2019-2022 Transportation Improvement Program Appendix H Non-regionally Significant Arterials in Mobility 2045 North Central Texas Council of Governments DFW Metropolitan Planning Organization

Transcript of Appendix H - nctcog.org · NRSA1‐DAL‐104 53138.2 Interchange 0495‐01‐064 SP 557 At Las...

2019-2022 Transportation Improvement Program

Appendix H Non-regionally Significant Arterials

in Mobility 2045

North Central Texas Council of Governments DFW Metropolitan Planning Organization

Mobility2045

Non‐regionallySignificantRoadwaysDallasDistrict

RevisedJune192018

TIP Code Project Type CSJ Facility From To DescriptionYOE Total 

Project CostFFCS 

NRSA1‐DAL‐ 8 11005Intersection Improvement

0918‐45‐864 Whitlock Road IH 35E Old Denton Road Reconstruct 4 lane undivided to four lane divided with left turns $3,802,480 Minor Arterial

NRSA1‐DAL‐ 11 11237.2 New roadway 0918‐45‐812 Conflans Road SH 161 Valley View laneConstruct 0 to 4 lane divided facility with new sidewalks and shared use path

$30,952,202 Major Collector

NRSA1‐DAL‐ 16 11217.2 Addition of lanes 0918‐46‐298Mckinney Street (Old FM 426)

1.4 Miles west of SL 288 1.1 Miles East of SL 288 Widen 2 lane roadway to 4 lane divided urban $18,267,303 Minor Arterial

NRSA1‐DAL‐ 17 11217.1 Addition of lanes 0081‐11‐012 FM 426 1.4 Miles west of SL 288 1.1 Miles East of SL 288Widen from 2 lane roadway to 4 lane divided urban; Addition of lanes

$682,697 Minor Arterial

NRSA1‐DAL‐ 31 20109 Addition of lanes 0619‐05‐034 FM 544 FM 2281 (Denton Drive)0.17 Miles West of Josey lane

Reconstruct and widen two lane rural highway to six lane dividedurban Facility

$43,439,321 Minor Arterial

NRSA1‐DAL‐ 32 11450Intersection Improvement

0918‐45‐853 Daniel Dale Road  IH 35E Houston School Road

Recon. 2 Ln Undiv to 2 Ln Undiv urban from IH 35E Nb Fr Rd to Longhorn Trl & Recon. 2 Ln Undiv to 3 Ln Undiv with Contin. Cntr turn Ln W/Transition Lns, Signals, & add Combo Lns For Lt & Rt turn Lns from Longhorn Trl to Houston School Rd

$6,194,242 Minor Arterial

NRSA1‐DAL‐ 33 11981.2 Addition of lanes 0918‐47‐134 Pleasant Run Road Lancaster‐Hutchins Millers Ferry Road Widen 2 lane to 4 lane divided urban roadway $15,423,000 Minor Arterial

NRSA1‐DAL‐ 37 11724Addition of lanes, Reconstruction

3148‐01‐006 FM 3097 FM 740 East of Tubbs Road Reconstruct and Widen 2 lane undivided to 4 lane divided $14,049,455 Major Collector

NRSA1‐DAL‐ 39 11727 Addition of lanes 0918‐45‐884 Medical District Drive IH 35E Harry Hines Blvd Reconstruct and widen from 4‐lane to 6‐lane divided $26,617,109 Major Collector

NRSA1‐DAL‐ 51 52559 Addition of lanes 2845‐01‐014 FM 455 Wildwood Trail SH 121 Widen Facility to 4 lane urban divided (ultimate 6 lane divided) $82,910,295 Minor Arterial

NRSA1‐DAL‐ 67 20113 New roadway 0918‐46‐240 Corporate Drive FM 544 Josey lane Construct four lane divided roadway segment 6 $20,898,278 Minor Arterial

NRSA1‐DAL‐ 71 53073 New roadway 2679‐03‐010 FM 2514 FM 1378 East of Lavon ParkwayRealign highway from FM 1378 southeast to near Lavon Parkway, Construct four lane divided highway (ultimate 6 lanes)

$9,251,843 Major Collector

NRSA1‐DAL‐ 72 20083 Addition of lanes 2679‐02‐008 FM 2514 FM 2551 West of FM 1378Widen 2 lane rural to 4 lane (ultimate 6 lane) urban roadway including new pedestrian improvements and left/right turn lanes

$26,454,250 Major Collector

NRSA1‐DAL‐ 82 20124 New roadway 0918‐47‐005 Pleasant Valley RoadRichfield Drive at Creek Meadow Lane

Miles Road Construct a 4 lane divided roadway and bridge $26,845,032 Minor Arterial

NRSA1‐DAL‐ 86 20141.1 Addition of lanes 0918‐46‐230 Gerault/ Morriss FM 2499 FM 407

Widen and reconstruct 4 to 6 lane divided urban arterial from FM 2499 to FM 3040 and Reconstruct 4 to 4 lane divided urban from FM 3040 to FM 407 with traffic signal and drainage improvements West of FM 2499/Gerault Road intersection

$32,047,204 Minor Arterial

MTP ID

Source:NorthCentralTexasCouncilofGovernmentsH.2

Mobility2045

Non‐regionallySignificantRoadwaysDallasDistrict

RevisedJune192018

TIP Code Project Type CSJ Facility From To DescriptionYOE Total 

Project CostFFCS MTP ID

NRSA1‐DAL‐ 89 20144 Addition of lanes 0918‐46‐246 Mayhill Road IH 35E US 380Expand 2 lane rural road to a 4 lane divided urban arterial (ultimate 6 lane), extension of FM 2499

$95,603,459 Minor Arterial

NRSA1‐DAL‐ 95 20066Intersection Improvement

2374‐03‐074 IH 20 At Bonnie View RoadImprove approach, widen bridge to add turn lanes and replace traffic signal system

$3,376,725 Minor Arterial

NRSA1‐DAL‐ 104 53138.2 Interchange 0495‐01‐064 SP 557 At Las Lomas Parkway (CR 305)Construct Phase 1 (4‐lanes) of ultimate 8 lane bridge Plus Connections to Las Lomas Parkway

$2,961,583Freeway/Expressway

NRSA1‐DAL‐ 105 83262 Addition of lanes 0495‐01‐065 SP 557 At Las Lomas Parkway (CR 305)Construct Phase 2 (Final 4‐lanes) of ultimate 8 lane bridge plus connections to Las Lomas Parkway

$6,021,704Freeway/Expressway

NRSA1‐DAL‐ 107 20213 Addition of lanes 0918‐47‐051 Wildlife Parkway SH 161 Belt Line RoadConstruct 0/2 lane rural to 2/4 lane divided including bridge over Trinity River

