APPLICATION DOCUMENT REF. NO. 4.10 KEY PLAN INDICATIVE … · Landscape Planting Indicative...
Transcript of APPLICATION DOCUMENT REF. NO. 4.10 KEY PLAN INDICATIVE … · Landscape Planting Indicative...
"
"
"
"
"
"
"
"
"
"
ExistingMainEntrance
TranmoreLaneEntrance
4.10_SHT1
4.10_SHT2
4.10_SHT3
4.10_SHT4
4.10_SHT5
4.10_SHT6
Client
Dra wnSJDa te18/05/2017
CheckedJW
ApprovedKC
Dra wing Number4.10 KEY PLAN
Project T itle
APPLICAT ION DOCU MENT REF. NO. 4.10 KEY PL ANINDICAT IV E GAS SU PPL Y PIPELINE
CONNECT ION WORKS: PIPELINE SECT IONS
Reproduced from Ordnance Survey digita l ma p da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673
100 0 100 200 300 400 500m
±
Sca le @ A31:12,500
Scott HouseAlençon L ink, Ba singstokeHampshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com
AECOM
Purpose of Issue
T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HE T ERMS OFAECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO LIABIL IT Y FOR ANY U SE OF T HIS
DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT OR FOL LOWING AECOM'S EXPRESS AGREEMENTT O SU CH U SE, AND ONL Y FOR T HE PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.
Rev
File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor_Overview.mxd
LEGENDT he Order L imits
"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting
Indica tive Construction T echnique(within Pipeline Construction Corridor)
Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction
EGGBOROU GH POWER L T DEGGBOROU GH CCGT DCODra wing T itle
Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)
4.10_SHT7
INDICAT IV E GAS SU PPL Y PIPEL INECONNECT ION WORKS T Y PICAL CROSSSECT ION OF CONST RU CT ION CORRIDOR
01
DCO APPLICATION
"
"Proposed AGI
West LaneAccess
Purpose of Issue
Project T itle
Dra wing T itle
Dra wn Checked
Scott HouseAlençon L ink, Ba singstokeHa mpshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com
AECOM
Da teApproved
Dra wing Number
4.10_SHT1
T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HET ERMS OF AECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO L IABIL IT YFOR ANY U SE OF T HIS DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT ORFOL L OWING AECOM'S EXPRESS AGREEMENT T O SU CH U SE, AND ONL Y FOR T HE
PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.
AECOM Interna l Project No. Sca le @ A360506766 1:2,500SJ JW EB 18/05/2017
Client
File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor.mxd
±50 0 50 100 150 200m
L EGENDT he Order L imits
"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting
Indica tive Construction T echnique(within Pipeline Construction Corridor)
Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction
APPLICAT ION DOCU MENTREF. NO. 4.10 SHEET 1
INDICAT IV E GAS SU PPL Y PIPELINECONNECT ION WORKS:PIPELINE SECT IONS
EGGBOROU GH CCGT DCO
EGGBOROU GH POWER L T D
T HIS DRAWING IS T O BE U SED ONL Y FOR T HE PU RPOSE OFISSU E T HAT IT WAS ISSU ED FOR AND IS SU BJECT T O AMENDMENT
CopyrightReproduced from Ordnance Survey digita l map da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673.
Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)
DCO APPLICATION
Rev:
01
"
"
Burn LodgeFarm Access
(Construction Only)
Whitings LaneAccess
Purpose of Issue
Project T itle
Dra wing T itle
Dra wn Checked
Scott HouseAlençon L ink, Ba singstokeHa mpshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com
AECOM
Da teApproved
Dra wing Number
4.10_SHT2
T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HET ERMS OF AECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO L IABIL IT YFOR ANY U SE OF T HIS DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT ORFOL L OWING AECOM'S EXPRESS AGREEMENT T O SU CH U SE, AND ONL Y FOR T HE
PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.
AECOM Interna l Project No. Sca le @ A360506766 1:2,500SJ JW EB 18/05/2017
Client
File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor.mxd
±50 0 50 100 150 200m
L EGENDT he Order L imits
"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting
Indica tive Construction T echnique(within Pipeline Construction Corridor)
Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction
APPLICAT ION DOCU MENTREF. NO. 4.10 SHEET 2
INDICAT IV E GAS SU PPL Y PIPELINECONNECT ION WORKS:PIPELINE SECT IONS
EGGBOROU GH CCGT DCO
EGGBOROU GH POWER L T D
T HIS DRAWING IS T O BE U SED ONL Y FOR T HE PU RPOSE OFISSU E T HAT IT WAS ISSU ED FOR AND IS SU BJECT T O AMENDMENT
CopyrightReproduced from Ordnance Survey digita l map da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673.
Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)
DCO APPLICATION
Rev:
01
"
Fox LaneAccess
Purpose of Issue
Project T itle
Dra wing T itle
Dra wn Checked
Scott HouseAlençon L ink, Ba singstokeHa mpshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com
AECOM
Da teApproved
Dra wing Number
4.10_SHT3
T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HET ERMS OF AECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO L IABIL IT YFOR ANY U SE OF T HIS DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT ORFOL L OWING AECOM'S EXPRESS AGREEMENT T O SU CH U SE, AND ONL Y FOR T HE
PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.
AECOM Interna l Project No. Sca le @ A360506766 1:2,500SJ JW EB 18/05/2017
Client
File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor.mxd
±50 0 50 100 150 200m
L EGENDT he Order L imits
"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting
Indica tive Construction T echnique(within Pipeline Construction Corridor)
Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction
APPLICAT ION DOCU MENTREF. NO. 4.10 SHEET 3
INDICAT IV E GAS SU PPL Y PIPELINECONNECT ION WORKS:PIPELINE SECT IONS
EGGBOROU GH CCGT DCO
EGGBOROU GH POWER L T D
T HIS DRAWING IS T O BE U SED ONL Y FOR T HE PU RPOSE OFISSU E T HAT IT WAS ISSU ED FOR AND IS SU BJECT T O AMENDMENT
CopyrightReproduced from Ordnance Survey digita l map da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673.
Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)
DCO APPLICATION
Rev:
01
"
Millfield RoadAccess
Purpose of Issue
Project T itle
Dra wing T itle
Dra wn Checked
Scott HouseAlençon L ink, Ba singstokeHa mpshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com
AECOM
Da teApproved
Dra wing Number
4.10_SHT4
T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HET ERMS OF AECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO L IABIL IT YFOR ANY U SE OF T HIS DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT ORFOL L OWING AECOM'S EXPRESS AGREEMENT T O SU CH U SE, AND ONL Y FOR T HE
PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.
AECOM Interna l Project No. Sca le @ A360506766 1:2,500SJ JW EB 18/05/2017
Client
File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor.mxd
±50 0 50 100 150 200m
L EGENDT he Order L imits
"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting
Indica tive Construction T echnique(within Pipeline Construction Corridor)
Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction
APPLICAT ION DOCU MENTREF. NO. 4.10 SHEET 4
INDICAT IV E GAS SU PPL Y PIPELINECONNECT ION WORKS:PIPELINE SECT IONS
EGGBOROU GH CCGT DCO
EGGBOROU GH POWER L T D
T HIS DRAWING IS T O BE U SED ONL Y FOR T HE PU RPOSE OFISSU E T HAT IT WAS ISSU ED FOR AND IS SU BJECT T O AMENDMENT
CopyrightReproduced from Ordnance Survey digita l map da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673.
Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)
DCO APPLICATION
Rev:
01
Purpose of Issue
Project T itle
Dra wing T itle
Dra wn Checked
Scott HouseAlençon L ink, Ba singstokeHa mpshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com
AECOM
Da teApproved
Dra wing Number
4.10_SHT5
T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HET ERMS OF AECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO L IABIL IT YFOR ANY U SE OF T HIS DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT ORFOL L OWING AECOM'S EXPRESS AGREEMENT T O SU CH U SE, AND ONL Y FOR T HE
PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.
AECOM Interna l Project No. Sca le @ A360506766 1:2,500SJ JW EB 18/05/2017
Client
File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor.mxd
±50 0 50 100 150 200m
L EGENDT he Order L imits
"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting
Indica tive Construction T echnique(within Pipeline Construction Corridor)
Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction
APPLICAT ION DOCU MENTREF. NO. 4.10 SHEET 5
INDICAT IV E GAS SU PPL Y PIPELINECONNECT ION WORKS:PIPELINE SECT IONS
EGGBOROU GH CCGT DCO
EGGBOROU GH POWER L T D
T HIS DRAWING IS T O BE U SED ONL Y FOR T HE PU RPOSE OFISSU E T HAT IT WAS ISSU ED FOR AND IS SU BJECT T O AMENDMENT
CopyrightReproduced from Ordnance Survey digita l map da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673.
Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)
DCO APPLICATION
Rev:
01
"
"
"
ExistingHensall Gate
Entrance
Existing WandLane Access
Additional WandLane Access
(Construction Only)
Purpose of Issue
Project T itle
Dra wing T itle
Dra wn Checked
Scott HouseAlençon L ink, Ba singstokeHa mpshire, RG21 7PPT elephone (01256) 310200Fa x (01256) 310201www.a ecom.com
AECOM
Da teApproved
Dra wing Number
4.10_SHT6
T HIS DOCU MENT HAS BEEN PREPARED PU RSU ANT T O AND SU BJECT T O T HET ERMS OF AECOM'S APPOINT MENT BY IT S CL IENT . AECOM ACCEPT S NO L IABIL IT YFOR ANY U SE OF T HIS DOCU MENT OT HER T HAN BY IT S ORIGINAL CL IENT ORFOL L OWING AECOM'S EXPRESS AGREEMENT T O SU CH U SE, AND ONL Y FOR T HE
PU RPOSES FOR WHICH IT WAS PREPARED AND PROV IDED.
