Appendix I Traffic Impact Analysis - Mt. San Jacinto … Intersection Lane Geometry and Control (1...

1074
I-15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendices August 2017 Appendix I Traffic Impact Analysis

Transcript of Appendix I Traffic Impact Analysis - Mt. San Jacinto … Intersection Lane Geometry and Control (1...

  • I - 1 5 C O R R I D O R C A M P U S M A S T E R P L A N D R A F T E I R M T . S A N J A C I N T O C O M M U N I T Y C O L L E G E D I S T R I C T

    Appendices

    August 2017

    Appendix I Traffic Impact Analysis

  • I - 1 5 C O R R I D O R C A M P U S M A S T E R P L A N D R A F T E I R M T . S A N J A C I N T O C O M M U N I T Y C O L L E G E D I S T R I C T

    Appendices

    PlaceWorks

    This page intentionally left blank.

  • Draft Report

    Wildomar Campus Master Plan Draft Traffic Study

    Prepared for Placeworks by IBI Group

    September 22, 2016

    I-1

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    Document Control Page

    CLIENT: Placeworks PROJECT NAME: Wildomar Campus Master Plan Traffic Study REPORT TITLE: Wildomar Campus Master Plan Traffic Study IBI REFERENCE: 100677 VERSION: DIGITAL MASTER: J:\100677_Wildomar_CC_TIA\10.0 Reports ORIGINATOR: Mike Arizabal REVIEWER: Bill Delo AUTHORIZATION: CIRCULATION LIST: HISTORY: Initial Draft submitted 9/1/2016; Second Draft submitted 9/22/2016

    September 1, 2016 I-2

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    Table of Contents

    1 Introduction .............................................................................................................. 1

    1.1 Study Purpose and Scenarios ...................................................................... 1 1.2 Report Sections ............................................................................................ 1

    2 Analysis and Methodology ..................................................................................... 4

    2.1 Signalized Intersections ................................................................................ 4

    2.2 Unsignalized Intersections ............................................................................ 5

    2.3 Caltrans Intersections ................................................................................... 5 2.4 Standard of Significance ............................................................................... 5

    2.5 Roadway Segment Analysis ......................................................................... 6

    2.6 Freeway Mainline Analysis ........................................................................... 6

    3 Existing (Year 2016) Conditions ............................................................................. 7

    3.1 Project Location and Study Area .................................................................. 7

    3.2 Roadway Network ......................................................................................... 7 3.3 Study Intersections ....................................................................................... 9

    3.4 Study Area Roadway Segments ................................................................. 12

    3.5 Study Area Freeway Mainline Segments .................................................... 12

    3.6 Study Periods and Scenarios ..................................................................... 12

    3.7 Existing Traffic Volumes ............................................................................. 12

    3.8 Existing Intersection LOS............................................................................ 15 3.9 Existing Roadway Segment LOS ................................................................ 16

    3.10 Existing Freeway Mainline LOS .................................................................. 17

    4 Future Traffic Volume Development .................................................................... 18

    4.1 Future Traffic Volumes ................................................................................ 18

    4.2 Ambient Traffic Growth ............................................................................... 18

    4.3 Cumulative Projects .................................................................................... 18

    September 1, 2016 i I-3

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    5 Opening (Year 2022) Conditions .......................................................................... 21

    5.1 Opening (Year 2022) Traffic Volumes ........................................................ 21 5.2 Opening (Year 2022) Intersection LOS ...................................................... 21

    5.3 Opening (Year 2022) Roadway Segment LOS .......................................... 24

    5.4 Opening (Year 2022) Freeway Mainline LOS ............................................. 25

    6 Interim (Year 2024) Conditions ............................................................................. 26

    6.1 Interim (Year 2024) Traffic Volumes ........................................................... 26

    6.2 Interim (Year 2024) Intersection LOS ......................................................... 26 6.3 Interim (Year 2024) Roadway Segment LOS ............................................. 29

    6.4 Interim (Year 2024) Freeway Mainline LOS ............................................... 30

    7 Future (Year 2030) Conditions.............................................................................. 31

    7.1 Future (Year 2030) Traffic Volumes ........................................................... 31

    7.2 Future (Year 2030) Intersection LOS .......................................................... 31 7.3 Future (Year 2030) Roadway Segment LOS .............................................. 34

    7.4 Future (Year 2030) Freeway Mainline LOS ................................................ 35

    8 Build Out (Year 2035) Conditions ........................................................................ 36

    8.1 Build Out (Year 2035) Traffic Volumes ....................................................... 36

    8.2 Build Out (Year 2035) Intersection LOS ..................................................... 36

    8.3 Build Out (Year 2035) Roadway Segment LOS ......................................... 40 8.4 Build Out (Year 2035) Freeway Mainline LOS ........................................... 40

    9 Proposed Project ................................................................................................... 41

    9.1 Project Description ...................................................................................... 41

    9.2 Trip Generation ........................................................................................... 42

    9.3 Trip Distribution ........................................................................................... 42

    10 Project Intersection Impact Analysis ................................................................... 43

    10.1 Existing (Year 2016) With Project Intersection LOS ................................... 43

    10.2 Opening (Year 2022) With Project Intersection LOS .................................. 43

    10.3 Interim (Year 2024) With Project Intersection LOS .................................... 43

    ii I-4

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    10.4 Future (Year 2030) With Project Intersection LOS ..................................... 43

    10.5 Build Out (Year 2035) With Project Intersection LOS ................................. 58

    11 Project Roadway Segment Impact Analysis ....................................................... 63

    11.1 Existing (Year 2016) With Project Roadway LOS ...................................... 63

    11.2 Opening (Year 2022) With Project Roadway LOS ..................................... 64

    11.3 Interim (Year 2024) With Project Roadway LOS ........................................ 64

    11.4 Future (Year 2030) With Project Roadway LOS ......................................... 65

    11.5 Build Out (Year 2035) With Project Roadway LOS .................................... 65

    12 Freeway Mainline Impact Analysis ...................................................................... 66

    12.1 Existing (Year 2016) With Project Mainline LOS ........................................ 66

    12.2 Opening (Year 2022) With Project Mainline LOS ....................................... 66

    12.3 Interim (Year 2024) With Project Mainline LOS .......................................... 67

    12.4 Future (Year 2030) With Project Mainline LOS .......................................... 68 12.5 Build Out (Year 2035) With Project Mainline LOS ...................................... 69

    13 Riverside County Congestion Management Plan (CMP) ................................... 70

    14 Parking Analysis .................................................................................................... 70

    15 Mitigation Measures .............................................................................................. 71

    15.1 Existing (Year 2016) With Project Intersection Impacts ............................. 71

    15.2 Existing (Year 2016) With Project Roadway Impacts ................................. 72 15.3 Existing (Year 2016) With Project Freeway Impacts .................................. 72

    15.4 Opening (Year 2022) With Project Intersection Impacts ............................ 73

    15.5 Opening (Year 2022) With Project Roadway Impacts ................................ 73

    15.6 Opening (Year 2022) With Project Freeway Impacts ................................. 74

    15.7 Interim (Year 2024) With Project Impacts ................................................... 74

    15.8 Interim (Year 2024) With Project Roadway Impacts ................................... 75 15.9 Interim (Year 2024) With Project Freeway Impacts .................................... 75

    15.10 Future (Year 2030) With Project Impacts ................................................... 76

    15.11 Future (Year 2030) With Project Roadway Impacts ................................... 78

    iii I-5

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    15.12 Future (Year 2030) With Project Freeway Impacts .................................... 78

    15.13 Build Out (Year 2035) With Project Impacts ............................................... 78 15.14 Build Out (Year 2035) With Project Roadway Impacts ............................... 81

    15.15 Build Out (Year 2035) With Project Freeway Impacts ................................ 81

    16 Local and Regional Funding Mechanisms .......................................................... 82

    16.1 TUMF Program ........................................................................................... 82

    16.2 Southwest RBBD Fee Program .................................................................. 82

    16.3 Wildomar DIF Program ............................................................................... 82 16.4 Fair-Share Contribution ............................................................................... 83

    17 Vehicle-Miles Travelled Analysis ......................................................................... 85

    18 Conclusion ............................................................................................................. 86

    Appendix ........................................................................................................................... 87

    A - Traffic Counts .......................................................................................................... 87 B - LOS Worksheets ..................................................................................................... 87 C - Freeway Mainline Analysis ..................................................................................... 87 D - Cumulative Projects Trip Generation ...................................................................... 87 E - With Project LOS Worksheets ................................................................................. 87 F - Mitigated LOS Worksheets ...................................................................................... 87

    iv I-6

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    List of Figures

    Figure 1. Project Location ............................................................................................... 2 Figure 2. Project Site Plan .............................................................................................. 3 Figure 3. Study Intersection Lane Geometry and Control (1 of 2) ................................ 10 Figure 3. Study Intersection Lane Geometry and Control (2 of 2) ................................ 11 Figure 4. Existing (Year 2016) Traffic Volumes (1 of 2) ............................................... 13 Figure 4. Existing (Year 2016) Traffic Volumes (2 of 2) ............................................... 14 Figure 5. Cumulative Residential Project Locations ..................................................... 19 Figure 6. Cumulative Commercial Project Locations .................................................... 20 Figure 7. Opening (Year 2022) AM/PM Peak Hour Traffic Volumes (1 of 2) ............... 22 Figure 7. Opening (Year 2022) AM/PM Peak Hour Traffic Volumes (2 of 2) ............... 23 Figure 8. Interim (Year 2024) AM/PM Peak Hour Traffic Volumes (1 of 2) .................. 27 Figure 8. Interim (Year 2024) AM/PM Peak Hour Traffic Volumes (2 of 2) .................. 28 Figure 9. Future (Year 2030) AM/PM Peak Hour Traffic Volumes (1 of 2) ................... 32 Figure 9. Future (Year 2030) AM/PM Peak Hour Traffic Volumes (2 of 2) ................... 33 Figure 10. Build Out (Year 2035) AM/PM Peak Hour Traffic Volumes (1 of 2) ............ 37 Figure 10. Build Out (Year 2035) AM/PM Peak Hour Traffic Volumes (2 of 2) ............ 38 Figure 11. Opening With Project AM/PM Peak Hour Traffic Volumes (1 of 2) ............. 46 Figure 11. Opening With Project AM/PM Peak Hour Traffic Volumes (2 of 2) ............. 47 Figure 12. Interim (2024) + Project AM/PM Peak Hour Traffic Volumes (1 of 2) ......... 50 Figure 12. Interim (2024) + Project AM/PM Peak Hour Traffic Volumes (2 of 2) ......... 51 Figure 13. Future (Year 2030) + Project AM/PM Peak Hour Traffic Volumes (1 of 2) . 54 Figure 13. Future (Year 2030) + Project AM/PM Peak Hour Traffic Volumes (2 of 2) . 55 Figure 14. Build Out With Project AM/PM Peak Hour Traffic Volumes (1 of 2) ............ 59 Figure 14. Build Out With Project AM/PM Peak Hour Traffic Volumes (2 of 2) ............ 60

    September 1, 2016 i I-7

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    1 Introduction The Mount San Jacinto Community College District (MSJCCD) is proposing to implement a Master Plan to construct and operate the I-15 Corridor Campus for Mt. San Jacinto Community College (MSJC).The campus would meet the demand for learning opportunities in accordance with the District Educational Master Plan, by providing the means to house instructional programs and related support services. Figure 1 shows the project location.

