APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration...

33
Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project Volume II, Part B – Technical Specification for SCADA/EMS & RTU System Appendix G (Option I) Page 1 of 33 APPENDIX- G(OPTION –I) Table-1 BILL OF QUANTITY FOR SCADA/EMS SYSTEM OF DEHRADUN SLDC Item no. ITEM DESCRIPTION UNIT QTY A SCADA/EMS APPLICATION SOFTWARE: 1 SCADA RTU Data Acquisition Data Exchange Data Processing Network Status Processor Sequence of Events Recording Supervisory Control Lot 1 2 NETWORK MANAGEMENT SYSTEM (NMS) Lot 1 3 INFORMATION STORAGE & RETRIEVAL (ISR) Real-Time Database Snapshot Historical Information Disturbance Data Collection Information Retrieval System Lot 1 4 REAL TIME DISPATCHING Operations Monitor Economic Dispatch Reserve Monitoring Load Shed Support Lot 1 5 OPERATION SCHEDULING (OS) Load Forecasting Inflow Forecasting Unit Commitment Hydro Scheduling Hydro-Thermal Coordination Interchange Scheduling Interchange Transaction Evaluation Current Operating Plan Outage Scheduler Lot 1 6 POWER SYSTEM ANALYSIS (PSA) Power System Model Update State Estimation Bus Load Forecast Transmission Loss sensitivity Factor Contingency Analysis Optimal Power Flow Short Circuit Analysis Lot 1

Transcript of APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration...

Page 1: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 1 of 33

APPENDIX- G(OPTION –I)

Table-1

BILL OF QUANTITY FOR SCADA/EMS SYSTEM OF DEHRADUN SLDC

Item no. ITEM DESCRIPTION

UNIT QTY

A SCADA/EMS APPLICATION SOFTWARE:

1 SCADA

• RTU Data Acquisition

• Data Exchange

• Data Processing

• Network Status Processor

• Sequence of Events Recording

• Supervisory Control

Lot 1

2 NETWORK MANAGEMENT SYSTEM (NMS)

Lot 1

3 INFORMATION STORAGE & RETRIEVAL (ISR)

• Real-Time Database Snapshot

• Historical Information

• Disturbance Data Collection

• Information Retrieval System

Lot 1

4 REAL TIME DISPATCHING

• Operations Monitor

• Economic Dispatch

• Reserve Monitoring

• Load Shed Support

Lot 1

5 OPERATION SCHEDULING (OS)

• Load Forecasting

• Inflow Forecasting

• Unit Commitment

• Hydro Scheduling

• Hydro-Thermal Coordination

• Interchange Scheduling

• Interchange Transaction Evaluation

• Current Operating Plan

• Outage Scheduler

Lot 1

6 POWER SYSTEM ANALYSIS (PSA)

• Power System Model Update

• State Estimation

• Bus Load Forecast

• Transmission Loss sensitivity Factor

• Contingency Analysis

• Optimal Power Flow

• Short Circuit Analysis

Lot 1

Page 2: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 2 of 33

B

SYSTEM HARDWARE:

1 Servers:

(a) SCADA/EMS Application Server (#)

No. 2 Nos.

(b) Communication Server for ICCP (#)

No. 2 Nos.

(c) Network Management System (NMS) Server

No. 2 Nos.

(d) Web Server with firewall and IDS (Host+Network)

i. A web server with host IDS ii. Firewall and network IPS iii. Centralized management console

Nos. Nos. No.

2 2 1

2 LAN & Device Interfaces (a) For Dual LAN at SLDC, Dehradun (b) 8 port 10/100 Mbps Switch for Dual LAN at

NRLDC, Delhi

Set

No.

1 2

3 Optical Disk Memory Unit , if applicable

No. A/R

4 Cartridge Magnetic Tape Unit (standalone)

No. 1

5 Processor Terminal (Laptop unit)

No. 1

6 Printers:

(a) Logger

No. 1

(b) Color Laser Printer

Nos. 2

(c) Color Multi function laser jet printer No. 1

7 Workstation Consoles :

(a) Workstation Consoles Integrated with Two 19” TFT Color Monitors

No. 3

(b) Workstation Consoles Integrated with One 19” TFT Color Monitor

No. 1

8

Video Projection System (Having 2x2 Screens, Each with 67 inch Diagonal)

Set

1

9 GPS Based Time Facility:

(a) GPS based system including antenna

No. 1

(b) Digital Display for Day of Week

No. 1

(c) Digital Display for time

No. 1

Page 3: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 3 of 33

(d) Digital Display for Power System Frequency

No. 1

10

WAN ROUTERS (with Firewall S/W) :

(a) WAN Router with following configuration : (2 at Dehradun SLDC & 2 at NRLDC)

• 2 Nos. Ethernet LAN Ports -10/100 Mbps

• 18 Nos. X.21/G.703 Ports, each configurable up to 2 Mbps

Nos. 4

(b) Remote End Router for Remote VDU locations with following configuration :

• 1 Nos. Ethernet LAN Port -10/100 Mbps

• 2 Nos.X.21 Ports, each configurable up to 2 Mbps

Nos. 3

11

Remote Video Display Unit (VDU)

Nos. 3

12 Modems

(a) Modem for Remote Diagnostics

Nos.

