    Response to ASD Comments

    ASD Comments (LetterRef: ASD63/6104/SSP318/C50/500(104) )

    Submission 1st AIP 3rd Submission Central Plants and Rooms and Undergroundand External Works (Part B Open Space)

    Sub. Date: 12-Jan-2009

    Doc. Ref.: DSF/BS/143

    ASD Comment JRP Response Appendix

    1 Major comments on design brief and reports:-

    a Clause 1.0 - Introduction

    i) The scope of this submission package and the space/areas, which are

    classified as Open Space presumably to be managed by LCSD, to be

    covered under the submission are still missing from the report (3rd

    reminder)

    Have been revised in this report.

    The details demarcation of the Open Space areas can refer to

    Appendix - D for details.

    -

    ii) The facilities shared use amongst the different user groups of

    CGC/LegCo, CGC/Open Space, CGC/LegCo/Open Space and

    LegCo/Open Space should be under separate package of communalfacilities. This submission shall only be focused on Open Space and

    shared facilities in relation to Open Space

    Have been revised in this report. -

    b Clause 2.1.2 Design Criteria for MV space

    Only those rooms/areas solely designed for Open Space should be

    mentioned in the design criteria table. Design criteria for irrigation

    water pump room, water pump room, filtration plant room, etc., which

    are served use should be submitted under Common Facilities

    package

    Have beed revised in this report. -

    c Clauses 2.2.3 & 2.2.4 - Plumbing and drainage installations

    Plumbing and drainage installations shall be submitted under separate

    packages

    Noted. -

    Clause 2.2 Air and water distribution velocity

    d The proposed design criteria for air distribution velocity shall be

    subject to the recommendation of acoustic report.

    Noted. -

    e Clause 3.1.1 AC system

    Tee off reserve from the central chiller plant should be allowed for

    Open Space.

    Chilled water and hot water tee-off will be provided inside

    Central chiller plant room.

    -

    Ref

  • 7/30/2019 Appendix - Response to ASD Comment2

    2/7

    Response to ASD Comments

    ASD Comments (LetterRef: ASD63/6104/SSP318/C50/500(104) )

    Submission 1st AIP 3rd Submission Central Plants and Rooms and Undergroundand External Works (Part B Open Space)

    Sub. Date: 12-Jan-2009

    Doc. Ref.: DSF/BS/143

    ASD Comment JRP Response AppendixRef

    f Clause 3.1.2.4 Park toilet

    CCMS with time scheduling supplemented with local control for

    circulating fans installed in toilets shall be provided.

    Confirmed to provide. -

    g Clause 3.1.3 - CCMS

    Description of CCMS proposed shall be specific for Open Space.

    Irrelevant information shall be removed from the report

    Have been revised in this report. -

    h Clause 3.2 FS installation

    Areas/rooms of Open Space proposed with shared use of fire hydrant/hose reel system, sprinkler, street hydrant, manual fire alarm, AFA,

    shall be summarized in the report for ease of reference

    i Clause 3.2.5 AFA

    i) The fire alarm and evacuation matrix table has not included Open

    Space

    ii) Please note the comment made on the same table under CGCO,

    CGCL and LegCo submissions

    iii) Fire alarm signal to be repeated to fire repeater station in Park

    Management office shall be stated in the report

    iv) Please indicate whether the actuation of building alarm will trigger the

    alarming in facilities of Open Space or vice versa

    j Clause 3.5 Electrical installation

    i) In view of optimization of transformer loading capacity, please review

    if the electric loading of common facilities/ open space can be

    combined into one single transformer and paired up with the

    transformer group of central chiller plant for resilience design

    It will be revised in schematic drawing and loading estimation

    in report

  • 7/30/2019 Appendix - Response to ASD Comment2

    3/7

  • 7/30/2019 Appendix - Response to ASD Comment2

    4/7

    Response to ASD Comments

    ASD Comments (LetterRef: ASD63/6104/SSP318/C50/500(104) )

    Submission 1st AIP 3rd Submission Central Plants and Rooms and Undergroundand External Works (Part B Open Space)

    Sub. Date: 12-Jan-2009

    Doc. Ref.: DSF/BS/143

    ASD Comment JRP Response AppendixRef

    p Clause 3.5.13 Active harmonic filtering equipment

    Harmonic filter shall be sized according to the harmonic

    characteristics of the associated non-linear equipment load so as to

    meet the requirement as laid down in the Electrical Energy Code

    instead of 15% of the rating of the connected load as stated in the

    report. Design calculation shall be submitted

    It will be provided in DDA.

    q Clause 3.5.15 Lightning protection system

    Lightning protection system proposed shall be subject to your

    submission of risk assessment as per the BS EN 62305 which has

    superseded BS6651 as effective on 31 Aug 2008

    It will be incorporated in report.

    r Clause 3.5.16 Public address system

    Design criteria of sound level shall be given in the report.

    It will be incorporated in report.

    s Clause 3.5.17 - Induction loop system.

    Please state the area of Open Space is to be provided with induction

    loop system. (2nd reminder)

    It will be incorporated in report.

    t Clause 3.5.18 Water leakage detection system

    Please explicitly state where the leakage detection system is to beprovided for Open Space. The proposed areas fall outside the scope of

    Open Space. Please review

    u Clause 3.5.19 Intercommunication system

    Please confirm whether intercom has been allowed for plant rooms of

    Open Space and EMSD office which is located under the Green

    Carpet

    It will be incorporated in report.

    v Appendix D Demarcation plan

    Please update the demarcation plan based on the latest agreement with

    the users. Also, please check and confirm if the B/F drivers room isunder management of Open Space

    The demarcation plan has been updated. The B/F driver's

    room is under the management of CGCO.