    1.1 Study Purpose and Scenarios The purpose of this report is to conduct a traffic analysis in support of an Environmental Impact Report (EIR) for the proposed project in Wildomar, California. The traffic analysis has been prepared to assess the potential circulation impacts associated with the construction and operation of the new I-15 Corridor Campus. The project would accommodate approximately 15,000 part-time or 10,000 full-time equivalent students (FTEs) at ultimate build-out. Approximately 400 staff would also be employed at full build out, including professors, administration, and other staff members. The proposed site plan is shown in Figure 2.

    1.2 Report Sections This report consists of the following sections:

    1 Introduction 2 Analysis and Methodology 3 Existing (Year 2016) Conditions 4 Future Traffic Volume Development 5 Opening (Year 2022) Conditions 6 Interim (Year 2024) Conditions 7 Future (Year 2030) Conditions 8 Build Out (Year 2035) Conditions 9 Proposed Project 10 Project Intersection Impact Analysis 11 Project Roadway Segment Impact Analysis 12 Project Freeway Mainline Impact Analysis 13 Riverside County CMP Analysis 14 Parking Analysis 15 Mitigation Measures 16 Local and Regional Funding Mechanisms 17 VMT Analysis 18 Conclusion

    1 I-8

  • Baxter Rd

    Monte Vista

    Clint

    on K

    eith

    Rd

    Nutm

    eg St

    Prielipp Rd

    Jackson Ave

    Palomar St

    George Ave

    Salida del Sol

    Inland Valley Dr

    Arya Rd

    Elizabeth Ln

    Calif

    orni

    a Oa

    ks R

    d

    Via Madrid

    Green Rd

    Murrei

    tta Oak

    s Rd

    McE

    lwai

    n Rd

    Whi

    tew

    ood

    Rd

    Hancock Ave

    LaEstrella St

    Clinton Keith Rd

    Los Ala

    mos R

    d

    Figure 1 Project Location

    IBI GROUP September 2016Wildomar Campus Master Plan Traffic Study

    1

    23

    4 56 7 8 9 10 11

    12 13 1415

    1617 18 19

    28 29 30

    20

    21

    22

    23

    24

    252627

    I-9

  • IBI GROUP September 2016Wildomar Campus Master Plan Traffic Study

    Figure 2 Project Site Plan

    200

    1

    22

    3

    5

    4

    7

    6

    6

    8

    9

    10

    11

    11

    12

    13

    14

    15

    15

    15 15

    17

    17

    18

    19

    19

    19

    20

    20

    20

    20

    21

    22

    22

    22

    23

    23

    24

    25

    27

    26

    28

    Phase I

    1 Library and technology center 74,000 sf2 Classroom building 47,000 sf3 Multipurpose building 47,000 sf

    Phase II

    4 Student Services / Student Union 89,000 sf5 Classroom Building 47,000 sf

    Phase III

    6 Science classroom buildings 94,000 sf7 Classroom building 47,000 sf8 Maintenance & operations building 8,000 sf

    Phase IV

    9 Gym / Fitness 42,000 sf

    Site Legend

    10 Main access driveway11 Secondary access driveway12 Exiting driveway13 Arrival / Drop-off14 Visitor parking15 General parking16 Overflow / Park access parking17 Pedestrian access spine18 Community park19 Linear stream park20 Protected riparian area21 Student green22 Courtyard23 Pedestrian bridge24 Access to Rattlesnake Hill25 Rattlesnake Hill26 Community play fields27 Community parking28 Tennis courts

    Building area

    Phase I 168,000 sfPhase II 136,000 sfPhase III 149,000 sfPhase IV 42,000 sf Total building area 495,000 sf

    Parking

    Parking ratio 4 spaces / 1,000 sfTotal parking 1,980 spaces

    INTEGRATED DESIGN

    MSJCCD / WILDOMAR CAMPUS MASTER PLAN I-10

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    2 Analysis and Methodology This section presents the methodology used to perform the traffic analysis, consistent with the City of Wildomar General Plan Circulation Element (September 2013), Caltrans Guide for the Preparation of Traffic Impact Studies (December 2002), and the Riverside County Traffic Impact Analysis Preparation Guide (April 2008). The methodology used to assess the operation of signalized intersections in Riverside County is the 2000 Highway Capacity Manual (HCM) methodology. HCM methodology presents levels of service (LOS) in terms of control delay in seconds per vehicle, which is defined as the average delay experienced at the traffic signal.

    2.1 Signalized Intersections The HCM methodology defines LOS as a qualitative measure that describes operational conditions within a traffic stream, generally in terms of such factors as speed and travel time, freedom to maneuver, traffic interruptions, comfort and convenience, and safety. The criteria used to evaluate LOS conditions vary based on the type of roadway and whether the traffic flow is considered interrupted or uninterrupted. The six qualitative categories of LOS and corresponding average delay that have been defined are presented below:

    Table 1: Categories of LOS for Signalized Intersections

    LOS Description Delay (sec)

    A No approach phase is fully utilized by traffic, and no vehicle waits longer than one red indication. Typically, the approach appears quite open, turns are made easily, and nearly all drivers find freedom of operation.

    0 -10

    B This service level represents stable operation, where an occasional approach phase is fully utilized, and a substantial number are nearing full use. Many drivers begin to feel restricted within platoons of vehicles.

    10 20

    C

    This level still represents stable operating conditions. Occasionally, drivers may have to wait through more than one red signal indication, and backups may develop behind turning vehicles. Most drivers feel somewhat restricted, but not objectionably so.

    20 35

    D

    This level encompasses a zone of increasing restriction approaching instability at the intersection. Delays to approaching vehicles may be sub-stantial during short peaks within the peak period; however, enough cycles with lower demand occur to permit periodic clearance of developing queues, thus preventing excessive backups.

    35 55

    E

    Capacity occurs at the upper end of this service level. It represents the most vehicles that any particular intersection approach can accom-modate. Full utilization of every signal cycle is attained no matter how great the demand.

    55 - 80

    F

    This level describes forced flow operations at low speeds, where volumes exceed capacity. These conditions usually result from queues of vehicles backing up from a restriction downstream. Speeds are reduced substantially, and stoppages may occur for short or long periods of time due to the congestion. In the extreme case, speed can drop to zero.

    80 or more

    Source: Highway Capacity Manual (2000)

    4 I-11

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    The Riverside County TIA Guidelines require specific assumptions regarding input values to the HCM methodology. These assumptions include:

    Saturation flow rate of 1,900 vehicles per hour per lane (vphpl);

    Signal cycle length range from 60 to 120 seconds;

    Four second lost time per phase; and,

    Credit for de facto right turn lanes (locations where a right turn lane is not striped, but enough width is provided such that vehicles are able to conduct right turns without disrupting through traffic in a shared through-right lane). A minimum of 20 feet from curb line to lane stripe is required.

    2.2 Unsignalized Intersections The two types of unsignalized intersections include two-way stop-controlled (TWSC) and all-way stop-controlled (AWSC). The delay range for unsignalized intersections is different from those of signalized intersections primarily due to driver expectation. The expectation is that signalized intersections are designed to carry higher volumes of traffic and therefore higher levels of delay are acceptable. The HCM methodology estimates the delay based on the worst approach at unsignalized intersections. Table 2 includes the LOS ranges for both intersection types.

    Table 2: Levels of Service for Intersections

    LOS Description Delay (sec) A Little or no delays 0 10 B Short traffic delays 10 15 C Average traffic delays 15 25 D Long traffic delays 25 35 E Very long traffic delays 35 50 F Extreme traffic delays with intersection capacity exceeded 50 or more

    Source: Highway Capacity Manual (2000), Chapter 17.

    2.3 Caltrans Intersections Per the Caltrans Guide for the Preparation of Traffic Impact Studies, intersections under the jurisdiction of Caltrans are also analyzed using the HCM methodology.

    2.4 Standard of Significance The Citys Circulation Element and County of Riverside LOS standards establish LOS D as the minimum acceptable level of service for major intersections in community development areas. Therefore, intersections operating at LOS E or F are considered deficient. Caltrans uses the transition between LOS C and LOS D as the threshold of acceptability, and generally, a delay of more than 45 seconds is considered unsatisfactory.

    Impacts to study area intersections are considered significant if:

    With addition of the proposed project, the LOS at any study area intersection deteriorates from acceptable to unacceptable LOS (e.g., from LOS C to LOS E); or

    When the proposed project creates or adds traffic to an intersection already operating at unsatisfactory LOS (below the target LOS of LOS D) by 5.0 seconds or more

    Recommendation of circulation improvements is required for all intersections operating at unsatisfactory LOS (i.e., LOS E or F).

    5 I-12

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    2.5 Roadway Segment Analysis A LOS analysis was prepared on existing roadway segments within the study area using daily roadway capacities. The roadway segment capacities are approximate figures only, and are used at the General Plan level to assist in determining the roadway functional classification (number of through lanes) needed to meet traffic demand. Roadway segment analysis is typically performed for planning purposes and are affected by such factors as intersections (spacing, configuration and control features), degree of access control, roadway grades, design geometrics (horizontal and vertical alignment standards), sight distance, vehicle mix (truck and bus traffic) and pedestrian and bicycle traffic.

    Table 3 presents the City of Menifee roadway segment capacities and LOS thresholds for each facility type. The roadway segment vehicle capacity thresholds represent the maximum two-way average daily traffic volume for LOS E conditions and are based on the 2001 County of Riverside General Plan Circulation Element Link Volume Capacities.

    The roadway segment analysis compares the ADT volume with the capacity to arrive at a volume to capacity or v/c ratio. Based on the v/c ratio, each study area roadway segment is classified into one of four categories; Acceptable (v/c 0.00-0.79), Approaching Capacity (v/c 0.80-1.00), Potentially Exceeds Capacity (v/c 1.01-1.25), and Exceeds Capacity (v/c > 1.26).

    The roadway segment daily capacity analysis is used to identify those roadway facilities that potentially exceed or exceed the estimated traffic volume for LOS E conditions. Since the LOS for each roadway segment is largely a function of the adjacent intersection operations, it is important to consider the intersection LOS in combination with the roadway segment v/c ratios. If the adjacent intersections are operating at an acceptable LOS during peak hour conditions, then it is likely that the roadway segment will also operate at an acceptable LOS even if the v/c ratio indicates that the ADT may approach or exceed the roadway capacity. Moreover, if both the roadway segment is experience capacity.

