.
51
7. REHABILITATION AND RESETTLEMENT (R &R) PLAN
7.1 Policy to be adopted (Central/ State)
IOCL Kochi, established in 1998 is notified as Prohibited Place by Government through the
Vide Gazette Notification No. G.O. (MS) No.79/99/Home dated 21.5.1999 for restriction of
entry and control of photography, and is located at Thiruvankulam Village, Thripunithura
Municipality, Ernakulam District, Kerala.
As this proposal is for Expansion and Reallocation of Tanks of storage facilities in the
existing project premises, no housing development is proposed.
52
8. PROJECT SCHEDULE AND COST ESTIMATE
8.1 Likely date of start of construction and likely date of completion
Project’s likely period of construction is 24 months from the date of securing all statutory
Approvals / Licenses.
8.2 Estimated project cost
The total estimated project cost is Rs. 31,289.59 Lakhs.
53
9. ANALYSIS OF PROPOSAL
9.1 Financial and social benefits
Financial:
Projected Annual Turnover: Nil as this is an enhancement of storage facility.
Anticipated Annual Profit: Nil as this is an enhancement of storage facility.
Social Benefit:
Employment shall be provided to local community as per the requirement.
CSR benefit to local community:
M/s. IOCL recognizes the role of the community in shaping the company and the
responsibility, it shoulders towards facilitating a sustainable transformation in this enabling
environment. Summary of CSR details is given in Table 9-1.
54
Table 9-1 CSR Details
S. No.Select
Thrust AreaPlace District
Brief Project
Description
Completion
Date
Rs lakh
Projected/Spent
2013-2016
1 Education Tripunithura ErnakulamProviding Toilet Block for GovernmentBoy's Higher secondarySchool,Tripunithura, Dist Ernakulam
31.03.16 20.50
2 Education Malippuram ErnakulamBenches/desks/Teachers' chairs/ utensils forcooking, IIVUP school
28.03.13 5.01
3 Education Murikkumpadam ErnakulamDesk/Benches/Baby friendly chairs/DeskTop Computer /Closed Glass shelf forbooks/ St. Mary's LP School
3.1
4 Education Elamkunnappuzha ErnakulamKitchen/Library/Staff Room/EuropeanPrimary School
14.97
5 Education Kochi ErnakulamProviding School Bus for School ServingDifferently abled children/SnehanilayamSpecial School
22.03.2014 10.85
6 Education Elamkunnappuzha ErnakulamSmart Computer Class facility for EuropeanPrimary School
31.03.14 1.6
7 Drinking Water Udayamperoor ErnakulamProviding Drinking Water filtration systemfor preschool children/12 Anganwadies
28.03.2014 0.680
8 Health & medical Care Udayamperoor Ernakulam Health Camps(2 nos)08.09.13 &
23.11.132
In pipeline
1 EducationManakkunnam(Udayamperoor)
ErnakulamKitchen for Government VigyanodayaBasic School 20
2 Social Infrastructure Aluva Ernakulam Construction of additional building forHome for Aged and Infirm, Aluva 40
3 Education ErnakulamErnakulam
Provision of smart classroom/computers atSt. Joachim UP School, Kathrikadavu
4
Greenbelt benefits to the environment:
M/s. IOCL maintains an 8 m wide greenbelt inside the facility premises and also planted trees in the peripheral boundary for environmentalprotection.
55
10. CONCLUSION
The proposed project is for construction of new tanks and reallocation of existing tank
facilities for Motor Spirit, High Speed Diesel and SKO storage.
Since the proposed expansion is within the existing project premises, there will not be
any change in land use, and no significant increase in effluent generation. However,
there is increase in hazardous waste generation due to addition of storage tanks. There
is no significant increase in air emissions.
The project site shall require no displacement of habitation as it is located away from
the habitation areas and the expansion is proposed within the existing land area only.
Socio-economic benefits to the local folk as it would provide both direct and indirect
employment in the operation of the plant.
There will be positive impacts on social conditions in and around the site due to the
proposed assignment.
The marginal impact due to the proposed assignment will be fully mitigated by the
Environmental Management Plan (EMP).
.