$35,121,000 Major Collector

NRSA1‐DAL‐ 108 54005Intersection Improvement, Addition of lanes

2351‐01‐017 FM 2478 US 380 FM 1461Widen two lane rural highway to four lane divided; Realign intersection at FM 1461; Six lane ultimate

$54,868,369 Minor Arterial

NRSA1‐DAL‐ 109 54005.1

Intersection Improvement, Reconstruction, Addition of lanes

2351‐02‐014 FM 2478 FM 1461 North of FM 1461Widen two lane rural highway to four lane divided; six lane ultimate; Realign intersection of FM 1461

$5,173,412 Minor Arterial

NRSA1‐DAL‐ 110 83209 Addition of lanes 2056‐01‐042 FM 2551 FM 2514 FM 2170 Reconstruct and widen 2 lane rural to 6 lane urban divided $65,817,835 Minor Arterial

NRSA1‐DAL‐ 111 54036 New roadway 1494‐03‐001 FM 3486 FM 986 SH 34 Reconstruct 2 lane County Road to 2 lane FM highway $6,311,958Not on FFCS (State 

Funded)

NRSA1‐DAL‐ 118 20121 Addition of lanes 0718‐01‐064 FM 156 SH 114 12th Street Widen 2 to 4 lane divided urban cross section $45,201,856 Minor Arterial

NRSA1‐DAL‐ 119 11719 Addition of lanes 3392‐01‐008 FM 2786 SH 5East of Angel Parkway in Allen

Widen 2 to 4 lane divided (6 lane ultimate) with Intersection Improvements at SH 5

$11,160,911 Minor Arterial

NRSA1‐DAL‐ 120 20082 Addition of lanes 3392‐01‐009 FM 2786 East of Angel Parkway FM 1378Reconstruct 2 lane roadway to a 4 lane (ultimate 6) divided roadway

$10,575,825 Minor Arterial

NRSA1‐DAL‐ 124 20208Addition of lanes, New roadway

0196‐03‐180, 0196‐03‐247

IH 35E/Dickerson Parkway

Sandy Lake Road/Whitlock lane PGBT (SH 190)Lane ramp and 4 to 6 frontage road Construction along IH 35E and a new 6 lane overpass at Dickerson Parkway (part of phased implementation of the IH 35E corridor)

$101,673,681 Minor Arterial

NRSA1‐DAL‐ 126 55006 Addition of lanes 1017‐01‐015 FM 552 SH 205 SH 66 Widen from 2 lane rural to 4 lane urban section $60,527,989 Major Collector

NRSA1‐DAL‐ 127 83221 Addition of lanes 1015‐01‐024 FM 549 SH 205 SH 276 Widen from 2 lane rural to 4 lane urban $28,194,287 Major Collector

NRSA1‐DAL‐ 128 13035 Addition of lanes 1051‐01‐051 FM 664 IH 35E IH 45 Widen 2/4 lane rural to 6 lane urban $237,068,224 Minor Arterial

NRSA1‐DAL‐ 129 83222 Addition of lanes 1015‐01‐023 FM 3549 IH 30 North of SH 66 Widen from 2 lane rural to 4 lane urban divided section $18,979,785 Minor Arterial

Source:NorthCentralTexasCouncilofGovernmentsH.3

Mobility2045

Non‐regionallySignificantRoadwaysDallasDistrict

RevisedJune192018

TIP Code Project Type CSJ Facility From To DescriptionYOE Total 

Project CostFFCS MTP ID

NRSA1‐DAL‐ 130 20231 Bike/Pedestrian 0918‐46‐261Old town Transit Oriented Development

Bounded By 100 N. Charles Street; 200 N. Charles Street

100 West to 500 E. Blocks of Main Street and The 100 N. to 500 S. Blocks of Mill Street

Pedestrian amenities; Landscaping; Intersection Improvements; Bike Connection; traffic signalization; and Street Improvements on Main St and Mill St to reduce from 2 lanes to 1 lane In each direction to accomm. Pedestrian Impr.

$3,750,000 Minor Arterial

NRSA1‐DAL‐ 131 20233 Bike/Pedestrian 0918‐47‐020 Thomasson SquareBounded By Karla Drive On The North, Moon Drive and; Whitson Way On The South

Forrest Drive On The East and The City Drainage Channel On The West

Ped amen., Bike Ln/Trl, Lndscp, Int. Improv. incl Lt Trn Lns, Rt Trn Lns, Improv. to Int. Geom. and/Or Lndscp on Gus Thomasson, & Traf. Sgnlztion & Str. Improv. incl 6 to 4 Lns on Gus Thomasson Rd B/W Karla Dr (N. Bndry) & Moon Dr & Whitson Way (S. Bndry)

$3,749,421 Minor Arterial

NRSA1‐DAL‐ 133 83255 Addition of lanes 0816‐02‐072 FM 455 West of FM 2450 East of Marion Road Reconstruct and widen two lane rural to four lane urban divided $66,770,314 Minor Arterial

NRSA1‐DAL‐ 139 20278 Addition of lanes 0918‐24‐194 West Lucas Road FM 2551 FM 1378Widen from 2 lanes to 3/4 lane section including traffic signal Modifications at FM 2551 and FM 1378 intersection

$1,500,000 Minor Arterial

NRSA1‐DAL‐ 140 20285 Addition of lanes 0918‐24‐191FM 3038 Virginia Parkway

West of Joplin Drive US 75 Widen 4 to 6 lane divided including a bridge over Wilson Creek $16,092,551 Major Collector

NRSA1‐DAL‐ 144 20280 New roadway 0918‐24‐196 Frontier Parkway (CR 5) SH 289 (Preston Road) DNTConstruct new 2 to 4 lane divided urban arterial with grade separation over BNRR, 2‐Way service road north of grade separation, and quiet zones

$24,586,700 Minor Arterial

NRSA1‐DAL‐ 150 83257 Addition of lanes 0751‐01‐046 FM 148 South of US 80 SP 557 Widen existing highway from two lane rural to four lane divided $15,400,000 Major Collector

NRSA1‐DAL‐ 152 20277.2 Addition of lanes 0918‐24‐206 Dallas Parkway SH 121 Lebanon RoadWiden northbound and southbound Dallas Parkway from 2 lanes in each direction to 3 lanes in each direction

$7,068,000 Major Collector

NRSA1‐DAL‐ 153 20277.1 Addition of lanes 0918‐24‐207 Dallas Parkway Lebanon Road Eldorado ParkwayWiden northbound and southbound Dallas Parkway from 2 lanes in each direction to 3 lanes in each direction

$4,550,000 Major Collector

NRSA1‐DAL‐ 154 55037 Addition of lanes 2679‐03‐016 FM 2514 North of Drain Drive Brown StreetWiden facility from 2 lane to 4 lane urban divided (ultimate 6 lane divided)