    Table 3: Roadway Segment Vehicle Capacity Thresholds

    Roadway Classification Number of

    Through Lanes Right-of-way Width

    (Feet) Roadway Capacity

    (Average Daily Traffic)2 Collector 2 56 - 74 13,000

    Secondary 4 88 - 100 25,900 Major 4 100 - 118 34,100

    Arterial 4 106 - 128 35,900 Urban Arterial 6 130 - 152 53,900 Expressway 6 130 - 200 61,300 Expressway 8 150 - 216 81,700

    Freeway 4 Caltrans 76,500 Freeway 6 Caltrans 117,500

    Source: County of Riverside General Plan Circulation Element, 2001.

    2.6 Freeway Mainline Analysis The mainline analysis was conducted using the Highway Capacity Software (HCS), 2010 compliant with the 2010 Highway Capacity Manual. For freeway segments, the measure used to evaluate LOS is density. As stated in the HCM, the upper value shown for LOS E (45 passenger cars per mile per lane pc/mi/ln) is the maximum density at which sustained flows at capacity are expected to occur. Deterioration from acceptable LOS A through E to unacceptable LOS F is

    6 I-13

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    considered an impact. Furthermore, an increase of 100 trips or more to any segment already operating at LOS F would be considered impacted.

    3 Existing (Year 2016) Conditions This section presents an overview of the existing roadway system within the study area and the methodology used to determine existing traffic volumes.

    3.1 Project Location and Study Area The proposed project site is located at the northeast corner of Clinton Keith Road and Salida del Sol, in the City of Wildomar, County of Riverside, California, and consists of Riverside County Assessor parcel numbers 362-150-026. The 78.32 acre site is a vacant rectangular parcel of land with a slightly irregular eastern border. The project site generally abuts La Estrella Street to the north, Clinton Keith Road to the south, Salida Del Sol to the west, and Elizabeth Lane and single-family residential units to the east. The project site is approximately 0.65 mile west of Interstate 15.

    The project site is designated by the City of Wildomar as R-R (Rural Residential) in the zoning map and OS-R (Open Space Recreation) in the General Plan. The area in the general vicinity of the project site is characterized by single-family and rural residential land uses, and undeveloped natural open space. Surrounding uses include Ronald Reagan Elementary school and a commercial center 0.5 mile to the west, a medical center 0.4 mile to the southwest, and single-family residential areas in the east as mentioned.

    3.2 Roadway Network Key roadway facilities within the project study area are described below. The discussion presented here focuses on roadways that approach the study intersections or roadways that are directly affected by the proposed project. The descriptions of the lane configurations are based on designations per the Citys General Plan Circulation Element and therefore may not reflect current configurations.

    I-15 Freeway: I-15 is located west of the proposed project site and is a major freeway that extends northwest and southeast through Riverside County. Access to the site from I-15 is provided via northbound and southbound on-ramps and off-ramps at Clinton Keith Road.

    Clinton Keith Road: Clinton Keith Road borders south of the proposed project site and is designated as an east-west major road in the Wildomar Circulation Plan. The roadway fluctuates as it approaches the site, from six lanes (divided) near the I-15 on and off ramps, to two lanes immediately south of the site, to three-four lanes east of Elizabeth Lane. Adjacent land use consists of vacant lots, residential areas, and some commercial uses. The speed limit is generally 35 to 45 mph. There are no bike lanes or street parking available.

    Salida del Sol: Salida del Sol borders west of the proposed project site and is designated as an urban arterial road in the Wildomar Circulation Plan. The road is planned to be reconfigured into a collector roadway and connect to Yamas Drive, which would provide additional access to the site from the south. Adjacent land use consists of vacant lots, a medical facility, and certain rural residential properties. The current speed limit is 40 mph. There are no bike lanes or street parking available.

    La Estrella Street: Estrella Street borders north of the proposed project site and is designated as a secondary road in the Wildomar Circulation Plan. The roadway fluctuates as it approaches the site, from two lanes from George Avenue until Salida del Sol, to four lanes

    7 I-14

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    until Crest Meadows Drive. The current speed limit is 40 mph. There are no bike lanes or street parking available.

    Elizabeth Lane: Elizabeth Lane borders east of the proposed project site and is designated as an urban arterial road, primarily serving a single-family residential neighborhood. The road is planned to be extended south of Clinton Keith Road to Prielipp Road, which would provide additional access to the site from the south. The current speed limit is 25 mph. There are no bike lanes or street parking available.

    Palomar Street: Palomar Street is located southwest of the proposed project site and is designated as a northwest-southeast arterial in the Wildomar Circulation Plan. It has two lanes with a painted median and the current speed limit is 50 mph. There are no bike lanes or street parking available.

    Baxter Road: Baxter Road is located north of the proposed project site and is designated as an east-west secondary road in the Wildomar Circulation Plan. It has two lanes with a painted median and the current speed limit is 45 mph. There are no bike lanes or street parking available.

    George Avenue: George Avenue is located west of the proposed project site and is designated as a north-south secondary road in the Wildomar Circulation Plan. It has two lanes with a painted median and the current speed limit is 35 mph. There are no bike lanes or street parking available.

    Inland Valley Drive: Inland Valley Drive is located southwest of the proposed project site and is designated as a secondary road in the Wildomar Circulation Plan. It has two lanes with a painted median and the current speed limit is 45 mph. There are no bike lanes or street parking available.

    Prielipp Road: Prielipp Road is located south of the proposed project site and is designated as an east-west secondary road in the Wildomar Circulation Plan. It has two to three lanes with a painted median and the current speed limit is 40 mph. There are no bike lanes or street parking available.

    Nutmeg Street: Nutmeg Street is located southeast of the proposed project site and is designated as a northeast-southwest secondary road in the Wildomar Circulation Plan. It has two lanes with a painted median and the current speed limit is 40 mph. There are no bike lanes or street parking available.

    California Oaks Road: California Oaks Road is located southeast of the proposed project site and is designated as a north-south major road in the Wildomar Circulation Plan. It has four lanes with a painted median and the current speed limit is 45 mph. There are bike lanes on both side of the road. No street parking available.

    Whitewood Road: Whitewood Road is located west of the proposed project site and is designated as a north-south urban arterial road in the Wildomar Circulation Plan. It has 4 lanes with a painted median and the current speed limit is 45 mph. There are no bike lanes or street parking available.

    8 I-15

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    3.3 Study Intersections A total of 30 existing intersections have been selected for analysis in this report. The Existing (Year 2016) lane geometry and signal control for each study intersection is illustrated in Figure 3.

    1. Palomar Street/Clinton Keith Road

    2. Hidden Springs Road/Clinton Keith Road

    3. I-15 Southbound Ramps/Clinton Keith Road

    4. I-15 Northbound Ramps/Clinton Keith Road

    5. Arya Road/Clinton Keith Road

    6. George Avenue/Clinton Keith Road

    7. Inland Valley Road/Clinton Keith Road

    8. Salida del Sol/Clinton Keith Road1

    9. Elizabeth Lane/Clinton Keith Road1

    10. Smith Ranch Road/Clinton Keith Road

    11. Copper Craft Drive/Clinton Keith Road

    12. Nutmeg Street/Clinton Keith Road

    13. California Oaks Road/Clinton Keith Road

    14. Via Madrid/Clinton Keith Road

    15. Greer Road/Clinton Keith Road

    16. Murrieta Oaks Avenue/Clinton Keith Road

    17. McElwain Road/Clinton Keith Road

    18. I-215 Southbound Ramps/Clinton Keith Road

    19. I-215 Northbound Ramps/Clinton Keith Road

    20. Whitewood Road/Clinton Keith Road

    21. California Oaks Road/Hancock Avenue

    22. California Oaks Road/Jackson Avenue

    23. Nutmeg Street/Jackson Avenue

    24. Inland Valley Road/Prielipp Road1

    25. Salida del Sol/ La Estrella Street1

    26. Iodine Springs/La Estrella Street1

    27. George Avenue/La Estrella Street1

    28. I-15 Southbound Ramps/Baxter Road1

    29. I-15 Northbound Ramps/Baxter Road1

    30. Monte Vista Drive/Baxter Road1

    1 Unsignalized Intersection

    9

    I-16

  • IBI GROUP September 2016Wildomar Campus Master Plan Traffic Study

    Baxter Rd

    Monte Vista

    Clint

    on K

    eith

    Rd

    Nutm

    eg St

    Prielipp Rd

    Jackson Ave

    Palomar St

    George Ave

    Salida del Sol

    Inland Valley Dr

    Arya Rd

    Elizabeth Ln

    Calif

    orni

    a Oa

    ks R

    d

    Via Madrid

    Green Rd

    Murrei

    tta Oak

    s Rd

    McE

    lwai

    n Rd

    Whi

    tew

    ood

    Rd

    Hancock Ave

    LaEstrella St

    Clinton Keith Rd

    Los Ala

    mos R

    d

    Clinton Keith Rd/Inland Valley Dr Clinton Keith Rd/Salida del Sol

    Clinton Keith Rd/Hidden Springs Rd Clinton Keith Rd/I-15 NS Ramps Clinton Keith Rd/Arya Rd

    Clinton Keith Rd/Smith Ranch RdClinton Keith Rd/Elizabeth LnClinton Keith Rd/George Ave

    Clinton Keith Rd/I-15 SB Ramps

    Clinton Keith Rd/Nutmeg St Clinton Keith Rd/California Oaks Rd Clinton Keith Rd/Greer RdClinton Keith Rd/Via MadridClinton Keith Rd/Copper Craft Dr

    Legend

    Signalized Intersections

    Unsignalized Intersections

    Permitled de facto Right Turn Stop Sign Control Lane Geometry

    Free Right Right Turn Overlap

    Protected LeftPROT PERM d

    o

    1

    23

    4 56 7 8 9 10 11

    12 13 1415

    1617 18 19 20

    21

    22

    23

    24

    252627

    28 29 30

    1

    6

    11

    2

    7

    12

    3

    8

    13

    4

    9

    14

    5

    10

    15

    Clinton Keith Rd/Palomar St

    Figure 3 Study Area Intersection Lane Geometry and Control

    PROT

    PROT PROT PROT

    PROT

    PROT

    PROT

    PROT

    PROT

    PROTPROT

    PROT

    PROT

    PROT

    PERMPERM

    PERM

    PERM

    PERMPERM

    PROT

    PROT

    PROT

    PROT PROT

    PROT PROTPROT

    PROT

    PROTPROT

    PERM

    PERM

    PERM

    d d

    d d

    d

    PERMPERM PERM

    PERM

    PERM

    PERM PERMPERMPERM d

    d dd

    d d dd

    d d

    d

    I-17

  • California Oaks/Jackson Ave Nutmeg Street/Jackson Ave

    Clinton Keith Rd/McElwain Rd Clinton Keith Rd/I-215 NB Ramps Clinton Keith Rd/Whitewood Rd