1

13 Furniture

Lot 1

14 Other items, if any

Nos. A/R

15 Weather sensors (one number each of the following) (Air temperature Sensor, Relative humidity Sensor, Rain fall sensor)

Set 1

16 Maintenance charges: (including Sub-LDCs) a) One year Guaranteed availability period

Lot

1

b) Five years after the Guaranteed availability period Lot 1

17 INTEGRATION with other Control centre

• Integration with NRLDC (including ICCP modification)

• Integration with Rishikesh Sub-LDC

• Integration with Kashipur Sub-LDC

Lot 1

C TEST EQUIPMENTS

1. Hand-held digital multimeter. No. 3

2. Portable isolation test meter No. 1

3. Digital wattmeter/varmeter, accuracy < 0.05%. No. 1

4. Laboratory DC stabilized power supply, 0-60V range, 0-50A range.

No. 1

5. Laboratory bench controller based on a PC/ Laptop configuration.

No. 1

6. Portable RTU Configuration and Maintenance Terminal. No. 2

7. PROM programmer & eraser. No. 2

Page 4: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 4 of 33

8. RTU Maintenace Support Hardware No. 2

9. Maintenance RTU on open vertical rack with wheels. No. 2

D

MANDATORY SPARES *

1 Server (one of each type)

Set 1

2 Workstation Console Integrated with Two TFT Monitors No. 1

3 LAN & Device interfaces (one of each type)

Set 1

4 Optical disk drive (if applicable) No. 1

5 Wan Routers (one of each type) Set 1

6 Color Laser printer No. 1

9 Video projection system components: a) VPS controller – One complete unit b) Projection module – One no. (excluding screen, cubicle/panel) c) Projector bulbs- 12 nos. d) Dust filters – 24 nos.

Set

1

10 Modem (one of each type) Set 1

* NOTES: (a) If servers are of same model with different configuration then highest configuration shall

be offered under spare, else separate server shall be offered for spares. All types of interface cards, TFT Monitor, Keyboard, mouse and KVM Switch (if applicable) shall be included with spares for each server.

(b) The spares for external auxiliary memory along with controller shall be included with the respective servers if applicable

(c) In case bidder offers centralized archival system consisting of multiple tape drive unit (in place of individual DAT with each server) then one multiple tape drive unit shall also be supplied as spare.

(d) (#): ‘SCADA/EMS Application Server’ & ‘Communication Server for ICCP’ shall be supplied as independent Hardware.

Page 5: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 5 of 33

Table-2 BILL OF QUANTITY FOR SCADA/EMS SYSTEM OF KASHIPUR SUB LDC

Item no. ITEM DESCRIPTION

UNIT QTY

A SCADA APPLICATION SOFTWARE:

1 SCADA

• RTU Data Acquisition

• Data Exchange

• Data Processing

• Network Status Processor

• Sequence of Events Recording

• Supervisory Control

Lot 1

2 INFORMATION STORAGE & RETRIEVAL (ISR)

• Real-Time Database Snapshot

• Historical Information

• Disturbance Data Collection

• Information Retrieval System

Lot 1

B SYSTEM HARDWARE:

1 Servers:

(a) SCADA Application Server (#)

Nos. 2

(b) Communication Server (b1) For ICCP(#) (b2) For RTU communication front end

Nos. Nos.

2 2

2 LAN & Device Interfaces – For Dual LAN

Set 1

3 Cartridge Magnetic Tape Unit (standalone)

No. 1

4 Processor Terminal (desktop unit)

No. 1

5 Printers:

(a) Logger

No. 1

(b) Color Laser Printer

Nos. 2

(c) Color multi function laser jet printer No. 1

6 Workstation Consoles:

(a) Workstation Consoles Integrated with one 19” TFT Color Monitor

No. 2

7 GPS Based Time & Frequency Facility:

(a) GPS based system including antenna

No. 1

(b) Digital Display for Day of Week

No. 1

(c) Digital Display for time

No. 1

Page 6: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 6 of 33

(d) Digital Display for Power System Frequency

No. 1

8

WAN ROUTERS (with Firewall S/W) :

c) WAN Router with following configuration:

• 2 Nos. Ethernet LAN Ports -10/100 Mbps

• 2 Nos. X.21 Ports, each configurable up to 2 Mbps

No. 2

9 Modems/Splitter:

a) Modem at Control center end for RTU b) Stand Alone Modems at wideband location (Pantnagar & Haldwani 132) c) Power supply unit for existing Modems for RTU at Control center end (230 V AC/+5 VDC, 60W)

Nos. Nos.

Nos.

4 7 2

10 Furniture

Lot 1

11 Other items, if any

Nos. A/R

12 Remote Terminal Units (RTU) cabinet including CPU, Power Supply, I/O Modules along with Interface Cabinet, Relay, Transducers, Modems, Terminal Blocks, cabling , switches, etc)

a) Pantnagar No. 1

b) Kichha No. 1

c) Pithoragarh No. 1

d) Sitarganj No. 1

e) Kashipur 132 No. 1

f) Khatima No. 1

13 Integration of existing RTUs:

a) Haldwani -220 No. 1

b) Ramganga H No. 1

c) Kashipur 400 No. 1

C

MANDATORY SPARES *

1 Server (one of each type) Set 1

2 Workstation Console Integrated with one 19” TFT Monitor

No. 1

3 LAN & Device interfaces (one of each type) Set 1

4 Wan Routers (one of each type)

Set 1

5 Color Laser printer

No. 1

6 RTU Cards (modules of each type for new RTUs) Set 2

7 Transducers (for new RTUs) Nos. 13

8 Interposing Relays Nos. 4

9 Contact Multiplying Realys Nos. 21

10 Modem along with rack & power supply (one of each type for new modems only)

Set 1

Page 7: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 7 of 33

* NOTES:

(a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall be offered for spares. All types of interface cards, TFT Monitor, Keyboard, mouse and KVM Switch (if applicable) shall be included with spares for each server.

(b) The spares for external auxiliary memory along with controller shall be included with the respective servers

(c) In case bidder offers centralized archival system consisting of multiple tape drive unit (in place of individual DAT with each server) then one multiple tape drive unit shall also be supplied as spare.

(d) (#): ‘SCADA Application Server’ & ‘Communication Server for ICCP’ shall be supplied as independent Hardware.

Page 8: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 8 of 33

Item no. ITEM DESCRIPTION

UNIT QTY

A SCADA APPLICATION SOFTWARE:

1 SCADA

• RTU Data Acquisition

• Data Exchange

• Data Processing

• Network Status Processor

• Sequence of Events Recording

• Supervisory Control

Lot 1

2 INFORMATION STORAGE & RETRIEVAL (ISR)

• Real-Time Database Snapshot

• Historical Information

• Disturbance Data Collection

• Information Retrieval System

Lot 1

B SYSTEM HARDWARE:

1 Servers:

(c) SCADA Application Server (#)

Nos. 2

(d) Communication Server (b1) For ICCP (#) (b2) For RTU communication front end

Nos. Nos.