$40,069,296 Major Collector

NRSA1‐DAL‐ 155 55038 Addition of lanes 2679‐03‐015 FM 2514 East of Lavon Parkway North of Drain DriveWiden Facility from 2 lane to 4 lane urban divided (ultimate 6 lane divided)

$21,271,466 Major Collector

NRSA1‐DAL‐ 156 55039 Addition of lanes 2679‐02‐011 FM 2514 West of FM 1378 FM 1378Reconstruct 2 lane rural to 4 lane urban (ultimate 6 lane urban divided)

$2,322,460 Major Collector

NRSA1‐DAL‐ 162 20297 Addition of lanes 0918‐46‐290 Hickory Creek Road FM 2181 Proposed FM 2499Construct and widen from 2 lane undivided to 4 lane undivided urban roadway

$3,000,000 Major Collector

NRSA1‐DAL‐ 163 82384 New roadway 0000‐18‐019Kirkpatrick Lane (Phase III)

FM 1171 Bellaire Blvd Construct 0 to 4 lane roadway $11,529,000 Major Collector

NRSA1‐DAL‐ 165 83030 Addition of lanes 0000‐18‐071 Hickox Road  Toler Road Merritt Road Widen from 2 lanes to 4 lanes (Phase 2) $3,000,000 Minor Arterial

NRSA1‐DAL‐ 166 83052 Addition of lanes 0000‐18‐026 Lawson Road Milam Road Clay‐Mathis Road Widen from 2 lanes to 4 lanes $13,335,000 Minor Arterial

NRSA1‐DAL‐ 167 83112 Addition of lanes 0000‐18‐027 Lebanon Road  Coit Road Independence Parkway Widen from 2 lanes to 4 lanes $5,800,000 Major Collector

NRSA1‐DAL‐ 168 83120 Addition of lanes 0000‐18‐028 Main Street FM 423 DNT Widen from 4 lanes to 6 lanes $1,200,000 Minor Arterial

NRSA1‐DAL‐ 169 55111 Addition of lanes 2588‐01‐017 FM 548 North of US 80 at Walmart SH 205Widen and reconstruct 2 lane rural to 4 lane urban divided (6 lane ultimate)

$109,599,843 Major Collector

NRSA1‐DAL‐ 171 83144 Addition of lanes 0000‐18‐033 Chaha Road Rowlett Road Kirby Road Widen from 2 lanes to 3 lanes $5,016,500 Major Collector

NRSA1‐DAL‐ 173 83215 Addition of lanes N/A Ridgeview Drive Alma US 75 Widen from 2 lanes to 4 lanes $18,979,785 Not on FFCS

NRSA1‐DAL‐ 175 83284 New roadway 0751‐02‐027 FM 148 South of FM 3039 US 175 Construct 0 to 2 rural lane undivided $41,868,896 Minor Arterial

Source:NorthCentralTexasCouncilofGovernmentsH.4

Mobility2045

Non‐regionallySignificantRoadwaysDallasDistrict

RevisedJune192018

TIP Code Project Type CSJ Facility From To DescriptionYOE Total 

Project CostFFCS MTP ID

NRSA1‐DAL‐ 177 83129.1 New roadway 0000‐18‐030 Denton Creek Blvd  At Graham Branch Build new location 0 to 4 lane bridge $8,967,000 Minor Arterial

NRSA1‐DAL‐ 178 83129.2 Interchange 0000‐18‐031 Denton Creek Blvd  At IH 35W Interchange $5,000,000 Minor Arterial

NRSA1‐DAL‐ 179 83266Intersection Improvement

0000‐18‐040 Skillern Road Flower Mound Road River Hill Drive Reconstruct 2 to 2 lanes $905,000 Minor Arterial

NRSA1‐DAL‐ 182 20296 New roadway 0918‐46‐289 Valley Ridge Blvd Mill Street College Street Construct 0 to 4 lane divided urban arterial $17,770,000 Major Collector

NRSA1‐DAL‐ 184 25025 New roadway 0918‐47‐237 Wheatland Road Dallas/Lancaster City LimitUniversity Hills along The Dallas/Lancaster City Limits

Construct 0 to 4 lane divided roadway and Bicycle/Pedestrian Facilities

$4,809,552 Major Collector

NRSA1‐DAL‐ 185 82130 Addition of lanes 0000‐18‐018 Hickory CreekRoad FM 2181 River Pass Widen from 2 lanes to 4 lanes (ultimate 6 lanes) $3,500,000 Major Collector

NRSA1‐DAL‐ 187 20290

Bridge, Intersection Improvement, Bike/Pedestrian

0353‐06‐057SH 114/Texas Plaza bridge

SL 12 SS 482Construct 0 to 4 lane signature bridge with bicycle lane, sidewalks, Intersection Improvements, and ramp modifications

$54,413,449 Minor Arterial

NRSA1‐DAL‐ 188 633Intersection Improvement/ Reconstruct

0918‐45‐372 Dolphin Road Spring AveNorth of Haskell Ave/Military Parkway

Reconstruct existing roadway from 4 lane undivided to 4 lane divided with intersection improvements at Haskell

$4,694,450 Minor Arterial

NRSA1‐DAL‐ 189 55205 Reconstruction 1310‐01‐043 FM 407 Gulf Ave Sage Drive Realign existing 2 to 2 lane roadway $2,890,927 Minor Arterial

NRSA1‐DAL‐ 190 13017Reconstruction, Addition of lanes

2588‐02‐008 FM 548S of SH 205 (Kaufman County Line)

SH 205Widen and reconstruct 2 lane rural to 4 lane divided urban roadway (ultimate 6)

$13,126,932 Minor Arterial

NRSA1‐DAL‐ 191 14002 Addition of lanes 0918‐47‐208 Wintergreen Road Jefferson Street West of Carpenter RoadReconstruct and widen 2 lane undivided rural to 4 lane divided urban

$18,885,938 Minor Arterial

NRSA1‐DAL‐ 192 14003ReconstructionAddition of lanes

0918‐47‐239

Jefferson Street from Wintergreen Road to Pleasant Run Road and Pleasant Run Road

Jefferson Street Lancaster‐Hutchins RoadWiden and reconstruct 2 lane undivided rural to 4 lane divided urban

$11,295,657 Major Collector

NRSA1‐DAL‐ 193 13020Reconstruction, Addition of lanes

1394‐02‐027 FM 1387 Midlothian Parkway FM 664Reconstruct and widen from 2 lane undivided rural to 4 lane urban divided (ultimate 6 lane)

$54,840,610 Major Collector

NRSA1‐DAL‐ 195 55218 New roadway 1311‐01‐055 FM 1171 IH 35W West of FM 156 Construct new 0 to 6 lane divided arterial $59,192,338 Major Collector

NRSA1‐DAL‐ 196 2310.1 Bike/Pedestrian 0918‐47‐057 Denton Drive  South of Walnut Hill lane North of Royal lane