    La Estrella St/Salida del SolInland Valley/Prielipp Rd

    Clinton Keith Rd/I-215 SB Ramps

    La Estrella St/George Ave Baxter Rd/SB I-15 Ramps Baxter Rd/Monte VistaBaxter Rd/NB I-15 Ramps

    IBI GROUP September 2016Wildomar Campus Master Plan Traffic Study

    16

    21

    26

    17

    22

    27

    18

    23

    28

    19

    24

    29

    20

    25

    30

    California Oaks/Hancock Ave

    La Estrella St/Iodine Springs Rd

    Clinton Keith Rd/ Murreitta Oaks Rd

    Baxter Rd

    Monte Vista

    Clint

    on K

    eith

    Rd

    Nutm

    eg St

    Prielipp Rd

    Jackson Ave

    Palomar St

    George Ave

    Salida del Sol

    Inland Valley Dr

    Arya Rd

    Elizabeth Ln

    Calif

    orni

    a Oa

    ks R

    d

    Via Madrid

    Green Rd

    Murrei

    tta Oak

    s Rd

    McE

    lwai

    n Rd

    Whi

    tew

    ood

    Rd

    Hancock Ave

    LaEstrella St

    Clinton Keith Rd

    Los Ala

    mos R

    d

    1

    23

    4 56 7 10 11

    12 13 1415

    1617 18 19 20

    21

    22

    23

    8 9

    24

    252627

    28 29 30

    Legend

    Signalized Intersections

    Unsignalized Intersections

    Permitled de facto Right Turn Stop Sign Control Lane Geometry

    Free Right Right Turn Overlap

    Protected LeftPROT PERM d

    o

    Figure 3 Study Area Intersection Lane Geometry and Control

    PROT

    PROTPROT

    PROTPROTPROT

    PROT

    PROT

    PROT

    PROTPROT

    PROT

    PERMd

    PROT

    PROT

    PROT

    PROT

    PROT

    PROT

    d

    o

    d

    d d dd d

    d

    d d

    d

    d

    I-18

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    3.4 Study Area Roadway Segments A total of eight (8) roadway segments were selected for analysis in this report:

    A. Clinton Keith Road between Palomar Street and Hidden Springs Road

    B. Clinton Keith Road between Inland Valley Road and Salida del Sol

    C. Clinton Keith Road between Salida del Sol and Elizabeth Lane

    D. Clinton Keith Road between Nutmeg Street and California Oaks Road

    E. Clinton Keith Road between Greer Road and Murietta Oaks Avenue

    F. Clinton Keith Road west of Whitewood Road

    G. Baxter Road east of Monte Vista Drive

    H. La Estrella Street east of George Avenue

    3.5 Study Area Freeway Mainline Segments Four freeway mainline segments were selected for analysis based on the anticipated trips to and from the project site. These locations are on the I-15 and I-215 north and south of Clinton Keith Road.

    3.6 Study Periods and Scenarios The study analyzes typical weekday daily, AM and PM peak hour conditions. Daily conditions were analyzed for a 24-hour period on the study area roadway segments. Traffic operations for the study area intersections and roadway segments were evaluated for each of the following scenarios:

    Existing (Year 2016) Conditions

    Opening (Year 2022) Conditions

    Interim (Year 2024) Conditions

    Future (Year 2030) Conditions

    Build Out (Year 2035) Conditions

    Existing (Year 2016) With Project Conditions

    Opening (Year 2022) With Project Conditions

    Interim (Year 2024) With Project Conditions

    Future (Year 2030) With Project Conditions

    Build Out (Year 2035) With Project Conditions

    3.7 Existing Traffic Volumes Manual intersection turning movement counts were collected in 15-minute intervals from 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m. on Tuesday May 3, 2016. Average Daily Traffic (ADT) counts were collected over a 24-hour period on the same day. Freeway mainline volumes were obtained from Caltrans Traffic Data Branch (2014). Existing (Year 2016) AM and PM peak hour turning movement count volumes is presented in Figure 4. Traffic count data is included in Appendix A.

    12 I-19

  • IBI GROUP September 2016Wildomar Campus Master Plan Traffic Study

    Clinton Keith Rd/Inland Valley Dr Clinton Keith Rd/Salida del Sol

    Clinton Keith Rd/Hidden Springs Rd Clinton Keith Rd/I-15 NS Ramps Clinton Keith Rd/Arya Rd

    Clinton Keith Rd/Smith Ranch RdClinton Keith Rd/Elizabeth LnClinton Keith Rd/George Ave

    Clinton Keith Rd/I-15 SB Ramps

    Clinton Keith Rd/Nutmeg St Clinton Keith Rd/California Oaks Rd Clinton Keith Rd/Greer RdClinton Keith Rd/Via MadridClinton Keith Rd/Copper Craft Dr

    Clinton Keith Rd/Palomar St

    1

    6

    11

    2

    7

    12

    3

    13

    4

    14

    5

    10

    15

    8 9

    Unsignalized Intersections

    Figure 4 Existing (Year 2016) Intersection Peak Hour Traffic Volumes46/29

    196/104

    189/143

    86/134

    21/19

    361/286

    359/389

    2/1

    470/584

    0/0

    0/0

    0/0

    57/51

    8/4

    23/35

    203/77

    35/22

    94/51

    0/0

    0/0

    0/0

    5/8

    0/0

    23/20

    48/28

    1/0

    10/6

    74/33

    3/0

    57/41

    21/16

    3/2

    22/11

    46/33

    89/34

    124/82

    0/0

    0/0

    0/0

    7/3

    1/1

    51/28

    50/46

    39/3

    193/98

    123/170

    389/640

    305/236

    235/494

    712/889

    59/63

    0/0

    644/1054

    386/266

    492/524

    769/760

    0/0

    58/45

    987/939

    103/89

    42/39

    821/917

    64/116

    0/0

    651/552

    132/66

    25/26

    807/616

    0/0

    4/9

    791/613

    2/1

    20/35

    666/570

    10/31

    7/16

    613/591

    15/18

    80/127

    526/541

    220/267

    0/0

    699/780

    484/384

    24/38

    1141/1190

    21/33

    62/127

    1042/1153

    22/53

    46/80

    139/194

    342/197

    49/74

    18/22

    76/71

    0/0

    0/0

    0/0

    265/570

    0/0

    266/449

    208/341

    5/11

    80/111

    83/56

    14/29

    45/99

    267/473

    0/0

    39/109 0/0

    0/0

    0/0

    2/4

    0/0

    2/3

    45/17

    0/1

    4/2

    40/22

    3/2

    23/15

    65/44

    38/44

    294/237

    102/161

    0/0

    375/532

    7/6

    1/1

    51/25

    122/40

    18/0

    38/24

    35/31

    631/592

    92/58

    75/115

    1041/848

    1/7

    0/0

    801/765

    675/437

    327/282

    947/1065

    0/0

    69/52

    913/1034

    250/371

    103/110

    868/1000

    22/24

    11/8

    513/770

    476/395

    8/13

    525/852

    0/0

    18/47

    531/825

    2/4

    27/49

    505/750

    12/20

    13/23

    545/718

    15/52

    24/63

    508/621

    92/72

    0/0

    853/835

    128/100

    6/7

    1211/1309

    4/15

    37/72

    1187/1193

    90/76

    Legend

    AM/PM Turning Movement Volume##/##Study Intersection

    Baxter Rd

    Monte Vista

    Clint

    on K

    eith

    Rd

    Nutm

    eg St

    Prielipp Rd

    Jackson Ave

    Palomar St

    George Ave

    Salida del Sol

    Inland Valley Dr

    Arya Rd

    Elizabeth Ln

    Calif

    orni

    a Oa

    ks R

    d

    Via Madrid

    Green Rd

    Murrei

    tta Oak

    s Rd

    McE

    lwai

    n Rd

    Whi

    tew

    ood

    Rd

    Hancock Ave

    LaEstrella St

    Clinton Keith Rd

    Los Ala

    mos R

    d

    1

    23

    4 56 7 10 11

    12 13 1415

    1617 18 19 20

    21

    22

    23

    8 9

    24

    252627

    28 29 30

    I-20

  • IBI GROUP September 2016Wildomar Campus Master Plan Traffic Study

    California Oaks/Jackson Ave Nutmeg Street/Jackson Ave

    Clinton Keith Rd/McElwain Rd Clinton Keith Rd/I-215 NB Ramps Clinton Keith Rd/Whitewood Rd

    La Estrella St/Salida del SolInland Valley/Prielipp Rd

    Clinton Keith Rd/I-215 SB Ramps

    La Estrella St/George Ave Baxter Rd/SB I-15 Ramps Baxter Rd/Monte VistaBaxter Rd/NB I-15 Ramps

