APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from...
Transcript of APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from...
![Page 1: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/1.jpg)
281
APPENDIX F
MAGNETIC FLUX LEAKAGE ASSESSMENT GRAPHS FOR SALVADGED BOX BEAMS J11, H6 & A1
(SUPPORT ANALYSIS FROM CHAPTER 5)
Department of Civil and Architectural Engineering
Lawrence Technological University
Southfield, MI 48075-0134
November 2015
![Page 2: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/2.jpg)
282
Figure F-1: M3 Consolidated Graph for Beam J11, North Half, Strand 4
2660
2710
2760
2810
2860
2910
2960
3010
3060
0 50 100 150 200 250
Signal Amplitude (m
V)
Distance (inches)
Beam J11, North Half, Strand 4, M3 Consolidated
Run 3
Run 4
Run 5
Run 6
Run 8
Run 9
Run 10
![Page 3: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/3.jpg)
283
Figure F-2: M3 Adjusted Graph for Beam J11, North Half, Strand 4
‐80
‐60
‐40
‐20
0
20
40
60
0 50 100 150 200 250
Signal Amplitude (m
V)
Distance (inches)
J11 North Half, Strand 4, M3 Adjust
Run 3
Run 4
Run 5
Run 6
Run 9
Run 10
A B
![Page 4: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/4.jpg)
284
Figure F-3: M3 Consolidated Graph for Beam J11, South Half, Strand 4
2660
2710
2760
2810
2860
2910
2960
3010
3060
0 20 40 60 80 100 120 140 160
Signal Amplitude (m
V)
Distance (inches)
Beam J11, South Half, Strand 4, M3 Consolidated
Run 1
Run 2
Run 3
Run 4
Run 5
Run 6
Run 7
Run 8
Run 9
Run 10
![Page 5: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/5.jpg)
285
Figure F-4: M3 Adjusted Graph for Beam J11, South Half, Strand 4
‐80
‐60
‐40
‐20
0
20
40
60
0 20 40 60 80 100 120 140 160
Signal Amplitude (m
V)
Distance (mV)
Beam J11, South Half, Strand 4 (M3 Adjust)
Run 1
Run 3
Run 4
Run 5
Run 6
Run 7
Run 9
A B
![Page 6: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/6.jpg)
286
Figure F-5: M3 Consolidated Graph for Beam J11, North Half, Strand 6
2660
2710
2760
2810
2860
2910
2960
3010
3060
0 50 100 150 200 250
Signal Amplitude (m
V)
Distance (inches)
Beam J11, North Half, Strand 6, M3 Consolidated
Run1Run2Run3Run5Run6Run7Run8Run9
![Page 7: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/7.jpg)
287
Figure F-6: M3 Adjusted Graph for Beam J11, North Half, Strand 6
‐80
‐60
‐40
‐20
0
20
40
60
0 50 100 150 200 250
Signal Amplitude (m
V)
Distance (inches)
Beam J11, North Half, Strand 6, M3 Adjusted
Run 2
Run 3
Run 6
Run 7
Run 9
A
B
![Page 8: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/8.jpg)
288
Figure F-7: M3 Consolidated Graph for Beam J11, South Half, Strand 6
2660
2710
2760
2810
2860
2910
2960
3010
3060
0 20 40 60 80 100 120 140 160
Signal Amplitude (m
V)
Distance (inches)
Beam J11, South Half, Strand 6, M3 Consolidated
Run 1
Run 2
Run 3
Run 4
Run 5
Run 6
Run 8
Run 9
Run 10
![Page 9: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/9.jpg)
289
Figure F-8: M3 Adjusted Graph for Beam J11, South Half, Strand 6
‐80
‐60
‐40
‐20
0
20
40
60
‐20 0 20 40 60 80 100 120 140 160
Signal Amplitude (m
V)
Distance (inches)
Beam J11, South Half, Strand 6, M3 Adjusted
Run 1
Run 2
Run 3
Run 9B
A
![Page 10: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/10.jpg)
290
Figure F-9: M3 Consolidated Graph for Beam H6, North Half, Strand 1
2660
2710
2760
2810
2860
2910
2960
3010
3060
0 50 100 150 200 250
Signal Amplitude (m
V)
Distance (inches)
H6, North Half, Strand 1, M3 Consolidated.