Reconstruct Denton Dr from 2 ln undivided rural into 3 ln urban transit oriented roadway with center turn ln, bike ln, sidewalks, and sidewalk connection to Harry Hines Blvd along both Walnut Hill Ln and Royal Ln connecting Dart LRT Station

$10,253,616 Major Collector

NRSA1‐DAL‐ 197 82386Intersection Improvement

0000‐18‐020 Waketon Road FM 2499 Chinn Chapel Road Realignment of roadway (2 to 2 lanes) $5,876,000 Not on FFCS

NRSA1‐DAL‐ 200 New roadwayNew Collin County N/S Road #1

SH 121/FM 455 FM 545/FM 1827 New 4‐lane road (PA)$8,587,037

Not on FFCS

NRSA1‐DAL‐ 201 RealignmentFM 1827/New Collin County N/S Road #1

FM 545/FM 1827 FM 1827/CR 470 Realign 4‐lane road (PA)$12,318,304

Not on FFCS

Source:NorthCentralTexasCouncilofGovernmentsH.5

Mobility2045

Non‐regionallySignificantRoadwaysDallasDistrict

RevisedJune192018

TIP Code Project Type CSJ Facility From To DescriptionYOE Total 

Project CostFFCS MTP ID

NRSA1‐DAL‐ 202 New roadwayNew Collin County N/S Road #1

FM 1827/CR 470 CR 463 (North) New 4‐lane road (PA)$4,897,286

Not on FFCS

NRSA1‐DAL‐ 203 RealignmentNew Collin County N/S Road #1

CR 463 (North)  US 380 Realign 4‐lane road (PA)$8,981,690

Not on FFCS

NRSA1‐DAL‐ 204 New roadwayNew Collin County N/S Road #1

US 380 FM 546/CR 447 New 4‐lane road (PA)$8,730,034

Not on FFCS

NRSA1‐DAL‐ 205 RealignmentNew Collin County N/S Road #1

FM 546/CR 447 FM 982/CR 444 Realign 4‐lane road (MA)$8,839,204

Not on FFCS

NRSA1‐DAL‐ 206 RealignmentFM 982/Collin County N/S Road #1

FM 982/CR 444 FM 3286 Realign 4‐lane road (MA)$1,396,662 Minor Arterial

NRSA1‐DAL‐ 207 WIdeningFM 3286 Lucas Road/Collin County N/S Road #1

FM 982 FM 1378 Widen 2 to 4 lanes (MA)$30,486,697 Major Collector

NRSA1‐DAL‐ 210 WIdeningMcMillien Dr/Collin County E/W Road #2

McCreary Rd Country Club Rd Widen 2 to 6 lanes (MA)$5,571,272 Major Collector

NRSA1‐DAL‐ 211 WIdeningPArk Blvd/Collin County E/W Road #2

Country Club Rd SH 78/Kreymer Ln Widen 2 to 6 lanes (MA)$13,266,495

Not on FFCS

NRSA1‐DAL‐ 212 WideningKreymer Ln/Collin County E/W Road #2

SH 78/Kreymer LnCollin County E/W Road #3/Troy Rd

Widen 2 to 4 lanes (MA)$3,934,743

Not on FFCS

NRSA1‐DAL‐ 213 New roadwayHenSLey Ln/New Collin County E/W Road #3

McCreary Rd Woodbridge Pkwy New 4‐lane road (MA)$3,620,045

Not on FFCS

NRSA1‐DAL‐ 214 WideningHenSLey Ln/New Collin County E/W Road #3

Woodbridge Pkwy Sanden Blvd Widen 2 to 4 lanes (MA)$2,794,349

Not on FFCS

NRSA1‐DAL‐ 215 RealignmentAlanis Dr/New Collin County E/W Road #3

Sanden Blvd Ballard St Realign 4‐lane road (MA) w/ SH 78 grade separation$7,199,601

Not on FFCS

NRSA1‐DAL‐ 217 New roadwayNew Collin County E/W Road #3

FM 544 (Vinson Rd) SH 205 New 4‐lane road (MA)$41,314,032 Minor Arterial

NRSA1‐DAL‐ 218 WideningCampbell Road/Collin County E/W Road #4

PGBT Murphy Rd Widen 2/4 to 6 lanes (PA)$5,017,220 Minor Arterial

NRSA1‐DAL‐ 219 WideningBlackburn Rd/Collin County E/W Road #4

Murphy Rd Dewitt Rd Widen 2 to 4 lanes (MA)$2,822,539 Major Collector

NRSA1‐DAL‐ 221 WIdeningSachse Rd/Collin County E/W Road #4

SH 78/Sachse Rd Sachse Rd/Elm Grove Rd Widen 2 to 4 lanes (MA)$7,185,250 Major Collector

NRSA1‐DAL‐ 222 WideningElm Grove Rd/Collin County E/W Road #4

Sachse Rd/Elm Grove Rd Vinson Rd Widen 2 to 4 lanes (MA)$5,758,348 Major Collector

NRSA1‐DAL‐ 223 WideningFM 544 (Vinson Rd)/Collin County N/S Road #5

Alanis Dr/Collin County E/W Road #3

Elm Grove Rd Widen 2 to 4 lanes (MA)$7,812,594

Not on FFCS

NRSA1‐DAL‐ 224 New roadwayFM 544 (Vinson Rd)/Collin County N/S Road #5

Elm Grove Rd Merritt Rd/Hickox Rd New 4‐lane road (MA) w/ diamond interchange @ PGBT$17,470,833 Major Collector

NRSA1‐DAL‐ 225 WideningHickox Rd/Collin County N/S Road #5

Merritt Rd/Hickox Rd Castle Dr Widen 2 to 4 lanes (MA)$2,252,085

Not on FFCS

NRSA1‐DAL‐ 226 New roadwayHickox Rd/Collin County N/S Road #5

Castle Dr Centerville Rd New 4‐lane road (MA)$4,535,436 Major Collector

NRSA1‐DAL‐ 227 WideningCastle Dr/Collin County N/S Road #5

Centerville Rd Country Club Rd Widen 2 to 4 lanes (MA)$3,022,428

Not on FFCS

NRSA1‐DAL‐ 229 New roadwayCollin County E/W Road #7

SH 5 (Greenville Ave)/Chaparral Rd

Chase Oaks Blvd (W of US 75)

New 4‐lane road (C) w/ grade separation over US 75 mainlanes & frontage roads $6,599,933 Major Collector