    California Oaks/Hancock Ave

    La Estrella St/Iodine Springs Rd

    Clinton Keith Rd/ Murreitta Oaks Rd

    16

    21

    17

    22

    18

    23

    19 20

    26 27 28

    24

    29

    25

    30

    Figure 4 Existing (Year 2016) Intersection Peak Hour Traffic Volumes0/0

    0/0

    0/0

    319/379

    0/0

    484/369

    533/724

    0/0

    119/108

    0/0

    0/0

    0/0

    246/192

    166/183

    6/1

    0/0

    752/511

    187/119

    222/153

    782/638

    37/55

    90/68

    274/236

    181/143

    35/6

    0/0

    358/340

    0/0

    0/0

    0/0

    7/9

    4/8

    3/3

    23/0

    253/100

    41/24

    226/172

    0/3

    87/58

    0/0

    0/0

    0/0

    120/88

    0/0

    132/30

    0/0

    1092/1323

    119/139

    68/254

    853/1053

    0/0

    247/148

    399/689

    0/0

    115/61

    479/422

    0/0

    3/1

    25/1

    26/2

    113/210

    0/0

    392/324

    29/98

    20/70

    14/31

    114/162

    121/172

    84/125

    236/331

    10/1

    1/0

    0/0

    68/16

    0/2

    9/3

    79/31

    0/1

    50/14

    16/10

    20/19

    0/0

    307/490

    77/60

    113/40

    187/137

    0/0

    56/26

    152/97

    0/0

    43/39

    0/0

    150/102

    0/0

    0/0

    0/0

    0/0

    0/0

    0/0

    158/417

    0/0

    427/556

    200/256

    92/355

    75/3

    0/0

    441/709

    304/358

    190/465

    509/946

    28/41

    57/61

    298/207

    124/88 0/0

    0/0

    0/0

    27/27

    0/0

    1/7

    5/2

    3/7

    0/3

    57/0

    101/151

    6/26 0/0

    0/0

    0/0

    196/411

    1/0

    60/56

    0/0

    0/0

    0/0

    0/0

    1250/1434

    138/29

    237/455

    1251/1057

    0/0

    0/0

    1058/1016

    683/454

    0/0

    550/657

    598/447

    298/746

    9/6

    219/360

    0/0

    0/0

    0/0

    197/159

    33/30

    317/265

    115/104

    189/181

    40/70

    21/30

    4/6

    0/0

    1/0

    40/31

    26/15

    11/10

    51/33

    1/3

    18/2

    17/4

    46/0

    0/0

    410/184

    461/340

    288/131

    207/121

    0/0

    112/72

    151/105

    0/0

    Baxter Rd

    Monte Vista

    Clint

    on K

    eith

    Rd

    Nutm

    eg St

    Prielipp Rd

    Jackson Ave

    Palomar St

    George Ave

    Salida del Sol

    Inland Valley Dr

    Arya Rd

    Elizabeth Ln

    Calif

    orni

    a Oa

    ks R

    d

    Via Madrid

    Green Rd

    Murrei

    tta Oak

    s Rd

    McE

    lwai

    n Rd

    Whi

    tew

    ood

    Rd

    Hancock Ave

    LaEstrella St

    Clinton Keith Rd

    Los Ala

    mos R

    d

    1

    23

    4 56 7 10 11

    12 13 1415

    1617 18 19 20

    21

    22

    23

    8 9

    24

    252627

    28 29 30

    Unsignalized Intersections

    Legend

    AM/PM Turning Movement Volume##/##Study Intersection

    I-21

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    3.8 Existing Intersection LOS A level of service analysis was conducted to evaluate existing intersection operations during the weekday AM and PM peak hours. Table 4 summarizes the existing levels of service at the study area intersections. Existing level of service calculation worksheets are included in Appendix B.

    Table 4 Existing Intersection LOS

    Signalized Intersections Control Existing Conditions

    AM Peak Hour PM Peak Hour Delay LOS Delay LOS

    1 Palomar and Clinton Keith Signal 75.6 E 45.0 D 2 Hidden Springs and Clinton Keith Signal 23.8 C 22.8 C 3 I-15 SB Ramps and Clinton Keith Signal 23.7 C 23.5 C 4 I-15 NB Ramps and Clinton Keith Signal 18.9 B 19.9 B 5 Arya and Clinton Keith Signal 24.5 C 25.4 C 6 George and Clinton Keith Signal 22.6 C 24.5 C 7 Inland Valley and Clinton Keith Signal 21.9 C 21.4 C 10 Smith Ranch and Clinton Keith Signal 5.4 A 5.8 A 11 Copper Craft and Clinton Keith Signal 19.3 B 19.6 B 12 Nutmeg and Clinton Keith Signal 21.2 C 25.9 C 13 California Oaks and Clinton Keith Signal >80.0 F 46.3 D 14 Via Madrid and Clinton Keith Signal 27.8 C 45.9 D 15 Greer and Clinton Keith Signal 24.8 C 35.2 D 16 Murrieta Oaks and Clinton Keith Signal 57.8 E >80.0 F 17 McElwain and Clinton Keith Signal 20.0 C 22.7 C 18 I-215 SB Ramps and Clinton Keith Signal 15.7 B 16.0 B 19 I-215 NB Ramps and Clinton Keith Signal 17.2 B 15.4 B 20 Whitewood and Clinton Keith Signal 49.6 D >80.0 F 21 California Oaks and Hancock Signal 14.9 B 14.1 B 22 California Oaks and Jackson Signal 25.4 C 40.3 D 23 Nutmeg and Jackson Signal 27.3 C 26.5 C

    Unsignalized Intersections Control Existing Conditions

    AM Peak Hour PM Peak Hour Delay LOS Delay LOS

    8 Salida del Sol and Clinton Keith TWSC 33.9 D 31.5 D 9 Elizabeth and Clinton Keith TWSC 19.1 C 25.1 D 24 Inland Valley and Prielipp AWSC 14.1 B 17.1 C 25 Salida del Sol and La Estrella TWSC 9.5 A 8.9 A 26 Iodine Springs and La Estrella TWSC 10.7 B 9.3 A 27 George and La Estrella AWSC 13.4 B 8.8 A 28 I-15 SB Ramps and Baxter AWSC 24.9 C 19.9 C 29 I-15 NB Ramps and Baxter AWSC 14.1 B 17.0 C 30 Monte Vista and Baxter TWSC 17.7 C 9.6 A

    Notes: Shaded unacceptable LOS; TWSC two-way stop; AWSC all-way stop 1 Delay for unsignalized intersections is reported as the worst approach. Delay for signalized and AWSC are reported as average of all approaches.

    15 I-22

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    As shown in Table 4, all study area intersections currently operate at acceptable LOS under Existing (Year 2016) Conditions with the exception of the following 4 intersections:

    Palomar Street/Clinton Keith Road : LOS E in the AM peak hour

    California Oaks Road/Clinton Keith Road: LOS F in the AM peak hour

    Murrieta Oaks Avenue/Clinton Keith Road: LOS E in the AM peak hour and LOS F in the PM peak hour

    Whitewood Road and Clinton Keith Road: LOS F in the PM peak hour

    3.9 Existing Roadway Segment LOS Table 5 provides a summary of the Existing (Year 2016) Conditions roadway segment capacity analysis based on the capacity thresholds identified on Table 3. As shown on Table 5, 2 out of the 8 existing study area roadway segments exceed the average daily vehicle capacity thresholds.

    Table 5: Existing Roadway Segment Analysis

    ID Roadway From To # Lanes Estimated

    Daily Capacity

    2016 V/C Ratio

    A Clinton Keith Palomar Hidden Springs 4D 34,100 25,484 0.75 B Clinton Keith Inland Valley Salida del Sol 2U 13,000 18,911 1.45 C Clinton Keith Salida del Sol Elizabeth 2U 13,000 18,973 1.46 D Clinton Keith Nutmeg California Oaks 4U 34,100 22,968 0.67 E Clinton Keith Greer Murietta Oaks 4U 34,100 32,517 0.95 F Clinton Keith West of Whitewood 6U 53,900 13,898 0.26 G Baxter East of Monte Vista 2U 13,000 3,303 0.25 H La Estrella East of George 2U 13,000 1,209 0.09

    Bolded: Potentially exceeds capacity (v/c 1.01-1.25); Bolded and Shaded: Exceeds capacity (v/c >1.26)

    As indicated in Section 2.5, the roadway segment analysis is used as a planning tool to evaluate the adequacy of existing roadway segment capacities. A v/c ratio of greater than 1.01 to 1.25 suggests that additional review is required; however, if adjacent intersections provide the lanes needed to achieve acceptable peak hour LOS, then segment capacity improvements between key intersections may not be needed. For roadway segments significantly exceeding capacity (v/c ratio > 1.25) then additional through lane roadway capacity and intersection improvements are more likely to be needed.

    16 I-23

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    3.10 Existing Freeway Mainline LOS Table 6 summarizes the existing freeway mainline LOS at the study area mainline segments. The freeway mainline analysis worksheets are contained in Appendix C.

    Table 6: Existing Freeway Mainline Analysis

    Existing AM Peak Hour Existing PM Peak Hour

    Mainline Segment Direction Mainline Segment Volume

    1 Density2 LOS Volume1 Density2 LOS

    1 NB I-15 north of Clinton Keith Road 3,760 19.6 C 5,640 33.3 D

    SB I-15 north of Clinton Keith Road 5,640 33.3 D 3,760 19.6 C

    2 NB I-15 south of Clinton Keith Road 3,760 19.6 C 5,640 33.3 D

    SB I-15 south of Clinton Keith Road 5,640 33.3 D 3,760 19.6 C

    3 NB I-215 north of Clinton Keith Road 2,600 13.5 B 3,900 20.4 C

    SB I-215 north of Clinton Keith Road 3,900 20.4 C 2,600 13.5 B

    4 NB I-215 south of Clinton Keith Road 2,680 13.9 C 4,020 21.1 C

    SB I-215 south of Clinton Keith Road 4,020 21.1 C 2,680 13.9 C

    1 Volumes referenced from Caltrans Traffic Data Branch (2014) 2 Density reported as pc/mi/ln

    17 I-24

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    4 Future Traffic Volume Development 4.1 Future Traffic Volumes The future background traffic is composed of existing traffic (based on the count data), background ambient traffic growth per year, and traffic from planned developments (i.e., cumulative projects). The analysis of cumulative conditions is required by the County of Riverside Traffic Study Guidelines. Traffic from all projects (anticipated to be completed by each analysis scenario) on file in the County and the City is added to baseline future traffic volumes to forecast traffic operations.

    Traffic volumes for all future scenarios were developed based on the build-up method, using a linear growth rate derived from RivTam 2007 and 2035 model plots obtained from the County. These future scenarios, however, do not take into account circulation improvements that would be associated with the construction of each of the cumulative projects. Therefore, these scenarios do not include the intersection improvements that may be attributable as mitigation measures for these discrete cumulative projects or per the Countys General Plan Circulation Element. This is a very conservative and unlikely scenario, since circulation improvements must accompany future development projects to maintain threshold LOS.

    4.2 Ambient Traffic Growth All future scenario traffic volumes were developed by applying a linear 2.4 percent annual growth rate to the existing (2016) traffic volumes. Use of an annual growth rate to account for area-wide growth is common to both current and previous traffic studies within the City and County.

    4.3 Cumulative Projects California Environmental Quality Act (CEQA) requires that other reasonably foreseeable development projects which are either approved or being processed concurrently in the study area also be included as parking of a cumulative analysis scenario. A cumulative project list comprised of 31 projects was developed for the purposes of this analysis in accordance with City of Wildomar Commercial and Residential Development List (as of July 1, 2016).

    For simplicity, the 31 projects have been grouped into areas that expected to have similar trip distribution patterns at the study area intersections. The reference number, project ID, project title, address and net trips for each related project are detailed in Appendix D. The location of each related project are shown in Figures 5 and 6.

    18 I-25

  • 3140

    35

    22

    216

    36

    7

    32 9 3

    38

    4

    41

    1

    17 1415

    1330

    39

    RESIDENTIAL PROJECT: 1: Lennar Briarwood

    2: Lesie Tract Map

    3: Richmond American Homes

    4: Lennar North Ranch

    9: Mc Vicar Residential Project

    13: Westpark Promenade Development (Mixed-use)

    14: Villa Siena Apartment Project

    15: Grove Park Mixed-Use Project

    16: Baxter Village Mixed-Use Project

    17: Horizons/Strata Mixed-Use Project- Assisted Living Facility

    22: Oak Creek Canyon

    30: Diversified Pacific Homes

    31: Pacific Grove Inv.