2 2

2 LAN & Device Interfaces - For Dual LAN

Set 1

3 Cartridge Magnetic Tape Unit (standalone)

No. 1

4 Processor Terminal (desktop unit)

No. 1

5 Printers:

(a) Logger

No. 1

(b) Color Laser Printer

Nos. 2

(c) Color multi function laser jet printer No. 1

6 Workstation Consoles:

(a) Workstation Consoles Integrated with one TFT Color Monitor

No. 2

7 GPS Based Time & Frequency Facility:

(a) GPS based system including antenna

No. 1

Table-3 BILL OF QUANTITY FOR SCADA/EMS SYSTEM OF RISHIKESH SUBLDC

Page 9: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 9 of 33

Item no. ITEM DESCRIPTION

UNIT QTY

(b) Digital Display for Day of Week

No. 1

(c) Digital Display for time

No. 1

(d) Digital Display for Power System Frequency

No. 1

8

WAN ROUTERS (with Firewall S/W) :

(a) WAN Router with following configuration:

• 2 Nos. Ethernet LAN Ports -10/100 Mbps

• 2 Nos. X.21 Ports, each configurable up to 2 Mbps

No. 2

9 Modems/Splitter:

a) Modem at Control center end for RTU b) Stand Alone Modems at wideband location (Roorkee)

Nos. Nos.

2 3

10 Furniture

Lot 1

11 Other items, if any

Nos. A/R

12 Remote Terminal Units (RTU) cabinet including CPU, Power Supply, I/O Modules along with Interface Cabinet, Relay, Transducers, Modems, Terminal Blocks, cabling , switches, etc):

a) Roorkee No. 1

b) Laksar No. 1

c) Manglour No. 1

d) Bhagwanpur No. 1

e) SIDCUL No. 1

f) Dharasu-H No. 1

13 Integration of existing Remote Terminal Units:

a) Chibro H No. 1

b) Chilla H No. 1

c) Dehradun(Mazra) No. 1

d) Dhalipur H No. 1

e) Khodri H No. 1

f) Kulhal H No. 1

g) Maneri Bhali H No. 1

h) Rishikesh 400/220 No. 1

i) Rishikesh 220/132 No. 1

j) Dhakrani H No. 1

k) Chamba H No. 1

C

MANDATORY SPARES *

Page 10: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 10 of 33

Item no. ITEM DESCRIPTION

UNIT QTY

1 Server (one of each type)

Set 1

2 Workstation Console Integrated with one 19”TFT Monitor

No. 1

3 LAN & Device interfaces (one of each type)

Set 1

4 Wan Routers (one of each type)

Set 1

5 Color Laser printer

No. 1

7 RTU Cards (modules of each type for new RTUs) Set 2

8 Transducers (for new RTUs) Nos. 13

9 Interposing Relays Nos. 2

10 Contact Multiplying Realys Nos. 27

11 Modem along with rack & power supply (one of each type for new modems only)

Set 1

* NOTES: (a) If servers are of same model with different configuration then highest configuration

shall be offered under spare, else separate server shall be offered for spares. All types of interface cards, TFT Monitor, Keyboard, mouse and KVM Switch (if applicable) shall be included with spares for each server.

(b) The spares for external auxiliary memory along with controller shall be included with the respective servers

(c) In case bidder offers centralized archival system consisting of multiple tape drive unit (in place of individual DAT with each server) then one multiple tape drive unit shall also be supplied as spare.

(d) (#): ‘SCADA Application Server’ & ‘Communication Server for ICCP’ shall be supplied as independent Hardware.

Page 11: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 11 of 33

APPENDIX- G(OPTION –II)

Table-1

BILL OF QUANTITY FOR SCADA/EMS SYSTEM OF DEHRADUN SLDC

Item no. ITEM DESCRIPTION

UNIT QTY

A SCADA/EMS APPLICATION SOFTWARE:

1 SCADA

• RTU Data Acquisition

• Data Exchange

• Data Processing

• Network Status Processor

• Sequence of Events Recording

• Supervisory Control

Lot 1

2 NETWORK MANAGEMENT SYSTEM (NMS)

Lot 1

3 INFORMATION STORAGE & RETRIEVAL (ISR)

• Real-Time Database Snapshot

• Historical Information

• Disturbance Data Collection

• Information Retrieval System

Lot 1

4 REAL TIME DISPATCHING

• Operations Monitor

• Economic Dispatch

• Reserve Monitoring

• Load Shed Support

Lot 1

5 OPERATION SCHEDULING (OS)

• Load Forecasting

• Inflow Forecasting

• Unit Commitment

• Hydro Scheduling

• Hydro-Thermal Coordination

• Interchange Scheduling

• Interchange Transaction Evaluation

• Current Operating Plan

• Outage Scheduler

Lot 1

6 POWER SYSTEM ANALYSIS (PSA)

• Power System Model Update

• State Estimation

• Bus Load Forecast

• Transmission Loss sensitivity Factor

• Contingency Analysis

• Optimal Power Flow

• Short Circuit Analysis

Lot 1

Page 12: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 12 of 33

B SYSTEM HARDWARE:

1 Servers:

(c) SCADA/EMS Application Server (#)

Nos. 2

(d) Communication Server for ICCP (#)

Nos. 2

(c) Network Management System (NMS) Server

Nos. 2

(d) Web Server i. Web Server with host IDS ii. Firewall & Network IPS iii. Centralized management console

Nos. Nos. No.

2 2 1

2 LAN & Device Interfaces (a) For Dual LAN at SLDC, Dehradun (b) 8 port 10/100 Mbps Switch for Dual LAN at

NRLDC, Delhi

Set

No.