Source:NorthCentralTexasCouncilofGovernmentsH.6

Mobility2045

Non‐regionallySignificantRoadwaysDallasDistrict

RevisedJune192018

TIP Code Project Type CSJ Facility From To DescriptionYOE Total 

Project CostFFCS MTP ID

NRSA1‐DAL‐ 230 WideningFM 6/Collin County E/W Road #8

SH 78 SH 66 Widen 2 to 4 lanes (MA)$27,985,519

Not on FFCS

NRSA1‐DAL‐ 231 New roadwayFM 6/Collin County E/W Road #8

SH 66 FM 35 (S of SH 66) New 4‐lane road (MA)$3,620,045 Major Collector

NRSA1‐DAL‐ 232 WIdeningFM 35/Collin County E/W Road #8

FM 35 (S of SH 66) IH 30 Widen 2 to 4 lanes (MA)$7,926,890 Major Collector

NRSA1‐DAL‐ 233 WideningFM 2755/Collin County E/W Road #9

SH 78 FM 2755/Watkins Rd Widen 2 to 4 lanes (PA)$11,571,025 Major Collector

NRSA1‐DAL‐ 234 WideningWatkins Rd/Collin County E/W Road #9

FM 2755/Watkins Rd FM 1777/CR 590 Widen 2 to 4 lanes (PA)$8,411,237

Not on FFCS

NRSA1‐DAL‐ 235 New roadwayFM 2642/Collin County E/W Road #9

FM 1777/CR 590 SH 66/FM 2642 New 4‐lane road (PA)$6,884,391 Major Collector

NRSA1‐DAL‐ 236 WideningFM 2642/Collin County E/W Road #9

SH 66/FM 2642 FM 35/FM 2642 Widen 2 to 4 lanes (PA)$6,930,322 Minor Arterial

NRSA1‐DAL‐ 237 WIdeningFM 35/Collin County E/W Road #9

FM 35/FM 2642 SH 276 Widen 2 to 4 lanes (PA)$15,711,295

Not on FFCS

NRSA1‐DAL‐ 238 WideningCR 482/Collin County E/W Road #10

SH 78 CR 483 (East) Widen 2 to 4 lanes (MA)$3,136,724

Not on FFCS

NRSA1‐DAL‐ 239 New roadwayCollin County E/W Road #10

CR 483 (East) FM 2755 (West) New 4‐lane road (MA)$5,855,730 Major Collector

NRSA1‐DAL‐ 240 WideningFM 2755/Collin County E/W Road #10

FM 2755 (West)Erby Campbell Rd/Collin County N/S Road #13

Widen 2 to 4 lanes (MA)$12,290,113

Not on FFCS

NRSA1‐DAL‐ 241 New roadwayCollin County E/W Road #10

Erby Campbell Rd/Collin County N/S Road #13

SH 66 New 4‐lane road (MA)$7,909,464

Not on FFCS

NRSA1‐DAL‐ 242 New roadwayFM 3549/Collin County N/S Road #11

FM 552/FM 3549 FM 2755 (West) New 4‐lane road (MA)$7,771,019 Major Collector

NRSA1‐DAL‐ 243 WideningFM 2755/Collin County N/S Road #11

FM 2755 (West) FM 2755/Watkins Rd Widen 2 to 4 lanes (MA)$4,562,970

Not on FFCS

NRSA1‐DAL‐ 244 New roadwayFM 3549/Collin County N/S Road #11

FM 2755/Watkins Rd FM 6 New 4‐lane road (MA)$9,030,894 Major Collector

NRSA1‐DAL‐ 245 WideningFM 1138/Collin County N/S Road #12

FM 1138/Outer LoopFM 1138 (S of Nevada/NETEX)

Widen 2 to 4 lanes (MA)$6,386,718

Not on FFCS

NRSA1‐DAL‐ 246 New roadwayCollin County N/S Road #12

FM 1138 (S of Nevada/NETEX) FM 6/FM 1138 New 4‐lane road (MA)$3,868,113 Major Collector

NRSA1‐DAL‐ 247 WideningFM 1138/Collin County N/S Road #12

FM 6/FM 1138 FM 1778/CR 643 Widen 2 to 4 lanes (MA)$7,527,111

Minor Collector

NRSA1‐DAL‐ 248 WIdeningCollin County N/S Road #12

FM 1778/CR 643 CR 609 (North) Widen 2 to 4 lanes (MA)$11,975,416

Not on FFCS

NRSA1‐DAL‐ 249 New roadwayCollin County N/S Road #12

CR 609 (North) Main St/Josephine Rd New 4‐lane road (MA)$5,827,540

Minor Collector

NRSA1‐DAL‐ 250 WideningMain St/Collin County N/S Road #12

Main St/Josephine Rd US 380/Main St Widen 2 to 4 lanes (MA)$1,281,854

Not on FFCS

NRSA1‐DAL‐ 251 RealignmentErby Campbell/Collin County N/S Road #13

Collin County E/W Road #10 SH 66 Realign 2 to 4 lanes (C) $5,673,779

Minor Collector

NRSA1‐DAL‐ 253 WideningFM 1778/Collin County E/W Road #14

SH 78 CR 695 Widen 2 to 4 lanes (MA)$19,018,180

Not on FFCS

NRSA1‐DAL‐ 254 RealignmentFM 1778/Collin County E/W Road #14

CR 695 FM 6/FM 1777 Realign 2 to 4 lanes (MA)$4,258,153

Not on FFCS

NRSA1‐DAL‐ 255 RealignmentFM 1777/Collin County N/S Road #14

FM 6/FM 1777 SH 66 Widen 2 to 4 lanes (MA)$17,250,442

Not on FFCS

Source:NorthCentralTexasCouncilofGovernmentsH.7

Mobility2045

Non‐regionallySignificantRoadwaysDallasDistrict

RevisedJune192018

TIP Code Project Type CSJ Facility From To DescriptionYOE Total 

Project CostFFCS MTP ID

NRSA1‐DAL‐ 256 New roadwayFM 1777/Collin County N/S Road #14

SH 66 FM 35/FM 2453 New 4‐lane road (MA) w/ IH 30 interchange$7,292,370

Not on FFCS

NRSA1‐DAL‐ 259 WIdening Rock Ridge Rd FM 1378 (Country Club Rd) Exchange Pkwy Widen 2 to 4 lanes (C) $1,853,342

Not on FFCS

NRSA1‐DAL‐ 260 WIdening Rock Ridge Rd Exchange Pkwy FM 2170 (Estates Pkwy) Widen 2 to 4 lanes (C) $2,936,834

Not on FFCS

NRSA1‐DAL‐ 261 New roadway McCReary Rd Lucas Rd/Lewis LnFM 2514 (Parker Rd)/McCReary Rd

New 4‐lane road (C) $7,913,051

Minor Collector

NRSA1‐DAL‐ 263 Widening Lucas Rd FM 2551 (angel Pkwy) FM 1378 (Country Club Rd) Widen 2 to 4 lanes (MA)$7,185,250

Not on FFCS

NRSA1‐DAL‐ 264 New roadwayOuter Loop/FM 548 Connector

IH 30 FM 548 New 4‐lane divided$9,100,000 Major Collector

NRSA1‐DAL‐ 265 Widening FM 548 Outer Loop/FM 548 Connector SH 276 Widen 2 to 4‐lane divided$8,400,000 Major Collector