    32: Beazer Homes

    35: Baxter/Susan GPA/TTM

    36: Ione/Palomar Residential

    38: Rhoades Residential Project

    39: Nova Homes Residential

    40: Darling/Bundy Canyon Residential

    41: Camelia Townhomes

    RESIDENTIAL PROJECT DEVELOPMENT LIST

    KEY Active (In-Process/Not Approved) Approved (Not Yet Under Construction) Approved (Under Construction)

    IBI GROUP September 2016Wildomar Campus Master Plan Traffic Study

    Figure 5 Residential Project Development List

    I-26

  • 21

    238

    6

    1334

    15517

    28

    27

    16

    COMMERCIAL PROJECT: 5: Rancon Medical/Retail Center and Business park

    6: Cornerstone Church Preschool & Admin Bld.

    8: Wal-Mart Retail

    13: Westpark Promenade Development (Mixed-use)

    15: Grove Park Mixed-Use Project

    16: Baxter Village Mixed-Use Project

    17: Horizons/Strata Mixed-Use Project- Assisted Living Facility

    21: Orange Bundy/Parcel Map 7 Community Retail Parcels

    23: Bundy Canyon Plaza

    27: Stable Lanes Retail Center

    28: Wildomar Square Retail Center

    COMMERICAL PROJECT DEVELOPMENT LIST

    KEY Active (In-Process/Not Approved) Approved (Not Yet Under Construction) Approved (Under Construction)

    IBI GROUP September 2016Wildomar Campus Master Plan Traffic Study

    Figure 6 Commercial Project Development List

    I-27

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    5 Opening (Year 2022) Conditions 5.1 Opening (Year 2022) Traffic Volumes The Opening (Year 2022) background traffic is composed of existing traffic (based on the count data), background ambient traffic growth per year (identified as 2.4 percent per year for a total of 14.4 percent over 6 years), and traffic from the cumulative projects listed in Appendix D. The peak hour study intersection volumes for the Opening (Year 2022) is shown in Figure 7.

    5.2 Opening (Year 2022) Intersection LOS A level of service analysis was conducted to evaluate Opening (Year 2022) intersection operations during the weekday AM peak hour. Table 7 summarizes the existing levels of service at the study area intersections. Opening (Year 2022) level of service calculation worksheets are included in Appendix B.

    Table 7 Opening (Year 2022) Intersection LOS

    Signalized Intersections Control Opening (Year 2022) Conditions

    AM Peak Hour PM Peak Hour Delay LOS Delay LOS

    1 Palomar and Clinton Keith Signal >80.0 F 54.6 D 2 Hidden Springs and Clinton Keith Signal 30.9 C 31.5 C 3 I-15 SB Ramps and Clinton Keith Signal 30.8 C 42.8 D 4 I-15 NB Ramps and Clinton Keith Signal 19.8 B 21.6 C 5 Arya and Clinton Keith Signal 29.1 C 49.6 D 6 George and Clinton Keith Signal 25.4 C 35.7 D 7 Inland Valley and Clinton Keith Signal 24.8 C 25.5 C 10 Smith Ranch and Clinton Keith Signal 9.5 A 6.2 A 11 Copper Craft and Clinton Keith Signal 19.7 B 20.8 C 12 Nutmeg and Clinton Keith Signal 23.5 C 33.9 C 13 California Oaks and Clinton Keith Signal >80.0 F 79.4 E 14 Via Madrid and Clinton Keith Signal 52.4 D 70.1 E 15 Greer and Clinton Keith Signal 39.1 D 79.8 E 16 Murrieta Oaks and Clinton Keith Signal >80.0 F >80.0 F 17 McElwain and Clinton Keith Signal 22.2 C 29.9 C 18 I-215 SB Ramps and Clinton Keith Signal 16.5 B 17.4 B 19 I-215 NB Ramps and Clinton Keith Signal 21.2 C 51.6 D 20 Whitewood and Clinton Keith Signal 67.2 E >80.0 F 21 California Oaks and Hancock Signal 16.2 B 15.7 B 22 California Oaks and Jackson Signal 30.3 C >80.0 F 23 Nutmeg and Jackson Signal 32.1 C 28.5 C

    Unsignalized Intersections Control Opening Year (2022) Conditions

    AM Peak Hour PM Peak Hour Delay LOS Delay LOS

    8 Salida del Sol and Clinton Keith TWSC 36.9 E 41.9 E 9 Elizabeth and Clinton Keith TWSC 19.7 C 31.6 D 24 Inland Valley and Prielipp AWSC 15.2 C 16.1 C 25 Salida del Sol and La Estrella TWSC 9.3 A 8.9 A 26 Iodine Springs and La Estrella TWSC 9.9 A 9.3 A 27 George and La Estrella AWSC 10.5 B 8.8 A 28 I-15 SB Ramps and Baxter AWSC 25.4 D 26.9 D 29 I-15 NB Ramps and Baxter AWSC 14.1 B 21.7 C 30 Monte Vista and Baxter TWSC 14.1 B 9.8 A

    Notes: Shaded unacceptable LOS; TWSC two-way stop; AWSC all-way stop

    21 I-28

  • IBI GROUP September 2016Wildomar Campus Master Plan Traffic Study

    Clinton Keith Rd/Inland Valley Dr Clinton Keith Rd/Salida del Sol

    Clinton Keith Rd/Hidden Springs Rd Clinton Keith Rd/I-15 NS Ramps Clinton Keith Rd/Arya Rd

    Clinton Keith Rd/Smith Ranch RdClinton Keith Rd/Elizabeth LnClinton Keith Rd/George Ave

    Clinton Keith Rd/I-15 SB Ramps

    Clinton Keith Rd/Nutmeg St Clinton Keith Rd/California Oaks Rd Clinton Keith Rd/Greer RdClinton Keith Rd/Via MadridClinton Keith Rd/Copper Craft Dr

    Clinton Keith Rd/Palomar St

    1

    6

    11

    2

    7

    12

    3

    13

    4

    14

    5

    10

    15

    8 9

    Unsignalized Intersections

    Figure 7 Opening (Year 2022) Intersection Peak Hour Traffic Volumes53/33

    225/119

    217/164

    99/153

    24/22

    414/327

    411/445

    2/1

    539/668

    0/0

    0/0

    0/0

    65/58

    9/5

    26/40

    233/88

    40/25

    108/58

    0/0

    0/0

    0/0

    6/9

    0/0

    26/23

    55/32

    1/0

    11/7

    85/38

    3/0

    65/47

    24/18

    3/2

    25/13

    53/38

    102/39

    142/94

    0/0

    0/0

    0/0

    8/3

    1/1

    58/32

    57/53

    45/3

    221/112

    141/195

    446/732

    350/270

    269/565

    816/1017

    68/72

    0/0

    738/1206

    442/304

    564/600

    881/870

    0/0

    66/51

    1131/1074

    118/102

    48/45

    941/1049

    73/133

    0/0

    746/632

    151/76

    29/30

    925/705

    0/0

    5/10

    907/701

    2/1

    23/40

    763/652

    11/35

    8/18

    703/676

    17/21

    92/145

    603/619

    252/306

    0/0

    801/892

    555/439

    28/43

    1308/1362

    24/38

    71/145

    1194/1319

    25/61

    53/92

    159/222

    392/225

    56/85

    21/25

    87/81

    0/0

    0/0

    0/0

    304/652

    0/0

    305/514

    238/390

    6/13

    92/127

    95/64

    16/33

    52/113

    306/541

    0/0

    45/125 0/0

    0/0

    0/0

    2/5

    0/0

    2/3

    52/19

    0/1

    5/2

    46/25

    3/2

    26/17

    74/50

    44/50

    337/271

    117/184

    0/0

    430/609

    8/7

    1/1

    58/29

    140/46

    21/0

    44/27

    40/35

    723/677

    105/66

    86/132

    1193/970

    1/8

    0/0

    918/875

    774/500

    375/323

    1085/1219

    0/0

    79/59

    1046/1183

    287/425

    118/126

    995/1144

    25/27

    13/9

    588/881

    546/452

    9/15

    602/975

    0/0

    21/54

    609/944

    2/5

    31/56

    579/858

    14/23

    15/26

    625/822

    17/59

    28/72

    582/711

    105/82

    0/0

    978/955

    147/114

    7/8

    1388/1498

    5/17

    42/82

    1360/1365

    103/87

    Legend

    AM/PM Turning Movement Volume##/##Study Intersection

    Baxter Rd

    Monte Vista

    Clint

    on K

    eith

    Rd

    Nutm

    eg St

    Prielipp Rd

    Jackson Ave

    Palomar St

    George Ave

    Salida del Sol

    Inland Valley Dr

    Arya Rd

    Elizabeth Ln

    Calif

    orni

    a Oa

    ks R

    d

    Via Madrid

    Green Rd

    Murrei

    tta Oak

    s Rd

    McE

    lwai

    n Rd

    Whi

    tew

    ood

    Rd

    Hancock Ave

    LaEstrella St

    Clinton Keith Rd

    Los Ala

    mos R

    d

    1

    23

    4 56 7 10 11

    12 13 1415

    1617 18 19 20

    21

    22

    23

    8 9

    24

    252627

    28 29 30

    I-29

  • IBI GROUP September 2016Wildomar Campus Master Plan Traffic Study

    California Oaks/Jackson Ave Nutmeg Street/Jackson Ave

    Clinton Keith Rd/McElwain Rd Clinton Keith Rd/I-215 NB Ramps Clinton Keith Rd/Whitewood Rd

    La Estrella St/Salida del SolInland Valley/Prielipp Rd

    Clinton Keith Rd/I-215 SB Ramps

    La Estrella St/George Ave Baxter Rd/SB I-15 Ramps Baxter Rd/Monte VistaBaxter Rd/NB I-15 Ramps