Run 1
Run 2
Run 3
Run 4
Run 5
Run 6
Run 8
Run 9
Run 10
![Page 11: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/11.jpg)
291
Figure F-10: M3 Adjusted Graph for Beam J11, North Half, Strand 6
‐80
‐60
‐40
‐20
0
20
40
60
0 50 100 150 200 250
Signal Amplitude (m
V)
Distance Iinches)
H6, North Half, Strand 1, M3 Adjust
Run 1
Run 3
Run 4
Run 5
Run 10
A B
![Page 12: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/12.jpg)
292
Figure F-11: M3 Consolidated Graph for Beam H6, South Half, Strand 1
2660
2710
2760
2810
2860
2910
2960
3010
3060
0 20 40 60 80 100 120 140 160
Signal Amplitude (m
V)
Distance (inches)
H6, South Half, Strand 1, M3 Consolidated
Run 1
Run 2
Run 3
Run 4
Run 5
Run 6
Run 7
Run 8
Run 9
![Page 13: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/13.jpg)
293
Figure F-12: M3 Adjusted Graph for Beam H6, South Half, Strand 1
‐80
‐60
‐40
‐20
0
20
40
60
0 20 40 60 80 100 120 140 160
Signal Amplitude (m
V)
Distance (inches)
S1, South Half, Strand 1, M3 Adjust
Run 1
Run 2
Run 4
Run 5
Run 6
Run 7
Run 8
A
![Page 14: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/14.jpg)
294
Figure F-13: M3 Consolidated Graph for Beam H6, North Half, Strand 8
2660
2710
2760
2810
2860
2910
2960
3010
3060
0 50 100 150 200 250
Signal Amplitude (m
V)
Distance (inches)
H6, North Half, Strand 8, M3 Consolidated
Run 1
Run 2
Run 3
Run 4
Run 5
Run 6
Run 7
Run 8
Run 9
Run 10
![Page 15: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/15.jpg)
295
Figure F-14: M3 Adjusted Graph for Beam H6, North Half, Strand 8
‐80
‐60
‐40
‐20
0
20
40
60
0 50 100 150 200 250
Signal Amplitude (m
V)
Distance (inches)
H6, North Half, Strand 8, M3 Adjusted
Run 1
Run 2
Run 3
Run 4
Run 5
Run 6
Run 7
Run 8
Run 9
Run 10
B
A
![Page 16: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/16.jpg)
296
Figure F-15: M3 Consolidated Graph for Beam H6, South Half, Strand 8
2660
2710
2760
2810
2860
2910
2960
3010
3060
0 50 100 150 200 250
Signal Amplitude (m
V)
Distance (inches)
H6, South Half, Strand 8, M3 Consolidated.
Run 1
Run 2
Run 3
Run 4
Run 5
Run 6
Run 7
Run 8
Run 9
Run 10
![Page 17: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/17.jpg)
297
Figure F-16: M3 Adjusted Graph for Beam H6, South Half, Strand 8
‐80
‐60
‐40
‐20
0
20
40
60
0 20 40 60 80 100 120 140 160 180 200
Signal Amplitude (m
V)
Distance (inches)
H6, South Half, Strand 8, M3 Adjusted
Run 2 Run 3 Run 5 Run 6 Run 7
B
A
![Page 18: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/18.jpg)
298
Figure F-17: M3 Consolidated Graph for Beam A1, North Half, Strand 4
2660
2710
2760
2810
2860
2910
2960
3010
3060
0 20 40 60 80 100 120 140 160
Signal Amplitude (m
V)
Distance (inches)
A1, North Half, Strand 4, M3 Consolidated
Run 1
Run 2
Run 3
![Page 19: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/19.jpg)
299
Figure F-18: M3 Consolidated Graph for Beam A1, South Half, Strand 4
2660
2710
2760
2810
2860
2910
2960
3010
3060
0 20 40 60 80 100 120 140 160 180 200
Signal Amplitude (m
V)
Distance (inches)
A1, South Half, Strand 4, M3 Consolidated
Run 1
Run 2
Run 3
![Page 20: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/20.jpg)
300
Figure F-19: M3 Consolidated Graph for Beam A1, North Half, Strand 8
2660
2710
2760
2810
2860
2910
2960
3010
3060
0 20 40 60 80 100 120 140 160
Signal Amplitude (m
V)
Distance (inches)
A1, North Half, Strand 8, M3 Consolidated
Run 1
Run 3
Run 4
![Page 21: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/21.jpg)
301
Figure F-20: M3 Consolidated Graph for Beam A1, South Half, Strand 8
2660
2710
2760
2810
2860
2910
2960
3010
3060
0 20 40 60 80 100 120 140 160 180 200
Signal Amplitude (m
V)
Distance (inches)
A1, South Half, Strand 8, M3 Consolidated
Run 1
Run 2
Run 3
![Page 22: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/22.jpg)
302
![Page 23: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/23.jpg)
303
REFERENCES
Andreas Loizes, Accuracy of pavement thickness estimation using Ground penetrating Radar
analysis approaches, 2006.
Andrzej Garbacz & Edward J. Garboczi, 2003. Ultrasonic evaluation methods applicable to
polymer concrete composites.
ASTM C876, Standards test method for half-cell potentials of reinforcing steel in concrete;
1991.