    Appendix-D

  • 7/30/2019 Appendix - Response to ASD Comment2

    5/7

    Response to ASD Comments

    ASD Comments (LetterRef: ASD63/6104/SSP318/C50/500(104) )

    Submission 1st AIP 3rd Submission Central Plants and Rooms and Undergroundand External Works (Part B Open Space)

    Sub. Date: 12-Jan-2009

    Doc. Ref.: DSF/BS/143

    ASD Comment JRP Response AppendixRef

    w Appendix E Load estimate

    i) Please elaborate the breakdown of load estimate of (150kVA normal

    + 37kVA essential) allowed for building landscape lighting

    Noted and It will be subject to LDP design.

    ii) Please elaborate the breakdown of load estimate of 60kVA allowed

    for ACMV installation

    It will be shown in load estimation.

    iii) Please elaborate the breakdown of load estimate of 132kVA allowed

    for irrigation water pump (2nd

    reminder)

    It will be shown in load estimation.

    iv) Please elaborate the breakdown of load estimate of 158kVA allowed

    for water feature (2nd

    reminder)

    It will be shown in load estimation.

    v) Firemans lift has been included into the load schedule of FSI

    generator. Please clarify if such is allowed for Open Space. If not,

    please delete it from the schedule

    It will be incorporated in common area report.

    x Appendix F Schedule of Maintenance Work

    The maintenance schedule is incomplete. FS, CCMS, generator, etc.,

    have been missing from the schedule

    Have been included in this report.

    y Appendix I Major Equipment Maintenance Route

    The proposed access route for major equipment maintenance in

    basement has not been shown on the submitted drawings. Also, the

    minimum clearance of access dimension required to be maintained all

    along the route is to be given.

    Will be provided in DDA submission for the details of

    maintenance route.

    z Please elaborate the design provision to cater for seismic situation and

    natural disasters as per the requirement stated in the ER.

    Have been included in this report. Section 1.0 in design report.

  • 7/30/2019 Appendix - Response to ASD Comment2

    6/7

    Response to ASD Comments

    ASD Comments (LetterRef: ASD63/6104/SSP318/C50/500(104) )

    Submission 1st AIP 3rd Submission Central Plants and Rooms and Undergroundand External Works (Part B Open Space)

    Sub. Date: 12-Jan-2009

    Doc. Ref.: DSF/BS/143

    ASD Comment JRP Response AppendixRef

    aa Maintenance requirements and strategy shall be proposed to address

    the shared use of installations amongst different groups of users, such

    as CGC/LegCo, CGC/LCSD, CGC/LegCo/LCSD or LegCo/LCSD.

    (2nd

    reminder)

    It will be provided in report.

    ab Please also refer to comments given on the same submission on

    Common Facilities for those areas relevant to the Open Space

    Have been included in this report. -

    ac Some of the replies to previous ArchSDs comments on 1st

    AIP 2nd

    submission is unsatisfactory. Please note the markup comment on the

    returned report and amend accordingly.

    Noted

    ad Please refer to other comments marked up on the returned design

    report

    Noted

    2 Major comments on drawings:-

    a Power distribution shall be divided into Open Space; Shared facilities

    of Open Space; and Shared facilities of non-open space

    There are two kind of power distribution. One is Open Space,

    another is Common area.

    b Power distribution feeders from the main cubicle switchboard and

    emergency generator cubicle designed for Open Space and Shared

    facilities of Open Space shall be dedicated in order to demarcate

    maintenance responsibility

    It will be shown in DDA drawings.

    c Local maintenance bypass switch shall be provided for those ATS of

    non-ACB or non-MCCB types.

    There is no ATS in kind of non ACB or non MCCB.

  • 7/30/2019 Appendix - Response to ASD Comment2

    7/7

    Response to ASD Comments

    ASD Comments (LetterRef: ASD63/6104/SSP318/C50/500(104) )

    Submission 1st AIP 3rd Submission Central Plants and Rooms and Undergroundand External Works (Part B Open Space)

    Sub. Date: 12-Jan-2009

    Doc. Ref.: DSF/BS/143

    ASD Comment JRP Response AppendixRef

    d Main switch shall be allowed for the respective main supplies of

    essential and normal power circuits of Open Space and Common

    Facilities in order to differentiate the ownership of the power supply

    system.

    It will be revised in schematic drawings.

    e Separate switchroom should be allowed for open space and common

    facilities for ease of future maintenance work under different

    ownership

    It will be revised in drawing layout.

    f PA Schematic The headend equipment of PA system should installed

    in Park Management office instead of G/F security control room

    Noted and will be incorporated in drawing layout.

    g Cubicle switchboard layout plan shall be submitted It will be incorporated in drawings.

    h IT infrastructure schematic diagram. Please indicate the provision for

    Open Space

    It will be incorporated in drawings.

    i The following areas/rooms which have been shown on Airside

    Schematic diagram should not be classified as open space:-

    HV generator room

    Fuel tank room for HV generator room

    It shall be SWHP plant room.