    California Oaks/Hancock Ave

    La Estrella St/Iodine Springs Rd

    Clinton Keith Rd/ Murreitta Oaks Rd

    16

    21

    17

    22

    18

    23

    19 20

    26 27 28

    24

    29

    25

    30

    Figure 7 Opening (Year 2022) Intersection Peak Hour Traffic Volumes0/0

    0/0

    0/0

    366/434

    0/0

    555/422

    611/828

    0/0

    136/124

    0/0

    0/0

    0/0

    282/220

    190/209

    7/1

    0/0

    862/585

    214/136

    254/175

    896/730

    42/63

    103/78

    314/270

    207/164

    40/7

    0/0

    410/389

    0/0

    0/0

    0/0

    8/10

    5/9

    3/3

    26/0

    290/114

    47/27

    259/197

    0/3

    100/66

    0/0

    0/0

    0/0

    138/101

    0/0

    151/34

    0/0

    1252/1514

    136/159

    78/291

    978/1205

    0/0

    283/169

    457/788

    0/0

    132/70

    549/483

    0/0

    3/1

    29/1

    30/2

    130/240

    0/0

    449/371

    33/112

    23/80

    16/35

    131/185

    139/197

    96/143

    270/379

    11/1

    1/0

    0/0

    78/18

    0/2

    10/3

    91/35

    0/1

    57/16

    18/11

    23/22

    0/0

    352/561

    88/69

    130/46

    214/157

    0/0

    64/30

    174/111

    0/0

    49/45

    0/0

    172/117

    0/0

    0/0

    0/0

    0/0

    0/0

    0/0

    181/477

    0/0

    489/636

    229/293

    105/406

    86/3

    0/0

    505/811

    348/410

    218/532

    583/1082

    32/47

    65/70

    342/237

    142/101

    0/0

    0/0

    0/0

    31/31

    0/0

    1/8

    6/2

    3/8

    0/3

    65/0

    116/173

    7/30 0/0

    0/0

    0/0

    225/470

    1/0

    69/64

    0/0

    0/0

    0/0

    0/0

    1433/1641

    158/33

    272/521

    1434/1209

    0/0

    0/0

    1213/1163

    783/519

    0/0

    630/752

    685/511

    342/854

    10/7

    251/412

    0/0

    0/0

    0/0

    226/182

    38/34

    363/303

    132/119

    217/207

    46/80

    24/34

    5/7

    0/0

    1/0

    46/35

    30/17

    13/11

    58/38

    1/3

    21/2

    19/5

    53/0

    0/0

    470/211

    528/389

    330/150

    237/138

    0/0

    128/82

    173/120

    0/0

    Baxter Rd

    Monte Vista

    Clint

    on K

    eith

    Rd

    Nutm

    eg St

    Prielipp Rd

    Jackson Ave

    Palomar St

    George Ave

    Salida del Sol

    Inland Valley Dr

    Arya Rd

    Elizabeth Ln

    Calif

    orni

    a Oa

    ks R

    d

    Via Madrid

    Green Rd

    Murrei

    tta Oak

    s Rd

    McE

    lwai

    n Rd

    Whi

    tew

    ood

    Rd

    Hancock Ave

    LaEstrella St

    Clinton Keith Rd

    Los Ala

    mos R

    d

    1

    23

    4 56 7 10 11

    12 13 1415

    1617 18 19 20

    21

    22

    23

    8 9

    24

    252627

    28 29 30

    Unsignalized Intersections

    Legend

    AM/PM Turning Movement Volume##/##Study Intersection

    I-30

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    As shown in Table 8, all study area intersections are forecast to operate at acceptable LOS under Opening (Year 2022) Conditions with the exception of the following 8 intersections:

    Palomar Street/Clinton Keith Road: LOS F in the AM peak hour

    California Oaks Road/Clinton Keith Road: LOS F in the AM peak hour and LOS E in PM peak hour

    Via Madrid/Clinton Keith Road: LOS E in the PM peak hour

    Greer/Clinton Keith Road: LOS E in the PM peak hour

    Murrieta Oaks Avenue/Clinton Keith Road: LOS F in the AM and PM peak hours

    Whitewood Road/Clinton Keith Road: LOS E in the AM peak hour and LOS F in the PM peak hour

    California Oaks Road/Jackson Avenue: LOS F in PM peak hour

    Salida del Sol/Clinton Keith Road: LOS E in AM and PM peak hours

    5.3 Opening (Year 2022) Roadway Segment LOS Table 8 provides a summary of the Opening (Year 2022) Conditions roadway segment capacity analysis based on the capacity thresholds identified on Table 3. As shown on Table 8, three out of the total of 8 study area roadway segments potentially exceed or exceed the average daily vehicle capacity thresholds under Opening (Year 2022) Conditions.

    Table 8: Opening (Year 2022) Roadway Segment Analysis

    ID Roadway From To # Lanes Estimated

    Daily Capacity

    2022 V/C Ratio

    A Clinton Keith Palomar Hidden Springs 4D 34,100 28,405 0.83

    B Clinton Keith Inland Valley Salida del Sol 2U 13,000 21,078 1.62

    C Clinton Keith Salida del Sol Elizabeth 2U 13,000 21,148 1.63

    D Clinton Keith Nutmeg California Oaks 4U 34,100 25,600 0.75

    E Clinton Keith Greer Murietta Oaks 4U 34,100 36,244 1.06

    F Clinton Keith West of Whitewood 6U 53,900 15,491 0.29

    G Baxter East of Monte Vista 2U 13,000 3,682 0.28

    H La Estrella East of George 2U 13,000 1,348 0.10

    Bolded: Potentially exceeds capacity (v/c 1.01-1.25); Bolded and Shaded: Exceeds capacity (v/c >1.26)

    24 I-31

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    5.4 Opening (Year 2022) Freeway Mainline LOS Table 9 summarizes the Opening (Year 2022) freeway mainline LOS at the study area mainline segments. The freeway mainline analysis worksheets are contained in Appendix C.

    Table 9: Opening (Year 2022) Freeway Mainline Analysis

    Opening AM Peak Hour Opening PM Peak Hour

    Mainline Segment Direction Mainline Segment Volume

    1 Density2 LOS Volume1 Density2 LOS

    1 NB I-15 north of Clinton Keith Road 4,335 23.1 C 6,502 45.3 F

    SB I-15 north of Clinton Keith Road 6,502 43.5 E 4,335 23.1 C

    2 NB I-15 south of Clinton Keith Road 4,335 23.1 C 6,502 43.5 E

    SB I-15 south of Clinton Keith Road 6,502 43.5 E 4,335 23.1 C

    3 NB I-215 north of Clinton Keith Road 2,997 15.6 B 4,496 27.3 D

    SB I-215 north of Clinton Keith Road 4,496 27.3 D 2,997 15.6 B

    4 NB I-215 south of Clinton Keith Road 3,090 16.0 B 4,634 25.0 C

    SB I-215 south of Clinton Keith Road 4,634 25.0 C 3,090 16.0 B

    1 Volumes referenced from Caltrans Traffic Data Branch (2014) 2 Density reported as pc/mi/ln

    25 I-32

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    6 Interim (Year 2024) Conditions 6.1 Interim (Year 2024) Traffic Volumes The Interim (Year 2024) background traffic is composed of existing traffic (based on the count data), background ambient traffic growth per year (identified as 2.4 percent per year for a total of 19.2 percent over 8 years), and traffic from the cumulative projects listed in Appendix D. The peak hour study intersection volumes for the Interim (Year 2024) including existing traffic volumes, ambient traffic growth, and related project trips (the cumulative base traffic) is shown in Figure 8.

    6.2 Interim (Year 2024) Intersection LOS A level of service analysis was conducted to evaluate Interim (Year 2024) intersection operations during the weekday AM peak hour. Table 10 summarizes the existing levels of service at the study area intersections. Interim (Year 2024) level of service calculation worksheets are included in Appendix B.

    Table 10 Interim (Year 2024) Intersection LOS

    Signalized Intersections Control Interim (Year 2024) Conditions

    AM Peak Hour PM Peak Hour Delay LOS Delay LOS

    1 Palomar and Clinton Keith Signal >80.0 F 58.9 E 2 Hidden Springs and Clinton Keith Signal 34.5 C 36.0 D 3 I-15 SB Ramps and Clinton Keith Signal 34.4 C 48.5 D 4 I-15 NB Ramps and Clinton Keith Signal 20.1 C 22.4 C 5 Arya and Clinton Keith Signal 32.7 C 58.6 E 6 George and Clinton Keith Signal 26.4 C 41.0 D 7 Inland Valley and Clinton Keith Signal 26.0 C 27.5 C 10 Smith Ranch and Clinton Keith Signal 8.7 A 6.4 A 11 Copper Craft and Clinton Keith Signal 20.1 C 20.9 C 12 Nutmeg and Clinton Keith Signal 25.3 C 37.0 D 13 California Oaks and Clinton Keith Signal >80.0 F >80.0 F 14 Via Madrid and Clinton Keith Signal 64.7 E >80.0 F 15 Greer and Clinton Keith Signal 47.4 D >80.0 F 16 Murrieta Oaks and Clinton Keith Signal >80.0 F >80.0 F 17 McElwain and Clinton Keith Signal 23.1 C 32.9 C 18 I-215 SB Ramps and Clinton Keith Signal 16.8 B 17.8 B 19 I-215 NB Ramps and Clinton Keith Signal 24.3 C 61.9 E 20 Whitewood and Clinton Keith Signal 73.8 E >80.0 F 21 California Oaks and Hancock Signal 16.7 B 16.7 B 22 California Oaks and Jackson Signal 32.6 C >80.0 F 23 Nutmeg and Jackson Signal 34.0 C 29.8 C

    Unsignalized Intersections Control AM Peak Hour PM Peak Hour

    Delay LOS Delay LOS 8 Salida del Sol and Clinton Keith TWSC 41.4 E 46.7 E 9 Elizabeth and Clinton Keith TWSC 20.7 C 32.6 D 24 Inland Valley and Prielipp AWSC 16.3 C 17.4 C 25 Salida del Sol and La Estrella TWSC 9.4 A 8.9 A 26 Iodine Springs and La Estrella TWSC 10.0 A 9.3 A 27 George and La Estrella AWSC 10.8 B 8.9 A 28 I-15 SB Ramps and Baxter AWSC 29.8 D 32.2 D 29 I-15 NB Ramps and Baxter AWSC 14.8 B 24.7 C 30 Monte Vista and Baxter TWSC 14.8 B 9.9 A

    Notes: Shaded unacceptable LOS; TWSC two-way stop; AWSC all-way stop

    26 I-33

  • IBI GROUP September 2016Wildomar Campus Master Plan Traffic Study

    Clinton Keith Rd/Inland Valley Dr Clinton Keith Rd/Salida del Sol

    Clinton Keith Rd/Hidden Springs Rd Clinton Keith Rd/I-15 NS Ramps Clinton Keith Rd/Arya Rd

    Clinton Keith Rd/Smith Ranch RdClinton Keith Rd/Elizabeth LnClinton Keith Rd/George Ave

    Clinton Keith Rd/I-15 SB Ramps

    Clinton Keith Rd/Nutmeg St Clinton Keith Rd/California Oaks Rd Clinton Keith Rd/Greer RdClinton Keith Rd/Via MadridClinton Keith Rd/Copper Craft Dr