1 2

3 Optical Disk Memory Unit , if applicable

No. A/R

4 Cartridge Magnetic Tape Unit (standalone)

No. 1

5 Processor Terminal (Laptop unit)

No. 1

6 Printers:

(b) Logger

No. 1

(c) Color Laser Printer

No. 2

(c) color multi function laser jet printer No. 1

7 Workstation Consoles :

(b) Workstation Consoles Integrated with Two 19” TFT Color Monitors

No. 3

(b) Workstation Consoles Integrated with One 19” TFT Color Monitor

No. 1

8

Video Projection System (Having 2x2 Screens, Each with 67 inch Diagonal)

Set

1

9 GPS Based Time Facility:

(e) GPS based system including antenna

No. 1

(f) Digital Display for Day of Week

No. 1

(g) Digital Display for time

No. 1

(h) Digital Display for Power System Frequency

No. 1

Page 13: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 13 of 33

10 WAN ROUTERS (with Firewall S/W) :

(a) WAN Router with following configuration : (2 at Dehradun SLDC & 2 at NRLDC)

• 2 Nos. Ethernet LAN Ports -10/100 Mbps

• 18 Nos. X.21/G.703 Ports, each configurable up to 2 Mbps

Nos. 4

(b) Remote End Router for Remote VDU locations with following configuration :

• 1 Nos. Ethernet LAN Port -10/100 Mbps

• 2 Nos.X.21 Ports, each configurable up to 2 Mbps

Nos. 3

11

Remote Video Display Unit (VDU)

Nos. 3

12 Modems

(b) Modem for Remote Diagnostics

Nos.

1

13 Furniture

Lot 1

14 Other items, if any

Nos. A/R

15 Weather sensors (one number each of the following) (Air temperature Sensor, Relative humidity Sensor, Rain fall sensor)

Set 1

16 Maintenance charges: (SLDC & Kashipur Sub-LDC) a) One year Guaranteed availability period

Lot

1

b) Five year after the Guaranteed availability period Lot 1

17 INTEGRATION with other Control centre

• Integration with NRLDC (including ICCP modification)

• Integration with Rishikesh Sub-LDC

• Integration with Kashipur Sub-LDC

Lot 1

C TEST EQUIPMENTS

1. Hand-held digital multimeter. No. 3

2. Portable isolation test meter No. 1

3. Digital wattmeter/varmeter, accuracy < 0.05%. No. 1

4. Laboratory DC stabilized power supply, 0-60V range, 0-50A range.

No. 1

5. Laboratory bench controller based on a PC/ Laptop configuration.

No. 1

6. Portable RTU Configuration and Maintenance Terminal. No. 2

7. PROM programmer & eraser. No. 2

8. RTU Maintenance Support Hardware No. 2

9. Maintenance RTU on open vertical rack with wheels. No. 2

Page 14: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 14 of 33

D

MANDATORY SPARES *

1 Server (one of each type)

Set 1

2 Workstation Console Integrated with Two TFT Monitors No. 1

3 LAN & Device interfaces (one of each type)

Set 1

4 Optical disk drive (if applicable) No. 1

5 Wan Routers (one of each type) Set 1

6 Color Laser printer No. 1

9 Video projection system components: e) VPS controller – One complete unit f) Projection module – One no. (excluding screen, cubicle/panel) g) Projector bulbs- 12 nos. h) Dust filters – 24 nos.

Set

1

10 Modem (one of each type) Set 1

* NOTES: (e) If servers are of same model with different configuration then highest configuration shall

be offered under spare, else separate server shall be offered for spares. All types of interface cards, TFT Monitor, Keyboard, mouse and KVM Switch (if applicable) shall be included with spares for each server.

(f) The spares for external auxiliary memory along with controller shall be included with the respective servers if applicable

(g) In case bidder offers centralized archival system consisting of multiple tape drive unit (in place of individual DAT with each server) then one multiple tape drive unit shall also be supplied as spare.

(h) (#): ‘SCADA/EMS Application Server’ & ‘Communication Server for ICCP’ shall be supplied as independent Hardware.

Page 15: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 15 of 33

Table-2

BILL OF QUANTITY FOR SCADA/EMS SYSTEM OF KASHIPUR SUBLDC

Item no. ITEM DESCRIPTION

UNIT QTY

A SCADA APPLICATION SOFTWARE:

1 SCADA

• RTU Data Acquisition

• Data Exchange

• Data Processing

• Network Status Processor

• Sequence of Events Recording

• Supervisory Control

Lot 1

2 INFORMATION STORAGE & RETRIEVAL (ISR)

• Real-Time Database Snapshot

• Historical Information

• Disturbance Data Collection

• Information Retrieval System

Lot 1

B SYSTEM HARDWARE:

1 Servers:

(e) SCADA Application Server (#)

Nos. 2

(f) Communication Server (b1) For ICCP (#) (b2) For RTU communication front end

Nos. Nos.

2 2

2 LAN & Device Interfaces – For Dual LAN

Set 1

3 Cartridge Magnetic Tape Unit (standalone)

No. 1

4 Processor Terminal (desktop unit)

No. 1

5 Printers:

(c) Logger

No. 1

(d) Color Laser Printer

Nos. 2

(e) Color multi function laser jet printer No. 1

6 Workstation Consoles:

(b) Workstation Consoles Integrated with one 19” TFT Color Monitor

No. 2

7 GPS Based Time & Frequency Facility:

(e) GPS based system including antenna

No. 1

(f) Digital Display for Day of Week

No. 1

(g) Digital Display for time

No. 1

Page 16: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 16 of 33

(h) Digital Display for Power System Frequency

No. 1

8

WAN ROUTERS (with Firewall S/W) :

c) WAN Router with following configuration:

• 2 Nos. Ethernet LAN Ports -10/100 Mbps

• 2 Nos. X.21 Ports, each configurable up to 2 Mbps

No. 2

9 Modems/Splitter:

a) Modem at Control center end for RTU b) Stand Alone Modems at wideband location (Pantnagar & Haldwani 132) c) Power supply unit for existing Modems for RTU at Control center end (230 V AC/+5 VDC, 60W)

Nos. Nos.