AECOM Interna l Project No. Sca le @ A360506766 1:2,500SJ JW EB 18/05/2017
Client
File Name:K:\5004 - Information Systems\60506766_Eggborough_CCGT_DCO\02_Maps\DCO Application\_DCO Application Document\Doc 4.10 Indicative Gas Supply Pipeline Connection Works Plans\Figure 4_10 - Whole Pipeline Corridor.mxd
±50 0 50 100 150 200m
L EGENDT he Order L imits
"Access Point to Ga s PipelineCorridorFeeder 29 (existing ga s pipeline)DCO Ga s Pipeline AlignmentL a ndsca pe Pla nting
Indica tive Construction T echnique(within Pipeline Construction Corridor)
Auger BoringHorizonta l Directiona l DrillingOpen Cut T rench Construction
APPLICAT ION DOCU MENTREF. NO. 4.10 SHEET 6
INDICAT IV E GAS SU PPL Y PIPELINECONNECT ION WORKS:PIPELINE SECT IONS
EGGBOROU GH CCGT DCO
EGGBOROU GH POWER L T D
T HIS DRAWING IS T O BE U SED ONL Y FOR T HE PU RPOSE OFISSU E T HAT IT WAS ISSU ED FOR AND IS SU BJECT T O AMENDMENT
CopyrightReproduced from Ordnance Survey digita l map da ta © Crown copyright 2017. All rights reserved. L icence number 0100031673.
Infra structure Pla nning (Applica tions: PrescribedForms and Procedures)Regula tions 2009 – Regula tion 5(2)(o)
DCO APPLICATION
Rev:
01
36mWORKING WIDTH
TEMPORARYFENCING
TEMPORARYFENCING
TRENCH
SUBSOIL
TOPSOILPIPE WORKING AREA
6m 6m 4m 5m 7m 8mSUBSOILSTORAGE
PIPETRENCH
PIPE LAYINGAREA
CONSTRUCTIONEQUIPMENT
AREA
RUNNINGTRACK
TOP SOIL STORAGE
Filenam
e: C
:\U
SE
RS
\G
AR
ET
H.B
LO
OM
ER
\A
PP
DA
TA
\LO
CA
L\M
IC
RO
SO
FT
\W
IN
DO
WS
\T
EM
PO
RA
RY
IN
TE
RN
ET
F
ILE
S\C
ON
TE
NT
.O
UT
LO
OK
\F
8B
NL4A
5\F
IG
UR
E 4.10 - S
HT
7.D
WG
Last saved by: M
IC
HA
EL.S
AV
AG
E Last P
lotted: 2017-05-25
IS
O A
3 297m
m x 420m
m
Scott HouseAlençon Link, BasingstokeHampshire, RG21 7PPTelephone (01256) 310200Fax (01256) 310201www.aecom.com
AECOM
Project Title
Client
Purpose of Issue
Drawing Title
Drawn Checked Approved Date
Scale @ A3AECOM Internal Project No.
THIS DOCUMENT HAS BEEN PREPARED PURSUANT TO AND SUBJECT TO THETERMS OF AECOM'S APPOINTMENT BY ITS CLIENT. AECOM ACCEPTS NO LIABILITY
FOR ANY USE OF THIS DOCUMENT OTHER THAN BY ITS ORIGINAL CLIENT ORFOLLOWING AECOM'S EXPRESS AGREEMENT TO SUCH USE, AND ONLY FOR THE
PURPOSES FOR WHICH IT WAS PREPARED AND PROVIDED.
Drawing Number Rev
THIS DRAWING IS TO BE USED ONLY FOR THE PURPOSE OFISSUE THAT IT WAS ISSUED FOR AND IS SUBJECT TO AMENDMENT
Copyright
60506766
4.10_SHT 7
DCO APPLICATION
KC
01
EGGBOROUGH POWER LTD
MS
EGGBOROUGH CCGT DCO
RW
NOTES
1. DIMENSIONS ARE INDUCTIVE.
APPLICATION DOCUMENT REF. NO. 4.10 SHEET 7
INDICATIVE GAS SUPPLY PIPELINECONNECTION WORKS TYPICAL CROSS
SECTION OF CONSTRUCTION CORRIDOR
20.05.2017
INFRASTRUCTURE PLANNING (APPLICATIONS:PRESCRIBED FORMS AND PROCEDURES)REGULATIONS 2009 -REGULATION 5(2)(O).