NRSA1‐DAL‐ 266 Widening FM 548 SH 276 SH 205 Widen 2 to 4‐lane divided$27,000,000

Major Collector

NRSA1‐DAL‐ 300 55236 Widening 1392‐03‐012 FM 1461 West of County Road 166 CR 123Widen and reconstruct 2 lane rural to 4 lane urban (ultimate 6 lanes) $15,834,370

Major Collector

NRSA1‐DAL‐ 301 55237 Widening 1973‐01‐015 FM 1461 SH 289 West of County Road 166Widen and reconstruct 2 lane rural to 4 lane urban (ultimate 6 lanes) $93,670,180

Minor Arterial

NRSA1‐DAL‐ 302 55239 Widening 1951‐01‐011 FM 1515/Airport Road Bonnie Brae Masch Branch Road Widen 2 lane rural section to 6 lane divided urban$34,751,182

Minor/Major Collector

NRSA1‐DAL‐ 304 14030 Reconstruct 0918‐46‐954 College Street Mill Street Railroad StreetReconstruct from 2 to 2 lanes, add bicycle lanes, widen/expand sidewalks, and add on‐street parking

$3,750,000 Major Collector

NRSA1‐DAL‐ 305 14033 Reconstruct 0918‐46‐952 South Shady Shores Road West Shady Shores Road Swisher RoadReconstruct Road from 2 to 2 lanes to elevate out of flood plain with drainage improvements

$19,110,000 Major Collector

NRSA1‐DAL‐ 306 55238Reconstruct and Widen

2845‐01‐020 FM 455 SH 5 Wildwood TrailReconstruct and widen 2 to 4 lane urban divided (ultimate 6 lanes)

$26,596,569 Minor Arterial

NRSA1‐DAL‐ 307 14032 Widening 0918‐45‐999 East Bear Creek Road Hampton Road IH 35EReconstruct and widen from 2 lane rural undivided to 4 lane urban divided (ultimate 6) with bicycle/pedestrian accomodations with intersection improvements

$25,825,442 Minor Arterial

Source:NorthCentralTexasCouncilofGovernmentsH.8

Mobility2045

Non‐regionallySignificantRoadwaysFortWorthDistrict

RevisedJune19,2018

TIP Code Project Type CSJ Facility From To DescriptionYOE Total Project Cost

FFCS 

NRSA1‐FTW‐ 4 11244.1 Addition of lanes 0718‐02‐045 FM 156 US 81/287 Watauga Road (McElroy) Reconstruct and Widen 2 lane to 4 lane divided $61,509,400 Major Collector

NRSA1‐FTW‐ 8 52501 Addition of lanes 3372‐01‐010 FM 3391 IH 35W East of CR 602Widen from 2 lanes to 6 lanes from IH 35W to Hurst Avenue and 2 lanes to 4 lanes from Hurst Avenue to CR 602

$35,273,646 Minor Arterial

NRSA1‐FTW‐ 11 11763 New roadway 0902‐48‐722 Chapel Creek Blvd At IH 30

Construct New 6 lane bridge with 4 Thru lanes, 2 Leftturn lanes, a Separate U‐turn bridge to Include Right‐turn lanes, approaches, Pedestrian Improvements, Signalization, Lighting, and Retaining Wall Improvements

$12,685,953 Major Collector

NRSA1‐FTW‐ 20 53079 New roadway 0902‐50‐104 Alsbury Hulen StreetCR 1020 (approximately 0.2 Miles)

Construction of a 4 lane extension of Alsbury Boulevard

$4,945,889 Minor Arterial

NRSA1‐FTW‐ 25 53125 New roadway 0902‐48‐697 White Settlement Road At Bypass ChannelConstruct 4 lane bridge at new location of proposed bypass channel for trinity river near CBD of Fort Worth

$48,923,288 Major Collector

NRSA1‐FTW‐ 38 53141 Rehabilitation 0312‐04‐022 FM 730Approx. 3 Miles north of SH 114

SH 114Widen and Reconst. from 2 lane to 2 lane urban For SHoulders and Safety, add turn lanes

$15,845,000 Major Collector

NRSA1‐FTW‐ 43 54004 Addition of lanes 1601‐02‐028 FM 1884 SH 171South of B.B. Fielder Road

Widen from 2 lane to 4 lane with raised median $12,103,299 Major Collector

NRSA1‐FTW‐ 51 11383 Bike/Pedestrian 0902‐48‐864Snider Street Extension Project 

On Main Street, Snider Street, and Northeast Parkway bounded by Main St to the south, Northeast Pkwy on the north, Davis Blvd on the east & Smithfield Rd on the west

Main Street to the south, Northeast Parkway on the north, Davis Blvd on the east & Smithfield Road on the west

Pedestrian amenities; Landscaping; traffic signalization; Street construction includes extending Snider Street north to connect to Northeast Parkway (2 lanes), and Northeast Parkway west to connect to Snider Street (2 lanes)

$2,927,324Not on FFCS (RTR 

Funded)

NRSA1‐FTW‐ 52 11386 Bike/Pedestrian 0902‐50‐114Joshua Station T.O.D. Infrastructure Project

Bounded By Hwy 174 on the East

Cleburne Rail Corridor on the West

Pedestrian amenities; Landscaping; Street Construction Includes Extending Plum Street (4 lanes)

$829,019N/A ‐ Railway‐highway grade 

crossing

MTP ID

Source:NorthCentralTexasCouncilofGovernmentsH.9

Mobility2045

Non‐regionallySignificantRoadwaysFortWorthDistrict

RevisedJune19,2018

TIP Code Project Type CSJ Facility From To DescriptionYOE Total Project Cost

FFCS MTP ID

NRSA1‐FTW‐ 58 11263.7 Safety 0902‐48‐688 Peach Street area Peach Street Live Oak Connector

Construct the Live Oak Connector; Close Peach Street and East 1St Street at Up crossing; and Install Fences to Restrict Pedestrian access across the RR Tracks

$3,200,254 Major Collector

NRSA1‐FTW‐ 59 83244

Bridge, grade separation, Intersection Improvement, Reconstruction

0013‐10‐082 Bailey‐Boswell  At BUS 287PIntersection Improvement ‐ Construct 0 to 2 lane overpass/bridge over UPRR, BNSFRR, & BUS 287P

$12,390,990 Major Collector

NRSA1‐FTW‐ 60 25013 Bike/Pedestrian 0902‐90‐046Meandering Road SH 183 to

Gillham Road 

LTJG Barnett Road from Gillham Road to Military Parkway

Realign Intersection and add traffic signal at Roberts Cut off, Construct Roundabout at LTJG Barnett, Reconstruct Meandering Road from 4 to 3 lanes, and add sidewalks and Bicycle lanes