    Clinton Keith Rd/Palomar St

    1

    6

    11

    2

    7

    12

    3

    13

    4

    14

    5

    10

    15

    8 9

    Unsignalized Intersections

    Figure 8 Interim (Year 2024) Intersection Peak Hour Traffic Volumes55/35

    234/124

    226/170

    103/160

    25/23

    431/341

    429/464

    2/1

    562/696

    0/0

    0/0

    0/0

    68/61

    10/5

    27/42

    243/92

    42/26

    112/61

    0/0

    0/0

    0/0

    6/10

    0/0

    27/24

    57/33

    1/0

    12/7

    88/39

    4/0

    68/49

    25/19

    4/2

    26/13

    55/39

    106/41

    148/98

    0/0

    0/0

    0/0

    8/4

    1/1

    61/33

    60/55

    47/4

    231/117

    147/203

    465/763

    364/281

    281/589

    851/1060

    70/75

    0/0

    769/1257

    461/317

    588/625

    919/906

    0/0

    69/54

    1179/1120

    123/106

    50/46

    981/1093

    76/138

    0/0

    778/658

    158/79

    30/31

    964/734

    0/0

    5/11

    945/731

    2/1

    24/42

    796/680

    12/37

    8/19

    732/705

    18/21

    96/151

    628/645

    263/318

    0/0

    835/930

    578/458

    29/45

    1363/1419

    25/39

    74/151

    1245/1375

    26/63

    55/95

    166/231

    409/235

    59/88

    22/26

    91/85

    0/0

    0/0

    0/0

    317/680

    0/0

    318/535

    249/407

    6/13

    96/132

    99/67

    17/35

    54/118

    319/564

    0/0

    47/130 0/0

    0/0

    0/0

    2/5

    0/0

    2/4

    54/20

    0/1

    5/2

    48/26

    4/2

    27/18

    78/52

    45/52

    351/283

    122/192

    0/0

    448/634

    8/7

    1/1

    61/30

    146/48

    22/0

    45/29

    42/37

    754/706

    110/69

    90/137

    1244/1011

    1/8

    0/0

    957/912

    807/521

    391/336

    1132/1270

    0/0

    82/62

    1091/1233

    299/442

    123/131

    1037/1192

    26/29

    13/10

    613/918

    569/471

    10/15

    627/1016

    0/0

    22/56

    634/984

    2/5

    32/58

    603/894

    14/24

    16/27

    651/856

    18/62

    29/75

    607/740

    110/86

    0/0

    1019/996

    153/119

    7/8

    1447/1561

    5/18

    44/86

    1418/1422

    108/91

    Legend

    AM/PM Turning Movement Volume##/##Study Intersection

    Baxter Rd

    Monte Vista

    Clint

    on K

    eith

    Rd

    Nutm

    eg St

    Prielipp Rd

    Jackson Ave

    Palomar St

    George Ave

    Salida del Sol

    Inland Valley Dr

    Arya Rd

    Elizabeth Ln

    Calif

    orni

    a Oa

    ks R

    d

    Via Madrid

    Green Rd

    Murrei

    tta Oak

    s Rd

    McE

    lwai

    n Rd

    Whi

    tew

    ood

    Rd

    Hancock Ave

    LaEstrella St

    Clinton Keith Rd

    Los Ala

    mos R

    d

    1

    23

    4 56 7 10 11

    12 13 1415

    1617 18 19 20

    21

    22

    23

    8 9

    24

    252627

    28 29 30

    I-34

  • IBI GROUP September 2016Wildomar Campus Master Plan Traffic Study

    California Oaks/Jackson Ave Nutmeg Street/Jackson Ave

    Clinton Keith Rd/McElwain Rd Clinton Keith Rd/I-215 NB Ramps Clinton Keith Rd/Whitewood Rd

    La Estrella St/Salida del SolInland Valley/Prielipp Rd

    Clinton Keith Rd/I-215 SB Ramps

    La Estrella St/George Ave Baxter Rd/SB I-15 Ramps Baxter Rd/Monte VistaBaxter Rd/NB I-15 Ramps

    California Oaks/Hancock Ave

    La Estrella St/Iodine Springs Rd

    Clinton Keith Rd/ Murreitta Oaks Rd

    16

    21

    17

    22

    18

    23

    19 20

    26 27 28

    24

    29

    25

    30

    Figure 8 Interim (Year 2024) Intersection Peak Hour Traffic Volumes0/0

    0/0

    0/0

    381/452

    0/0

    578/440

    637/863

    0/0

    142/129

    0/0

    0/0

    0/0

    294/229

    198/218

    7/1

    0/0

    899/609

    223/142

    265/182

    934/761

    44/66

    108/81

    327/281

    216/170

    42/7

    0/0

    428/405

    0/0

    0/0

    0/0

    8/11

    5/10

    4/4

    27/0

    302/119

    49/29

    270/205

    0/4

    104/69

    0/0

    0/0

    0/0

    143/105

    0/0

    158/36

    0/0

    1305/1577

    142/166

    81/303

    1019/1255

    0/0

    295/176

    477/821

    0/0

    137/73

    572/503

    0/0

    4/1

    30/1

    31/2

    135/250

    0/0

    468/386

    35/117

    24/83

    17/37

    136/193

    145/205

    100/149

    282/395

    12/1

    1/0

    0/0

    81/19

    0/2

    11/4

    94/37

    0/1

    60/17

    19/12

    24/23

    0/0

    367/584

    92/72

    135/48

    223/163

    0/0

    67/31

    182/116

    0/0

    51/46

    0/0

    179/122

    0/0

    0/0

    0/0

    0/0

    0/0

    0/0

    189/497

    0/0

    510/663

    239/305

    110/423

    90/4

    0/0

    527/845

    363/427

    227/554

    608/1128

    33/49

    68/73

    356/247

    148/105

    0/0

    0/0

    0/0

    32/32

    0/0

    1/8

    6/2

    4/8

    0/4

    68/0

    121/180

    7/31 0/0

    0/0

    0/0

    234/490

    1/0

    72/67

    0/0

    0/0

    0/0

    0/0

    1494/1710

    165/35

    283/542

    1495/1260

    0/0

    0/0

    1264/1211

    816/541

    0/0

    657/783

    715/533

    356/889

    11/7

    262/429

    0/0

    0/0

    0/0

    235/190

    39/36

    379/316

    137/124

    226/216

    48/83

    25/36

    5/7

    0/0

    1/0

    48/37

    31/18

    13/12

    61/39

    1/4

    22/2

    20/5

    55/0

    0/0

    490/219

    551/405

    344/156

    247/144

    0/0

    134/86

    180/125

    0/0

    Baxter Rd

    Monte Vista

    Clint

    on K

    eith

    Rd

    Nutm

    eg St

    Prielipp Rd

    Jackson Ave

    Palomar St

    George Ave

    Salida del Sol

    Inland Valley Dr

    Arya Rd

    Elizabeth Ln

    Calif

    orni

    a Oa

    ks R

    d

    Via Madrid

    Green Rd

    Murrei

    tta Oak

    s Rd

    McE

    lwai

    n Rd

    Whi

    tew

    ood

    Rd

    Hancock Ave

    LaEstrella St

    Clinton Keith Rd

    Los Ala

    mos R

    d

    1

    23

    4 56 7 10 11

    12 13 1415

    1617 18 19 20

    21

    22

    23

    8 9

    24

    252627

    28 29 30

    Unsignalized Intersections

    Legend

    AM/PM Turning Movement Volume##/##Study Intersection

    I-35

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    As shown in Table 10, all study area intersections are forecast to operate at acceptable LOS under Interim (Year 2024) Conditions with the exception of the following 9 intersections:

    Palomar Street/Clinton Keith Road: LOS F in the AM peak hour and LOS E in the PM peak hour

    Arya/Clinton Keith Road: LOS E in the PM peak hour

    California Oaks Road/Clinton Keith Road: LOS F in the AM and PM peak hours

    Via Madrid/Clinton Keith Road: LOS E in the AM peak hour LOS F in the PM peak hour

    Greer/Clinton Keith Road: LOS F in the PM peak hour

    Murrieta Oaks Avenue/Clinton Keith Road: LOS F in the AM and PM peak hours

    Whitewood Road/Clinton Keith Road: LOS E in the AM peak hour and LOS F in the PM peak hour

    California Oaks Road/Jackson Avenue: LOS F in PM peak hour

    Salida del Sol/Clinton Keith Road: LOS E in AM and PM peak hours

    6.3 Interim (Year 2024) Roadway Segment LOS Table 11 provides a summary of the Interim (Year 2024) Conditions roadway segment capacity analysis based on the capacity thresholds identified on Table 3. As shown on Table 11, three out of the total of 8 study area roadway segments potentially exceed or exceed the average daily vehicle capacity thresholds under Interim (Year 2024) Conditions.

    Table 11: Interim (Year 2024) Roadway Segment Analysis

    Bolded: Potentially exceeds capacity (v/c 1.01-1.25); Bolded and Shaded: Exceeds capacity (v/c >1.26)

    ID Roadway From To # Lanes Estimated

    Daily Capacity

    2024 V/C Ratio

    A Clinton Keith Palomar Hidden Springs 4D 34,100 29,378 0.86

    B Clinton Keith Inland Valley Salida del Sol 2U 13,000 21,801 1.68

    C Clinton Keith Salida del Sol Elizabeth 2U 13,000 21,872 1.68

    D Clinton Keith Nutmeg California Oaks 4U 34,100 26,478 0.78

    E Clinton Keith Greer Murietta Oaks 4U 34,100 37,486 1.10

    F Clinton Keith West of Whitewood 6U 53,900 16,022 0.30

    G Baxter East of Monte Vista 2U 13,000 3,808 0.29

    H La Estrella East of George 2U 13,000 1,394 0.11

    29 I-36

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    6.4 Interim (Year 2024) Freeway Mainline LOS Table 12 summarizes the Interim (Year 2024) freeway mainline LOS at the study area mainline segments. The freeway mainline analysis worksheets are contained in Appendix C.

    Table 12: Interim (Year 2024) Freeway Mainline Analysis

    Interim AM Peak Hour Interim PM Peak Hour

    Mainline Segment Direction Mainline Segment Volume

    1 Density2 LOS Volume1 Density2 LOS

    1 NB I-15 north of Clinton Keith Road 4,478 24.0 C 6,717 45.7 F

    SB I-15 north of Clinton Keith Road 6,717 45.7 F 4,478 24.0 C

    2 NB I-15 south of Clinton Keith Road 4,478 24.0 C 6,717 45.7 F

    SB I-15 south of Clinton Keith Road 6,717 45.7 F 4,478 24.0 C

    3 NB I-215 north of Clinton Keith Road 3,097 15.7 B 4,645 24.4 C

    SB I-215 north of Clinton Keith Road 4,645 24.4 C 3,097 15.7 B

    4 NB I-215 south of Clinton Keith Road 3,192 16.2 B 4,788 25.4 C

    SB I-215 south of Clinton Keith Road 4,788 25.4 C 3,192 16.2 B

    1 Volumes referenced from Caltrans Traffic Data Branch (2014) 2 Density reported as pc/mi/ln

    30 I-37

  • IBI GROUP DRAFT REPORT WILDOMAR CAMPUS MASTER PLAN DRAFT TRAFFIC STUDY Prepared for Placeworks

    7 Future (Year 2030) Conditions 7.1 Future (Year 2030) Traf