Nos.

4 7 2

10 Furniture

Lot 1

11 Other items, if any

Nos. A/R

12 Remote Terminal Units :

a) Pantnagar No. 1

b) Kichha No. 1

c) Pithoragarh No. 1

d) Sitarganj No. 1

e) Kashipur No. 1

f) Khatima No. 1

13 Integration of existing RTUs:

a) Haldwani -220 No. 1

b) Ramganga H No. 1

c) Kashipur 400 No. 1

C

MANDATORY SPARES *

1 Server (one of each type) Set 1

2 Workstation Console Integrated with one 19” TFT Monitor

No. 1

3 LAN & Device interfaces (one of each type) Set 1

4 Wan Routers (one of each type)

Set 1

5 Color Laser printer

No. 1

6 RTU Cards (modules of each type for new RTUs) Set 2

7 Transducers (for new RTUs) Nos. 13

8 Interposing Relays Nos. 4

9 Contact Multiplying Relays Nos. 21

10 Modem along with rack & power supply (one of each type for new modems only)

Set 1

Page 17: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 17 of 33

* NOTES:

(e) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall be offered for spares. All types of interface cards, TFT Monitor, Keyboard, mouse and KVM Switch (if applicable) shall be included with spares for each server.

(f) The spares for external auxiliary memory along with controller shall be included with the respective servers

(g) In case bidder offers centralized archival system consisting of multiple tape drive unit (in place of individual DAT with each server) then one multiple tape drive unit shall also be supplied as spare.

(h) (#): ‘SCADA Application Server’ & ‘Communication Server for ICCP’ shall be supplied as independent Hardware.

Page 18: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 18 of 33

Item no. ITEM DESCRIPTION

UNIT QTY

A SYSTEM HARDWARE:

1 Workstation Console of SLDC Dehradun (including software if any)

(b) Workstation Consoles Integrated with one TFT Color Monitor

No. 2

2

WAN ROUTERS (with Firewall S/W) :

(a) WAN Router with following configuration:

• 2 Nos. Ethernet LAN Ports -10/100 Mbps

• 2 Nos. X.21 Ports, each configurable up to 2 Mbps

No. 2

3 Modems/Splitter:

a) Modem at Control center end for RTU b) Stand Alone Modems at wideband location (Roorkee)

Nos. Nos.

2 3

4 Remote Terminal Units :

a) Roorkee No. 1

b) Laksar No. 1

c) Manglour No. 1

d) Bhagwanpur No. 1

e) SIDCUL No. 1

f) Dharasu-H No. 1

B

MANDATORY SPARES *

1 RTU Cards (modules of each type for new RTUs) Set 2

2 Transducers (for new RTUs) Nos. 13

3 Interposing Relays No. 1

4 Contact Multiplying Realys Nos. 27

5 Modem along with rack & power supply (one of each type for new modems only)

Set 1

Table-3

BILL OF QUANTITY FOR SCADA/EMS SYSTEM OF RISHIKESH SUBLDC

Page 19: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 19 of 33

TABLE 1 RTU CONFIGURATION AND POINT COUNT : KASHIPUR SUB- LDC

RTU

Volt Level

Communication

Analog

Input Points

Single Contact Digital Status Input Points

Double Contact Digital Status

Input Points

SOE (In

addition to Dl 2 Bit input points)

Two State Digital Control Output

Raise/L-ower Pulse Control Output

Setpoint Control Analog Output

No.

Station Name

kV

Data Rate

Type

(AI)

(DI 1Bit)

(DI 2Bit)

(DI 1 Bit)

(DO 2ST)

(DO PLSE)

(AO)

1.

Khatima

132

600

P

43

13

7

9

0

2

0

2.

Sitarganj

132

600

P

43

13

7

9

0

2

0

3.

Kichha

132

600

P

30

11

6

8

2

2

0

4.

Pithoragarh

132

300

P

19

5

3

4

0

2

0

5.

Rudrapur

132

600

P

43

13

7

9

0

2

0

6.

Pantnagar

220

1200

P

60 15 9

15

3

1

0

7.

Haldawani ( Kathgodam)

132

600

P

43

13

7

9

0

2

0

8.

Haldawani * (Kamlwaganj)

220

300

P

17

31

15

3

0 0

0

9.

Almora

132

300

P

27

9

5

7

1

2

0

10.

Ramganga H*

132

300

R

21

32

16

11

0

0

0

11.

Ranikhet

132

600

P

43

13

7

9

0

2

0

Page 20: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 20 of 33

RTU

Volt Level

Communication

Analog

Input Points

Single Contact Digital Status Input Points

Double Contact Digital Status

Input Points

SOE (In

addition to Dl 2 Bit input points)

Two State Digital Control Output

Raise/L-ower Pulse Control Output

Setpoint Control Analog Output

No.

Station Name

kV

Data Rate

Type

(AI)

(DI 1Bit)

(DI 2Bit)

(DI 1 Bit)

(DO 2ST)

(DO PLSE)

(AO)

12.

Kashipur

132

600

P

43

13

7

9

0

2

0

13.

Kashipur*

400

300

R

9

38

13

12

0

0

0

Note: (1) : * RTUs already existing (2) : In addition to above, the status points count shall also include points (SS type) for Local/Remote switch & Latching Relay.

Page 21: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 21 of 33

TABLE 3 TRANSDUCER AND INTERPOSING RELAY COUNT: KASHIPUR SUB- LDC

RTU

Volt Level

Multi Function Transducer

Digital Interposing

Relay (Two State Control)

Contact

Multiplying Relay (CMR)

Sl. No

Station Name

kV

MFT

DO 2ST

CMR 1.

Khatima

132

12

0 17

2.

Sitarganj

132

12 0 17

3.

Kichha

132

9 4 17

4.

Pithoragarh

132

6 0 9

5.

Rudrapur

132

12 0 17

6.

Pant Nagar

220

12 6 26

7.