$17,334,010 Minor Arterial

NRSA1‐FTW‐ 61 14016 Reconstruct 0902‐90‐089 Main Street (FM 1187 BUS) Crowley Road (FM 731) Beverly StreetReconstruct from 3 to 2 lanes, add bicycle lanes, new sidewalks, add on‐street parking, construct two roundabouts

$11,677,376 Minor Arterial

NRSA1‐FTW‐ 62 11385 Bike/Pedestrian 0902‐48‐860 Hurst Bellaire Sd ProjectBounded By Pipeline On The North; Brown Trail On The West

Pecan Street On The South; Bellaire On The East

Pedestrian amenities; Landscaping; Intersection Improvements; Signalization; Street Construction Realigning 4 lane Brown Trail Ave

$973,368Major Collector/

Principal

NRSA1‐FTW‐ 63 11572

Reconstruction, grade separation, Ramp Improvements

0902‐48‐579 US 81/US 287At FM 3479/Harmon Road/North Tarrant Parkway

Construct North Tarrant Parkway over US 287 with turnaround on eastside; Construct Harmon Rd over US 287; Reconstruct existing SB entrance ramp to US 287 W/auxiliary lane

$8,068,892Other Freeway/ Expressway

NRSA1‐FTW‐ 65 13004

Reconstruction, grade separation, Intersection Improvement

2418‐01‐013 FM 1810 East of Public Road 1122Int. of US 81/287 at FM 1810

Realignment of FM 1810 and grade separation and Retaining Walls at Realigned Intersection at US 81/287 & Bu 81D

$41,709,417 Major Collector

NRSA1‐FTW‐ 66 81423 Reconstruct 0000‐02‐011 Holiday lane IH 820 Lewis Drive Reconstruct 4 to 4 lane roadway $1,700,000 Major Collector

Source:NorthCentralTexasCouncilofGovernmentsH.10

Mobility2045

Non‐regionallySignificantRoadwaysFortWorthDistrict

RevisedJune19,2018

TIP Code Project Type CSJ Facility From To DescriptionYOE Total Project Cost

FFCS MTP ID

NRSA1‐FTW‐ 67 13040

Addition of lanes, Bridge, Rail Transit, Reconstruction

0747‐05‐043 FM 157 Main Street 8TH Street 7th StreetRealign roadway 2 lane rural to 2 lane urban with sidewalks and turn lanes

$4,353,344 Major Collector

NRSA1‐FTW‐ 68 13041

Addition of lanes, Bridge, Rail Transit, Reconstruction

0747‐05‐042 FM 157 US 67 8th StreetRealign roadway 2 lane rural to 2 lane urban with sidewalks and turn lanes

$9,928,344 Minor Arterial

NRSA1‐FTW‐ 69 14039 Reconstruct 0000‐02‐019 Glade Road NB SH 360 Frtg West Airfield DriveReconstruct from 2 to 2 lanes (add center turn lane and shoulders)

$5,942,036 Minor Arterial

NRSA1‐FTW‐ 70 11754.1Intersection Improvement

0902‐38‐075 On Lakeshore Drive At US 180/IH 20

Improvements at Lakeshore Drive, US 180, and IH 20 frontage roads, construct turnaround Bridge, and widen existing Lakeshore Drive Bridge to accommodate turn lanes

$9,632,465 Major Collector

Source:NorthCentralTexasCouncilofGovernmentsH.11

Mobility2045

Non‐regionallySignificantRoadwaysParisDistrict

RevisedJune19,2018

TIP Code Project Type CSJ Facility From To DescriptionYOE Total Project Cost

FFCS 

NRSA1‐PAR‐ 4 54112 New roadway 2659‐02‐001 SS 1570 SH 66 US 380Construct 2 lanes (4 lane ultimate) divided highway on new location

$11,904,439 Major Collector

NRSA1‐PAR‐ 6 13039 Widening 2658‐01‐013 FM 2642 FM 35 SH 66 Widen 2 lane to 4 lane divided urban with sidewalks $23,728,088 Major Collector

NRSA1‐PAR‐ 7 13052 Widening 2659‐01‐010 FM 1570 IH 30 SH 66Construct 2 lane to 4 lane divided with shoulders (HMAC Pavement and RR crossing) North Project

$23,507,081 Major Collector

MTP ID

Source:NorthCentralTexasCouncilofGovernments H.12

Mobility2045

Non‐regionallySignificantRoadwaysFrontageRoads

RevisedJune19,2018

TIP Code

Project Type CSJ Facility From To Description YOE Total Project Cost

NRSA1‐

1.30.1, 1.30.2, 1.40.1, 1.40.2

55026 Reconstruction 0013‐08‐111 US 81/287 SH 114 Wise/Tarrant County Line Convert frontage roads to 4/6 One‐Way Operation $139,896,000

NRSA1‐ 1.40.2 53029 Rehabilitation 0014‐15‐033 US 287On US 81/US 287 From FM 3479 (Harmon Road)

South of North Tarrant Parkway Crossover

Reconstruct Northbound Frontage Road And Exit Ramp South of FM 3479

$3,320,649

NRSA‐ 1.40.2 53030 Rehabilitation 0014‐15‐034 US 287On US 81/US 287 From FM 3479 (Harmon Road)

Southbound Entrance Ramp

Construct Turnaround from NB to SB at North Tarrant Parkway; Reconstruct existing southbound frontage road from FM 3479 to US 287

$3,313,133

NRSA1‐ 1.40.2 53031 Rehabilitation 0014‐15‐035 US 287On US 81/US 287 From North Entrance/Exit Ramp North

FM 3479 (Harmon Road)Reconstruct NB frontage road from FM 3479 to Ramp and southbound frontage road from ramp to FM 3479

$3,313,131

NRSA1‐ 1.40.2 53032 Rehabilitation 0014‐15‐036 US 81/287 North of FM 3479North of IH 35W interchange

Construct auxiliary lane from northbound entrance from FM 3479 and IH 35W to North Tarrant Parkway; auxiliary lane for southbound exit to FM 3479 and entrance from North Tarrant

$3,352,548

NRSA1‐ 1.40.2 55027 Rehabilitation 0014‐15‐037 US 81/287 Tarrant/Wise County Line IH 35WConvert frontage roads from 4 disc. frtg roads to 4/6 con. frtg roads one‐way operation

$47,783,614

NRSA1‐ 1.60.6 13059 New Roadway 0172‐09‐037 US 287 Heritage Pkwy Johnson County Line Construct 0 to 4 lane frontage roads$1,657,177

NRSA1‐ 1.70.1 13060 New Roadway 0172‐10‐013 US 287 Tarrant County Line BU 287 Construct 0 to 4 lane frontage roads$6,405,530