Atorod Azizinamini, Improved Inspection Techniques for Steel Prestressing/Post Tensioning
strands, FDOT Contract No BDK80 977-13, Final Report Volume I June, 2012.
Baumann, K. 2008. Practical Example of Interpretation of Half Cell Measurements on R.C.
Structures. Proc., 12th International Conference on Structural Faults and Repair, Edinburgh,
United Kingdom.
Bungey JH, Shaw MR, Millard SG, Molyneaux TCK. Location of steel reinforcement in
concrete using ground penetrating radar and neural networks. In: Forde MC, editor.
Structural faults and repair. London: Engineering Technics Press; 2003. p. 8.
Castel A, Vidal T, Zhang R, François R, Sirivivatnanon V. Corrosion initiation and
propagation in the service life of reinforced concrete in chloride environment. In:
Proceedings of the international RILEM workshop on integrated service life modeling of
concrete structures. 2007. p. 239-46
Cairns, J., and Melville, C., “The Effect of Concrete Surface Treatments on Electrical
Measurements of Corrosion Activity”, Construction and Building Materials, Vol. 17 (5), July
2003, Pages 301-309.
DaSilva, M., Javidi, S., Yakel, A., and Azizinamini, A. 2009. Nondestructive Method to Detect
Corrosion of Steel Elements in Concrete. Final Report NDOR Research Project No. P597.
National Bridge Research Organization (NBRO).
Elsener B, B¨ohni H. Potential mapping and corrosion of steel in concrete-ASTM STP 1065.
In: Berke NS, Chaker V, Whiting D, editors. Corrosion rate of steel in concrete. Philadelphia:
American Society for Testing and Materials, 1990:143]156.
Elsener B, B¨ohni H. Electrochemical methods for the inspection of reinforcement corrosion.
Concrete structures-field experience. Material Science Forum, 1992:635]646.
![Page 24: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/24.jpg)
304
Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment
of RC structures. Proceedings of the International Conference on Understanding Corrosion
Mechanisms of steel in concrete. Boston USA: MIT, 1997, invited paper.
Elsener, B. 2003. Half-Cell Potential Measurements—Potential Mapping on Reinforced
Concrete Structures. Materials and Structures, Vol. 36, pp. 461–471.
Elsener, B., “Half-Cell Potential Mapping to Assess Repair Work on RC Structures”,
Construction and Building Materials, Vol. 15 (2-3), 2001, pp. 133-139.
Elsener, B. and Bohni, H., “Electrochemical Methods for the Inspection of Reinforcement
Corrosion”. In: Concrete structures-field experience, Material Science Forum, 1992, pp. 635–
646.
Emmons PH, Vaysburd AM. Corrosion protection in concrete repair: myth and reality.
Concrete Int 1997;19(3):45 –56.
Francisco Valentine, P.E., Effect of Debris-Induced Lift-off on Magnetic Flux Leakage
Inspection Results, 2000.
G.I. Crawford, Guide to Nondestructive Testing of Concrete, 1997.
Ghorbanpoor, A., Borchelt, R., Edwards, M., and Abdel Salam, E., “Magnetic-Based NDE of
Prestressed and Post-Tensioned Concrete Members-The MFL System,” Publication FHWA-
RD-00-026, FHWA, U.S. Department of Transportation, 2000.
Grosse, C. U. (Ed.). 2007. Advances in Construction Materials. 2007, 639–649. Springer,
Berlin, Germany.
Gu, P., and J. J. Beaudoin. 1998. Obtaining Effective Half-Cell Potential Measurements in
Reinforced Concrete Structures. Construction Technology Update No. 18, National Research
Council of Canada.
Halabe UB, Chen HL, Bhandarkar V, Sami Z. Detection of subsurface anomalies in concrete
bridge decks using ground penetration radar. Mater J ACI 1997; 94(5):369–408.
Hugenschmidt J. Concrete bridge inspection with a mobile GPR system. Constr Build Mater
2002; 16:147–54.
I. L. AL-Qadi, S. Labouar, Measuring layer thickness with GPR- Theory to practice, 2005.
International Atomic Energy Agency, Vienna, 2002. Guidebook on non-destructive testing of
concrete structures.
![Page 25: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/25.jpg)
305
Josef Krautkramer & Herbert Krautkramer, Ultrasonic Testing of Materials, 4th Fully
Revised Edition, 1990.
Kusenberger, F. N., and Barton, J. R. 1981. Detection of Flaws in Reinforcement Steel in
Prestressed Concrete Bridges. Final Report FH-WA/RD-81/087, Federal Highway
Administration (FHWA), Washington, DC.
Mutsuyoshi H. Present situation of durability of post-tensioned PC bridges in Japan. In:
Proceedings of workshop on durability of posttensioning tendons, fib, Belgium; 2001. p. 75–
88.