Haldawani (Kathgodam)

132

10 0

17

8.

Haldawani*

(Kamalwaganj)

220

0 0 0

9.

Almora

220

8 2 14

10.

Ramganga H*

132

0 0 0

11

Ranikhet

132 7 4 20

12

Kashipur

132 12 0 17

13

Kashipur*

400 0 0 0

Note: * RTUs already existing

Page 22: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power Transmission Corporation of Uttarakhand Ltd. Uttarakhand Load Despatch & Communication Project

Volume II, Part B – Technical Specification for SCADA/EMS & RTU System

Appendix G (Option I) Page 22 of 33

TABLE 7 REQUIREMENT OF STAND ALONE MODEMS FOR PTCUL : KASHIPUR Sub-LDC

SL. NO.

RTU LOCATION

TYPE OF RTU

Nearest Node

Modems At Control Center End

Stand Alone Modems At Wideband Node

1

RamGanga –H*

R

- 2 -

2

Kashipur 132

P

- 1 -

3 Haldwani 220 (Kamalwaganj)

P

- 1 -

4 Khatima

P Pant Nagar 220 - 1

5 Sitarganj

P Pant Nagar 220 - 1

6 Kichha

P Pant Nagar 220 - 1

6 Rudrapur

P Pant Nagar 220 - 1

7 Pithoragarh

P Haldawani

(Kathgodam)-132

-

1

8 Ranikhet

P Haldawani

(Kathgodam)-132

-

1

9 Almora

P Haldawani

(Kathgodam)-132

-

1

Note : DPLC shall be integrated directly with the LAN at Control Center.

Page 23: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power TransmissionCorporation of Uttarakhand Limited Uttarakhand Load Despatch & Communication Project

Volume II, Part A – Project Scope & Summary

Section-1 Page 1 of 33

preferably in the same volume, and titled "Alternatives." A separate section titled

"Exceptions" should be provided containing any discussion or explanation Bidder

chooses to provide concerning exceptions taken. Alternatives which do not substantially

comply with the intent of the bid documents will be considered exceptions.

The Employer will assess the merits of each alternative and exception and will be the

sole judge as to their acceptance.

1.1 Organization of the Volume II Document

This Volume II shall consist of four parts as follows:

A - Project Scope and Summary B - Technical specifications, requirements and Appendices for SCADA/EMS and

RTU System C - Technical specifications, requirements and Appendices for PLCC/PABX System D - Technical specifications, requirements and Appendices for Auxiliary Power

Supply System

1.2 Applicable Standards The applicable standards are mentioned in the respective technical section. The offered

equipment shall conform to the standards mentioned in the specification except to the

extent modified by this specification. In case of any discrepancy between the description

given in the specification and the standards the provisions of the technical specification

shall be followed. The parameters not specifically mentioned in this specification shall

conform to the standard mentioned in this specification.

Specifications and codes shall be the latest version, inclusive of revisions, which are in

force. Where new specifications, codes, and revisions are issued during the period of

the contract, the Contractor shall attempt to comply with such, provided that no

additional expenses are charged to employer.

In the event the Contractor offers to supply material and/or equipment in compliance to

any standard other than those listed herein, the Contractor shall provide, full salient

characteristics of the new standard for comparison.

------------------------------------------End of the Section--------------------------------------------

Page 24: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power TransmissionCorporation of Uttarakhand Limited Uttarakhand Load Despatch & Communication Project

Volume II, Part A – Project Scope & Summary

Section-1 Page 2 of 33

Table 2.1

Training Requirements

Item No. Description No. of

Trainees

Duration of

Training in

At Contractor’s

facility

At Site

1 RTU 8 Month 1

2 Computer System Software & Hardware

6

Month

2

3 Database & Display

8 Month - 1

4 Application Software

6 Month 2 -

5 Dispatcher Training

12 Week - 2

6 Communication

System

Week

7 PLCC PABX

2 2

Week Week

2 2

8. Auxiliary Power Supply System

4 Week 2 -

Total

One Man-week = 5 working days

Page 25: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power TransmissionCorporation of Uttarakhand Limited Uttarakhand Load Despatch & Communication Project

Volume II, Part A – Project Scope & Summary

Section-1 Page 3 of 33

5.8.1 Logger

Logger shall have the following features:

� Shall be black & white 24 pin dot matrix printer

� Printing speed of 270 characters per second in draft mode of printing

� Line length of at least 132 characters

� Shall be suitable for fan-fold paper having 8 to 15 inches width

� Shall include Baskets and accessories to ensure orderly paper handling

� Supporting Draft and Near Letter Quality (NLQ) print modes

5.8.2 Colour Laser printer

Colour Laser printer shall be used to take coloured hardcopy printout. The Printer shall have the following features:

� Shall be suitable for printing on A4 & A3 size normal paper. Printer shall support Dual LAN interface, Different types of paper - weight (75 GSM to 200 GSM)the printout shall match to object/content to be printed in colour & size.

� shall have resolution of at least 600 X 600 dots per inch. � print time shall be less than 30 seconds per page for a coloured printout in

normal mode � Print speed of 20 colour pages per minute � Automatic Duplex printing � Duty cycle of at least 100000 per month � shall have input trays of 500 sheets & output trays

� shall have landscape and portrait print orientation

5.8.3 Add clause 5.8.3

5.8.3 Color Multifunction Laser Jet Printer

The Color Multifunction Laser Jet Printer shall have the following capabilities:

a) Printing

b) Scanner

c) Fax

d) Copier

The following general features are to be provided

• Automatic two sided printing

• Input ray of 100 A4 sheets

• Interfaces USB 2.0 or parallel port

• One Ethernet interface 10/100 A4 Sheets

• Page sizes up to A4

• Paper type- Plain recycled and weight 60gsm to 150 gsm

• Duty cycle of 10000 pages per month

The following functions are to provided

a) Printing function:

• Color and Black & White Printing

• The printout shall match to object/content to be printed in size

• Resolution of at least 600x600 dots per inch

Page 26: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power TransmissionCorporation of Uttarakhand Limited Uttarakhand Load Despatch & Communication Project

Volume II, Part A – Project Scope & Summary

Section-1 Page 4 of 33

• Printing speed of 19 ppm for Black & White and 4 ppm for color

• Landscape and portrait print orientation.

b) Scanner function :

• Color scanning resolution 600x600 dpi

• Scanning upto A4 size paper

• Scanning from Automatic Document Feeder (50 pages)

• File formats JPEG, PDF, TIFF

c) Fax function

• Fax resolution upto 200x200dpi

• Fax memory of at least 30 pages

• Support auto-redial

• Have internal dialup modern of 33 kbps to interface with PSTN telephone line

• Fax from Automatic Document Feeder

• Fax send software for PC

d) Copier function

• Copy upto A4 size paper

• Copy quality upto 600x600 dpi

• Copy speed of at least 19 pages black and 4 pages color per minute.