NRSA1‐12.30.312.30.4

13006New frontage roads

0353‐03‐100 SH 114 FM 1938 Dove RoadConstruct 0 to 2 lane EB frontage road from FM 1938 to Solana/Kirkwood and construct 0 to 2 lane WB and 0 to 2 lane EB frontage roads from Solana/Kirkwood to Dove

$37,301,365

NRSA1‐ 12.50.1 55089 New Roadway 0353‐04‐095 SH 114 Freeport Parkway Esters BlvdConstruct WB 0 to 2 lane Frontage Road and Ramp Modifications

$4,350,854

NRSA1‐ 130.10.2 54047 New Roadway 2374‐07‐063 IH 635 Royal lane West of Belt Line RdConstruct 0 to 2 lane WB Frontage Road and Ramp Modifications

$33,554,913

NRSA1‐ 131.20.2 53053 New Roadway 2374‐02‐126 IH 635 South of Gross Rd US 80Construct Northbound Frontage Road to Provide Access to Galloway Avenue, Intersection And Ramp Improvements at Gross Rd

$10,924,920

NRSA1‐ 28.50.1 52527 New Roadway 1068‐04‐119 IH 30 SH 161 NW 7th Street Construct 0 to 4 lane frontage roads $31,640,353

NRSA1‐ 28.50.1 54033 New Roadway 1068‐04‐149 IH 30 NW 7th Street Belt Line RoadConstruct 0 to 2/3 lane WB Frontage Road And Ramp Modifications

$21,977,250

NRSA1‐ 28.50.2 52520 New Roadway 1068‐04‐122 IH 30 Belt Line Rd Macarthur Blvd Construct 3 lane frontage roads On Each Side (Eb And WB) $32,731,618

MTP ID

Source:NorthCentralTexasCouncilofGovernmentsH.13

Mobility2045

Non‐regionallySignificantRoadwaysFrontageRoads

RevisedJune19,2018

TIP Code

Project Type CSJ Facility From To Description YOE Total Project CostMTP ID

NRSA1‐ 28.80.2 55169

Addition of lanes, New Roadway, Bridge, Interchange

0009‐11‐241 IH 30 Bass Pro Drive Dalrock RdConstruct 0 to 6 lane frontage roads, Bayside Bridge, And Ramp Modifications; Reconstruct Dalrock Interchange

$148,954,586

NRSA1‐ 28.90.1 55195 New Roadway 0009‐12‐220 IH 30 Dalrock HorizonConstruct 0/4 to 4/6 lane frontage roads; Reconstruct Horizon Rd interchange and ramp modifications

$89,889,572

NRSA1‐ 28.90.2 52229 Interchange 0009‐12‐072 IH 30 At FM 3549Reconstruct Interchange at FM 3549 Including 2/3 lane Frontage Rds And Ramps Construction

$111,933,568

NRSA1‐ 30.10.4 11754New Roadway, Reconstruction

0314‐07‐046 IH 20On IH 20 frontage roads From Centerpoint Road

Lakeshore Drive

Construct New Eastbound 2/3 lane Frontage Road And Reconstruct Existing 2 lane Portion of Eastbound Frontage Road to 2/3 lane Frontage Road West of Lakeshore Drive (Phase 1B of 3)

$14,379,742

NRSA1‐ 30.10.4 11932Addition of lanes, Bridge, Reconstruction

0314‐07‐052 IH 20 Bankhead Highway Centerpoint RoadReconstruct 2 lane Bridge to 1 lane U‐Turn Bridge, Construct 0 to 4 lane Bridge at Centerpoint Rd, Construct 0 to 4/6 lane frontage roads on IH 20 and Ramps

$27,615,937

NRSA‐ 30.10.4 11934 Addition of lanes 0314‐07‐051 IH 20 West of Bankhead Highway East of Bankhead Highway

Reconstruct and widen 2 lane bridge to 4 lane bridge at Bankhead over IH 20, ramp modifications and 2 lane frontage roads in each direction with an auxiliary lane between ramps west of Bankhead, construct new U‐Turn bridge east of Bankhead

$250,000

NRSA1‐30.80.1, 30.80.2

55031 New Roadway 2374‐04‐076 IH 20 Sh 161/Lakeridge Parkway East of Carrier Parkway Construct 0 to 6 lane frontage roads and ramp modifications $44,389,365

NRSA1‐ 30.80.12 54041 New Roadway 2374‐03‐077 IH 20 West of Haymarket Rd West of US 175 Construct 2 lane EB And WB frontage roads and new ramps $8,744,273

NRSA1‐ 30.80.2 20212New Roadway, Bike/Pedestrian

2374‐04‐049 IH 20 West of Carrier Parkway FM 1382 (Belt Line Road)Construct 0 to 6 lane frontage roads, ramp modifications, and sidewalks

$35,543,589

NRSA1‐ 30.80.5 11265 New Roadway 2374‐04‐060 IH 20 North Main Street Camp Wisdom Road Construct 0 to 4 lane frontage roads $8,054,299

NRSA1‐30.80.5, 30.80.6

55240 New Roadway 2374‐04‐085 IH 20 West of Cockrellhill Rd Hampton Rd Construct 0 to 4 lane frontage roads $35,114,451

NRSA1‐ 30.90.2 55232 New Roadway 0095‐13‐038 IH 20 Lawson Road Kaufman County Line Add 0 to 4 lanes continuous frontage roads $77,263,210

NRSA1‐ 34.10.1 83224 New Roadway 0495‐01‐066 SP 557 FM 148 IH 20 New location two lane frontage road eastbound only $4,266,024

NRSA1‐ 36.30.2 51460 New Roadway 0197‐03‐054 US 175 FM 148 CR 4106 in CrandallConstruct new 2‐lane frontage roads; Convert existing frontage road from 2‐lane 2‐way to 2‐lane 1‐way frontage road & ramp modifications

$19,922,969

Source:NorthCentralTexasCouncilofGovernmentsH.14

Mobility2045

Non‐regionallySignificantRoadwaysFrontageRoads

RevisedJune19,2018

TIP Code

Project Type CSJ Facility From To Description YOE Total Project CostMTP ID

NRSA1‐ 5.20.1 55036 New Roadway 0081‐13‐041 IH 35W Eagle Parkway SH 114Construct 2 lane southbound frontage roads with ramp modifications (Phase 1)

$35,080,152

NRSA1‐ 7.40.1 83259Bike/Pedestrian, New Roadway

0196‐03‐263 IH 35E Manana Drive Royal lane

Construct new 0 to 2 lane frontage roads northbound from Manana Dr to Royal lane and southbound from Walnut Hill Lane to Manana Dr and pedestrian improvements along Walnut Hill Lane

$21,882,803

NRSA1‐ 7.50.1 52201New Roadway, Bottleneck Removal

0196‐03‐223 IH 35E Lombardy lane Spur 482 (Storey Rd) Construct 0 to 2 SB frontage road and ramp modifications $11,689,762