Makar, J.M. and Desnoyers, R. (2001). “Magnetic Field Techniques for the Inspection of Steel
Under Concrete Cover,” Report No. NRCC-43699, Canada.
Maierhofer C, Leipold S. Radar investigation of masonry structures. NDT&E Int 2001; 34:39–
147.
Marcelo DaSilva, Saeed Javidi, Aaron Yakel and Atorod Azizinamini, 2009. Nondestructive
Method to Detect Corrosion of Steel Elements in Concrete
Millard SG, Shaw MR, Giannopoulos A, Soutsos MN. Modelling of sub-surface pulse radar
for non-destructive testing of structures. J Mater Civ Eng ACSE 1998; 10(3):188–96. [24]
Padaratz IJ, Forde MC. Influence of antenna
Misra, S. and Uomoto, T., “Corrosion of Rebars under Different Conditions”. Proceedings of
JCI, 1990, 12(2), 825-830.
Naito, C., and Jones, L. 2010. Nondestructive Inspection of Strand Corrosion in Prestressed
Concrete Box Beam Members. NDE/NDT for Highways and Bridges: Structural Materials
Technology Conference, New York City.
NDT Resource Centre. Combine introductions I &II.
Nenad Gucunski, Arezoo Imani, and Francisco Romero, Soheil Nazarian, Deren Yuan,
Herbert Wiggenhauser, Parisa Shokouhi, Alexander Taffe and Doria Kutrubes,
Nondestructive Testing to Identify Concrete Bridge Deck Deterioration, Strategic Highway
Research Program, 2013.
Nürnberger U. Corrosion induced failure mechanisms of prestressing steel. Mater Corros
2002; 53:59-601.
P. Kumar Mehta, Paulo J. M. Monteiro. Concrete: Microstructure, Properties and Materials,
Fouth Edition, 2014
![Page 26: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/26.jpg)
306
Padaratz IJ, Forde MC. Influence of antenna frequency on impulse radar surveys of concrete
structures. In: Ford MC, editor. Proceedings of structural faults and repair 95 Edinburgh:
ETC; 1995. p. 331–6
Pessiki et al, Inspection Methods & Techniques to Determine Non Visible Corrosion of
Prestressing Strands in Concrete Bridge Components, Task 2-Assessment of Candidate NDT
Methods, June 2010.
Pradhan, B., and Bhattacherjee, B., “Half-Cell Potential as an Indicator of Chloride-Induced
Rebar Corrosion Initiation in RC”, Journal of Materials in Civil Engineering, Vol. 21, Issue
10, 2009, pp. 543-552.
Pucinotti R, De Lorenzo RA. Nondestructive in situ testing for the seismic damageability
assessment of ancient r/c structures. Book of Proceedings, third international conference on
NDT, Chania, Crete, Greece. p. 189–94.
Qian SY, Chagnon N. Evaluation of corrosion of reinforcement in repaired concrete. Structural
faults and repair. London, UK; 2001.
Robert A. Dielectric permittivity of concrete between 50 MHz and 1 GHz and GPR
measurements for building materials evaluation J Appl Geophys 1998;40(1–3):89–94.
Sawade, G., and Krause, H-J. 2007. “Inspection of Prestressed Concrete Members Using the
Magnetic Leakage Flux Measurement Method – Estimation of Detection Limit.” Advances in
Construction Materials. 639-649
Scheel, H. and Hillemeier, B. (2003). “Location of Prestressing Steel Fractures in Concrete,”
Journal of Materials in Civil Engineering, ASCE, Vol.15, No. 3, pp. 228-234.
Singh SK. Corrosion studies on prestressing steel wire. Ph.D. Thesis, Imperial College,
University of London; 2000.
Spaehn H, Wagner GH, Steinhoff U. Stress corrosion cracking and cathodic hydrogen
embrittlement in the chemical industry. In: Staehle RW, Hochman J, Mc Right RD, Slater JE,
editors. Stress corrosion cracking and hydrogen embrittlement of iron base alloys. NACE-5
Houston; 1977.
![Page 27: APPENDIX F MAGNETIC FLUX LEAKAGE … Elsener B, B¨ohni H. Half-cell potential measurements} from theory to condition assessment of RC structures. Proceedings of the International](https://reader031.fdocuments.in/reader031/viewer/2022020412/5b18dbb17f8b9a37258c35df/html5/thumbnails/27.jpg)
307
Stratfull JR. Corrosion NACE 1957; 13:173t.
Ultrasonic Methods of Non-destructive Testing. By J. Blitz, G. Simpson – 1995.
Ulriksen P. Application of impulse radar to civil engineering. PhD Lund University of
Technology, Lund, Coden: Lutvdg (TVTG-1001), Sweden; 1982.