5.9 Video Projection System (VPS)

The contractor shall provide a video projection system based on modular DLP (Digital Light Processing) technology. All the screen modules of the VPS system, shall be suitable to form combined high resolution projection images. The VPS system will be used to project displays of SCADA/EMS system independently of workstation console monitors. All the operations envisaged from workstation console (dispatcher) shall be possible from VPS also.

The Contractor shall supply all necessary hardware and software, including the multi-screen drivers, adapters and memory to seamlessly integrate the video projection system with the user interface requirements described in the specification.

The video projection systems shall be rear projection systems and shall be complete with all projection modules, supporting structures and cabling. Design & installation of the video projection systems shall be coordinated with the Employer during project implementation. The requirement for each modular video display system include:

a) VPS screen shall form a seamless rectangular array, using modules.

b) VPS Graphics controller shall be interfaced to the SCADA/EMS system through dual LAN connectivity.

c) Each projector shall provide a minimum resolution of 1024X768 pixels per module. The rear projection screens shall be capable of displaying full resolution of the source.

d) The VPS shall be capable of supporting multiple display modes in which one or more modules show one or more SCADA/EMS displays concurrently as selected by the user.

Page 27: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power TransmissionCorporation of Uttarakhand Limited Uttarakhand Load Despatch & Communication Project

Volume II, Part A – Project Scope & Summary

Section-1 Page 5 of 33

Table 4: BOQ for 48V DC Power Supply (DCPS) Equipments

along with associated Battery for Uttaranchal

Sl. No.

Site Location Load (Amp-DC)

Type of Battery

48V Battery AH Capacity

Unit Qty.

A Dehradun SLDC

1 Dehradun SLDC 15 VRLA 200 No. 2

B. Rishikesh Sub-LDC

1. Rishikesh Sub-LDC 30 VRLA 300 No. 2

2. Laksar 132 kV 25 Tubular 300 No. 1

3. Manglour 132 kV 25 Tubular 300 No. 1

4. Bhagwanpur 132 kV 25 Tubular 300 No. 1

5. Darasu-H 25 Tubular 300 No 1

6. Chamba 10 Tubular 200 No 1

7. Rishikesh 220 10 Tubular 200 No 1

C. Kashipur Sub-LDC

1. Pantnagar 220 KV 50 Tubular 550 No. 1

2. Kichha 132 kV 45 Tubular 500 No. 1

3. Sitarganj 132 kV 30 Tubular 300 No. 1

4. Khatima 132 kV 20 Tubular 200 No. 1

5.

Fibre Optic Link Repeater (Rishikesh SLDC – Kashipur)

10

Tubular

200 No. 1

6. Rudrapur 50 Tubular 350 No. 1

7. Haldwani 132 30 Tubular 300 No. 1

8. Haldwani 220 5 Tubular 200 No. 1

9. Ramganga 15 Tubular 200 No. 1

10. Almora 10 Tubular 200 No. 1

Note: 1. Criteria for sizing calculation of DCPS system: The number of SMPS modules to be provided in the DCPS system shall be N+2, where N is the number of SMPS modules to meet the battery charging current (@20% of C10 AH Capacity) of the battery and the load current as specified in above table.

The current rating of each module shall be considered as output current of the SMPS module at nominal voltage (48V).

2. DCPS Battery capacity has been calculated considering 8 hrs backup requirement.

Page 28: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power TransmissionCorporation of Uttarakhand Limited Uttarakhand Load Despatch & Communication Project

Volume II, Part A – Project Scope & Summary

Section-1 Page 6 of 33

List of PABX

Sl. No. Name of Sub-Stations

New PABX required under this Project

1 Rudrapur

2 Almora

3 Roorkee 220

4 Kasipur Sub-LDC

5 Dehradun SLDC

6 SitarGanj

7 Kichha

8 Pant Nagar 220

9 Jaspur

10 RamNagar

11 Bazpur

12 Purkul

13 Kulhal

14 Dharasu -H

15 Jwalapur

16 Bhupatwala

17 SIDCUL, Haridwar

18 Bhagwanpur

19 Manglour

20s Laksar

Existing PABXs to be integrated under this Project

1 Kamalwa Ganj (Haldawani-220)

2 Kathgodam (Haldawani-132)

3 Bhowali

Page 29: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power TransmissionCorporation of Uttarakhand Limited Uttarakhand Load Despatch & Communication Project

Volume II, Part A – Project Scope & Summary

Section-1 Page 7 of 33

List of PABX

Sl. No. Name of Sub-Stations

4 Kashipur 132

5 Dhalipur -H

6 Khodri-H

7 Rishikesh -220

8 Rishikesh Sub-LDC

9 Chamba -H

Page 30: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power TransmissionCorporation of Uttarakhand Limited Uttarakhand Load Despatch & Communication Project

Volume II, Part A – Project Scope & Summary

Section-1 Page 1 of 33

Table – B3

PLCC CHANNEL REQUIREMENT DETAILS FOR UTTARAKHAND LOAD DESPATCH & COMMUNICATION PROJECT

Channelization Sl. No. Station A Station B Kv

Voice RTU Data

(no.x baud rate)

Total PLC Channel

Requirement

1 Khatima Sitarganj 132 1

(Admin.1) 1X600 1

2 Sitarganj Kichha 132 2

(Admin.2) 2X600 2

3 Kichha Rudrapur 132 3

(Admin.3) 3X600 3

4 Rudrapur Pant Nagar 132 1

(Admin.1) 4X600 3

5 Pant Nagar Kashipur 400 220 Digital PLCC LINKS ( 3VOICE + 3X600, 1X1200)

6 Kathgodam (Haldawani132)

Pant Nagar 132 Digital PLCC LINKS ( 3VOICE +

1x300+3X600+2x1200) FOR REDUNDANCY

7 Kamalwaganj (Haldawani220)

Kashipur 400 220 Digital PLCC LINKS ( 2VOICE + 1X300+1X1200)

8 Kamalwaganj (Haldawani220)

Kathgodam (Haldawani132)

132 Digital PLCC LINKS ( 1VOICE + 1X300)

9 Bhowli Kathgodam (Haldawani132)

132 1

(Admin.1) 1X300 1

Page 31: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power TransmissionCorporation of Uttarakhand Limited Uttarakhand Load Despatch & Communication Project

Volume II, Part A – Project Scope & Summary

Section-1 Page 2 of 33

Table – B3

PLCC CHANNEL REQUIREMENT DETAILS FOR UTTARAKHAND LOAD DESPATCH & COMMUNICATION PROJECT

Channelization Sl. No. Station A Station B Kv

Voice RTU Data

(no.x baud rate)

Total PLC Channel

Requirement

10 Almora Bhowli 132 1

(Admin.1) 1X300 1

11 Almora Pithoragarh 132 1

(Admin.1) 1X300 0

12 RamGanga(H) Jaspur 132 1

(Admin.1) 1X300 0

13 Jaspur Kashipur 400 132 1

(Admin.1) 1X300 0

14 RamGanga(H) Ram Nagar 132 1

(Express1) 1X300 0

15 RamNagar Kashipur 400 132 1

(Express1) 1X300 0

16 Laksar Roorke 220 132 1

(Admin.1) 1X600 0

17 Bhagwanpur Roorke 220 132 1

(Admin.1) 1X300 0

18 Manglour Roorke 220 132 1

(Admin.1) 1X600 0

19 Roorkee220 SIDCUL220 220 Digital PLCC LINKS ( 3VOICE +1x300, 2X600,1X1200)

2 PANELS

Page 32: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power TransmissionCorporation of Uttarakhand Limited Uttarakhand Load Despatch & Communication Project

Volume II, Part A – Project Scope & Summary

Section-1 Page 3 of 33

Table – B3

PLCC CHANNEL REQUIREMENT DETAILS FOR UTTARAKHAND LOAD DESPATCH & COMMUNICATION PROJECT

Channelization Sl. No. Station A Station B Kv

Voice RTU Data

(no.x baud rate)

Total PLC Channel

Requirement

20 SIDCUL220 Rishikesh 220 220 Digital PLCC LINKS ( 3VOICE +1x300, 2X600,2X1200)

2 PANELS

21 Dharasu(H) Chamba 132 1

(Admin.1) 1X300 0

22 Chamba Rishikesh 220 132 1

(Admin.1) 1X300 0

23 Dharasu(H) Rishikesh 220 132 1

(Admin.1) 1X300 0

Note : The break up required for 2W/4W cards shall be provided during detailed engineering.

Page 33: APPENDIX- G(OPTION –I) Table-1 · (a) If servers are of same model with different configuration then highest configuration shall be offered under spare, else separate server shall

Power TransmissionCorporation of Uttarakhand Limited Uttarakhand Load Despatch & Communication Project

Volume II, Part A – Project Scope & Summary

Section-1 Page 1 of 33

Table-C1 Bill of Quantity

Sl. No.

Description Unit Quantity

A1 Analog PLCC Indoor Equipment

1 PLC Terminal Equipment , Single Channel, 40W Set 2

2 PLC Terminal Equipment , Single Channel, 20W Set 14

A2 Digital PLCC Terminal Equipment

1 PLC Terminal Equipment , 40W Set 10

2 PLC Terminal Equipment, 80W Set 2

A3 Network Management System(NMS) in Laptop PC for Digital PLCC Terminal Equipment

Set 1

B PABX Equipment

1 PABX 120 lines Set 2

2 PABX 25 lines Set 19

C Remote Subscriber Unit

1 Remote Subscriber Unit- Rack mountable type No. 2

2 Remote Subscriber Unit- Wall mountable standalone type

No. 2

D Despatcher Consoles Set 4

E PABX Administrative Consoles/ MMI

1 PABX Administrative Console/MMI at Control center end

Set 2

2 PABX Administrative Console/MMI at Sub-Stations with UPS

Set 19

F FAX Machine , Plain Paper Set 2

G 2-Wire LS Telephone set for Local Administrative & Express subscriber to PABXs

Set 60

H1 Main Distribution Frame (4x100 Pair Patch Panels)

No 2

H2 Main Distribution Frame (1x100 Pair Patch Panel)

No 19

I OUT DOOR PLCC EQUIPMENTS

1 Coupling device suitable for 220kV system (phase to phase) consisting of two (2) LMUs & one(1) Balancing Transformer

Set

2

2 Coupling device suitable for 132kV system (phase to ground) consisting of one (1) LMUs

Set 1

3 Coupling device suitable for 132kV system (phase to phase) consisting of consisting of two (2) LMUs & one(1) Balancing Transformer

Set 1

4 CVT Suitable for 132 kv (Rated voltage of 145kv) Set 1

5 CVT Suitable for 220 kv (Rated voltage of 245kv) Set 1

6 Line Trap 0.5 mH Suitable for 220Kv Set 1

7 Line Trap 1.0 mH Suitable for 220Kv Set 1

8 Line Trap 0.5 mH Suitable for 132Kv Set 1

9 HF Co-axial Cable Mtrs. 2000